DAFTAR GAMBAR

PEKERJAAN PEMBANGUNAN
MESS AEK RENGAT

NO JUDUL GAMBAR SKALA NO JUDUL GAMBAR SKALA


00 DAFTAR GAMBAR 1 : 200 31 DENAH RENCANA PONDASI MENERUS ELV. +0.51 1 : 250
01 SITE PLAN 1 : 500 32 DENAH RENCANA ROLLAG BATA ELV. +0.51 1 : 250
02 LONG SECTION 1 : 400 33 DETAIL ROLLAG 1 : 15
03 CROSS SECTION 1 1 : 400 34 DENAH RENCANA BALOK SLOOF ELV. +0.51 1 : 250
04 CROSS SECTION 2 1 : 400 35 DENAH RENCANA PLAT LANTAI ELV. +0.51 1 : 250
05 SITE PLAN RENCANA 1 : 500 36 DENAH RENCANA KOLOM ELV. +0.51 1 : 250
06 GROUND PLAN RENCANA 1 : 500 37 DENAH RENCANA BALOK ELV. +3.910 1 : 250
07 DENAH RENCANA ELV. +0.51 1 : 250 38 DENAH RENCANA PLAT LANTAI ELV. +3.910 1 : 250
08 DENAH RENCANA ELV. +3.910 1 : 250 39 DENAH RENCANA KOLOM ELV. +3.910 1 : 250
09 DENAH RENCANA ELV. +7.310 1 : 250 40 DENAH RENCANA BALOK ELV. +7.310 1 : 250
10 TAMPAK DEPAN & BELAKANG 1 : 250 41 DENAH RENCANA ATAP 1 : 250
11 TAMPAK KANAN & KIRI 1 : 300 42 DETAIL TANGGA 1 : 100
12 POTONGAN 1 : 150 43 PONDASI TANGGA 1 : 20
13 DENAH RENCANA POLA LANTAI ELV. +0.51 1 : 250 44 DETAIL RAM DAN ATAP 1 : 75
14 DENAH RENCANA POLA LANTAI ELV. + 3.910 1 : 250 45 DENAH RETAININGWALL 1 : 250
15 DENAH RENCANA PINTU & JENDELA ELV. +0.51 1 : 250 46 DENAH DAN POTONGAN RETAINING WALL 1 : 250
16 DENAH RENCANA PINTU & JENDELA ELV. + 3.910 1 : 250 47 POTONGAN 1 : 50
17 DETAIL PINTU P1 & P2 1 : 25 48 DENAH GWT DAN SPT 1 : 250
18 DETAIL PINTU P3 & P4 1 : 25 49 DENAH & POTONGAN SPT 1 : 50
19 DETAIL PINTU P5, P6 & P7 1 : 25 50 DENAH & POTONGAN GWT 1 : 50
20 DETAIL PINTU PJ2 1 : 25 51 DENAH DRAINASE 1 : 250
21 DETAIL JENDELA J1 & J3 1 : 20 52 DETAIL DRAINASE 1 : 20
22 DETAIL JENDELA J2 1 : 20 53 DENAH RENCANA TITIK LAMPU ELV. +0.51 1 : 250
23 DENAH RENCANA PLAFOND ELV. +0.51 1 : 250 54 DENAH RENCANA TITIK LAMPU ELV. + 3.91 1 : 250
24 DENAH RENCANA PLAFOND ELV. +3.910 1 : 250 55 DENAH RENCANA WIRING 1 : 250
25 DETAIL TWN ROOM 1 : 100 56 DENAH RENCANA AIR BERSIH ELV. +0.51 1 : 250
26 DETAIL ROOM 1 1 : 100 57 DENAH RENCANA AIR BERSIH ELV. + 3.91 1 : 250
27 DENAH RENCANA PONDASI ELV. +0.51 1 : 250 58 DENAH RENCANA AIR BERSIH ATAP 1 : 250
28 DENAH PONDASI P1 1 : 25 59 DENAH RENCANA AIR KOTOR ELV. +0.51 1 : 250
29 DETAIL PONDASI MENERUS & KOLOM 1 : 25 60 DETAIL RENCANA SPT 1 : 75
30 DETAIL STRUKTUR 1 : 25 61 DENAH RENCANA AC DAN EXHAUST ELV. +0.51 1 : 250
62 DENAH RENCANA APAR ELV. +0.51 1 : 250
Ja
lan
Pa
n gu
rur
an

ik
n Na Elv.J
alan
ala Tu
v.J run
El
Elv.
917.23
9 17
.20 Elv.

91
917.18

7.2
Elv.
917.44

0
Elv.

Jala

9 17
917.14

.40
917.
60
917.
40
n Pa
ngu
91
7.6
0

rura
n
Elv.
0
917.6
I
917.82

h
918.00

n Tana
7.8
9911
Elv.

91
77.8.8
Elv. 917.92

00
917.75
918.20 Elv.

Pend
914.51
917.80

penaha
918.00
Elv.
918.05 918.
40
op o Elv.
917.95
Elv.
914.76
Elv.
Elv.
910.48
915.51

9 1 .60
914 0
00
918.

914 00

4 .4
Elv.

915.
D inding
917.20
917.40

915.

0
913.76

910
917.60

.8
917.80
.00

.40
20
918
Elv.

916.20
916.40
916.60
916.80
917.00

915.40
918.14

910.
Jala
918.20

915.60
Elv.

60
Elv. Elv.

n Pa
914.84
915.27 913.06
Elv.
Dinding
ngu
915.61 Elv.
910.80
penaha Elv.

rura
912.80
Pelatara n Tanah Elv.
912.97
91
0.8
n / Hal 0

Elv.
am an
Elv.
912.65
9 11
91
1.0
0 n
Elv. 918.32 .20
918.24 Elv.
914.78 Elv.

Pelatara Elv.
910.30

n / Hal 917.44 Elv. Elv.


am an 917.442 910.80

Elv.Tanah
Elv.
917.76

Elv.
918.24 Elv.
917.83

Elv.Tanah

ton
or Be
Bangunan

ak C
Pemandian Air Pa Mes Pem
pro
Aek Ran vsu
Elv.Tanah
nas

Setap
gat
B

Jalan
Elv.
918.06

Elv.
920.00
Elv.

Elv.
919.02 Elv.Tanah Elv.
918.45
919.72
Elv.
918.95

7.0851 Elv.
918.93
Elv.Tanah

Elv. Elv. Elv.


919.40 918.47 917.87

Elv.

91
918.12

9.0
0
Elv.

91
920.40

9.2
B 91

0
9.4
Elv.Tanah 0
91
9.6
0
91 918
9 .80 .40

Bangunan 9 20
.00
A
Elv.

Pemandian A
92 918.50

91
0 .2
0

8
ir Panas

.60
Elv.
Elv. 920.13
920.43

91
Elv.

8 .8
92 918.70
0.4

0
0 Elv.Tanah

91
21.6894 Elv.

9.0
919.12

0
Elv.
920.70

92
Elv.

0.6
919.81

0
Elv. Elv.
920.35 920.28
Elv. Elv.
920.76 920.18
Elv.
920.03

Elv.
Elv. 920.89
Elv.
920.91 919.60

Elv. Elv.
921.40 921.31 920.28

Elv.
Elv.
921.42 921.8 922.15
0
Elv.
922.60 921.6 922.00
0 Elv.
922.60
Elv. 922.20
920.70

A Elv.
Elv.
921.86
922.40
922.60
922.08
Elv. 922.8
922.45 0 Elv.
922.60 921.46
923.00
Elv.
922.80 923.17

Elv.
923.00 922.60 Elv.
923.00 921.86
Elv.Tanah
Elv.
922.8 922.46
923.20 0
Elv.
922.80

Elv.
923.40 922.80
92
2.8
0
923.60 Elv.Tanah 923.00
923.20
923.80 Elv. 923.40
Elv. 923.70
923.96
923.60
923.80
Elv.
924.80 924.00 Elv.
00
925. 923.30

20
925. Elv.
924.10
Elv. .40
92

924.60 925 0
3.6
5.6

Elv. 92
0

0 924.42
5.6
923.80
925.

92 Elv.
926.00 92
80

6.0
0 0
5.8
92 Elv.
.00
9 24
925.50

Elv. 924.20
925.87
Elv.
925.34 Elv. 924.
925.80 40
924.
92

926.20 60
4 .8
925 .00

0
9 25

Elv.
.20

926.20
40
926.
92
Elv.Tanah 5.4
0 0
Elv.
925.90
926.6 92
5.6
Elv. Elv.
0
926.15 Elv. 926.37
925.80

925.96 Elv.
926.33 Elv.
925.83

Elv.BM
926.01
Elv. Elv.Tanah
925.94

Elv.
Elv. 926.29 Elv. Elv.
926.23 Elv. 926.18
926.60
926.31

I
25.0478

skala 1 : 500
929.00
928.00
927.00
926.00
925.00
924.00
923.00 Muka Tanah Rencana
(917.91) Muka Tanah Asli Galian Tanah
922.00
Pagar
921.00
920.00 Timbunan Tanah
919.00 Pelataran
918.00 Lantai
917.00 Dinding Penahan 44.7
2%

916.00
915.00
STA 0+01 914.00
Datum 913.00(M)
No

918.1
915.6

920.0
917.9
914.5
914.8
915.5

Elevasi
30.994 30.85
Jarak 1.3 1 4.437 5.038
Skala Horisontal 1 : 100
Skala Vertikal 1 : 100

skala 1 : 300
Pagar Muka Tanah Rencana Tanah Timbun
Muka Tanah Asli
(922.25)

Pagar
923.00

922.00

921.00

920.00

919.00

918.00

Datum 924.00(M)
No
922.60

921.42

920.91

920.18

919.81

919.12

918.70

918.50
Elevasi

Jarak 5.00 5.00 5.00 5.00 5.00 5.00 3.68

Skala Horisontal 1 : 100


Skala Vertikal 1 : 100

skala 1 : 400
Pagar Muka Tanah Rencana
Muka Tanah Asli Galian Tanah
(917.91)

Pagar
923.00

922.00

921.00

920.00

919.00

918.00

Datum 924.00(M)
No
922.60

921.42

920.91

920.18

919.81

919.12

918.70

918.50
Elevasi

Jarak 5.00 5.00 5.00 5.00 5.00 5.00 3.68

Skala Horisontal 1 : 100


Skala Vertikal 1 : 100

skala 1 : 400

Pagar Muka Tanah Asli Galian Tanah Muka Tanah Rencana


(917.91)
923.00 Pagar

922.00

921.00

920.00

919.00

918.00

Datum 924.00(M)
No
920.40

919.40

918.95

918.45

918.06
Elevasi

Jarak 5.00 5.00 5.00 5.00

Skala Horisontal 1 : 100


Skala Vertikal 1 : 100

skala 1 : 400
9 17
.20

91
7.2
0
9 17
.40
917.
60 40
917.
91
7.6
0

0
917.6
918.00

0
7.8
9911

91
77.8.8
00
918.20
917.80
40
918.
918.00

9 1 .60
914 .80
00
918.

914

4 .4
915.
917.20
917.40

915.

910
917.60
917.80

00
.00

.40
20
918

916.20
916.40
916.60
916.80
917.00

915.40

910.
918.20

915.60

60
91
0.8
0
91
1.0
0
9 11
.20

skala 1 : 500
9 17
.20

91
7.2
0
9 17
.40
917.
60 40
917.
91
7.6
0

0
917.6
918.00

0
7.8
9911

91
77.8.8
00
918.20
917.80
40
918.
918.00

9 1 .60
914 .80
00
918.

914

4 .4
915.
917.20
917.40

915.

910
917.60
917.80

00
.00

.40
20
918

916.20
916.40
916.60
916.80
917.00

915.40

910.
918.20

915.60

60
91
0.8
0
91
1.0
0
9 11
.20

skala 1 : 500
235

348

365

2045
365

365

365
350 235
235
237
350 235

1917 235
235
350
292 2721
235
350 235
235
312
350

180 140 140


180
640

skala 1 : 250
235

348

365

2045
365

365

365
350 235
235
237
350
235

1917 235
235
350
292 2721
235
350 235
235
312
350

180 140 140


180
640

skala 1 : 250
235

348

365

2045
365

365

365
350 235
235
237
350
235

1917 235
235
350
292 2721
235
350 235
235
312
350

180 140 140


180
640

skala 1 : 250
+7.50
+6.70

+4.86

+2.65

-00.18

skala 1 : 250

+9.00

-00.18

skala 1 : 250
+7.50
+6.70

+5.22
+4.86
+3.91

-00.18

skala 1 : 300

+7.50
+6.70

+5.22
+4.86
+3.91

-00.18

skala 1 : 300
+ 7.50

Atap Pvc Atap Pvc


+ 5.22 Rangka Atap Baja Ringan Rangka Atap Baja Ringan
Atap Pvc
+ 4.86 Rangka Atap Baja Ringan
Lantai Daag Atap Lantai Daag Atap
Dinding Retaining Wall + 3.91 (Elv. + 3.91) (Elv. + 3.91) Dinding Retaining Wall

Dinding Retaining Wall


Dinding Pagar Deluxe Room 1 Koridor Koridor
Lantai Batu Serak Twin Room
+ 0.51 (Elv. +0.51) (Elv. +0.51) (Elv. +0.51)
(Elv. + 0.36) (Elv. +0.51)
± 0.00

- 2.50

353 255 748 545


49

skala 1 : 150

+ 7.50
Atap Pvc
+ 5.68 Rangka Atap Baja Ringan

Lantai Daag Atap Pas. Dinding Bata Lantai Daag Atap


Dinding Retaining Wall (Elv. + 3.91) Cmp. 1:4 (Elv. + 3.91) Dinding Retaining Wall
+ 3.91

Bordes
Elv.+2.21
Pas. Dinding Bata
Cmp. 1:4
Dinding Pagar Koridor R. Pompa Filter Dinding Retaining Wall
Koridor
Lantai Batu Serak
(Elv. +0.51) (Elv. +0.51) (Elv. +0.51)
+ 0.51 (Elv. + 0.36)
± 0.00

- 2.50

862 275 370 540

skala 1 : 150
K01 = EKSISTING
K02 = GRANITE TILE NIRO, MURALE, 60 X 60
K03 = GRANITE TILE NIRO, SPLASH, 60 X 60
K04 = VINYL
K01
K05 = LANTAI BATU SERAK
K06 = GRANITE TILE, NIRO, GRANULO 60 X 60
K07 = LANTAI KERAMIK 40 X 40 K01 K01
K01
K04

K01

235
K02
K05 K02

348

K02

K03
365 K03

K06
2045
K03 K03
365
K06

K06
K03
365
K03
K06 K05

K02 K02
K06
365 K03
350 235
K06 235
237
350 235
K03 2
K0
1917 235
2 K02
K0 235
350
292 2721
K07
235
350 235
235
312
350

180 140 140


180
640

skala 1 : 250
K02 = GRANITE TILE NIRO, MURALE, 60 X 60

235

348

365

2045
365

365

365
350 235
235
237
350
235
K02
1917 235
2
K0 235
350 2
K0 292 2721
235
350 235
235
312
350

180 140 140


180
640

skala 1 : 250
P-1

PJ-2
P-6

P-3 P-2
P-5 P-3

J-1 P-2 P-6


P-6 PJ-2

P-3

P-2 P-2
P-3

P-6
J-1 P-6 PJ-2

P-3

P-2 P-2
P-3

P-6
J-1 P-6

P-3
P-2

J-1

P-4

J-2

skala 1 : 250
P-2

P-7

J-3

skala 1 : 250
Balok Latei 11x15 cm 180 Balok Latei 11x15 cm 100

5 5
Upper Patch

Pintu Kaca Frameless

Pintu Solid Pintu Double Sipilcus + Honeycomb


Kaca Tempered Fin. HPL
Tbl. 10 mm

UPVC

220 220
215 215
Handle Pintu Stainlees
Door Holder Stainless Steel Handle Pintu Stainlees
Kunci Tanam 2 Slaag
Kunci Tanam 2 Slaag

Corner Lock

Bottom Patch

90 90 100

15 15

5 170 5 5 90 5

DETAIL PINTU P1 DETAIL PINTU P2


skala 1 : 25 skala 1 : 25
Balok Latei 11x15 cm 90 180

UPVC Door Frame 5 Rangka Hollow 3


UPVC Door Sash 10

Plat Besi Tbl. 5mm

Kaca Tempered Buram Kaca Tempered Buram


Tbl. 6 mm Tbl. 6mm

UPVC
Plat Besi Tbl. 5mm
UPVC
Rangka Hollow Rangka Hollow
Handle Pintu Stainlees 220 195 220

Kunci Tanam 2 Slaag 240 234 240


Rangka Hollow

Kaca Tempered
Tbl. 6 mm Plat Besi Tbl. 5mm

Sculptured Edge Design


UPVC Door Sash 10

Rangka Hollow

3
4

5 5
8 64 8
15
3
84 33 84 3
90
15

90 90

DETAIL PINTU P4
DETAIL PINTU P3 skala 1 : 25

skala 1 : 25
80

Rangka Hollow 3
Balok Latei 11x15 cm 80
40

Plat Besi Tbl. 5mm

Pintu Multipleks
Fin. Cat Motif Gorga Batak
Pintu Multipleks Pintu Multipleks
Fin. Cat Fin. Cat
Plat Besi Tbl. 5mm
Pintu Multipleks
Fin. Cat Motif Gorga Batak
Rangka Hollow Rangka Hollow
180 180

240 234 240

220 220
215
Handle Pintu Stainlees Handle Pintu Stainlees

Kunci Tanam 2 Slaag Kunci Tanam 2 Slaag

Plat Besi Tbl. 5mm

40
Rangka Hollow

80 40

15 15
3
74 3
5 70 5 9
15

80

DETAIL PINTU P7 DETAIL PINTU P6 DETAIL PINTU P5


skala 1 : 25 skala 1 : 25 skala 1 : 25
256
Balok Latei 11x15 cm Balok Latei 11x15 cm

UPVC Door Frame 5 5 UPVC Door Frame


UPVC Door Sash 10

Kaca Bening Polos Kaca Tempered


Tbl. 6 mm Kaca Tempered Tbl. 6 mm
Tbl. 6 mm

Kaca Tempered
Tbl. 6 mm
Handle Pintu Stainlees 220 195 220 210 220

Kunci Tanam 2 Slaag Handle Pintu Stainlees

Kaca Bening Polos


Tbl. 6 mm

UPVC Door Sash

10 UPVC Door Frame


5

5 5 5
10 60 10 5 78 78
15

256

DETAIL PINTU PJ2


skala 1 : 20
15 15

Balok Latei 11x15 cm Balok Latei 11x15 cm


335

UPVC Window Frame 5 5 UPVC Window Frame


UPVC Window Sash 6

Kaca Bening Polos Kaca Bening Polos


Tbl. 6 mm Tbl. 6 mm
Kaca Bening Polos
Tbl. 6 mm

145 123 145 135 145

Kaca Bening Polos


Tbl. 6 mm

UPVC Window Sash 6


UPVC Window Frame 5 5 UPVC Window Frame

Balok 10x15 cm Balok 10x15 cm

15

48 128 128
5 6 6 5 5 5

DETAIL JENDELA J1
skala 1 : 20

15

Balok Latei 11x15 cm


70

UPVC Window Frame 5


UPVC Window Sash 6

Kaca Bening Polos


Tbl. 6 mm

Kaca Bening Polos


Tbl. 6 mm
145 123 145

UPVC Window Sash 6


UPVC Window Frame 5

Balok 10x15 cm

15

5 6
48
6 5
DETAIL JENDELA J3
skala 1 : 20
280
2 2 2 2
91 91 91

Rangka Hollow

Plat Besi Tbl. 5mm

Rangka Hollow

286 287

327

Plat Besi Tbl. 5mm

Rangka Hollow

40 40

2 2 2 2
91 91 91

15

280

DETAIL JENDELA J2
skala 1 : 20
PG PLAFOND GYPSUM
TEBAL 9 MM

KALSIBOARD
PK
TEBAL 6 MM

RP RANGKA FURING
Ukr. 60 x 80 cm

PLAFOND
EKSISTING

PLAFOND
EKSISTING PLAFOND
EKSISTING PLAFOND PLAFOND
EKSISTING EKSISTING

PLAFOND
EKSISTING

235

348

PG

PG
365 PK
PK
PK
2045
PG RP
365
RP

RP
RP
365 PG

PK
PG
PG PK
PG
365
350 235
RP 235
237
350 RP 235

1917 235
PG
235
350
292 2721
PG
235
350 235
235
312
350

180 140 140


180
640

skala 1 : 250
PG PLAFOND GYPSUM
TEBAL 9 MM

RP RANGKA FURING
Ukr. 60 x 80 cm

235

348

365

2045
365

365

365
350 235
235
237
350
RP 235

1917 235

PG 235
350
292 2721
PG
235
350 235
235
312
350

180 140 140


180
640

skala 1 : 250
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

Drop Plafond lampu


Sembunyi
Atap UPVC Putih
Plafond GRC 6mm

Plafond Gypsum 9mm


Rangka Hollow Plat Lantai
Beton Talang Air
Conwood Balok
Plafond Gypsum 9mm

Granit Ukr. 60 x 60 cm

Lis GRC Cutting


Pola Batak
POT B POT A
Twin Room
Muka Tanah (Elv. +0.51)
Dinding Granit Ukr. 60x60 cm
Lantai Granit Ukr. 60x60 cm

POT C

skala 1 : 100

Atap UPVC Putih


Plafond GRC 6mm
Plafond Gypsum 9mm
Plat Lantai Rangka Hollow
Balok Conwood

Granit Ukr. 60 x 60 cm
Jendela Kaca Mati
Lemari Cabinet Fin. HPL

Twin Room
(Elv. +0.51)

skala 1 : 100
skala 1 : 100

Atap UPVC Putih


Plafond Gypsum 9mm
Balok

Hadboard rangka
conwood & GRC Cutting
Televisi
kasur
Meja Televisi

Granit Ukr. 60 x 60 cm

skala 1 : 100
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

Atap UPVC Putih

Plafond Gypsum 9mm


Plat Lantai
Beton Talang Air
POT B POT A Balok
Plafond Gypsum 9mm

Shower
Granit Ukr. 60 x 60 cm Dinding Keramik Ukr. 25x25 cm
Kaca tempret tebal 8 mm
Lis GRC Cutting Cermin
Pola Batak
Wastafel
Deluxe Room 1 Jet Shower
DELUXE ROOM 1

Muka Tanah (Elv. +0.51) Closet Duduk


FFL +0.510

Dinding Granit Ukr. 60x60 cm


POT C
Lantai Granit Ukr. 60x60 cm

skala 1 : 100

Atap UPVC Putih


Plafond GRC 6mm
Plafond Gypsum 9mm
Plat Lantai Rangka Hollow
Balok Conwood

Granit Ukr. 60 x 60 cm
Jendela Kaca Mati
Lemari Cabinet Fin. HPL

Twin Room
(Elv. +0.51)

skala 1 : 100

skala 1 : 100

Atap UPVC Putih


Plafond Gypsum 9mm
Balok

Jendela Kaca mati


Hadboard rangka
Jendela Kaca Mati conwood & GRC Cutting
kasur kasur

Granit Ukr. 60 x 60 cm

skala 1 : 100
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

235
P1
P1

348

P1

365 P1
P1
P1

2045
P1
365
P1
P1
P1

365 P1
P1
P1
P1

365
350 P1 235
P1
P1 235
237
350
235
P1
1917 235
P1
P1 235
350
292 2721
P1 P1
235
350 P1 235
P1 235
312
350

180 140 140


180
640
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
5 D 16 JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
2 D 16 SUMATERA UTARA

30
20152
Ø10 - 100
Ø10 - 100
5 D 16

40 C

5 D 16
B
Ø 10 - 100
Muka Tanah Muka Tanah
2 D16

40 Ø10 - 100 40

3 D16

20 3 D 16
Ø 10 - 100
4 D 16

Ø 10 - 100
160
Beton Cor Mutu 250

F'c 24.9 Mpa

Urugan Kembali

Beton Cor Mutu


F'c 24.9 Mpa

D 19 - 150 40
D 19 - 150
TANAH URUG
LANTAI KERJA 1 : 3 : 5 10

120

D19 - 150
D19 - 150

A
120

D19 - 150
D19 - 150

skala 1 : 25
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

Lantai Granit 60x60 cm TYPE K1 = 30 x 40 CM


Plat Lanatai Beton Cor POSITION SUPPORT MIDSPAN

Wiremash M6 20
Pasir Urug Muka Tanah
20
Balok Sloof 15x20 cm
30 30
SECTION
Urugan Kembali
40 40
60
Pondasi Menerus Camp. 1:4

Lantai Kerja Fc' 8,3 mpa TULANGAN UTAMA 12 D16 12 D16


5
Pasir Urug 5 cm 5 TULANGAN SENGKANG D10- 100, 3L D10- 150, 3L
15
20
60 TYPE K2 = 20 x 40 CM
70 POSITION SUPPORT MIDSPAN

20 20

SECTION
40 40

skala 1 : 25

TULANGAN UTAMA 12 D 16 12 D 16
TULANGAN SENGKANG Ø10- 100, 3L Ø10- 150, 3L

Pas. Dinding Bata


TYPE KP = 15 x 15 CM
Dilatasi 5 cm POSITION SUPPORT MIDSPAN

Kolom Ram 20x40 cm


15 15
Balok 15x30 cm
SECTION 15 15

Balok 30x60 cm

Plafond Gypsum 9 mm
TULANGAN UTAMA 2 Ø12 2 Ø12
152 20 TULANGAN SENGKANG Ø8- 150 Ø8- 150
5

skala 1 : 25

skala 1 : 25
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

TYPE S1 20/40 TYPE B1 25/40


POSITION LFT SUP MIDSPAN RGT SUP POSITION LFT SUP MIDSPAN RGT SUP

30 30 30

40 40 40
SECTION SECTION 60 60 60

20 20 20

TULANGAN ATAS 4 D16 4 D16 4 D16 TULANGAN ATAS 5 D19 3 D19 5 D19
TULANGAN BAWAH 4 D16 4 D16 4 D16 TULANGAN BAWAH 3 D19 5 D19 3 D19
TULANGAN SENGKANG D10- 100 D10-150 D10- 100 TULANGAN SENGKANG D10- 100 D10- 150 D10- 100
TULANGAN TORSI TULANGAN TORSI 2 D12 2 D12 2 D12

TYPE S2 15/20 TYPE B2 20/40


POSITION LFT SUP MIDSPAN RGT SUP POSITION LFT SUP MIDSPAN RGT SUP

20 20 20

15 15 15

SECTION 20 20 20
SECTION
40 40 40

TULANGAN ATAS 2 D13 2 D13 2 D13 TULANGAN ATAS 3 D19 2 D19 3 D19
TULANGAN BAWAH 2 D13 2 D13 2 D13 TULANGAN BAWAH 2 D19 3 D19 2 D19
TULANGAN SENGKANG D10- 150 D10- 150 D10- 150 TULANGAN SENGKANG D10- 100 D10- 150 D10- 100
TULANGAN TORSI TULANGAN TORSI

skala 1 : 25

TYPE BALOK PRAKTIS/LATEI 15/15 TYPE B3 15/30


POSITION LFT SUP MIDSPAN RGT SUP POSITION LFT SUP MIDSPAN RGT SUP

15 15 15

15 15 15

30 30 30
SECTION 15 15 15 SECTION

TULANGAN ATAS 2 Ø12 2 Ø12 2 Ø12 TULANGAN ATAS 2 D 13 2 D 13 2 D 13


TULANGAN BAWAH 2 Ø12 2 Ø12 2 Ø12 TULANGAN BAWAH 2 D 13 2 D 13 2 D 13
TULANGAN SENGKANG Ø8- 150 Ø8- 150 Ø8- 150 TULANGAN SENGKANG D10- 100 D10- 150 D10- 100
TULANGAN TORSI TULANGAN TORSI 2 D 13 2 D 13 2 D 13

skala 1 : 25
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

235

348

365

pondasi Menerus
2045 Camp. 1:4
pondasi Menerus
365 Camp. 1:4

pondasi Menerus
pondasi Menerus Camp. 1:4
365 Camp. 1:4

pondasi Menerus
365 pondasi Menerus
Camp. 1:4
Camp. 1:4
350 235
235
237
350 pondasi Menerus 235
Camp. 1:4
1917 235
235
350
pondasi Menerus
Camp. 1:4 292 2721
pondasi Menerus 235
Camp. 1:4
350 235
235
312
350

180 140 140


180
640
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

235
ta
ta ata Ba
Ba gB llag :2
lla . 1:2 ta Ro mp. 1
ollag . 1:2 o
R mp a
R mp C llag B :2 C
348 C Ro mp. 1
C

Ro mp. 1
Rollag Bata

lla
C
Cmp. 1:2

g B :2
ata
365

Ro mp. 1
C
lla
2045

g B :2
I

ata
365

Ro mp. 1
Rollag Bata

C
lla
Rollag Bata
Cmp. 1:2

Cmp. 1:2

g B :2
365

ata
365
350 235
235
237
350
235
ata 235
1917 g B :2
II lla
Ro mp. 1
C 235
350
Rollag Bata 292
Cmp. 1:2 2721
235
350 235
235
312
350

180 140 140


180
640

skala 1 : 250
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

0.26
0.60

0.25

0.10

0.05
0.05

skala 1 : 15

1.00

0.10

0.05
0.05

skala 1 : 15
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

235
S1

S1
348 S1

S1 S1
S1

S2 S1
365 S1
S2 S1 S2
S1 S1
S2 S2 S2 S2
S2 S1
S1
S2 S1 S2 S1
2045 S1
S1 S1
365 S1
S2
S1 S1
S2 S2 S2
S1
S2 S2
S2 S1 S1
S2
S1 S1
S1
365 S1
S1
S2 S1
S1 S1 S2
S2 S2
S2 S2 S1
S2 S1
S2
S1
365 S1
350 S1 S1 235
S2 S1
S1 235
S2 S2

S2
S1 237
S1 S1
350
235
S1
1917 S1 235
S1
S2 S2 S1 235
350 S1 S2
S1
S2
292 2721
S1 S1
235
S2 S1
350 235
S2
235
312
350

180 140 140


180
640
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

235

348
cm
t 10
Pl a cm
t 10
Pl a
365

2045
cm -6
10 WM

WM
365 t
Pl a

-6
-6 cm
t 10

WM
365 WM
Pl a

-6

WM -6
WM -6
365
350 235
235
237
350
-6 235
WM

WM
cm 235
t 10
1917
-6

Pl a 235
350
cm 292 2721
t 10
Pl a 235
350 235
235
312
350

180 140 140


180
640

skala 1 : 250
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

235
K1
K1

348 KP
K1

K1
K1 KP
365 KP
KP K1
KP KP
KP KP
KP KP
2045 K1 KP
365 KPK1 K1
KP
KP KP K1
KP KP
KP
KP KP KP
K1
365 K1 K1
KP
KP KP K1
KP KP
KP KP KP
365 K1
350 K1 K1 235
KP 235
KP KP
237
350 KP
K1 235
K1 KP
1917 235
K1
235
350
K1 K1 292 2721
KP
K1 235
350 235
K1
KP 235
312
350

180 140 140


180
640

skala 1 : 250
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

235
B1

B2 B1 B1
348 B2
B1
B2
B1 B2
B3
B1 B3 B1
B3 B2
365 B1 B2 B1
B1 B1
B1 BP
B2 B2 BP
B1 BP B3 BP B1 B2
2045 BP B2
B1 B1
B2 B2
365 B3 B2
B1 B1 B1
B1 BP B2 BP
B1 BP B2 B3 BP B2
B2 B1 B2
365 B1 B1
B2 B2
B1 B3 B2 B1
B2
B1 BP B2 BP
BP B1
B1 B2 B3 B2 BP
365 B1 B1
350 B2 235
B1 B3
B2 235
B1 BP B2 B3 B2 237
B1 BP
350 B2 235
B2 B1 B3 B3
1917 B1 235
B1
B2 235
350 B1
B1 292
B1 B2 2721
B1 235
B2
350 235
B1
235
312
350

180 140 140


180
640

skala 1 : 250
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

235

348

Plat 12 cm
365

Plat 12 cm

Pl a
2045

Ø1

t 12
Ø1 - 150
0-
365

Ø1
0-

cm
150

0
150 mm
mm

mm
mm VOID
- 150
365
Ø1
0 mm mm

Plat 12 cm
50 50
0 -1 0 - 1 0 mm
Ø1 Ø1 - 1 5

Plat 12 cm
0
Ø1

Pl a
Ø1

t 12
365 Ø1

0-

cm
350 0- 235

150
150
235
mm
mm
237
350 mm
- 150 235
Ø1
0 mm
150 Plat 12 cm
1917 235
0 -
Ø1 235
350
VOID
292 2721
235
350 235
235
312
350

180 140 140


180
640

skala 1 : 250
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

235

348

365

2045
365

365

365
350 235
K1 235
237
350
KP
KP 235

1917 K1 235
KP K1 235
350
K1 292 2721
K1
KP 235
350
K1
235
K1 235
312
350

180 140 140


180
640

skala 1 : 250
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

235

348

365

2045
365

365

365
350 235
235
237
BP BP
350 235
BP 235
1917 BP
BP
BP 235
350 BP BP
BP 292 2721
BP
BP 235
350 BP 235
BP
235
312
350

180 140 140


180
640

skala 1 : 250
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

235

Kuda-Kuda Rangka Baja Ringan C-100


348 Jarak 1.2 m
Join Atap Dengan Dinding Flashing
Reng Rangka Baja Ringan R-45 WaterProofing
Jarak 0.8 m
Atap Pvc
365

Kuda-Kuda Rangka Baja Ringan C-100


2045 80 120 Jarak 1.2 m

365 Reng Rangka Baja Ringan R-45


Jarak 0.8 m

Kuda-Kuda Rangka Baja Ringan C-100 365


Jarak 1.2 m
80 120
Reng Rangka Baja Ringan R-45
Jarak 0.8 m
365
350 235
235
Atap Pvc
237
350
235

1917 235 Listplank GRC


80 120 235
350
120 292 2721 Atap Pvc
80
235 Join Atap Dengan Dinding Flashing
350 WaterProofing
235
Kuda-Kuda Rangka Baja Ringan C-100
235 Jarak 1.2 m
312 Reng Rangka Baja Ringan R-45
350
Jarak 0.8 m

180 140 140


180
640

skala 1 : 250
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152
230
Atap Pvc

Rangka Atap Baja Ringan

Pas. Dinding Bata


115 470
Cmp. 1:4

Lantai Daag Atap


(Elv. + 3.91)

115

Bordes
Elv.+2.21

Pas. Dinding Bata


125
Cmp. 1:4

170
115

130
R. Pompa Filter
17 (Elv. +0.51)

470

skala 1 : 100
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

3
30
2
17
1 15

30

45 17 15
Timbunan Tanah

Muka Tanah

TANAH URUG 35 Ø12 - 150


Ø12 - 150 55
Ø12 - 150
Ø12 - 150

Ø12 - 150
20

LANTAI KERJA 1 : 3 : 5 10
120

10 120 10
skala 1 : 20

120

50 20 50

Ø12 - 150
Ø12 - 150
Ø12 - 150
Ø12 - 150
Plat Bordes T=15 cm
Ø12 - 150

Ø12 - 150
Ø12 - 150

Balok Tangga Uk. 20x40 cm


130

Ø12 - 150

Ø12 - 150

skala 1 : 20
skala 1 : 20
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
310 SUMATERA UTARA
20152

Handrail Tangga Stainles


steel dia. 2"
Handrail Tangga Stainles
632 steel dia. 2"
Ramp
Tangga

632 200

skala 1 : 75

Penutup Atap Atap UPVC Putih


Reng Atap Bajaringan
Rangka Hollow 30x30x2 cm
Kuda-Kuda Bajaringan
Condwood Balok
Plafond Gypsum 9mm
Dinding

skala 1 : 75
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

3472

3375

skala 1 : 250
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

POT - IV

skala 1 : 250

C B
Top Retaining Wall
A
Top Muka Tanah Asli
Top Muka Tanah Rencana
66 72
100

385 385
485

100 100

433 3036

skala 1 : 250
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152
30
Pas. Dinding 1 Bata Cpm. 1:2
MUKA TANAH ASLI
D 13 - 100 72

D 13 - 100

D 13 - 100

D 13 - 100 D 13 - 100

385
MUKA TANAH ASLI

D 13 - 100
D 13 - 200
D 16 - 100
385
D 13 - 200
Beton Cor D 16 - 100

Beton Cor

MUKA TANAH RECANA

70
D 13 - 150
MUKA TANAH RECANA
D 16 - 100
30 Beton Cor
Pasir Urug
5
D 13 - 150 70
D 13 - 150

D 16 - 100
80 40 60 30 Beton Cor
180 Pasir Urug
5
D 13 - 150

80 40 60
180

skala 1 : 50

skala 1 : 50

30
Top Retaining Wall

41 MUKA TANAH ASLI


66
D 13 - 200
25 MUKA TANAH RECANA
D 16 - 100
Beton Cor

D 13 - 100
70
D 13 - 150
100
D 16 - 100
30 Beton Cor
Pasir Urug
5
D 13 - 150

80 40 60
180

skala 1 : 50
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

GWT

skala 1 : 250
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
20 900 20 JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152
20

280
60 60

60
60

20

skala 1 : 50 Besi Plat Sumbu-x D10 - 100 mm


Besi Plat Sumbu-y D10 - 100 mm
20 900 20
105 209 134 122 122 120 105

Muka Tanah Asli 20 Muka Tanah Asli

280
Besi Dinding Sumbu-x D10 - 100 mm Besi Dinding Sumbu-Y
D10 - 100 mm
Besi Dinding Sumbu-x D10 - 100 mm Besi Dinding Sumbu-x
D10 - 100 mm

Beton Cor Bertulang


Fc' = 20,75 MPa

50*d 50*d
20
Balok Sloof Ukr. 20x30 cm
Tulangan Utama 6 D13 mm 30
Tulangan Sengkang Ø10 - 100 mm

Besi Main Hole D16 - 100 mm Besi Lantai Sumbu-y D10 - 100 mm
Besi Lantai Sumbu-x D10 - 100 mm
Besi Main Hole D16 - 100 mm
skala 1 : 50 320
20 140 140 20
20 Muka Tanah Asli

280

Besi Lantai Sumbu-y D10 - 100 mm

Besi Lantai Sumbu-x D10 - 100 mm

Beton Cor Bertulang


Fc' = 20,75 MPa

50*d 50*d
20
Balok Sloof Ukr. 20x30 cm
30 Tulangan Utama 6 D13 mm
Tulangan Sengkang Ø10 - 100 mm

Besi Dinding Sumbu-x D10 - 100 mm


Besi Dinding Sumbu-x D10 - 100 mm skala 1 : 50
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

118

60
390

60 350

334

skala 1 : 50

Besi Main Hole D16 - 100 mm Besi Main Hole D16 - 100 mm
Besi Main Hole D16 - 100 mm Besi Main Hole D16 - 100 mm
334 350
20 147 147 20 20 155 155 20
20 Muka Tanah Asli 20 Muka Tanah Asli

Tangga Besi D19 - 300 mm


Keramik Dinding 25x40 cm

Keramik Dinding 25x40 cm


Waterprofing Coating
Waterprofing Coating

Besi Lantai Sumbu-y D10 - 100 mm Besi Lantai Sumbu-y D10 - 100 mm
310 310
Besi Lantai Sumbu-x D10 - 100 mm Besi Lantai Sumbu-x D10 - 100 mm

Beton Cor Bertulang Beton Cor Bertulang


Fc' = 20,75 MPa Fc' = 20,75 MPa

Keramik Lantai Keramik Lantai


50*d 25x25 cm 50*d 50*d 25x25 cm 50*d
20 20
Balok Sloof Ukr. 20x30 cm Balok Sloof Ukr. 20x30 cm
30 Tulangan Utama 6 D13 mm 30 Tulangan Utama 6 D13 mm
Tulangan Sengkang Ø10 - 100 mm Tulangan Sengkang Ø10 - 100 mm

Besi Dinding Sumbu-x D10 - 100 mm Besi Dinding Sumbu-x D10 - 100 mm
Besi Dinding Sumbu-x D10 - 100 mm Besi Dinding Sumbu-x D10 - 100 mm

skala 1 : 50 skala 1 : 50
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

3800

GWT

skala 1 : 250
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

400
Kolom Praktis Kolom Praktis

15

30 60

15

Kolom Praktis Kolom Praktis

Pot - I Pot - II

skala 1 : 20

Muka Tanah Muka Tanah

Kolom Praktis Pas Dinding 12 Bata Camp. 1:2

50 50
Plesteran Dinding Camp. 1:2 60 Plesteran Dinding Camp. 1:2 60

Lantai Drainase Cor K-175 10 Lantai Drainase Cor K-175 10


Pasir Urug 5 cm 5 Pasir Urug 5 cm 5
10

15 30 15

15 30 15 60

60

skala 1 : 20
skala 1 : 20
L ED STRIP 7,2W pe r meter

MCB Box

Panel SDP Gedung

MCB Box

MCB Box MCB Box

MCB Box
MCB Box

MCB Box

MCB Box

Panel Pompa Filter dan Booster

skala 1 : 250
skala 1 : 250
DARI SUMBER AIR

KRAN TAMAN

KRAN TAMAN

2x L 1"

TEE 1" KE 3/4" CW 1"

CW 1"
TEE 1" KE 3/4"

L 1" KE 3/4"

CW 1"
235

348
JALUR MELAL
UI
BAWAH TANAH

L 1" KE 3/4"
KRAN TAMAN

365
L 3/4"

L 3/4"

L 3/4"
3/4" TEE
CW 3/4"

TEE 3/4" L 3/4"


L 3/4" TEE 3/4"

TEE 3/4" 3/4"


CW L 3/4"

2045
L 3/4"

L 1" KE 3/4"
L 3/4"

L 3/4" L 1" KE 3/4"

365 L 3/4"
L 3/4"

CW
3/4" TEE
3/4"

TEE 3/4"
L 3/4"

L 3/4"
TEE 3/4"

TEE 3/4" 3/4"


CW L 3/4"

L 3/4"

L 1" KE 3/4"
L 3/4"

365 L 3/4" L 1" KE 3/4"

L 3/4"

L 3/4"
3/4" TEE
CW 3/4"

TEE 3/4"
L 3/4"

L 3/4"
TEE 3/4"

TEE 3/4" 3/4"


CW L 3/4"

365
L 3/4"

L 1" KE 3/4"
L 3/4"

350 L 3/4"
L 3/4" L 1" KE 3/4"
235
L 3/4"
3/4" TEE

235
CW 3/4"

TEE 3/4"
L 3/4"

237
350 TEE 1" DARI
TANGKI
235

1917 235
235
350
292 2721
235
KE TANGKI
350 235
235
312
350

180 140 140


180
640

skala 1 : 250
235

348

365

2045
365

365

365
350 235
235
237
350
235

1917 235
235
350
DARI POMPA 292 2721
FILTER

235
350 235
235
312
350

180 140 140


180
640

skala 1 : 250
235

348

365

2045
365

365

365
350 235
235
237
350
235

1917 235
235
350
292 2721
235
350 235
235
312
350

180 140 140


180
640

skala 1 : 250
STP

PIPA BUANGAN 4" SW - 4"


MENUJU STP

WW - 3"

skala 1 : 250
BIRO UMUM SEKRETARIAT DAERAH
PROVINSI SUMATERA UTARA
JALAN PANGERAN DIPONEGORO NO. 30, MADRAS HULU
KECAMATAN MEDAN POLONIA, KOTA MEDAN
SUMATERA UTARA
20152

UPPER VIEW UPPER SECTION

A - A SECTION B - B SECTION
Keterangan:

AC (AIR CONDITIONER)
AC
AC OUTDOOR
COMP
EXHAUST

CO
MP
AC

CO
MP
AC

AC
CO
MP

CO
MP
AC

AC
CO
MP

AC
CO
MP

AC
CO
MP

skala 1 : 250
Keterangan:

APAR = (3 UNIT)

APAR

APAR

APAR

skala 1 : 250