LESSON 2

D
STARTING
THE PROJECT or
• Determine Appropriate Project Methodology/
Methods and Practices​
e
• Plan and Manage Scope​
• Plan and Manage Schedule​
at

• Plan and Manage Budget and Resources​


• Plan and Manage Quality of Products and
lic

Deliverables
• Integrate Project Planning Activities​
• ​Plan and Manage Procurement​
• Establish Project Governance
up

Structure​
• Plan and Manage Project/Phase
Closure
D
ot
N

1
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
is
D
or
e
at
lic

Determine Appropriate
Project Methodology/Methods and
up

Practices
D

TOPIC A
ot
N

2
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
STARTING THE PROJECT > DETERMINE APPROPRIATE PROJECT METHODOLOGY/

tr
METHODS AND PRACTICES​

Deliverables and Tools

is
D
or
e
Surveys Expert judgement
at

Project business case/needs document Meetings


Project Overview Statement Focus groups
lic

Project Implementation Plan Workshops


Agile practice guidelines SMART objectives
up

Knowledge of classic PM and agile practice


Project Integration
D
ot

3
N

3
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Business Case and

tr
Business Needs

is
Documents

D
Business case:
✓ Documented economic feasibility
study
✓ Establishes benefits of project
or
components
e
✓ Provides a basis for authorization
at

of further project activities


lic

Business needs documents:


✓ Provide high-level deliverables
up

✓ Prerequisite of formal business


case
✓ Describe requirements - what
D

needs creating and / or performing


ot

4
N

4
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project Implementation

tr
Plan

is
Consider all stakeholders, schedules, risks,

D
budgets, and quality standards.
Identify deliverables - due at the end of the
or
project.
Identify project outputs - delivered
throughout the project.
e
When delivering outputs, are we:
at

✓ Implementing them in a new or existing


lic

business environment?
✓ Transitioning them into a live
environment?
up

✓ Decommissioning or removing old


systems, processes, or materials?
D

✓ Ensuring training and knowledge transfer


is complete / satisfactory?
ot

5
N

5
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Rolling Wave Planning

tr
is
D
or
DEFINITION
e
An iterative planning technique in which the
at

work to be accomplished in the near term is


planned in detail, while work further in the future
lic

is planned at a higher level.


up
D
ot

6
N

6
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Rolling Wave

tr
Planning

is
D
✓ Used in agile or predictive
approaches

✓ A form of progressive elaboration


or
applied to work packages, planning
e
packages, and release planning
at

✓ Decompose work down to the


lic

known level of detail during


strategic planning
up

✓ Decompose work packages into


activities as work progresses
D
ot

7
N

7
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Progressive

tr
Elaboration

is
D
or
DEFINITION
e
The iterative process of increasing the level of
at

detail in a project management plan as greater


amounts of information and more accurate
lic

estimates become available.


up
D
ot

8
N

8
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
Overview: Project Management

ib
Methodologies, Methods, and

tr
Practices

is
D
Agile
• Team works collaboratively with the customer to determine the
project needs. or
• The coordination of the customer and the team drives the project
forward. / Plan-Driven
Predictive
e
at

• Project needs, requirements, and constraints are understood, and


plans are developed accordingly.
lic

• Plans drive the project forward.

Hybrid
up

• Combines strategies from agile or predictive as required.


• Can switch approaches based on need, changing work
D

requirements, or circumstances.
ot

9
N

9
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Types of Life Cycles

tr
is
D
Predictive or
e
at

• Iterative
Hybrid • Incremental
lic

• Agile
up

Adaptive
D
ot

10
N

10
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Predictive Life Cycle

tr
is
D
or
DEFINITION
e
at

Determine project scope, time, and cost in the


early phases of this life cycle.
lic
up
D
ot

11
N

11
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Predictive Life Cycle

tr
is
Also known as Traditional or Waterfall

D
approach:
✓ Requirements are typically fixed, but
can be changed using the change
control process
or
e
✓ Activities and work culminate in final
at

output, always a deliverable


lic
up
D
ot

12
N

12
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Adaptive and Hybrid

tr
Life Cycles

is
Use these methods in dynamic and

D
complex environments, where
change is a constant.
or
Let’s learn more about these
e
methods next.
at
lic
up
D
ot

13
N

13
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Hybrid Methods

tr
is
Combine predictive and adaptive

D
approaches to offer flexibility to
teams.

Great for projects:


or
✓ Seeking or willing to learn new
e
methods or techniques.
at

✓ With a mix of resources and


experience levels
lic

✓ With shorter, iterative time


frames.
up

✓ With high stakeholder


involvement
✓ With in-depth requirements
D
ot

14
N

14
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Adaptive Life Cycles

tr
is
D
• Dynamic requirements

Iterative • Activities repeated until correct


or • Single delivery
e
• Dynamic requirements

Incremental
at

• Activities performed once per increment


• Frequent small deliveries
lic

• Iterative or incremental -change-driven/adaptive.

Agile
up

• Dynamic requirements
• Combines iterative repetition of activities with
incremental deliveries
D
ot

15
N

15
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Adaptive Life Cycles

tr
is
Determine project scope

D
early in this project life
cycle.
Continuously assess
Agile Incremental and modify time and
or cost estimates as the
team's understanding of
the product increases.
e
Iterative
at

repetition with
lic

Uses series of iterations


incremental to add functionality to
deliverables within a
predetermined time
up

deliveries Iterative frame.


The deliverable is
considered complete
only after the final
D

iteration.
ot

16
N

16
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Typical Use Cases

tr
is
Methodology Typical Use Cases

D
• Software projects
Agile • Intellectual property projects

Predictive /


or
Research projects

Construction projects
• Projects with many physical assets
Plan Driven
e
• “Repeats” of similar, completed projects
at

Projects where learning and correction is expected to eventually reach


Iterative
the ideal solution.
lic

Customers or business wants or expects to see outputs or partial


Incremental
outputs early and often.
up

• Mix of resources and experience levels


Hybrid
• Those seeking or willing to learn new methods or techniques.
D
ot

17
N

17
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
is
D
or
e
at
lic

Plan and Manage Scope


up

TOPIC B
D
ot
N

18

18
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
STARTING THE PROJECT > PLAN AND MANAGE SCOPE

tr
Deliverables and Tools

is
D
or
e
Requirements Documentation Agile estimating
at

Work performance reports Product backlog


Requirements Traceability Matrix Change requests
lic

Product backlog
Scope management plan and
up

Requirements management plan


D
ot

19
N

19
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Scope Management Plan

tr
is
D
or
DEFINITION
e
A component of the project or program
at

management plan that describes how the scope


will be defined, developed, monitored, controlled,
lic

and validated.
up
D
ot

20
N

20
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Scope Management Plan

tr
is
✓ Should include processes to prepare

D
a project scope statement

✓ Enables the creation of the WBS from


the detailed project scope statement
or
e
✓ Establishes how the scope baseline
will be approved and maintained
at

✓ Specifies how formal acceptance of


lic

the completed project deliverables


will be obtained.
up

✓ Can be formal or informal, broadly


framed or highly detailed.
D
ot

21
N

21
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Scope Management Tools and Techniques

tr
is
D
Expert judgment

Internal and external experts or


e
Alternatives analysis
at

Used to evaluate identified options in order to select the options or


lic

approaches to use to execute and perform the work of the project.


up

Meetings
D

Team members help create the scope management plan


ot

22
N

22
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project Requirements

tr
is
D
or
DEFINITION
e
The actions, processes, or other conditions the
at

project needs to meet e.g. milestone dates,


contractual obligations, constraints, etc.
lic
up
D
ot

23
N

23
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Product Requirements

tr
is
D
or
DEFINITION
e
The agreed-upon conditions or capabilities of a
at

product, service, or outcome that the project is


designed to satisfy.
lic
up
D
ot

24
N

24
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
Project and

ib
Product

tr
Requirements

is
D
✓ High-level requirements might
be documented in the project
charter. or
✓ Verify that all requirements are
e
determined and documented.
at

✓ Provide the foundation for


building the WBS.
lic
up
D
ot

25
N

25
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project Scope

tr
is
D
or
DEFINITION
e
The work performed to deliver a product, service,
at

or result with the specified features and


functions. “Project scope” may include product
lic

scope.
up
D
ot

26
N

26
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Product Scope

tr
is
D
or
DEFINITION
e
at

The features and functions that characterize a


product, service, or result.
lic
up
D
ot

27
N

27
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project and Product

tr
Scope

is
D
✓ Predictive - The scope baseline for
the project is the approved version
of the project scope statement,
work breakdown structure (WBS),
or
and associated WBS dictionary.
e
at

✓ Agile - Backlogs (including product


requirements and user stories)
lic

reflect current project needs.

✓ Measure completion of project


up

scope against the project


management plan.
D

✓ Measure completion of the product


scope against product
ot

requirements.
28
N

28
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Tolerances

tr
is
Tolerance levels enable you to effectively
manage an issue without needing to

D
escalate it every time.

Areas of tolerance might include:


✓ Budget
or
✓ Schedule
e
✓ Quality
at

✓ Accepted or baselined requirements,


including:
lic

- Solution – functional/non-functional
- Business and Stakeholder
up

- Quality
D
ot
N

29

29
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Enterprise Environmental Factors

tr
(EEFs)

is
D
or
DEFINITION
e
Conditions (internal or external) not under the
at

control of the project team, that influence,


constrain, or direct the project at organizational,
lic

portfolio, program, or project level.


up
D
ot

30
N

30
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Organizational Process Assets

tr
(OPAs)

is
D
or
DEFINITION
e
Plans, processes, policies, procedures, and
at

knowledge bases specific to and used by the


performing organization. These assets influence
lic

the management of the project.


up
D
ot

31
N

31
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
EEFs and OPAs

tr
is
✓ Projects exist and operate in
environments that may influence

D
them, favourably or unfavourably.

✓ EEFs and OPAs are two major


categories of project influences.
or
e
at
lic
up
D
ot

32
N

32
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Enterprise Environmental Factors

tr
(EEFs)

is
D
Internal External
✓ Organizational culture, structure,
and governance or
✓ Marketplace conditions
✓ Social and cultural influences
✓ Geographic distribution of and issues
e
facilities and resources
at

✓ Legal restrictions
✓ Infrastructure
✓ Commercial databases
✓ Resource availability
lic

✓ Academic research
✓ Employee capability
✓ Government or industry
up

standards
✓ Financial considerations
D

✓ Physical environmental elements


ot

33
N

33
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Organizational Process

tr
Assets (OPAs)

is
Processes, policies, and procedures are:

D
✓ Established by the project management
office (PMO) or another function outside of
the project.
✓ Not updated as part of project work
or
e
✓ Templates, lifecycles, and checklists can be
at

tailored, but not updated, for a project.


lic

Organizational knowledge bases are:


✓ Updated throughout the project with project
up

information
✓ Updated information such as financial
performance, lessons learned, performance
D

metrics and issues, and defects.


ot

34
N

34
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Document Analysis

tr
is
D
or
DEFINITION
e
at

A technique used to gain project requirements


from current documentation evaluation.
lic
up
D
ot

35
N

35
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Document Analysis

tr
is
Derive new project requirements from
existing documents such as:

D
✓ Business plans
✓ Service agreements
✓ Marketing materials
or
e
✓ Current process diagrams
at

✓ Application software documentation


lic
up
D
ot

36
N

36
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Focus Groups

tr
is
D
or
DEFINITION
e
An elicitation technique that brings together
prequalified stakeholders and subject matter
at

experts to learn about their expectations and


attitudes about a proposed product, service, or
lic

result.
up
D
ot

37
N

37
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Focus Groups

tr
is
✓ Loosely structured, information-sharing

D
sessions

✓ Moderator-guided, interactive or
✓ Includes stakeholders and SMEs
e
✓ Qualitative research
at
lic
up
D
ot

38
N

38
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Questionnaires and Surveys

tr
is
D
or
DEFINITION
e
at

Written format of questions designed to quickly


capture information from many respondents.
lic
up
D
ot

39
N

39
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Questionnaires

tr
and Surveys

is
D
or Often used data
e
gathering technique:
• With varied audiences
at

• When a quick
lic

turnaround is needed
• When respondents are
up

geographically
dispersed
• Where statistical
D

analysis could be
appropriate.
ot

40
N

40
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Benchmarking

tr
is
D
or
DEFINITION
e
The comparison of actual or planned products,
processes, and practices to those of
at

comparable organizations to identify best


practices, generate ideas for improvement, and
lic

provide a basis for measuring performance.


up
D
ot

41
N

41
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Benchmarking

tr
is
✓ Evaluates and compares a
business’ or project’s practices

D
with others.

✓ Identifies best practices in order


to meet or exceed them.
or
e
at
lic
up
D
ot

42
N

42
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Interviews

tr
is
D
or
DEFINITION
e
A formal or informal approach to elicit
at

information from stakeholders by talking with


them directly.
lic
up
D
ot

43
N

43
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Interviews

tr
is
✓ Helps to identify a stakeholder's

D
requirements, goals, or
expectations for a project.

✓ Use to identify/define features and


functions of desired project’s
or
e
deliverables.
at
lic
up
D
ot

44
N

44
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Group Decision-Making Techniques

tr
is
D
Voting Autocratic decision Multicriteria decision
making analysis
Collective decision-making
and assessment
or
One team member makes Method - Establish criteria
Determines several the decision for the group. in decision matrix e.g. risk
e
alternatives, with future levels, uncertainty, and
at

actions as the expected valuation


outcome Uses a systematic,
lic

Use to generate, classify, analytical approach


and prioritize product Evaluate and rank many
requirements ideas
up
D
ot

45
N

45
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Types of Voting

tr
is
Unanimity
Everyone agrees on a single course of action.
Useful in project teams with great cohesion.

D
Example: Delphi technique

Majority
Decision reached with > 50% of group support
Tip: Create groups of an uneven number of
or
e
participants to ensure decisions are made and tie
votes avoided.
at

Plurality
lic

Decision reached with largest block in a group


deciding, even if majority is not achieved.
Use this method when more than 2 options are
up

nominated.

Agile Methods
D

Thumbs up/down/sideways
Fist of Five
ot

46
N

46
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Data Representation

tr
is
Tailor to project context and decision-

D
making criteria.

✓ Mind Mapping – Consolidate ideas


created through individual brainstorming
or
sessions into a single map to reflect
e
commonality and differences in
understanding and to generate new
at

ideas
lic

✓ Affinity Diagram – Allows large numbers


of ideas to be classified into groups for
up

review and analysis


D
ot

47
N

47
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Observations

tr
is
D
or
DEFINITION
e
A technique used to gain knowledge of a
at

specific job role, task, or function in order to


understand and determine project requirements.
lic
up
D
ot

48
N

48
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Facilitated Workshops

tr
is
D
or
DEFINITION
e
Organized working sessions led by qualified
at

facilitators to determine project requirements


and to get all stakeholders together to agree on
lic

project outcomes.
up
D
ot

49
N

49
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Context Diagrams

tr
is
D
or
DEFINITION
e
Visual depiction of product scope, showing a
at

business system (process, equipment, computer


system, etc.) and how people and other systems
lic

interact with it.


up
D
ot

50
N

50
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Context Diagrams

tr
is
Business Context Diagram Sample

D
Government

Request for
or
Request for
Private Sector

Funding Funding Funding Funding


e
at

Hardware, Software, and Educational


Support Services
User Community University Industry
lic

Request for Hardware, Request for


Software, and Support Educational
Services
up

Request for
Educational
Educational
Services
Services

Education
D

Community
ot

51
N

51
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Storyboarding

tr
is
D
or
DEFINITION
e
A prototyping method using visuals or images to
at

illustrate a process or represent a project


outcome.
lic
up
D
ot

52
N

52
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Prototyping

tr
is
D
or
DEFINITION
e
Assists in the process of obtaining early
at

feedback on requirements by providing a


working model of the expected product before
lic

building.
up
D
ot

53
N

53
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Requirements

tr
Documentation

is
D
✓ Describes how individual requirements
meet project business need.
✓ Starts at a high level before providing
details. or
✓ Requirements need to be unambiguous
e
(measurable and testable), traceable,
complete, consistent, and acceptable
at

to key stakeholders.
✓ Format can be simple (document
lic

listing all requirements, categorized by


stakeholder and priority) or more
up

elaborate (executive summary, detailed


descriptions, attachments).
D
ot

54
N

54
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Types of Requirements

tr
is
Business Stakeholder Transition and Readiness
Temporary capabilities
Higher-level needs of the Stakeholder or e.g. data conversion and training
organization e.g. business issues stakeholder group

D
requirements needed to transition from the
or opportunities, and reasons why a needs. Reporting current as-is state to the desired future
project has been undertaken. requirements. state.

or
Quality Project
e
Condition or criteria needed to validate the successful Actions, processes, or other conditions the
completion of a project deliverable or fulfilment of other project project needs to meet e.g. milestone dates,
at

requirements e.g. tests, certifications, validations. contractual obligations, constraints.


lic
up

Solutions (Functional and Non-functional)


Describe features, functions, and characteristics of the product, service, or result that will meet the business and
stakeholder requirements.
Functional requirements - Describe the behaviors of the product
e.g. actions, processes, data, and interactions that the product should execute.
D

Non-functional requirements - Supplement functional requirements to describe environmental conditions or qualities


required for the product to be effective
e.g. reliability, security, performance, safety, level of service, supportability, retention/purge, etc.
ot

55
N

55
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Nonfunctional Requirements

tr
is
Type Considerations

D
• How and when is the service available?
Availability • If the service were to become unavailable, how quickly can


or
it be restored to working?
What level of service performance, speed, and throughput is
required?
Capacity
e
• Given the number of stakeholders using the service, is there
enough supply to meet demand?
at

• If there were a disaster of some kind, how quickly could the


Continuity
lic

service be recovered to support operations.


• How well is the service and its information protected from
security risks and threats?
up

Security
• How do you guarantee the confidentiality, integrity, and
availability of the information?
D
ot

56
N

56
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
Requirements Management Plan

is
D
or
DEFINITION
e
A component of the project or program
at

management plan that describes how


requirements will be analyzed, documented, and
lic

managed.
up
D
ot

57
N

57
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Requirements

tr
Management Plan

is
D
✓ Planning, tracking, and reporting
information for requirements activities.
✓ Configuration management activities:
- Version control rules
or
e
- Impact analysis
- Tracing, tracking, and reporting
at

✓ Required authorization levels for change


lic

approval
✓ Prioritization criteria / process
up

✓ Product metrics and accompanying


rationale
D

✓ Traceability structure, including


requirement attributes
ot

58
N

58
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Requirements Traceability

tr
Matrix

is
D
or
DEFINITION
e
at

Links product requirements from their origin to


the deliverables that satisfy them.
lic
up
D
ot

59
N

59
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Requirements Traceability Matrix

tr
is
D
or
e
at
lic
up
D
ot

60
N

60
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Collecting Project Requirements

is
D
• Review:
– Scope management plan

– Requirements management plan


or
– Stakeholder engagement plan
e
– Project charter
at

– Stakeholder register
lic

• Use tools and techniques such as interviews, focus groups, facilitated


workshops, group creativity techniques.
up
D
ot

61
N

61
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project Scope Statement

tr
is
D
or
DEFINITION
e
at

The description of the project scope, major


deliverables, assumptions, and constraints.
lic
up
D
ot

62
N

62
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project Scope Statement

tr
is
D
or
e
at
lic
up
D
ot

63
N

63
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Scope Tools and Techniques

tr
is
Expert Judgment

D
Judgment provided by a group or
person, based upon expertise in an
application area, Knowledge Area,
discipline, industry, etc.
or Product Analysis
e
Defines products and services.
Facilitation Includes asking questions about a
at

Effective guidance of a group to a product/service, forming answers


successful decision, solution, or to describe the use,
conclusion. characteristics, and other relevant
aspects of what is going to be
lic

delivered
up

Multi-criteria decision analysis Alternatives analysis


Technique of organizing decision Evaluation of choices available to
factors in a matrix to evaluate reach an objective.
D

options
ot

64
N

64
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Product Analysis

tr
is
D
or
DEFINITION
e
A tool to define scope by asking questions
at

about a product and forming answers to


describe the use, characteristics, and other
lic

relevant aspects of the product.


up
D
ot

65
N

65
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Product Analysis

tr
Value Analysis
Systematic,

is
interdisciplinary
examination of factors

D
affecting the cost of a
Product Breakdown product or service
Splinter a product and its Requirements towards achieving the
work requirements into
components to achieve a
clear understanding of
or
Analysis
Process of
identifying, validating,
purpose at lowest cost
and required standards of
quality and reliability
work and documenting
e
specifications for
projects
at

Systems Analysis
lic

Process of studying a
product /service to
identify its goals and
Value Engineering purposes and create
up

Structured technique Systems Engineering


systems / procedures
to optimize value in a Design, integration,
to achieve them
project and management of
efficiently
complex systems
D

over their life cycles


ot

66
N

66
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Develop a Project Scope Statement

is
D
• Review:
- Scope management plan (developing, monitoring, and controlling project
scope activities) or
- Project charter (high-level project description and product characteristic
e
and project approval requirements)
at

• Requirements documentation
• OPAs – templates, processes, and procedures
lic

• Use tools and techniques to define the project scope (expert judgment,
product analysis, alternatives generation, and facilitated workshops).
up

• Document the project scope statement and update project documents.


D
ot

67
N

67
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
Work Breakdown Structure

is
D
or
DEFINITION
e
A hierarchical decomposition of a project’s total
at

scope of work to accomplish project objectives


and create the required deliverables.
lic
up
D
ot

68
N

68
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Work Breakdown Structure

tr
is
D
DMAIC
Project

1.0
Define
2.0
Measure
or
3.0
Analyze
4.0
Improve
5.0
Control
e
at

1.1 2.1 3.1 4.1 5.1


Work
lic

Packages 1.2 2.2 3.2 4.2 5.2


up

1.3 2.3 3.3 4.3 5.3


D
ot

69
N

69
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Code of Accounts

tr
is
D
or
DEFINITION
e
at

Numbering system that uniquely identifies each


component of the WBS.
lic
up
D
ot

70
N

70
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
WBS Dictionary

tr
is
D
or
DEFINITION
e
Provides detailed deliverable, activity, and
at

scheduling information about each component


in the WBS.
lic
up
D
ot

71
N

71
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
WBS Dictionary

tr
is
Can include:

D
✓ Code of account identifier
✓ Description of work

✓ Assumptions and constraints


or
✓ Responsible organization
e
✓ Schedule milestones
at

✓ Associated schedule activities

✓ Resources required to complete


lic

the work
✓ Cost estimations

✓ Quality requirements
up

✓ Acceptance criteria

✓ Technical references
D

✓ Agreement information
ot

72
N

72
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Decomposition

tr
is
D
or
DEFINITION
e
A technique of dividing and subdividing the
at

project scope and deliverables into smaller,


more manageable parts.
lic
up
D
ot

73
N

73
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Decomposition - Example

tr
is
D
or
e
at
lic
up
D
ot

74
N

74
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
Control

is
Accounts, Work

D
and Planning
Packages or
e
Let’s explore the units of work
at

in a project WBS.
lic
up
D
ot

75
N

75
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Control Account

tr
is
D
or
DEFINITION
e
A management control point where scope,
at

budget, actual cost, and schedule are integrated


and compared to earned value for performance
lic

measurement.
up
D
ot

76
N

76
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Planning Package

tr
is
D
or
DEFINITION
e
A WBS component below the control account
at

with known work content but without detailed


schedule activities.
lic
up
D
ot

77
N

77
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Work package

tr
is
D
or
DEFINITION
e
The work defined at the lowest level of the WBS
at

for which cost and duration are estimated and


managed.
lic
up
D
ot

78
N

78
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Planning Work Using a WBS

tr
1
✓ A control account has two or more

is
Project
work packages. Name

D
✓ A planning package may or may not
be used. 1.1 2.1
Control Control
✓ Each work package is part of a single
control account.
or Account A Account B

✓ Identifiers provide a structure for 1.2 1.3 2.2


e
Planning Planning Planning
hierarchical summation of costs, Package A Package B Package
schedule, and resource information
at

and form a code of accounts.


1.2.1 1.2.2 2.2.1
lic

Work Work Work


Package Package Package
up

Planning package
(optional layer) Lowest level - a work
houses work content, package with a unique
but no schedule or
D

identifier; contains
details. detailed schedule and
cost information.
ot

79
N

79
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Scope Baseline

tr
is
D
or
DEFINITION
e
Approved version of a scope statement, WBS,
and its associated WBS dictionary, that can be
at

changed using formal change control


procedures and is used as a basis for
lic

comparison to actual results.


up
D
ot

80
N

80
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Scope Baseline

tr
is
Components include:

D
✓Project scope statement
✓WBS
or
✓Work packages
✓Planning package
e
✓WBS dictionary
at
lic
up
D
ot

81
N

81
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Create a WBS

is
D
• Review:
- Scope management plan
- Project scope statement
or
- Requirements documentation
e
• EEFs and OPAs
at

• Use tools and techniques e.g. decomposition


lic

• Use expert judgment


• Include notes on work products that might be delivered incrementally
up

• Document the scope baseline


D
ot

82
N

82
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Product and Iteration

tr
Backlogs

is
Product backlogs A product backlog
is a list of the

D
✓ Change throughout the project. expected work to
✓ Groom and refine the product deliver the
backlog continually; weekly or
monthly intervals are typical.
or product.

✓ Remove product backlog items


e
(PBIs) as work is completed.
at

- Edit and clarify PBIs as more


becomes known or as product
Iteration backlogs include items
lic

requirements change.
- Add PBIs when more work must from the product backlog that can
be done. conceivably be completed within
up

the time period based on the


team’s capacity.
Iteration backlog
D

✓ Teams must estimate effort and


understand business priorities.
ot

83
N

83
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
User Stories

tr
is
D
or
DEFINITION
e
at

Short descriptions of required functionality; told


from user’s point of view
lic
up
D
ot

84
N

84
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
User Stories

tr
is
✓ Help teams focus on that

D
value provided to the user.

✓ Suggest who will benefit from


the work and how.
or
e
✓ Driven by description instead
at

of technical specifications to
give holistic view
lic
up

User Story
D

Story Points
ot

85
N

85
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Tools and Techniques for Verifying Scope

tr
is
D
Tool and Technique Description

Checklist of required criteria for a deliverable to be considered ready for


Definition of Done

Definition of Ready
customer use. or
Checklist for a user-centric requirement with all required information to
begin work.
e
Acceptance Criteria A set of conditions to meet before acceptance of deliverables.
at

Interval at or near the conclusion of a timeboxed iteration when the project


Iteration Reviews team shares and demonstrates the work produced during the iteration
lic

with stakeholders.
A technique for determining the cause and degree of difference between
Variance Analysis
up

the baseline and actual performance.


An analytical technique that uses mathematical models to forecast future
Trend Analysis
outcomes based on historical results.
D
ot

86
N

86
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
is
D
or
e
at
lic

Plan and Manage Schedule


up

TOPIC C
D
ot
N

87

87
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
STARTING THE PROJECT > PLAN AND MANAGE SCHEDULE

tr
Deliverables and Tools

is
D
or
Activity cost estimates Product Roadmaps
e
Activity duration estimates Earned Value
at

Task estimates Updated schedule


lic

Story estimates
Updated release plan
Feature estimates
Updated product backlog
up

Updated documentsBacklog
Velocity data Network diagram
Project schedule Planning meetings
D

Release plan Negotiations


ot

88
N

88
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
STARTING THE PROJECT > PLAN AND MANAGE SCHEDULE

tr
Tools, Activities & Processes

is
D
Process assets
Backlog management
or Release planning
Iteration planning
e
Top-Down Estimating: Expert, Burndown / Burnup charts
Analogous, Parametric
at

Cumulative flow diagrams


Bottom Up Estimating: Roll up
Throughput analysis
lic

WBS packages
T-Shirt sizing Velocity analysis
Retrospectives
up

Estimating using Fibonacci


sequences Review work produced
Story points Backlog reprioritization
D

Relative estimating Scaling projects


Affinity estimates Meetings
ot

PMIS Procurement negotiations 89


N

89
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project Schedule

tr
is
✓ Includes start and finish activities

D
✓ Uses specific dates and in a certain
sequence
✓ Sets dates for project milestones
✓ Coordinates activities to ensure on-
or
time project completion
e
✓ Tracks schedule performance and
at

provides visibility of project status


to upper management and project
lic

stakeholders
up
D
ot

90
N

90
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Benchmarks and

tr
Historical Data

is
D
Benchmarking is the comparison of a
project schedule to another, similar
product/service schedule to provide a
good “starting point” for estimation
before detailed analysis.
or
e
Benchmarks can be useful in the initial
stage of scheduling to help assess the
at

feasibility of a project.
lic

Historical data can come from other


projects completed within an
organization for which detailed
up

information is available.
D
ot

91
N

91
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Schedule Management Plan

tr
is
D
or
DEFINITION
e
A component of the project or program
at

management plan that establishes the criteria


and activities for developing, monitoring, and
lic

controlling the schedule.


up
D
ot

92
N

92
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Schedule

tr
Management Plan

is
D
Describes how activities will be defined
and progressively elaborated.

Identifies a scheduling method and


or
scheduling tool to be used.
e
at

Determines the format of the schedule.


lic

Establishes criteria for developing and


controlling the project schedule.
up
D
ot

93
N

93
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Components of the Schedule

tr
Management Plan

is
D
Organizational
Accuracy of activity Project schedule
procedure links used
duration estimates model used
or with the WBS

Process descriptions
e
to explain how
Rules of schedule
at

Units of measure to performance management


be used measurements to be processes are to be
lic

used documented
throughout the
project.
up

Control thresholds to
Reporting formats to be used for
be used monitoring schedule
D

performance
ot

94
N

94
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Schedule Management

tr
Considerations for Agile/
Adaptive Environments

is
D
Consider developing project roadmap.
Schedule individual activities iteratively. or
e
Choose an iterative approach:
at

✓ Iterative scheduling with backlog

✓ On-demand scheduling
lic
up
D
ot

95
N

95
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Iterative Scheduling with Backlog

tr
is
D
or
Does not work
e
well with
Delivers Allows
projects
at

business value changes


featuring
early and during entire
complex
incrementally project
dependency
lic

relationships
up
D
ot

96
N

96
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Iterative Scheduling
with a Backlog

tr
Process

is
D
✓ Use progressive elaboration (rolling wave) to
schedule activities

✓ Use a specific time window e.g. two weeks


or
e
✓ Define requirements in user stories
at

✓ Prioritize stories
lic

✓ Select based on priority and time box

✓ Add remaining stories to backlog


up

✓ Construct later based on their priority


D
ot

97
N

97
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
On-Demand Scheduling

tr
is
✓ Does not use traditional schedules

D
✓ Team members “pull” work from a queue
when available

✓ Based on Kanban and Lean


or
methodologies
e
at

✓ Provides incremental business value

✓ Levels out work of team members


lic

✓ Works best when activities can be divided


into equal amounts
up

✓ Does not work well with projects


comprised of complex dependency
D

relationships
ot

98
N

98
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Develop a Schedule Management Plan

is
D
• Review the following:
or
- Project management plan (for information to develop the schedule)
- Project charter (for a summary, high-level milestone schedule)
- EEFs
e
- OPAs
at

• Use tools and techniques such as expert judgment and historical


information.
lic

• Use meetings to develop the schedule management plan.


• Document the schedule management plan for the project.
up
D
ot

99
N

99
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project Activity

tr
is
D
or
DEFINITION
e
at

A distinct, scheduled portion of work performed


during a project.
lic
up
D
ot

100
N

100
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project Activities

tr
is
D
An activity is a component of a
decomposed work package.
- Activities are not the same as work
packages or ‘tasks’.
or
A work package is the lowest level of the
e
WBS.
at

A task refers to project management


software.
lic
up
D
ot

101
N

101
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Feature

tr
is
D
or
DEFINITION
e
at

A set of related requirements that allows the


user to satisfy a business objective or need.
lic
up
D
ot

102
N

102
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Epic

tr
is
D
or
DEFINITION
e
at

A very large collection of user stories. Epics can


be spread across many sprints.
lic
up
D
ot

103
N

103
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Features and Epics

tr
is
✓ Usually described as a short phrase. This

D
term groups related functionality together
to deliver business value.
✓ Includes activities and efforts such as
or
documentation, bug fixes, testing, and
e
quality/defect repairs.
at

✓ Delivers the capability that can be


estimated, tracked, and managed as a set.
lic

✓ Epics are responsible for producing a major


deliverable, which may include various
up

Agile features, for example.


D
ot

104
N

104
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Working with

tr
Features

is
D
✓ Scheduling aligned to features
ensures associated work is
or
coordinated.

✓ Estimating features offers visibility to


e
when blocks of functionality can be
released to the business and end
at

users.
lic

✓ Progress can be measured by drawing


a ratio of accepted to remaining
features.
up
D
ot

105
N

105
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Milestones

tr
is
D
or
DEFINITION
e
A significant point or event in a project, program,
at

or portfolio.
lic
up
D
ot

106
N

106
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Milestones 5

tr
is
A milestone list identifies all project milestones
and indicates whether the milestone is

D
mandatory, such as those required by contract,
or optional, such as those based on historical
information.
Milestones have zero duration because they
or 4
e
represent a significant point or event.
at

3
lic
up

2
D
ot

1
107
N

107
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Milestone Chart

tr
is
✓ Provides the summary level view of a project’s milestones.

D
✓ Uses icons or symbols.

✓ Useful for upper management who only require an overview.


or
e
at
lic
up

Q1 Q2 Q3 Q4
20xx 20xx 20xx 20xx
D
ot

108
N

108
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Estimating Project Activities

is
D
• Review:
- Schedule management plan
or
- Scope baseline for WBS, deliverables, assumptions, and constraints
- EEFs
- OPAs
e
• Analyze and decompose each work package of the WBS into activities that
at

will be required to produce the deliverable.


• Consult SMEs about unfamiliar material.
lic

• Evaluate all constraints and assumptions for their possible impact on


activity definition.
up

• After decomposing each work package into activities, evaluate the activity
list.
D
ot

109
N

109
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Activity Dependency

tr
is
D
or
DEFINITION
e
A logical relationship that exists between two
at

project activities.
lic
up
D
ot

110
N

110
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Activity Example activity:

tr
Designing Room Layouts
Dependency

is
D
Relationship indicates whether the
start of an activity is contingent on
an event or input from outside the
or
• Architect needs to assess the
functionality of a room
activity. design.
e
Activity dependencies determine the
at

precedence relationships. • Assessment cannot start


until workers finish framing
lic

the walls, windows, and roof.

• After structure is in place,


up

then architect can reassess


design plans to determine if
D

modifications are necessary.


ot

111
N

111
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Types of Activity Dependencies

tr
is
Mandatory

D
A relationship that is contractually required or inherent in
the nature of the work.

Discretionary
or
e
A relationship that is established based on knowledge of
best practices within a particular application area or an
at

aspect of the project where a specific sequence is desired.


lic

External

A relationship between project activities and non-project


up

activities.

Internal
D

Contingent on inputs within the project team’s control.


ot

112
N

112
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Precedence

tr
Relationships

is
Precedence relationships express a

D
logical dependency in precedence
diagramming methods.

It is a logical relationship between


activities that describes what the activity
or
sequence should look like.
e
at

Precedence relationships are always


assigned to activities based on the
lic

dependencies of each activity:

✓ Predecessor activity drives the


up

relationship; most often, it occurs first.


✓ Successor activity is driven by the
relationship.
D
ot

113
N

113
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Types of Precedence Relationships

tr
is
D
or
e
at
lic
up
D
ot

114
N

114
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Sequence Project Activities

is
D
• Review:
− Schedule management plan (for information on the scheduling method

or
and tool, and information on how activities may be sequenced)
− Activity list for all project schedule activities

− Activity attributes for each activity


e
− Milestone list for the dates for specific schedule milestone events
at

− Project scope statement

− EEFs
lic

− OPAs

• Use tools and techniques such as the precedence diagramming method


up

(PDM), dependency determination, and leads and lags to develop the


project schedule network diagram.
• Document the project schedule network diagram and update any project
D

documents, as needed.
ot

115
N

115
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Activity Duration Estimates

tr
is
D
Activity duration estimate
The quantitative assessment of the likely number of
or
time periods that are required to complete an activity.
e
Elapsed time
at

The actual calendar time required for an activity from


start to finish.
lic
up

Effort
The number of labor units required to complete a
scheduled activity or WBS component, often expressed
D

in hours, days, or weeks. Contrast with duration.


ot

116
N

116
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Estimate Activity Durations

is
• Involve the work package owners or those familiar with the work of the

D
activity.
• Consult lessons learned and historical information.
• Review the schedule management plan.
or
• Determine how you want to quantify the work that needs to be done.
e
• Consider resource requirements and capabilities.
at

• Review the resource requirements for each activity.


lic

• Check the resource calendars for resource availability.


• Consider interactions with other projects or operations.
up

• Review the project scope statement for assumptions and constraints.


• Review the risk register for risks that may affect resource estimation.
• Review the resource breakdown structure.
D

• Document the activity duration estimates.


ot

117
N

117
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Schedule

tr
Presentation Formats

is
D
Select the type of schedule to suit your
project.

✓ Gantt Chart
or
e
✓ Milestone Chart
at

✓ Project Schedule Network Diagram with


lic

Dates
✓ Roadmap
up

✓ Task board
✓ Kanban board
D

✓ Burndown chart
ot

118
N

118
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Gantt Chart

tr
is
D
or
DEFINITION A bar chart of schedule information where
e
activities are listed on the vertical axis, dates are
at

shown on the horizontal axis, and the activity


durations are shown as horizontal bars placed
lic

according to start and finish dates.


up
D
ot

119
N

119
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Gantt Chart

tr
is
Useful for:

D
✓ Start and end dates, duration, and
order
✓ Precedence relationships
✓ Percentage completion and actual
or
progress
e
✓ Presentation of project status to
at

the team and management


lic
up
D
ot

120
N

120
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project Schedule Network

tr
Diagram with Dates and
Dependencies

is
D
Project schedule can be shown with or
without dependencies.
Network diagrams have clear
advantages, they assign start and finish
or
dates to activities and show the
e
interrelationship of activities with arrows.
at

Further benefits:
✓ Clear visual of project progress,
lic

workflow, and interdependencies of


activities.
up

✓ Justification of time estimate for the


project.
✓ Planning and organizational aid.
D

✓ Schedule compression opportunities


are more easily identifiable.
ot

121
N

121
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Critical Path Method

tr
is
D
or
DEFINITION
e
Estimates the minimum project duration and
at

determines the amount of schedule flexibility on


the logical network paths within the schedule
lic

model.
up
D
ot

122
N

122
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Critical Path Activity

tr
is
D
or
DEFINITION
e
at

Any activity on the critical path in a project


schedule.
lic
up
D
ot

123
N

123
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Use the Critical Path Method

tr
is
• Sequence activities to represent the longest path through a project

D
• Goal is to determine the shortest possible project duration.
• Use early start (ES); early finish (EF); late start (LS); and late finish (LF) dates for all activities.
• Do not factor in resource limitation. or
e
Activity 2 Activity 4
4 weeks 3 weeks
at

Activity 1 Activity 6
Start Finish
6 weeks 1 week
lic

Activity 3 Activity 5
5 weeks 4 weeks
up

1[6w] + 2[4w] + 4[3w] + 6[1w] = 14 weeks


1[6w] + 3[5w] + 5[4w] + 6[1w] = 16 weeks Critical Path
D
ot

124
N

124
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
is
D
or
About Float
e
at
lic

Float is the amount of time an activity can be delayed from its early start date
without delaying the project finish date or consecutive activities.
Total float is the amount of time that a schedule activity can be delayed or
up

extended from its early start date without delaying the project finish date or
violating a schedule constraint.
D

Free float is the amount of time that a scheduled activity can be delayed without
delaying the early start date of any successor or violating a schedule constraint.
ot

125
N

125
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Agile Release
Planning

tr
is
✓ High-level summary timeline of the

D
release schedule based on product
roadmap and vision for the product’s
evolution.
✓ Determines the number of iterations
or
e
or sprints in the release
at

✓ Allows product owner and team to


decide:
lic

− how much needs to be developed


− how long it will take to have a
up

releasable product based on


business goals, dependencies, and
impediments.
D
ot

126
N

126
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Ongoing Progress Based

tr
on Methodology

is
Traditional - Measure project progress

D
according to schedule by:
✓ Monitoring project status to update the
schedule.
✓ Managing changes to schedule baseline.
or
e
Agile - Evaluate progress by:
at

✓ Comparing the total amount of work


delivered and accepted to the amount
estimated for the current time period.
lic

✓ Reviewing completed work in regular


Sprint demos.
up

✓ Conducting scheduled reviews to record


lessons learned (or retrospectives).
D

✓ Determining the rate at which


deliverables are produced, validated, and
ot

accepted. 127
N

127
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Resource

tr
Optimizatio

is
D
n
Techniques or
e
at
lic
up
D
ot

128
N

128
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Smoothing

tr
and Levelling

is
D
Use Resource Optimization to
adjust the start and finish dates of
activities. or
You need to adjust planned
e
resource use so that it’s equal to or
at

less than resource availability.

Adjust the schedule model due to


lic

demand and supply of resources.


up

Use smoothing and levelling


techniques.
D
ot

129
N

129
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Smoothing
• Adjusts the activities of a schedule model to

tr
keep resource requirements within predefined
resource limits and within free and total floats.

is
• Does not change the critical path is not

D
changed nor delay the completion date.
• This method may not be able to optimize all
or
resources.
e
at
lic

Levelling
• Adjusts start and finish dates based on
up

resource constraints
• Goal is to balance demand for resources with
available supply.
D

• Use when shared or critically required


resources have limited availability or are over-
ot

allocated
130
• Can change the critical path.
N

130
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Schedule

tr
Compression

is
Techniques

D
or
e
at
lic
up
D
ot

131
N

131
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Schedule Compression

tr
Techniques

is
Crashing

D
• Shortens schedule duration for the
least incremental cost by adding
or
resources e.g. overtime, additional
resources
• Works only for activities on the critical
e
path
at

• Does not always produce a viable


alternative and may result in increased
lic

risk and/or cost.


up

Fast-tracking
• Perform activities in parallel to reduce
D

time
• May result in rework, increased risk,
ot

and increased cost


132
N

132
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Coordination with

tr
Other Projects

is
D
✓ If the project is part of a program or
a portfolio, evaluate the schedule
status for effects on other program
or portfolio components. or
✓ A delay (or acceleration) of a project
e
may not necessarily impact other
at

projects.
lic

✓ However, if the delay or acceleration


is caused by activities on the
project’s critical path and that
up

project is critical to the schedule of


other projects, the overall effect can
be significant.
D
ot

133
N

133
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
is
D
or
e
at
lic

Plan and Manage Budget and


Resources
up

TOPIC D
D
ot
N

134

134
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
STARTING THE PROJECT > PLAN AND MANAGE BUDGET AND RESOURCES

tr
Deliverables and Tools

is
D
or
Cost baseline Estimating techniques: Three Point,
e
Management reserve Analogous, Parametric, T-Shirt sizing,
Planning poker
at

Resource management plan


Review organization data
Change requests
lic

Meetings
Cost forecasts
Leverage PMIS
Risk analysis
up

Understand change control


Use velocity data and analysis
D

Throughput analysis
Cost Variance, EVM, EAC
ot

Features accepted vs feature remaining


135
N

135
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Cost Estimates

tr
is
Develop an approximation of the cost for

D
each activity in a project.

Use logical estimates to provide a basis


for making sound decisions and they
or
establish baselines.
e
at
lic
up
D
ot

136
N

136
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Estimating Techniques –

tr
Advantages and Disadvantages

is
D
Analogous Parametric Bottom-up
Estimating Estimating Estimating
or
Can ensure no work is Is very accurate and
e
Is not time consuming
inadvertently omitted gives lower-level
at

from work estimates. managers more


responsibility.
lic

Can sometimes be May be inaccurate, May be very time


difficult for lower-level
up

depending on the consuming


managers to apportion integrity of the historical Can be used only after
cost estimates. information. the WBS has been well-
defined.
D
ot

137
N

137
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Common Estimate Types

tr
is
D
Accuracy: Rough Accuracy:
(-5% to +10%) Order of (-25% to +75%)
Definitive
estimate
or
Magnitude
e
Phased
at

estimate
lic
up

Project Cost
D
ot

138
N

138
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project

tr
Governance

is
D
✓ Budget management is a critical
project oversight and within the
or purview of project governance.
✓ Deviations in budget, scope,
e
schedule, resources or quality, will
impact the project.
at

✓ Project governance tells you whom


lic

these issues would impact and how


to deal with them.
up

✓ Tailor cost estimation approach to


phases of the project life cycle.
D
ot

139
N

139
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Compliance

tr
is
Projects must be compliant with internal and
external standards, such as:

D
✓ Appropriate government regulations
✓ Corporate policies
✓ Product and project quality
✓ Project risk
or
e
The Project Compliance Plan is a sub-plan of
at

the project management plan.


In this step, you:
lic

✓ Classify compliance categories


✓ Determine potential threats to compliance
up

✓ Analyze the consequences of


noncompliance
D

✓ Determine necessary approach and action


to address compliance needs
ot

140
N

140
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Lessons Learned
Register

tr
is
D
✓ Use during and after projects.

✓ Start with budgets from


or previous, similar projects.
e
✓ They contain valuable cost-
estimating information - both
at

successes and shortcomings.


lic
up
D
ot

141
N

141
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Estimate Costs

is
D
• Gather estimates for individual work packages.
• Check with the resource supplier to validate assumptions.
or
• Choose a suitable estimating technique according to context.
• Look for alternative costing options.
e
• Determine which units of measure to use.
at

• Consider impact of risks on cost.


lic

• Ensure that cost estimates are assigned to the right account.


• Ensure estimates include resource costs, level of estimate, and a list of
assumptions.
up
D
ot

142
N

142
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Estimate Budget

is
D
• Aggregate the estimated costs of individual activities or work packages to
or
establish an authorized cost baseline.
• Ensure budget contains funding needed to complete the project as defined
in the scope baseline and the project schedule.
e
• Measure project cost performance against this cost baseline
at
lic
up
D
ot

143
N

143
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
Cost Baseline

is
D
or
DEFINITION
e
The cost baseline is the approved version of the
at

time-phased project budget, excluding any


management reserves.
lic
up
D
ot

144
N

144
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Cost Baseline

tr
Project Budget

is
Can be changed only through formal
change control procedures and is

D
the basis for comparison to actual
results.

Cost baseline:
or
✓ Monitors and measures cost
e
performance
at

✓ Includes a budget contingency


lic

✓ Is tailored for each project


management reserve
Other components of the project
up

budget are depicted at right.


control accounts
D

contingency reserve
work package estimates
ot

145
N

145
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Estimate Cost Baseline

is
D
• Gather inputs to establish the baseline e.g. WBS, project schedule, cost
estimates, and risk management plan.
or
• Assign work to dates on project schedule and allocate funds for each
activity or work package for assigned time period.
e
• Consider a contingency reserve to cover expenses associated with risks.
at

• Total the costs for each time period, then plot these on a chart to create an
S-curve of the baseline.
lic

• Publish and distribute the cost baseline to the appropriate project


stakeholders.
up
D
ot

146
N

146
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Budget Challenges

tr
is
✓ Ideally, budget is set during project
planning and does not change.

D
✓ However, the following changes can
or pose a challenge:
− New/changed project requirements.

− New risks, or changes to the


e
probabilities or impacts of existing
at

risks.
− Changes to cost estimates resulting
lic

from economic factors, procurement


contract modifications, resource
costs, etc.
up
D
ot

147
N

147
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Response to

tr
Budget Challenges

is
D
When changes or challenges occur, you
must tailor:
or✓ Budget or funding

✓ Cost

✓ Schedule
e
✓ Scope
at

If the budget remains fixed and


lic

additional funds are not available, then


the project must change.
up
D
ot

148
N

148
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
Funding Limit Reconciliation

is
D
or
DEFINITION
e
The process of comparing the planned
expenditure of project funds against any limits
at

on the commitment of funds for the project to


identify any variances between the funding
lic

limits and the planned expenditures.


up
D
ot

149
N

149
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Funding Limit

tr
Reconciliation

is
D
Keep in mind:
✓ Most budgets assume steady incoming
and outgoing flows. or
✓ Large, sporadic expenditures are usually
e
incompatible with organizational
operations.
at

✓ Funding limits help regulate the


lic

outgoing capital flow to protect against


overspending.
up
D
ot

150
N

150
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Anticipate Future Budget Challenges

is
D
• Keep the stakeholder register current and be aware of changes to project
or
requirements if new stakeholders are added to the project.
• Monitor risks frequently to look for new risks and changes to existing ones.
e
• Monitor the performance of suppliers and vendors.
at

• Monitor all changes to the project and follow the Change Management
System to try to keep them within budget.
lic
up
D
ot

151
N

151
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Determine a Budget

is
D
• Review:
− Cost management plan

− Human resource management plan or


− Scope baseline for project scope statement, WBS, and WBS dictionary

− Risk register to consider any risks that may impact cost estimation
e
− EEFs and OPAs
at

• Check the project schedule for type, quantity, and duration of resources.
lic

• Use appropriate tools and techniques.


• Document the project budget, creating a cost baseline.
up

• Understand project funding requirements or cash flow to enable the


project.
• Update project documents, as needed.
D
ot

152
N

152
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
is
D
or
e
at
lic

Plan and Manage


Quality of Deliverables
up

TOPIC E
D
ot
N

153

153
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
STARTING THE PROJECT > PLAN AND MANAGE QUALITY OF DELIVERABLES

tr
Deliverables and Tools

is
D
or
e
Quality Management Plan Cost benefits analysis
at

Quality Metrics Cost of Quality


Quality Assurance Benchmarking
lic

Quality Control Quality audit


Process analysis
up

Measure quality
Verify deliverables
D

Quality measurement tools


ot

154
N

154
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
Quality

is
D
or
DEFINITION
e
at

The degree to which a set of inherent


characteristics fulfill requirements.
lic
up
D
ot

155
N

155
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Quality Standards

tr
and Regulations

is
D
Standards - Documents established as a model
by an authority, custom, or by general consent.
or
Regulations - These requirements can establish
product, process, or service characteristics,
including applicable administrative provisions
e
that have government-mandated compliance.
at

De facto regulations - Regulations that are


widely accepted and adopted through use.
lic

De jure regulations - Regulations that are


mandated by law or have been approved by a
recognized body of experts.
up

ISO 9000 Series - A quality system standard


that can be applied to any product, service, or
process in the world.
D
ot

156
N

156
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Verified

tr
Deliverables

is
D
✓ Project team verifies deliverables
based on quality standards and
requirements
✓ The verified deliverables are
presented to and accepted (or
or
e
validated) by the customer –
resulting in accepted deliverables.
at

✓ Measure products and outputs


against the project’s quality
lic

standards.
✓ Implement corrections and controls
up

when quality standards are neither


met nor within acceptable ranges.
D
ot

157
N

157
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
Quality Management Plan

is
D
or
DEFINITION
e
A component of the project management plan
at

that describes how applicable policies,


procedures, and guidelines will be implemented
lic

to achieve the quality objectives.


up
D
ot

158
N

158
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Quality Management

tr
Plan

is
D
✓ Describes the activities and resources
necessary for the project management
team to achieve the quality objectives.
✓ May be formal or informal, detailed, or
or
broadly framed. Style and detail are
e
determined by project requirements.
at

✓ Review the quality management plan early


in the project.
lic

✓ Benefits:
− Decisions based on accurate
up

information
− Sharper focus on the project’s value
proposition
D

− Cost reductions
− Mitigate schedule overruns from
ot

rework
159
N

159
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Cost of Quality
¥ €

tr
(CoQ)

is
£
D
CoQ is all costs incurred over the life of
the product by investment in
preventing nonconformance to
requirements, appraisal of the product
or service for conformance to
or
requirements, and failure to meet
e
requirements.
at
lic
up
D
ot

160
N

160
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Quality Metrics

tr
is
Quality metrics - A description of a

D
project or product attribute and
how to measure it.

Tolerance - The quantified


or
description of acceptable variation
e
for a quality requirement.
at
lic
up
D
ot

161
N

161
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
Quality Audit

is
D
or
DEFINITION
e
A structured, independent process to determine
at

if project activities comply with organizational


and project policies, processes, and procedures.
lic
up
D
ot

162
N

162
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Quality Audit

tr
is
✓ Improves quality performance of a
project.

D
✓ Can be conducted at scheduled or
random intervals.
or
✓ Topics include:
e
− Quality management policy
at

− Collection and use of information

− Analytical methods
lic

− Cost of quality

− Quality process design


up
D
ot

163
N

163
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Manage Quality

is
D
• Ensure that random and/or scheduled quality audits are conducted by
qualified auditors. or
• Use one or more of the quality assurance tools and techniques to
determine the causes of quality problems of the project’s product, service,
e
systems, or processes.
at

• Identify and implement the appropriate actions to take to increase the


effectiveness and efficiency of the project team’s work results.
lic
up
D
ot

164
N

164
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Control Quality Tools

tr
is
D
Data Data Data
Gathering Analysis Representation
or
e
• Checklists/Check • Performance • Cause-and-Effect
at

Sheets Reviews Diagram


• Statistical Sampling • Root Cause Analysis • Control Charts
lic

• Questionnaires and • Histograms


Surveys • Scatter Diagrams
up
D
ot

165
N

165
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Data Gathering

tr
Questionnaires and Surveys

is
• Written set of questions, quickly accumulates information from a large number of
respondents.

D
• Useful for varied audiences, for quick turnaround, or geographical dispersion of
respondents

or
Checklists
e
• Check Sheets
at

A structured tool, usually component-specific


• Verifies performance of required steps or completion of requirements
• Used to organize facts to facilitate data collection about a potential quality problem
lic

• Useful for gathering attribute data while performing inspections for defects.
up

Statistical sampling
• Choosing part of a population of interest for inspection.
• Determine characteristics of an entire population based on measurement of
D

representative sample.
ot
N

166
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Data Analysis

tr
is
Performance Reviews Root Cause Analysis

D
Technique that is used to measure, Analytical technique used to
compare, and analyze actual determine the basic underlying
performance of work in progress on
the project against the baseline.
or
reason that causes a variance,
defect, or a risk.
e
• Critical chain method • Using gathered data, identify
at

• Earned value management the cause of the problem.


• Trend analysis • Goal is to pinpoint the exact
lic

cause.
• Critical path method
• Follow issue back to the initial
up

trigger.
• Use RCA tools - Failure Modes
and Effects Analysis (FMEA), a
D

fishbone diagram, a Pareto


chart, a scatter diagram
ot

167
N

167
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Data Representation

tr
(1 of 4)

is
D
Cause and Effect Diagram
Fishbone diagrams, why-why diagrams, or Ishikawa diagrams
or
Breaks down the causes of the problem statement identified into discrete branches, helping to
identify the main or root cause of the problem.
e
at

Example
lic

fishbone
diagram
up
D
ot

168
N

168
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Data Representation

tr
(2 of 4)

is
Scatter Diagram

D
✓ A graph that shows the relationship
between two variables.
✓ Demonstrates a relationship between
or
any element of a process, environment,
e
or activity on one axis and a quality
at

defect on the other axis.


lic
up
D
ot

169
N

169
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Data Representation

tr
(3 of 4)

is
Control Chart

D
A tool used to determine the predictability, behavior and stability of a process over time.

✓ A graphic display of project data


against established control limits
or specification limit
to reflect both the maximum and
e
control limit
minimum values.
at

center line

✓ Gives visibility to where corrective


lic

actions can prevent further


problems.
up

✓ Ideal for repetitive processes with


predictable results.
D
ot

170
N

170
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Data Representation

tr
(4 of 4)

is
Pareto chart

D
✓ A histogram used to rank causes
of problems in a hierarchical
format.
or
✓ Use to help determine the most
e
frequent defects, complaints, or
at

other factors that affect quality.


✓ Demonstrates the frequency of
lic

occurrence
✓ Analyzes data sets related to a
up

specific problem or issue.


✓ Does not define the root cause of
D

a problem.
ot

171
N

171
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Control Product Quality

is
D
• Conduct inspections to detect quality errors during project work.
• Use Pareto diagrams to focus corrective actions on the problems with the
greatest effect on quality. or
• Use control charts to analyze and communicate the variability of a process
or project activity over time.
e
• Identify ways to eliminate causes of unsatisfactory results.
at

• Use flowcharts to identify redundancies, missed steps, or the source of


lic

quality performance problems.


• Initiate process adjustments by implementing corrective or preventive
actions.
up

• Continue to monitor, measure, and adjust quality throughout project life


cycle.
D
ot

172
N

172
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
is
D
or
e
at
lic

Integrate Project Planning Activities


up

TOPIC F
D
ot
N

173

173
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
Integration

ib
Management

tr
is
✓ Assessment and coordination of
all plans and activities that are

D
built, maintained, and executed
throughout a project.
or ✓ A holistic, integrated view ties
plans together, aligns efforts,
and highlights how they depend
e
on each other.
at

✓ An integrated view of all plans


can identify and correct gaps or
lic

conflicts.
✓ A consolidation of the plans
encapsulates the overall project
up

plan and its intended business


value.
D
ot

174
N

174
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project Management Plan

tr
The document that describes how the

is
project will be executed, monitored,
controlled, and closed.

D
or
e
at
lic
up
D
ot

175
N

175
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project Integration

tr
Management Processes

is
D
Projects and project management are
integrative by nature. This is an
overview of the processes that project
managers need to know.
or
Also know that:
e
✓ These processes overlap and
at

interact with each other.


✓ The links among these processes
lic

are often iterative.


up
D
ot

176
N

176
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project Management

tr
Information System

is
(PMIS)

D
An information system e.g.
Microsoft Project consisting of
the tools and techniques used to
gather, integrate, and
or
disseminate the outputs of
e
project management processes.
at

The PMIS enables quick and


efficient work.
lic
up
D
ot

177
N

177
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project Management

tr
Plan Components

is
Subsidiary Plans
Scope

D
Requirements
✓ These are a combination of Schedule
essential and supporting Baselines
Cost
processes used to run a
project.
or
Scope
Schedule
Quality
Resource
Communications
Cost
Risk
✓ Ensure the essential plans and
e
Procurement
processes are in place.
at

Stakeholder
✓ Adapt and tailor the supporting
Additional
lic

plans and processes to your components


project. include:
Project Processes
up

✓ Consider the needs of the Work Explanation


project to determine which Agile Project Plan
Project approach
components of the project Change Management Plan
D

management plan are needed. Configuration


Management Plan
Management Reviews
ot

178
N

178
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project Management Plan

tr
Tools and Techniques

is
Expert
Judgment

D
✓ Use expert judgment to make
critical decisions.

✓ Use meetings to facilitate


or Meetings

communication and understanding.


e
at

✓ Gather data to understand the Data


project Gathering
lic

✓ Leverage interpersonal and team


up

skills to be an effective leader. Interpersonal


and Team
Skills
D
ot

179
N

179
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
is
D
or
Managing Change
e
at
lic
up
D
ot

180
N

180
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Configuration Change

tr
is
Management Plan Management Plan

D
Identify and account for project Provides direction for managing the
artifacts under configuration control,
and how to record and report changes
to them.
or
change control process and documents
the roles and responsibilities of the
change control board (CCB).
e
at
lic

Identification, maintenance, status Identification, impact analysis,


up

reporting, and verification of documentation, and approving or


configurable items rejecting of change requests.
D
ot

181
N

181
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Change Management Plan

tr
is
Answers the following questions:

D
• Who can propose a change?
• What exactly constitutes a change? or
• What is the impact of the change on project objectives?
• What are steps to evaluate a change request before approving or rejecting it?
e
• When a change request is approved, what project documents will record the
at

next steps (actions)?


lic

• How will you monitor these actions to confirm completion and quality?
up
D
ot

182
N

182
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Develop a Project Management Plan

is
D
• Review:
Project charter - for the high-level boundaries of the project

− Outputs from other processes


or
− EEFs and OPAs
e
• Use tools and techniques.
at

• Use facilitation techniques.


lic

• Document the project management plan.


• Assess incremental delivery options.
up
D
ot

183
N

183
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Factoring in

tr
Dynamic Change

is
Highly dynamic and complex projects which are

D
very common, require a robust approach to
change.
Some Agile approaches for managing change:
Disciplined Agile (DA) - a hybrid tool kit that
or
harnesses hundreds of agile practices to devise
e
the best “way of working” (WoW) for your team or
at

organization.
Scrum of Scrums - A technique for operation of
lic

Scrum at scale for multiple teams working on the


same product, coordinating discussions of
progress on interdependencies, and focusing on
up

how to integrate the delivery of software,


especially in areas of overlap.
Scaled Agile Framework (SAFe®) - A knowledge
D

base of integrated patterns for enterprise-scale,


lean-agile development.
ot

184
N

184
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
is
D
or
e
at
lic

Plan and Manage


Procurement
up

TOPIC G
D
ot
N

185

185
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
STARTING THE PROJECT > PLAN AND MANAGE PROCUREMENT

tr
Deliverables and Tools

is
D
or
e
Statement of Work Make or Buy Analysis
at

Procurement Management Plan Market research


Source selection criteria Meetings
lic

Selected sellers Expert judgment


Change Control Log Proposal Evaluation Techniques
up

Agreement Negotiations
Change Requests Bidder Conferences
D

Change Control Process


ot

186
N

186
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Procurement Strategy

tr
is
The approach by the buyer to determine the project delivery method and the type of

D
legally binding agreement(s) that should be used to deliver the desired results.

or
e
Contract
at

Delivery Procurement
Payment
Method Phases
Types
lic
up
D
ot

187
N

187
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Delivery Solution

tr
is
The goal of procurement is the delivery of procured goods or

D
services by the supplier to the procuring organization.

Solution Delivery Phase

Planning and analysis


Description or
Customer requirements are documented
e
Detailed design Solution is documented
at

Implementation or installation Solution is implemented or installed


lic

Testing Solution is tested

Training Training is provided to the customer


up

Handover Solution is formally handed over to the customer

Support and maintenance Solution is transferred to customer support


D
ot

188
N

188
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Make or Buy?

tr
Make-or-buy analysis - The process of

is
gathering and organizing data about
product requirements and analyzing them

D
against available alternatives including the
purchase or internal manufacture of the
product.
Make-or-buy decisions - Decisions made
or
regarding the external purchase or internal
e
manufacture of a product.
at

Make-or-buy decision considerations:


• What is the impact on cost, time, or quality?
lic

• Is there an ongoing need for the specific skill


set?
up

• How steep is the learning curve?


• Are required resources readily available
D

within the organization?


ot

189
N

189
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
Statement of Work (SOW)

is
D
or
DEFINITION
e
at

A narrative description of products, services, or


results to be delivered by the project.
lic
up
D
ot

190
N

190
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Procurement SOW

tr
summary

is
The Statement of Work (SOW)
scope

D
describes the procurement item in
sufficient detail to allow prospective
sellers to determine if they are capable deliverables
of providing the products, services, or
results.
or fees
e
✓ Distributed to potential vendors to
at

evaluate their capability to perform


the work or provide the services.
lic

✓ Serves as a basis to develop the


procurement documents during the
up

solicitation process.
✓ A project scope baseline is used to
create the procurement SOW.
D
ot

191
N

191
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
Procurement Management Plan

is
D
or
DEFINITION
e
A component of the project or program
at

management plan that describes how a project


team will acquire goods and services from
lic

outside of the performing organization.


up
D
ot

192
N

192
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Procurement

tr
Management Plan

is
D
✓ Specifies the types of contracts that
will be used
✓ Describes the process for obtaining
or
and evaluating bids
e
✓ Mandates standardized procurement
at

documents
✓ Describes how providers will be
lic

managed
up
D
ot

193
N

193
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
✓ Overall or life-cycle cost
Source Selection

tr
✓ Understanding of need
Criteria

is
✓ Technical capability
A set of attributes desired by the buyer

D
✓ Management approach
which a seller is required to meet or
exceed to be selected for a contract. ✓ Technical approach
Some of these are: or
✓ Warranty
e
✓ Financial capacity
at

✓ Production capacity and interest


lic

✓ Business size and type


up

✓ Past performance of sellers

✓ References
D

✓ Intellectual property rights


ot

✓ Proprietary rights 194


N

194
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Qualified Vendors

tr
is
D
✓ Vendors approved to deliver
products, services, or results based
on the procurement requirements
identified for a project.
or
e
✓ The list of qualified vendors can be
based on historical information
at

about the vendors.


lic

✓ If the required resources are new to


the organization, market research
can help to ”vet” them.
up
D
ot

195
N

195
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Bidder Conferences

tr
These are meetings with prospective sellers

is
prior to the preparation of a bid or proposal to
ensure all prospective vendors have a clear

D
and common understanding of the
procurement.
Also known as contractor conferences, vendor
conferences, or pre-bid conferences.
or
e
✓ Buyer explains the requirements, proposed
at

terms, and conditions; buyer clarifies the


vendors’ queries.
lic

✓ Buyer ensures all prospective vendors have


a clear and common understanding of
up

technical and contractual requirements of


the procurement.
D
ot

196
N

196
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
External Resource

tr
Requirements and

is
Needs

D
Sometimes you need to move beyond
the organization to secure services
and expertise from outside sources on
a contract or short-term basis.
or
e
External resource are used commonly.
at

It helps businesses to focus more on


their core competencies.
lic
up
D
ot

197
N

197
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Supplier and

tr
Contracts

is
D
Contract - A mutually binding agreement
that obligates the seller (supplier) to
provide the specified project or service or
result and obligates the buyer to pay for it.
or
e
✓ Customized for each agreement
at

✓ Contract types:
− Fixed-price
lic

− Cost-reimbursable

− Time-and-material (T&M)
up

✓ Agile contract types


− Capped Time and Materials Contracts

− Target Cost Contracts


D

− Incremental Delivery Contracts


ot

198
N

198
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Communicating with

tr
Suppliers and Vendors

is
✓ Critical component of the

D
procurement process due to the
people involved.

✓ Consult the Communications


or
Management Plan for provisions for
e
working with vendors or suppliers,
such as:
at

− Periodic progress reports of


lic

supplier activities.
− Advance notification of potential
supplier cost overruns or schedule
up

delays, and acknowledgement by


the project manager to the
supplier.
D

− Formal acceptance by the project


manager of supplier’s contract
ot

deliverables.
199
N

199
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Components of

tr
Contracts

is
✓ Description of the work being procured

D
for the project, its deliverables, and
scope
or
✓ Delivery date and schedule information
✓ Identification of authority, where
e
appropriate
at

✓ Responsibilities of both parties


✓ Management of technical and business
lic

aspects
✓ Price and payment terms
up

✓ Provisions for termination


✓ Applicable guarantees and warranties
D
ot

200
N

200
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Traditional Contract Types

tr
is
D
Contract type Description
Fixed-price • An agreement that sets the fee that will be paid for a defined scope of work
regardless of the cost or effort to deliver it.


or
Also known as a lump sum contract.
Provides maximum protection to buyer but requires a lengthy preparation and
bid evaluation.
• Suited for projects with a high degree of certainty about their parameters.
e
Cost-reimbursable • A contract involving payment to the seller for the seller's actual costs, plus a fee
at

typically representing the seller's profit.


• Includes incentives for meeting certain objectives, such as costs, schedule, or
technical performance targets.
lic

• Suited for projects when parameters are uncertain.

Time and Material • A type of contract that is a hybrid contractual arrangement containing aspects
up

(T&M) of both cost-reimbursable and fixed-price contracts.


• Combines a negotiated hourly rate and full reimbursement for materials.
• Include not-to-exceed values and time limits to prevent unlimited cost growth.
• Suited for projects when a precise statement of work cannot be quickly
D

prescribed.
ot

201
N

201
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Agile Contract Types

tr
is
D
Contract Type Description

Capped Time and • Works like traditional Time and Materials contracts.
Materials Contracts •


or
However, an upper limit is set on customers’ payment.
Customers pay up for the capped cost limit.
Suppliers benefit in case of early time-frame changes.
e
Target Cost Contracts • Supplier and customer agree on final price during project cost
negotiation.
at

• Primarily for mutual cost savings if contract value runs below


budget.
lic

• These contracts may allow both parties to face additional costs


if it exceeds budget.
Incremental Delivery • Customers review contracts during the contract life cycle at pre-
up

Contracts negotiated designated points of the contract lifecycle.


• Customers can make required changes, continue or terminate the
project at these points.
D
ot

202
N

202
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
Control Procurements Process

is
D
or
DEFINITION
e
The process of managing procurement
at

relationships, monitoring contract performance,


making changes and corrections as appropriate,
lic

and closing out contracts.


up
D
ot

203
N

203
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Notify the appropriate entity

tr
(usually Accounts Payable)

is
when work has been fulfilled
and contracts can be paid.

D
or
e
at
lic
up
D
ot

204
N

204
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Contract Change

tr
Control System

is
D
The system used to collect, track,
adjudicate, and communicate changes to
a contract.
✓ Might be a component of the
integrated change control system or a
or
separate system.
e
✓ Specifically dedicated to control
at

contract changes.
lic

✓ Specifies the process by which project


contract changes can be made.
✓ Includes the documentation, dispute-
up

resolution processes, and approval


levels to authorize the changes to
contract specifications.
D
ot

205
N

205
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Types of Contract Changes

tr
is
D
Component Description

Administrative changes Non-substantive changes, usually about the way the contract is
administered.

Contract modification
or
A substantive change to the contract requirements such as a
new deadline or a change to the product requirements.
e
at

Supplemental agreement An additional agreement related to the contract but negotiated


separately.
lic

Constructive changes Changes that the buyer may have caused through action or
inaction.
up

Termination of contract A contract may be terminated due to vendor default or for


customer convenience. Defaults are due to nonperformance,
such as late deliveries and poor quality, or nonperformance of
some or all project requirements.
D
ot

206
N

206
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Legal Concepts when Managing

tr
Disputes

is
Seek legal advice if the terms of a contract have not been met.

D
Negotiate settlements to arrive at a final equitable settlement of all outstanding issues, claims,
and disputes by negotiation.

Legal Issue Description


or
e
at

A promise, explicit or implied, that goods or services will meet a pre-determined


Warranty
standard. The standard may cover reliability, fitness for use, and safety.
lic

Waiver The giving up of a contract right, even inadvertently.


up

Failure to meet some or all of the obligations of a contract. It may result in damages
Breach of contract
paid to the injured party, litigation, or other ramifications.
D

A letter sent to an individual or a business to stop (cease) allegedly illegal activities


Cease and desist (C&D)
and to not undertake them again (desist). Often used as a warning of impending legal
letter
action if it is ignored.
ot

207
N

207
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Handle Disputes

is
D
• Be aware of important legal terms e.g. ’warranty’, ’waiver’, and ‘breach of
contract’ that can, if ignored, have a significant impact on the project.
or
• Consult with the legal department or an outside legal expert so you
thoroughly understand any contracts that affect your project.
e
• If your contract isn't written specifically to exclude inadvertent waivers,
avoid waiving your contract rights by:
at

− Accepting a product that fails to meet standards for quality or


lic

performance.
− Accepting late deliveries.

− Overlooking an aspect of nonconformance to contractual obligations.


up
D
ot

208
N

208
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Manage Suppliers and Contracts

is
• Index and store all contract correspondence for ease of retrieval.

D
• Develop and implement an effective contract change control system.
or
• Evaluate the risk of each contract change request.
• Document all contract changes and incorporate any effects of the changes
into the project plan.
e
• Develop and implement an effective performance reporting system for the
at

seller.
• Specify any performance reporting criteria to apply to the seller.
lic

• Set performance milestones to monitor project progress.


• If work is performed at another site, conduct site visits to determine how
up

the seller’s work is progressing.


• Submit approved invoices for payment in accordance with the contract and
the project’s payment system.
D
ot

209
N

209
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
is
D
or
e
at
lic

Establish Project Governance


Structure
up

TOPIC H
D
ot
N

210

210
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
STARTING THE PROJECT > ESTABLISH PROJECT GOVERNANCE STRUCTURE

tr
Deliverables and Tools

is
D
or
e
Stakeholder Artifacts Meetings
at

Leverage Organizational Process Assets


PMIS
lic

Update documents
up
D
ot

211
N

211
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project Governance

tr
is
D
or
e
at
lic
up
D
ot

212
N

212
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
Project Governance

is
D
or
DEFINITION
e
The framework, functions, and processes that
guide project management activities in order to
at

create a unique product, service, or result to


meet organizational, strategic, and operational
lic

goals.
up
D
ot

213
N

213
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project Governance

tr
Components:

is
✓ Project success and deliverable acceptance
criteria

D
✓ Process to identify, escalate, and resolve issues
✓ Relationship between project team,
or
organizational groups, and external
stakeholders
✓ Project organization chart with project roles
e
✓ Communication processes and procedures
at

✓ Processes for project decision-making


✓ Guidelines for aligning project governance and
lic

organizational strategy
✓ Project life cycle approach
up

✓ Process for stage gate or phase reviews


✓ Process for review and approval of changes
above the project manager's authority
D

✓ Process to align internal stakeholders with


project process requirements
ot

214
N

214
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Project Phases

tr
is
D
A collection of logically related Produce one or more
deliverables in a
project activities that culminates in phase
the completion of one or more
deliverables. or
e
Can be performed
sequentially or can
at

overlap
lic

Outputs from one


up

phase are generally


inputs to the next
phase
D
ot

215
N

215
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Apply Governance to

tr
the Project Life Cycle

is
D
✓ At the beginning of a phase, verify and
validate the former assumptions made
to the project, analyze risks, and provide
detailed explanation of the phase's
deliverables.
or
✓ After the phase’s key deliverables are
e
produced, a review ensures
at

completeness and acceptance.


✓ A phase can be closed, or the project
lic

terminated when huge risks are


involved for the project or when the
objectives are no longer required.
up
D
ot

216
N

216
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Phase Gates

tr
A review at the end of a phase in which a decision is made to continue to the next

is
phase, to continue with modification, or to end a project or program.

D
Synonyms include governance gate, tollgate, and kill point.
Used to check if each phase has fulfilled the exit criteria and is eligible to move to
the next step.
or
Software development projects use a specialized type of phase gate called a quality
gate.
e
at
lic

Final
G G G G G
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Project
1 2 3 4 5
Deliverable
up
D

G = Phase gate
n
ot

217
N

217
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Phase-to-Phase
Relationships

tr
is
Sequential relationships contain

D
consecutive phases that start
only when the previous phase is
orcomplete. This relationship
reduces the level of uncertainty,
which may eliminate the option
e
for shortening a project's
at

schedule.
Overlapping relationships contain
lic

phases that start prior to the


previous phase ending. This
relationship increases the level of
up

risk and may cause rework if


something from the previous
D

phase directly affects the next


phase.
ot

218
N

218
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Determine Appropriate Governance for a

is
Project

D
• Involve the organization’s decision managers i.e. senior managers.
or
• Choose the most appropriate governance goals and try to keep them
simple.
e
• Select a group of experienced individuals to be responsible for all
governance activities.
at

• Practice governance for projects, programs, and portfolios.


lic

• Keep the governance process transparent to the project stakeholders.


• Remember that governance is an evolutionary process and take advantage
up

of the lessons you have learned during it.


D
ot

219
N

219
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
is
D
or
e
at
lic

Plan and Manage Project/Phase


Closure
up

TOPIC I
D
ot
N

220

220
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
STARTING THE PROJECT > PLAN AND MANAGE PROJECT/PHASE CLOSURE

tr
Deliverables and Tools

is
D
or
e
Definition of Done Nil
at

Accepted Deliverables
lic
up
D
ot

221
N

221
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Close Project or

tr
Phase

is
D
Several important activities occur
during closeout:
✓ The planned work is completed.
✓ Project or phase information is
or
e
archived.
at

✓ Project team resources are


released to pursue other
endeavors.
lic
up
D
ot

222
N

222
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Close Project or Phase

tr
Criteria

is
Closure Reasons:

D
• The project or phase successfully met its
completion objectives.
or
• Requirements changed during execution and the
project is no longer feasible.
• Funding is no longer available to complete the
e
requirements.
at

• Significant risks make the successful completion


of the project impossible.
lic

• The organization no longer needs the project


deliverables.
up

• External factors eliminate the need for the project.


Examples of these factors include:
− Change in laws or regulations.
D

− Merger or acquisition that affects the


organization.
ot

− Global or national economic changes.


223
N

223
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Close Procurements

tr
is
D
✓ Close procurements when the
contract terms of a procurement
have been satisfied by both
buyer and seller.
✓ This occurs throughout the life of
or
the project, not during project
e
closure.
at

✓ Keep contracts open only for the


necessary period, to avoid
lic

erroneous or unintentional
charges against the contract.
up
D
ot

224
N

224
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Acceptance of

tr
Project Deliverables

is
D
✓ Project deliverables are deemed
accepted when acceptance criteria
have been met.
✓ These criteria generally refer to
or
some or all of the requirements that
e
were established at the beginning
at

of the project (and which might


have been modified during the
project’s life cycle).
lic

✓ Deliverables that meet these


acceptance criteria are formally
up

signed off and approved by the


customer or sponsor.
D
ot

225
N

225
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Payments

tr
is
✓ Payments made to a supplier or vendor

D
are made in accordance with the terms of
the contract between the buyer and the
supplier or vendor. or
✓ Unless a contract is closed at the
e
completion of the project or phase,
payment will most likely have been made
at

at the time of contract closure.


lic

✓ It should not be delayed until project or


phase closure (unless specified in the
up

contract), to avoid the potential for


accidental charges to the contract.
D
ot

226
N

226
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Knowledge
Knowledge

tr
Management

is
Management

D
or
e
at
lic
up
D
ot

227
N

227
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Use the Lessons-Learned

tr
Register

is
D
Considerations:
✓ Scheduling lessons learned
✓ Conflict management lessons learned or
✓ Sellers lessons learned
e
✓ Customer lessons learned
at

✓ Strategic lessons learned


lic

✓ Tactical lessons learned


✓ Any other aspects of lessons learned
up
D
ot

228
N

228
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Knowledge

tr
Management

is
D
or
DEFINITION
e
at

A store of historical information about lessons


learned in projects.
lic
up
D
ot

229
N

229
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Knowledge

tr
Management

is
D
✓ Knowledge management during
project or phase closure consists of
or finalizing the lessons-learned
register, which is compiled
throughout the project life cycle.
e
✓ This document should then be
at

added to the lessons-learned


repository, which is a database of
lic

lessons learned from multiple


projects.
up

✓ At the close of the project – the


lessons learned should be added to
the Knowledge
D

Management/Lessons Learned
repository
ot

230
N

230
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Transition

tr
Planning Artifacts

is
D
Coordination and strategy about how to
best deliver and transition the product
and other deliverables is needed. or
Releasing and deploying deliverables in
e
the most suitable manner ensures end-
at

user awareness and increases the


proper usages and adoption of outputs.
lic

Preparation of artifacts includes:


✓ Training
up

✓ Documentation

✓ Communication
D

✓ Support
ot

231
N

231
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
Transition

tr
Readiness

is
D
Releasing, delivering, and deploying the
project’s work into an environment that is
not ready may negate its value.
Examine the readiness of all parties and
prepare them for delivery, including:
or
✓ End users
e
✓ The business
at

✓ The physical resources

✓ The project team


lic

Most critical in situations where there is


an upgrade or improvement to an existing
up

product or service.
Assess the readiness of all parties,
implement the transition plans
D

accordingly, and capture lessons learned


for the next release or project.
ot

232
N

232
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
GUIDELINES

tr
Close Out a Project or Phase

is
• Review the project management plan.

D
• If applicable, use a project termination checklist.
or
• Gather and organize performance measurement documentation, product
documentation, and other relevant project records.
• Confirm project's products meet compliance requirements.
e
• Release project resources.
at

• Update records to ensure that they reflect final specifications.


• Be sure to update the resource pool database to reflect new skills and
lic

increased levels of proficiency.


• Analyze project success and effectiveness and document lessons learned.
up

• Prepare lessons-learned reports and a final project report.


• Obtain project approval and formal project acceptance.
D

• Archive a complete set of indexed project records.


• Celebrate the success of the project with the team and
ot

other stakeholders. 233


N

233
o
D

Licensed For Use Only By: Murugan K 8542542 Jan 2 2023 3:06AM
e
ut
ib
tr
is
D
or
End of
e
Module 2