ELEVATION FINISHING:

KEY PLAN

1 CEMENT RENDER FINISHED WITH EXTERIOR PAINT IN DARK CREAM.

2 CEMENT RENDER FINISHED WITH EXTERIOR PAINT IN LIGHT CREAM.

3 STRIPPED EXTERIOR CEMENT RENDER PAINTED IN DARK CREAM

4 200 MM GROOVE

5 ARTIFICIAL STONE RENDER

A 6
B B
6
A
NOTES
AR-GUR-05 AR-GUR-05
1. ALL DIMENSIONS ARE GIVEN IN MILLIMETERS AND ALL LEVELS
GIVEN IN METERS.
2. ALL DIMENSIONS MUST BE VERIFIED BY THE CONTRACT BEFORE
4.400 m 4.400 m 4.400 m 4.400 m PREPARATION OF SHOP DRAWINGS.
Top of Parapet+4.40 Top of Parapet+4.40 Top of Parapet+4.40 Top of Parapet+4.40 3. THESE DRAWINGS MUST BE READ IN COORDINATION WITH ALL
OTHER ARCHITECTURAL AND
1000

1000

1000

1000
M01 ENGINEERING DRAWINGS RELATED TO THE SAME SHEET AND ANY ITEM
3.400 m 1 3.400 m 3.400 m 1 3.400 m ON IT.
02-ROOF FLOOR PLAN 4147 02-ROOF FLOOR PLAN 02-ROOF FLOOR PLAN 02-ROOF FLOOR PLAN 4. DISTANCE BETWEEN DOOR JAMB AND ADJACENT WALL SHALL BE
FIXED TO
2 2 BE 200mm UNLESS NOTED OTHERWISE.
5. ALL FLOOR SLAB EDGE SHOULD BE COORDINATED WITH BUILDING
ELEVATIONS
W2
4400

4400

4400

4400
W2 AND STRUCTURAL DRAWINGS AND APPROVED BY CONSULTANT
ENGINEER

1200

1200
W2
3100

3100

3100

3100
BEFORE CONSTRUCTION.
4 6. ALL INTERIOR BLOCK WALLS TO BE EXTENDED TO THE SLAB SOFFIT
D1

2570
0.300 m 0.300 m UNLESS OTHERWISE INDICATED.
0.300 m 4
0.300 m 3 01-GROUND FLOOR PLAN 01-GROUND FLOOR PLAN 01-GROUND FLOOR PLAN 7. ALL ROOF ACCESS ONLY FOR MAINTENANCE PURPOSE.
3

1150
01-GROUND FLOOR PLAN

1300
150

150
0.150 m 5 0.150 m 0.150 m 5 0.150 m
+0.15 -PAVEMENT LEVEL +0.15 -PAVEMENT LEVEL +0.15 -PAVEMENT LEVEL +0.15 -PAVEMENT LEVEL

260
300

300

150

150

150
0.000 m 0.000 m 0.000 m

0
0.000 m
ZERO LEVEL ZERO LEVEL ZERO LEVEL
ZERO LEVEL
2
AR-GUR-05

02 03 04 REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

PLUM. PAD
FOR DETAILS REFER
4.400 m TO STR. & PLUM. DWGS 4.400 m
Top of Parapet+4.40 Top of Parapet+4.40
1000

1000
3.400 m 3.400 m
02-ROOF FLOOR PLAN 02-ROOF FLOOR PLAN 0 1 2 3 4 5m

SCALE 1 : 50 GRAPHIC SCALE


750

M02
4400

4400
1200

1200
3100

3100

W1 W1

M01
2200

D2
0.300 m
0.300 m
01-GROUND FLOOR PLAN
1000

01-GROUND FLOOR PLAN


MAR
1300

00 ISSUED FOR TENDER PACKAGE A.A A.A A.M M.A A.M M.A
2023
150 150
150 150

0.150 m 0.150 m

TED
D

ED
NED
+0.15 -PAVEMENT LEVEL +0.15 -PAVEMENT LEVEL

E
WN

IEW
CKE

ROV
REV.NO. DATE ISSUED FOR

MIT
150

IG
DRA
0.000 m 0.000 m

REV
CHE
DES

SUB

APP
ZERO LEVEL ZERO LEVEL
DRAWING
STATUS ISSUED FOR TENDER PACKAGE
CLIENT
B 6
AR-GUR-05
A
PLUM. PAD
FOR DETAILS REFER
4.400 m TO STR. & PLUM. DWGS 4.400 m
Top of Parapet+4.40 Top of Parapet+4.40
1000

1000

3.400 m 3.400 m CONSULTANT


02-ROOF FLOOR PLAN 02-ROOF FLOOR PLAN

M02
700

& PARTNERS
CONSULTING ENGINEERS

W2
4400

4400

W2
800

M01 TENDER
M01
3100

3100
2950

CONSTRUCTION WORKS
2900

523

0.300 m FOR THE UPGRADE OF AL WAGAN STP IN AL AIN


0.300 m 01-GROUND FLOOR PLAN
927

01-GROUND FLOOR PLAN


150 150
150 150

0.150 m 0.150 m
+0.15 -PAVEMENT LEVEL +0.15 -PAVEMENT LEVEL
ELEVATIONS 3&4 - SECTIONS
0.000 m 0.000 m
ZERO LEVEL ZERO LEVEL
TENDER NO. 0-15527

SHEET SIZE A1

SCALE DRAWING No. REV.

1:50 AR-GUR-05 00

You might also like