You are on page 1of 1

ACC CM Commissioning Check Lists Machine No:-------

Payoff check
 Shaft alignment Ok No comments
 Pulley alignment Ok No comments
 Hook direction Ok No comments
 Grouting Ok No comments
 Break belt Ok No comments

Feeder check:
 Tips Ok No comments
 Fitting Ok No comments
 Bearing Ok No comments
 Rolls Ok No comments

Volume checks:
 Alignment Ok No comments
 Volume integration Ok No comments
 Pulley Ok No comments

Cutting machine
 Rottor bearing and fitting Ok No comments
 Motor bearing and fittings Ok No comments
 Pulleys alignment Ok No comments
 Vibration and sound check Ok No comments
 Roll set bearing check Ok No comments
 Die stand fitting Ok No comments

Quenching machine
 Water box sealing Ok No comments
 Tips installation Ok No comments
 Gear fitting Ok No comments
 oil check Ok No comments

Coiler checks
 Coiler gears check Ok No comments
 Coiler tips+pulley Ok No comments
 Coiler speed check. Ok No comments

Electrical wiring Ok No comments


Torch set Ok No comments
Alignment Ok No comments
Carbide tips check. Ok No comments
Ok No comments
Belt checks.

You might also like