PROPOSAL TO DIVERSIFY FREIGHT BASKET AND INCREASE FREIGHT/PARCEL TRAFFIC REVENUE
1__| Zone NER.
2__| Target industry ‘CONSTRUCTION
3__| Target Commodity(ies) STONE
4 | Specify Traffic requirement- quantity and period (Eg. One BCN | 4-5 BCN RAKES PER MONTH
rake per week etc, one VPN, Container rake ete.)
5 __ | Originating Station BN
6 | Destination station BHRB.
7 | Proposal REBATE UNDER STATION TO STATION
RATE SCHEME FOR STONE TRAFFIC FOR
0-D PAIR BNV TO BHRB. PROPOSAL
| SUBMITTED BY Mr. VIVEK AGARWAL,
PROPRIETOR OF “MAA DURGA
MINERALS” (GLOBAL CODE: MOM)
~_| Details and justification TT IS A NEW TRAFFIC PRESENTLY BEING
CAPTURED FROM ROADWAYS, WHICH
WILL ATTRACT ADDITIONAL STONE
TRAFFIC FROM APDJ DIVISION TO NE
REGION
= __| Freight/Parcel traffic targeted FREIGHT TRAFFIC
= _| Policy in force STS
~ | Comparative analysis with other modes for road (or other modes | NEW TRAFFIC
as the case may be) in terms of rate/ton and NTKMSs etc.
8 | Policies/concessions which will be used along with the proposed
change, if any (Tariff and non Tariff measures)
9 _| Existing classification of commodity 150
10 __| Classification proposed, ifany
{117 outcome for Traffic- Quantitative targets for the commoditylies) proposed
| Division [Total Existing rail | Targeted Targeted Additional | Increase | Additional
Existing | Co-efficient | Additional | Loading Annually | intraffic | revenue
Traffic Loading per (wm) (%) Over | annually from
(wr) month Previous | Target Traffic
(wt) Year (Rs Cr)
‘APDI O11 3% 0.0135 0.162, 59% 25 Cr
(2022-23)
12 _ | Details of Zones existing loading of all Commodities for the current year and previous year (To be attached as
additional sheet)
Division | Nameofthe | Originating to Volume Revenue | 9% Variation over
commodity (Bulk/ | Destin: (mt) (Rs Cr) Previous year
| Non-Bulk/Parcel) | Station
ls
Total |
Scanned with CamScannerPlease indicate any loadability trial (if required) has been conducted (Requisite form to be completed).
15 _| Please specify if PHOD and Finance have approved proposal
Designation Sr.DOM/APD) DCM/IC/APDS
Lg ee, So Sait
ono) UMESH asso
sac oe RT
Signature Sx so Se arta oe
a rales.
Note: 1. The proposal should be implementable within the existing infrastructure.
2. 1f additional infrastructure or non-tarif resources/measures are envisaged the requirement, cost and
timeline for implementation should be specified.
3.Any other document supporting proposal may be attached
Scanned with CamScanner