WORK METHOD STATEMENT Rev. No: Doc. No.

IADC - PJ Effective Date: Page No: 2 of 13

TABLE OF CONTENT

TABLE OF CONTENT.......................................................................................................................................2
APPROVAL SHEET...........................................................................................................................................3
REVISION HISTORY SHEET...........................................................................................................................4

I. GENERAL......................................................................................................................................................
.......................................................................................................................................................5
1.1 Purpose
1.2 Scope
1.3 Definition
1.4 Location
II. WORK SEQUENCE................................................................................................................................... 6
II.1 Materials Weight Identification
II.2 Working Flow Chart
II.3 Working Schedule

Appendix:
Appendix A : Mapping Area
Appendix B : Crane Brochure
WORK METHOD STATEMENT Rev. No: Doc. No.:

IADC - PJ Effective Date: Page No: 3 of 13

APPROVAL SHEET

Approved by, Prepared by,

PT. TOSPLANT ENGINEERING INDONESIA PT. TOKYU CONSTRUCTION INDONESIA

A Kikumoto Triono
Construction Manager Engineering
WORK METHOD STATEMENT Rev. No: Doc. No.:

IADC - PJ Effective Date: Page No: 4 of 13

REVISION HISTORY SHEET

Rev. Date Description of Change

0 09th April, 2018 Issued for Approval


WORK METHOD STATEMENT Rev. No: Doc. No.:

IADC - PJ Effective Date: Page No: 5 of 13

I. GENERAL
1.1 Purpose
This method statement covers the method for " Formwork and rebar installation at line 5" to be performed for
area at line 5, IADC KBI Factory Project – Purwakarta, Main contractor by PT. Tosplant Engineering Indonesia.

1.2 Scope
This method explain activities for " Formwork and rebar installation at line 5". All activities/steps shall be
performed with the Task Risk Assessment and Quality Control Procedures.

1.3 Definition
OWNER : PT. Indo Agri Daito Cacao
CONTRACTOR : PT. Tosplant Engineering Indonesia
SUBCONTRACTOR : PT. Tokyu Construction Indonesia
HSE : Health Safety & Environment
WMS : Work Method Statement

1.4 Location

Line 6

Line 4

Line D Line J

Installation area
II. WORK SEQUENCE
Transfer material area (4,6-D,J)
2.1 Material
WORK METHOD STATEMENT Rev. No: Doc. No.:

IADC - PJ Effective Date: Page No: 6 of 13

2.1.1 Formwork
For column formwork we make 2 type of formwork, for installation with crane and installation
manual by manpower (transfer material to area use crane, maximum radius).

a. Formwork column fabricate type I

Part 2
W= 150kg Formwork separate in 2 part
W= 150kg

Part 1 Tie Rod


W= 150kg

b. Formwork column fabricate type II


Part 4

Part 1 Part 3 Formwork separate in 4 part


W= 75kg

Part 2

Tool & Equipment:

No Tools/ Equipment Quantity


1 Mobile crane caps. 50ton 1 unit
2 Sling wire 2 set
3 Segel 5/8 inch 4 pcs
WORK METHOD STATEMENT Rev. No: Doc. No.:

IADC - PJ Effective Date: Page No: 7 of 13

2.1 Working Flow Chart


REBAR INSTALLATION

START

INSTALL
SCAFFOLDING

SETTING CRANE TO
POSITION

LIFT BELT INSTALL TO


REBAR

NO

CHECK

YES

PUT REBAR TO LINE 6

SETTING MANUAL BY
MAN POWER

FINISH
WORK METHOD STATEMENT Rev. No: Doc. No.:

IADC - PJ Effective Date: Page No: 8 of 13

FORMWORK INSTALLATION

START

INSTALL
SCAFFOLDING

SETTING CRANE TO
POSITION

LIFT BELT INSTALL TO


FORMWORK

NO

CHECK

YES

PUT FORMWORK TYPE II TO


LINE 6

SETTING MANUAL BY
MAN POWER

FINISH
WORK METHOD STATEMENT Rev. No: Doc. No.:

IADC - PJ Effective Date: Page No: 9 of 13

Installation of Scaffolding
Column
Catwalk

Stair

Scaffolding installation at the right and left side of column position


WORK METHOD STATEMENT Rev. No: Doc. No.:

IADC - PJ Effective Date: Page No: 10 of 13

Transfer material plan:

W = 220 kg
Crane Cap. 50 t

Area transfer material use crane

Continue manual by man power

Litfing material using crane 50t Tadano, base on the load and radius chart, the load for 29m
radius is 1.65t.

Calculation:
Weight of load:
Formwork type I = 100 kg
Hook = 120 kg
Total = 220 kg

Radius = 29 m
Boom Length = 35 m Degree 53˚
JIB = 12.7 m Degree 5 ˚

Load check = 1.65 t x 0.80(safety factor)


= 1.32 t > 0.22 t ………………………..OK
WORK METHOD STATEMENT Rev. No: Doc. No.:

IADC - PJ Effective Date: Page No: 11 of 13


WORK METHOD STATEMENT Rev. No: Doc. No.:

IADC - PJ Effective Date: Page No: 12 of 13

II.4 Working Schedule


WORK METHOD STATEMENT Rev. No: Doc. No.:

IADC - PJ Effective Date: Page No: 13 of 13

You might also like