Professional Documents
Culture Documents
0.4 Content
0.4 Content
TABLE OF CONTENT
TABLE OF CONTENT.......................................................................................................................................2
APPROVAL SHEET...........................................................................................................................................3
REVISION HISTORY SHEET...........................................................................................................................4
I. GENERAL......................................................................................................................................................
.......................................................................................................................................................5
1.1 Purpose
1.2 Scope
1.3 Definition
1.4 Location
II. WORK SEQUENCE................................................................................................................................... 6
II.1 Materials Weight Identification
II.2 Working Flow Chart
II.3 Working Schedule
Appendix:
Appendix A : Mapping Area
Appendix B : Crane Brochure
WORK METHOD STATEMENT Rev. No: Doc. No.:
APPROVAL SHEET
A Kikumoto Triono
Construction Manager Engineering
WORK METHOD STATEMENT Rev. No: Doc. No.:
I. GENERAL
1.1 Purpose
This method statement covers the method for " Formwork and rebar installation at line 5" to be performed for
area at line 5, IADC KBI Factory Project – Purwakarta, Main contractor by PT. Tosplant Engineering Indonesia.
1.2 Scope
This method explain activities for " Formwork and rebar installation at line 5". All activities/steps shall be
performed with the Task Risk Assessment and Quality Control Procedures.
1.3 Definition
OWNER : PT. Indo Agri Daito Cacao
CONTRACTOR : PT. Tosplant Engineering Indonesia
SUBCONTRACTOR : PT. Tokyu Construction Indonesia
HSE : Health Safety & Environment
WMS : Work Method Statement
1.4 Location
Line 6
Line 4
Line D Line J
Installation area
II. WORK SEQUENCE
Transfer material area (4,6-D,J)
2.1 Material
WORK METHOD STATEMENT Rev. No: Doc. No.:
2.1.1 Formwork
For column formwork we make 2 type of formwork, for installation with crane and installation
manual by manpower (transfer material to area use crane, maximum radius).
Part 2
W= 150kg Formwork separate in 2 part
W= 150kg
Part 2
START
INSTALL
SCAFFOLDING
SETTING CRANE TO
POSITION
NO
CHECK
YES
SETTING MANUAL BY
MAN POWER
FINISH
WORK METHOD STATEMENT Rev. No: Doc. No.:
FORMWORK INSTALLATION
START
INSTALL
SCAFFOLDING
SETTING CRANE TO
POSITION
NO
CHECK
YES
SETTING MANUAL BY
MAN POWER
FINISH
WORK METHOD STATEMENT Rev. No: Doc. No.:
Installation of Scaffolding
Column
Catwalk
Stair
W = 220 kg
Crane Cap. 50 t
Litfing material using crane 50t Tadano, base on the load and radius chart, the load for 29m
radius is 1.65t.
Calculation:
Weight of load:
Formwork type I = 100 kg
Hook = 120 kg
Total = 220 kg
Radius = 29 m
Boom Length = 35 m Degree 53˚
JIB = 12.7 m Degree 5 ˚