Professional Documents
Culture Documents
BSL T2 Supplier Fire Risk Assessment - MNL Automotive Pvt. Ltd. 29-May-2023 (14750)
BSL T2 Supplier Fire Risk Assessment - MNL Automotive Pvt. Ltd. 29-May-2023 (14750)
Result
OK
Can Improve
NG √
Mr. Bhajan Lal, Mr. Ajay, Mr. Tarun somnaine, Mr. Ravikant
Auditee Present
Overall Remarks
The Overall Score 27%
1. Fire NOC shall be obtained.
2. Electrical connections & Panel observed in unsafe condition. Electrical system shall be improved.
3. Firefighting structure under break down, must be maintained in good working condition,
4. 5’S shall be improved
5. Re grinding area shall be isolated from other process.
Page 1 of 7
6. 1.8-Meter-high barricading for transformer shall be provided.
7. Lightening arrestor shall be installed.
All other open points raised in the report shall also be closed.
Evaluation Comments OK - 02
A. Management Focus & Prevention of NG - 06
Fire (Proactive Measures)
OK NG
Mandatory
1. Is valid Fire NOC available & renewed every
year?
Are conditions of NOC followed/regularly ☐ ⩗ Fire NOC not available
reviewed?
(As per State Fire Service Act)
2. Is Fire Safety Organization structure / fire
volunteer list available within the company with
clear responsibility?
☐ ⩗ Safety organization structure was not available
(As per State Factory Rule)
3. Has the Fire Safety Risk assessment been
carried out & mitigation of risk being done? ⩗ ☐ MACE
(As per State Factory Rule)
4. Is valid license for storage of flammable liquid
as per petroleum rule (if applicable) & license
conditions being followed (Outside production N/A
area/well ventilated, shaded designated
☐ ☐
No flammable chemical storage was available
premises with warning sign)?
(as per Petroleum Rule)
5. Is Gas cylinder storage as per Gas Cylinder
Rule (if applicable) & license conditions being N/A
followed (Outside production area/well
ventilated, shaded designated premises with
☐ ☐ No gas cylinder storage was evident during
warning sign)? inspection.
(As per Gas Cylinders Rule)
6. Are Explosive/ Liquefied Flammable Gas
Cylinder like LPG/Hydrogen/Dissolve N/A
Acetylene/Oxygen) kept in upright & anchored ☐ ☐ No gas cylinder storage was evident during
condition? inspection.
(As per Gas Cylinders Rule)
7. Is valid license available for storage of
LPG/Propone in bullet/vessel and license N/A
condition being followed?
☐ ☐
No Propane/LPG bullet was available.
(As per Static Mobile & Pressure vessels rule)
8. Are electrical fittings Flame/Spark Proof in N/A
flammable material processes/ storage area? ☐ ☐
(As per Indian Electricity Rule) No such process was available.
Page 2 of 7
11. Is lightening arrestor & separate earthing pit
provided for the protection/ hazardous material
storage & company building?
☐ ⩗ Lightening arrestor was not installed.
(As per Petroleum Rule)
12. Is Maximum storage quantity of flammable
material fixed & displayed in the area? ⩗ ☐ For RM Max/Min quantity board was maintained.
(As per Petroleum Rule)
13. Has provision of Electrical Circuit Breaker
device (ELCB/RCCB/MCB etc.) been given for
main power supply & maintained in working ☐ ⩗ MCCB for mains was not available.
condition?
(Indian Electricity Rule)
14. Is approved/ISI marked electrical equipment or
Electrical equipment was observed in unsafe
fittings installed/used? ☐ ⩗ condition.
(Indian Electricity Rule)
Comments OK - 01
MSIL- Other Evaluation NG - 06
OK NG
b) Is responsibility fixed & displayed that which ☐ ⩗ Zone wise responsibility was not fixed
area is maintained by whom?
Comments OK - 03
B. Fire Detection & Quick Suppression Evaluation NG - 07
(When Fire small)
OK NG
Mandatory
1. Is compartmentalization done in Building for
separation of fire prone area in order to prevent
the spread of Fire?
☐ ⩗ Grinder area shall be isolated
(As per National Building Code)
2. If compartmentalization is done, is Fire
wall/Door / Fire damper provided for
combustible material storage room/building?
☐ ⩗ Fire wall was not available for Re- grinder area
(As per National Building Code)
3. a) Are fire dampers interlocking System
available in fire prone area/flammable material
process (hazardous process) storage? N/A
b) Are they tested at half yearly interval for ☐ ☐
correct operation and results recorded? Ducting system was not available
c) Are exhaust ducts being cleaned at half
yearly intervals? (As per state Factory Rule)
4. Is Automatic Fire Detection/Alarm/water
sprinkler system provided for office/building
area & integrated with fire/emergency control
room?
Automatic
Hazard Area Automatic Detection &
Category (M2) Sprinkler Alarm
Low > 500 ⩗ ⩗
Hazard Fire detection was not installed. Fire hydrant &
Moderate ≤ 500 ⩗ X ☐ ⩗ hose reels were not maintained in working
Hazard ⩗ condition.
> 500 ⩗
High ≤ 50 ⩗ X
Hazard ⩗
> 50 ⩗
Storage ≤ 250 ⩗ X
Building ⩗
> 250 ⩗
area
(As per National Building Code)
5. Is Automatic Fire Detection/Alarm/water
sprinkler system being tested & maintained in
working condition? ☐ ⩗ Fire alarm was not available
(As per National Building Code)
6. Is appropriate Fire detection and suppression
system provided in fire prone area like (server N/A
room, paint shop, paint & thinner store, ☐ ☐
gasoline storage, diesel & other storage) No such process was available
(As per National Building Code)
Page 4 of 7
7. Are Fire detection and Suppression system
being tested and maintained in working
condition? ☐ ☐ N/A
(As per National Building Code & State Factory
Rule)
8. a) Are enough number & appropriate type of
Fire extinguishers available? 08 fire extinguishers installed, 02 more ABC type
b) Is quality of Fire Extinguishers good? ⩗ ☐ fire extinguishers shall be procured.
(As per State Factory Rule /IS2190)
9. Are Fire Extinguishers being maintained
properly? Fire extinguishers were found in good working
(As per Punjab Factory Rule (Applicable in ⩗ ☐ condition.
Haryana)/IS2190)
10. Is Fire Extinguishers operation trained
persons’/security team available in each shift At least 06 employees shall be trained in
(24X7)?
☐ ⩗ firefighting.
(As per State Factory Rule)
11. Are hose reels provided in the building?
(As per National Building Code) ⩗ ☐ 04 Hose reel installed
Evaluation Comments OK - 01
MSIL- Other NG - 03
OK NG
Mandatory
1. Is Emergency evacuation & communication
chart displayed at prominent location in the
plant? Emergency evacuation & communication chart
Are all employees aware about the emergency ⩗ ☐ was displayed
communication chart?
(as per State Factory Rule)
Page 5 of 7
2. a) Is enough number of Fire Hydrant Points
available
b) Is Fire Pump house adequate & maintained
in good condition (Condition of Jockey
Hydrant system not found in working
Pump/DG availability for power failure)? ☐ ⩗ condition.
c) Is Hydrant Water is charged at
7 Kg/Cm2 Pressure?
(As per National Building Code/State Factory
Rule)
3. Is Onsite Emergency Plan available &
responsible persons are fully aware about
their responsibility? ☐ ⩗ Emergency preparedness plan was not available
(State Factory Rule/ Manufacture, Storage
and Import of Hazardous Chemicals Rule)
4. Is dedicated Fire Water Tank (min. capacity
450,000 liters as per State Factory Rule)
If capacity of tank is lower than 450,000 but N/A
suffices 100 minutes firefighting backup as per
☐ ☐
Follow NBC-4
fire load of the company will be considered as
OK. (As per State Factory Rule)
5. Is overhead water tank provided with
adequate water capacity?
Hazard category & Buildup area: -
(Low Hazard > 500 M2 – 10000 Liters) ⩗ ☐ Static fire reserve water tank: 20 KL
(Moderate & High Hazard > 500M2 area -
20000 Liters) - As per National Building Code
6. Are Mock drills/ fire drills being conducted at
regular intervals?
(As per Manufacture, Storage and Import of ☐ ⩗ Mock drill record was not available
Hazardous Chemicals Rule/State Factory
Rule)
7. Is the emergency escape lighting systems
properly tested, maintained and recorded? ⩗ ☐ Emergency light installed.
(As per State Factory Rule)
8. Are Emergency assembly points available? Emergency assembly area was defined near main
(As per State Factory Rule) ⩗ ☐ gate.
Evaluation Comments OK - 00
MSIL- Other
NG - 03
OK NG
Page 6 of 7
1. Is the fire/security team familiar with the premises
and any particular special hazards relating to the ☐ ⩗ Fire & Safety team was not available
premises or the activities within it?
2. Is isolation valve/main switch provided for
fuel/flammable material pipelines/any energy
source including electrical power & easily
accessible?
☐ ⩗ MCCB for mains was not available
Are concerned persons aware about the isolation
valve/main switch?
3. Is Public addressable (PA) system available &
maintained in working condition?
☐ ⩗ PA system was not installed.
Evaluation Comments OK -
Any New Expansion in the Plant
NG -
OK NG
1. In Case of any New expansion after achieving the
Fire OK status, New Area to be covered as per MSIL ☐ ☐ N/A
check sheet points
Note: In-case of MAH (Major Accident Hazard) Unit, please specify the quantity of hazardous material.
OK = 38 or 100% ≥7
Testing Emergency Response team & Fire Fighting Equipment’s Working Insert Photo
1.Fire Extinguisher 2. First Aid Hose 3. Yard Hydrant 4.Automatic 5.Fire Pump Room Photo
Operation Reel 3, 4 person operate Detection
2, 3 Person Operate Alarm System
Page 7 of 7