You are on page 1of 1

MACOVS LIMITED

P O BOX 5859
BOROKO, NCD
PH: +675 72007088

Date: 07/04/2023
Attention To: MD & GM
Subject: Request for Nembi Bridge Upgrade
The Nembi River wood bridge that connects Nipa Station to Nemda Village needs maintenance for small
vehicles to cross over. This bridge is important to the people of Pulim 2, Pulim 3 and Erap 1 and Erap 2 as well
other surrounding villages.
Bridge Disprction:
Length 18m
Width 3m

Materials:
1. Logs x4
2. Bridge Deckings (3m*400mm*600mm) – 60 pieces)
3. Bridge Nails 6inchs – 150nails
Note: sourcing of material and transporting of materials to the site. (duration: 2 days)
Work Description
1. Move logs from Nemda Village to Nembi River (duration: 1 day)
2. Replace the old logs with new ones, and ensure all logs are stabilised and levelled (duration: 1 day)
3. Install new bridge deckings (duration 1 day)
4. Engage causal labours to work on bridge decking

Respectfully,
Project Engineer

You might also like