SECTION 4-4 03.004

(THROUGH POWER INTAKE-4)


1 2 0 5 10 m ROPE DRUM HOIST
03.002 03.004
CL OF GATE SHAFT
70.50 GANTRY CRANE
24.21
3.21 Ø14.00 7.00
3.50 ROAD
1.3m HIGH ROAD 466.00 TBL
PARAPET WALL
463.00 FRL ASSUMED ROCK LINE SEMI-SANDWICH SYSTEM
1.7
90mm UPPER DENSE LAYER
NSL R1 1
80mm DRAINAGE BINDER
80mm LOWER DENSE LAYER
BITUMEN EMULSION 1.50 TO 3.00 Kg/ m²
? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?
100mm FILTER 0-2/32mm 2.00
? ? ? ? ?
FOR APPROACH CHANNEL 300mm FILTER (2B)
? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?
1 456.00
? ? ? ? ?
REFER SEPARATE DRAWING 2 1 ?
SERVICE GATE GROOVE
1
3.00 452.00
AIR VENT PIPES
1.78 6
1 EMERGENCY GATE GROOVE
ANTI VORTEX BEAM 1
(AS PER HM DRG.)
11.00 3.00 446.00
445.50 MDDL
1.50 10.90 1.10
443.55 441.30 Ø11.0m GATE SHAFT
2
442.05 1
3.10 6.20 1.70 3.00
3.00 3.00 3.00 440.00
APPROACH CHANNEL
Ø7.50 UNIT PENSTOCK
437.45

R2.50
439.55 440.50

FLOW ℄ CG

CJ CJ
300mm THK. CONCRETE BASE TRASH RACK GATE GROOVE
℄ CG

WS WS 432.70

Ø7.50
(FOR DETAIL REFER SEPARATE DRG.) GENERATION MODE 2.25

7.50
1.15 (FOR DETAIL REFER HM DRG.)
7.72
℄ CG
75

~12.28 428.95 428.95


°

428.41
℄ CG

1 428.25
WS
425.45 15.88 31.43 6.28 4.15 15.20 LEGEND:
1.50 POWER INTAKE 100mm THICK PCC
5.31 20.00 60.00 7.50 10.40 10.00 CONCRETE FIRST STAGE (M25-A40)
TRANSITION TRANSITION
7.5x7.5m TO 6.2x7.5m 6.2x7.5m TO Ø7.5m CONCRETE BACKFILL R1
GROUT CURTAIN ALONG PLINTH AND
1 BELOW INTAKE AREA. DEPTH HAVE TO 2 3
BE DEFINED IN GTP. 03.004 ROCKFILL / GRANULAR BACKFILL (FREE DRAINING)
03.002 03.004

2B FILTER

3
SECTION 5-5 03.004 RIP RAP

0 5 10 m ROCK SURFACE
ROPE DRUM HOIST
SOIL SURFACE
1 2
03.002 03.004 CJ CONTRACTION JOINT
GANTRY CRANE
24.21 EJ EXPANSION JOINT
3.50 7.00
GTP GROUT TEST PANEL
ROAD ROAD
SEMI-SANDWICH SYSTEM 1.3m HIGH 466.00 TBL
90mm UPPER DENSE LAYER PARAPET WALL
80mm DRAINAGE BINDER
NOTES:
463.00 FRL ASSUMED ROCK LINE R1
80mm LOWER DENSE LAYER 1.7 1. ALL DIMENSIONS, LEVELS ARE IN METERS, UNLESS OTHERWISE SPECIFIED.
NSL BITUMEN EMULSION 1.50 TO 3.00 Kg/ m² 1 2. NO DIMENSION SHALL BE MEASURED FROM THE DRAWING.
100mm FILTER 0-2/32mm
3. GROOVE SIZE SHALL BE FINALIZED AS PER HM DRAWING.
300mm FILTER (2B)
4. FOR AFRD ZONING AND PLINTH DETAILS REFER SEPARATE DRAWING.
? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?
2.00
? ? ? ? ? ? ? ? ? ? ? 1 456.00
? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?
5. FOR OTHER NOTES AND REFERENCE DRAWING REFER DRAWING NO. AFRY.4649.03.001.
FOR APPROACH CHANNEL ? ? ? ? ? ? ? ? ? ? ? ?1 ? ? 6. FOR PARAPET DETAILS, REFER SEPARATE DRAWING.
REFER SEPARATE DRAWING 2
3.00 1 7. FOR EXCAVATION AND SUPPORT DETAILS REFER DRAWING NO. AFRY.4649.03.101.
452.00

1.78
1 6
ANTI VORTEX BEAMS
3.00 1
445.50 MDDL 1.50 1.50 446.00
10.50
1.10 R1 CONCRETE BACKFILL ADDED BAS JIT SSE 04.04.22
R1 2 REV.No. REVISION DESCRIPTION DRAWN CH'KED APP'D DATE
442.05 1
DRAINAGE PIPE @ 30m c/c 3.00 PREFEASIBILITY STUDY INCEPT. & BASIC DESIGN CONSTRUCTION DESIGN
3.00 3.00 3.00 WITH OUTLET AT NORTH 440.00 FEASIBILITY STUDY TENDER DESIGN AS-BUILT DRAWINGS
PORTAL OF INTAKE TUNNEL
438.00
2 GREENKO AP01 IREP PRIVATE LIMITED
APPROACH CHANNEL 1
FLOW 39.84
MEIL - HES (PINNAPURAM PSP PROJECT) JV
CONSULTING ENGINEERS LIMITED
300mm THK. CONCRETE BASE GENERATION MODE
(FOR DETAIL REFER SEPARATE DRG.) 4 SLOPE AS PER SITE STANDALONE PUMPED STORAGE COMPONENT OF PINNAPURAM IREP

33.30
428.25
428.95 1.50
WS 1 UPPER / POWER INTAKE
1
GENERAL ARRANGEMENTS
425.45 WS 25.00
20.00 38.00 SECTION 4-4 & 5-5
100mm THICK PCC DESIGNED: JIT SCALE: 1:250 FORMAT: A1
(BELOW STRUCTURE)
DRAWN: BAS 1:500 [A3]
1 GROUT CURTAIN ALONG PLINTH AND
2 3 CHECKED: JIT/SMM DRAWING No. REV. No.
03.002 BELOW INTAKE AREA. DEPTH HAVE 03.004 03.004