[Project name]

Greenko Energy Projects Ltd.


Planning to tap Runoff at Power House Pit & Disposal by
Provision of Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 1/15

Greenko Energy Projects Ltd.


Planning to tap Runoff at Power House Pit & Disposal by
Provision of Sumps and Pumping Arrangement

R-AFRY.4649.05.004_R1

01 November 2022

Copyright © AFRY India Pvt. Ltd.


The reproduction, distribution and utilization of this document as well as the communication of its contents to others without explicit authorization is
prohibited.
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 2/15

Contents
Summary .......................................................................................................... 4

1 Planning of Sump Locations & Its Size ............................................................ 5


1.1 Catchment area Determination ............................................................. 5
1.2 Rainfall Intensities calculation .............................................................. 6
1.3 Catchment Runoff Estimation ............................................................... 8
1.4 Calculation of Size of the Sumps........................................................... 8

2 Planning to Pump Runoff Stored in Sumps ...................................................... 9

List of Figures
Figure 1-1- Catchment Area Determination for the Powerhouse Sump ........................................ 5
Figure 1-2 : IDF Curves ........................................................................................................ 7
Figure 2-1- Sump Water/runoff disposal planned for West side of P/H ...................................... 11
Figure 2-2- Sump Water/runoff disposal planned for East side of P/H ....................................... 12

List of Tables
Table 1-1:Details of Catchment Areas and Sump Location ......................................................... 6
Table 1-2:Calculation of IDF curve for different return periods ................................................... 6
Table 1-3: IDF curve Table .................................................................................................... 7
Table 1-4: Computation table for Runoff from Diffetent Catchments ........................................... 8
Table 1-5: Computation table for Size of the Sumps ................................................................. 9

Annexures
Annexure I : Design storm for the Pinnapuram

Plates
1. POWERHOUSE COMPLEX – POWERHOUSE - DRAIN CATCHMENT & SUMP – PLAN
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 3/15

Report History

Rev. Description Submitted on

0 R-AFRY.4649.05.004 10.09.2022
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 4/15

Summary
The Powerhouse pit lies in the Drainage path of flood water/runoff from near-by hillocks. The Report
deals with

(i) the calculation of the Powerhouse Sump sizes to retain the runoff during the rainfall
events and its disposal by the pumping network,
(ii) Powerhouse Sump related planning to store, &
(iii) dispose the Runoffs coming from the near-by catchments.
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 5/15

1 Planning of Sump Locations & Its Size


1.1 Catchment area Determination
The Pinnapuram surface power house is planned at the gorge of the west side and east
side hillock. During the rainfall events to trap the surface runoff generated from the
nearby catchments, five (5) sumps have been planned in the Powerhouse pit area at
different locations and elevations. To estimate the runoff contributing to each Sump,
contributing calcthment area planning has been done. The catchment area/boundary
contributing to each five (5) sump are marked in the drawing and shown below in Figure
1-1. The details of catchment area and Sump location (Elevation) are shown below in
Table 1-1. The details of the Sump sizes, locations and water/runoff disposing network
(pumping) are shown in the attached drawing as PLATES attached at the end of the report.

Figure 1-1- Catchment Area Determination for the Powerhouse Sump


Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 6/15

Table 1-1:Details of Catchment Areas and Sump Location

DETAILS OF THE CATCHMENT AREA & SUMP LOCATION


Area of
Location of
S.N. Sump No. Contributing
the Sumps
Catchment
- - m2 El. m
1 Sump-1 13600 304.3
2 Sump-2 11900 304.3
3 Sump-3 11900 328.3
Sump-4/cooling
4 16700 328.3
water pit-2
5 Sump-5 17800 344.0

1.2 Rainfall Intensities calculation


Considering the critical location of the power house, the 100-year 24 hours point rainfall
of 240 mm (as per details received vide email dated 02.12.2020, Refer Annexure I) has
been considered for the drain design. Accordingly, the short duration rainfall intensities
for various time durations are calculated. Further, the rainfall intensities for the return
periods of 100, 50, 25 and 5 year are calculated from the 100 year return period 24 hour
rainfall i.e. 240 mm. The 100 yr return period 24 hour rainfall for the project location has
been taken from the report on “Flood Estimation Report for Krishna and Pennar Subzone-
3h)” by Central Water Commission, refer Annexure-I. The smaller return period 24 hour
rainfall i.e. for 50 yr RP and 25 yr RP has been calculated by Kothyari and Garde Method
by using 100yr RP rainfall value. The 5 year return period 24 hr rainfall value has been
taken from PMP Atlas for Isopluvial (Return period) map of the southern Peninsula, Part-
I, Prepared by Indian Meteirological Department. The 5yr return period 24hr rainfall value
has been given as 127.65 mm, Refer Table 1-2.

Table 1-2:Calculation of IDF curve for different return periods

Return Period Catchment 100 50 25 5


24hr Point rainfall mm 240 208.93 181.89 127.65
Catchment Area West Side km2 4.87 4.87 4.87 4.87
East Side km2 3.50 3.50 3.50 3.50
Areal reduction factor - 1.00 1.00 1.00 1.00
Return period 24hr areal rainfall mm 240.00 208.93 181.89 127.65
Conversion factor for 1hr rainfall - 0.44 0.44 0.44 0.44
Different Return period 1hr rainfall mm 105.60 91.93 80.03 56.17

Furthermore the 24 hr return period rainfall value for 100yr, 50yr, 25yr, and 5yr has been
converted into one (1) hr rainfall value for the corresponding years.

Rainfall for smaller duration than one (1) hour is worked out using formula as shown in
IRC-SP-13:

where
i = Rainfall intensity in t duration in mm/hr
F = Rainfall depth in T duration in mm
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 7/15

T = larger duration in hours


t = smaller duration in hours
250
100 yr RP
50 yr RP
200
Rainfall Intensity (mm/hr)
25 yr RP
5 yr RP
150

100

50

0
0 10 20 30 40 50 60 70 80 90 100 110
Time (minute)

Figure 1-2 : IDF Curves

The IDF curves for 100yr, 50yr, 25yr, and 5yr return period are prepared accordingly and
presented herewith in Figure 1-2 and table of IDF curve is presented in Table 1-3.

Table 1-3: IDF curve Table

Rainfall Intensity (mm/hr ) for duration in minutes (t)


Return Return Return
Return period
Time (t) period (T), period (T), period (T),
(T), Yrs
Yrs Yrs Yrs
minute 100 50 25 5
5 194.95 169.72 147.75 103.69
10 181.03 157.59 137.19 96.28
15 168.96 147.09 128.05 89.87
20 158.40 137.90 120.04 84.25
25 149.08 129.78 112.98 79.29
30 140.80 122.57 106.71 74.89
35 133.39 116.12 101.09 70.95
40 126.72 110.32 96.04 67.40
45 120.69 105.06 91.46 64.19
50 115.20 100.29 87.31 61.27
55 110.19 95.93 83.51 58.61
60 105.60 91.93 80.03 56.17
65 101.38 88.25 76.83 53.92
70 97.48 84.86 73.87 51.85
75 93.87 81.72 71.14 49.93
80 90.51 78.80 68.60 48.14
85 87.39 76.08 66.23 46.48
90 84.48 73.54 64.02 44.93
95 81.75 71.17 61.96 43.48
100 79.20 68.95 60.02 42.12

Considering the severity of the damage during the runoff from a rainfall event,
fifty (50) year return period rainfall intensity as 169.72 mm/hr has been
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 8/15

considered for the calculation of the runoff for five (5) minute duration (time of
concentration), refer Table 1-3.

1.3 Catchment Runoff Estimation


The runoff generated from the catchment has been calculated by using the formula given
below

Q=CIA

Where,

C = Coefficient of runoff

I = Rainfall Intensity

A = Catchment Area

Considering the impermiable cover at the power house pit, a runoff coefficient of 0.9 has
been considered for the estimation of runoff.

The computed runoffs from different catchments for a return period of 50yrs correspond
to 5 minute time of concentration have been presented below in Table 1-4.

Table 1-4: Computation table for Runoff from Diffetent Catchments

CALCULATION OF RUNOFF FROM DIFFERENT CATCHMENT

Area of
S. Contributi Time of Rainfall Runoff Estimated
N Sump No. ng Concentra Intensity Coefficie Runoff
. Catchmen tion (tc) (I) nt (C) (Q)
t (A)
- - m2 Minute mm/hr - m3/s

1 Sump-1 13600 5 169.72 0.9 0.58

2 Sump-2 11900 5 169.72 0.9 0.50

3 Sump-3 11900 5 169.72 0.9 0.50

Sump-4/

4 Cooling 16700 5 169.72 0.9 0.71

Water Pit-2

5 Sump-5 17800 5 169.72 0.9 0.76

1.4 Calculation of Size of the Sumps


Based on the runoff estimated (clause 1.3), the sump sizes have been calculated for 5
minute storage. The calculation for the size of the sumps has been shown below in Table
1-5. The location of the Sumps have been marked in the attached drawing as PLATES at
the end of the report.
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 9/15

Table 1-5: Computation table for Size of the Sumps

CALCULATION OF SIZE OF THE SUMPS

Total Elevatio
S.N Calculate Storage Runoff Proposed Capacit n
Sump No.
. d Runoff Time Volume Sump Size y of the
Sump
Q t Vr L W D Vs El.
- -
m3/s Minute m3 m m m m3 m

1 Sump-1 0.58 5 173 10.0 6.0 3.5 210 304.3

2 Sump-2 0.50 5 151 9.5 4.0 5.0 190 304.3

3 Sump-3 0.50 5 151 9.0 6.0 3.5 189 328.3

Sump-4/

4 Cooling 0.71 5 213 11.5 8.0 6.0 552 328.3

Water Pit-2

5 Sump-5 0.76 5 227 13.0 6.0 3.5 273 344.0

After examining the Table 1-5, it is found that the storage capacity of the proposed Sumps
sizes are more than the total runoff volume generated in 5 minute duration. Hence, the
prosed sizes of the Sumps are adequate.

The storm water/runoff collected along the East Side power house ramp, from center of
the south side of powerhouse towards East and the storm water collected at Transformer
Hall at El. 328.3 will be collected into the Cooling Water Pit-2 of finished size 11.5 m(L) X
8.00 m(W) X 6.00 m(D), located at East corner of the Transformer hall. The cooling water
pit-2/Sump-4 will be used to collect the cooling water outlet from the machines (from
each Large Unit) & (from each Small Unit). The 50 Year return period storm water/runoff
of discharge of 0.71m3/s for five (5) minute duration (total runoff volume in 5
minutes=213m3) shall also be collected in the same pit, and pumped out to Tailpool as
shown in the drawing.

2 Planning to Pump Runoff Stored in Sumps


After planning to store the runoff in five (5) different Sumps proposed in different locations
of power house pit, the planning to dispose the runoff has been done by provision of
pumping arrangement at different Sumps.

Considering the location and elevation of the Sump and site conditions, the runoff volume
stored in Sump-1 is proposed to be disposed into pool maintained in upstream of flood
retention dam proposed in the WEST side, by the suitable pumping arrangement. The
flood retention dam is proposed to retain the surface runoff from the West side catchment
during the flood event.

The runoff stored in Sump-2 is proposed to be discharged in to tail Pool as per the site
conditions by the suitable pumping arrangenets.
The runoff stored in Sump-3 is proposed to be discharged in to pool maintained in
upstream of flood retention dam proposed in the WEST side, by the suitable pumping
arrangement.
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 10/15

Considering the location and elevation of the Sump-4/Cooling Water Pit-2, the combined
runoff volume and cooling water form the TG units stored in cooling watetr pit-2 is
proposed to be disposed in to Tail pool, by the suitable pumping arrangement.

The runoff stored in Sump-5 is proposed to be discharged in to tail Pool, with common
piping arrangement as used for Sump-2.

The network planning of the pumping of water/runoff stored in different Sums have been
shown in the attached drawings as PLATES, attached at the end of the report.
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of Sumps and Pumping
Arrangement
R-AFRY.4649.05.004_R1.docx
Page 11/15

Figure 2-1- Sump Water/runoff disposal planned for West side of P/H
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of Sumps and Pumping
Arrangement
R-AFRY.4649.05.004_R1.docx
Page 12/15

Figure 2-2- Sump Water/runoff disposal planned for East side of P/H
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 13/15

ANNEXURES
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 14/15

Annexure I – Design storm for the Pinnapuram

Design Storm for the Pinnapuram PSP” as suggested by TCE-EDF, received vide email dated
02.12.2020.
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 15/15

PLATES
N:\Working Drawings\4649_Pinnapuram IREP\Drawing Under prepration\05-Powerhouse Complex, Draft Tube Tunnels\SUMP\SK.05.DRAIN.001 & 002_P1.dwg
E 20
400 5100
395
390
LAYOUT PLAN

38

360
38
0 25 50 m

5
0

365
37
5

405

370
E 20
5200

375
39
38

380
370 5

0
WEST SIDE
365
DRAINAGE SYSTEM
404.00
360 394.00

5
35
4
PIPE-2
DRAINAGE SUMP-3 384.00
355 9.0(L)x6.0(W)x3.5(H)m 378.00
HEADER PIPE 500NB P AT EL. 328.30
(NOT IN ANDRITZ SCOPE) M D C B A B' 368.00
A 328.30 358.00
R

6000
316.30 346.75
10 9000 346.00

SH.1/2
340.30

4
PIPE-1

SERVICE BAY

05.055
6000 1

A"
HEADER PIPE 650NB

A'
(NOT IN ANDRITZ SCOPE

RAMP
05.055 SH.1/2

328.30
1

10000
333.20 340.00
UNLOADING 338.00
2 BAY
05.055 SH.1/2

4000

CHAMBER
DRAINAGE SUMP-1
2 5

13.0(L)x6.0(W)x3.5(H)m
12.0(L)x6.0(W)x5.5(H)m 2Nos.
10.0(L)x6.0(W)x3.5(H)m

DRAIN
4000

DRAINAGE SUMP-5
09

FIRE FIGHTING TANKS


AT EL. 304.30 05.055 SH.1/2

2000

AT EL. 344.00
WEST SIDE 5

AT EL. 344.00
Ø500 PIPE DEWATERING SYSTEM
9500
346.75

343.75

Ø500 PIPE DRAINAGE SYSTEM


Ø350 PIPE FLOOD SYSTEM

5000
325.50

Ø250 PIPE 2000


E 20
5300

PH1
OIL SOAK PIT-2
35

DRAINAGE SUMP-2
5

4.0(L)x5.0(W)x6.0(H)m
08 9.5(L)x4.0(W)x5.0(H)m AT EL. 328.30
AT EL. 304.30 OIL DRAIN PIT-2

PH2
2.0(L)x2.0(W)x2.50(H)m
36

AT EL. 328.30
0

POWER HOUSE DRAINAGE SUMP


SUMP SIZE
36

07 L (m) W (m) D (m) EL.


5

DRAINAGE SUMP-1 10.0 6.0 3.5 304.30


PH3

DRAINAGE SUMP-2 9.5 4.0 5.0 304.30


67

DRAINAGE SUMP-3 9.0 6.0 3.5 328.30


0

TRANSFORMER SUMP
06 COOLING WATER PIT-1 6.0 9.0 6.0 328.30
328.30
346.75

336.00

316.30

304.30

328.30
COOLING WATER PIT-2 11.5 8.0 6.0 328.30

CVT
PH4

LA

BPI

BPI
CONTROL BUILDING
67

POTHEAD YARD
OIL SOAK PIT 4.0 5.0 6.0 328.30
316.30
5

338.00
POWER HOUSE

BPI
CVT
FLOW

LA

BPI

344.00
318.30

OIL SOAK PIT-2 4.0 5.0 6.0 328.30


6

CVT

BPI

BPI
LA
6000 OIL DRAIN PIT-1 2.0 2.0 2.5 328.30
05.055 SH.1/2
6 OIL DRAIN PIT-2 2.0 2.0 2.5 328.30
68

05
0

9000

CVT

BPI

BPI

BPI
LA

BPI

BPI

BPI
PH5

FLOW

CVT

LA

BPI

BPI

BPI

BPI

BPI
HOLD FOR TRANSFORMER

BPI
E 20 1000
5400
362.00

340.00
GA NOT FINALIZED

LA

BPI

BPI

BPI

BPI

BPI

BPI
CVT
COOLING WATER PIT-1
6.0(L)x9.0(W)x6.0(H)m
TRANSFORMER HALL
RAMP

04
68

AT EL. 328.30
5

PH6

LEGEND:
318.80
0
2790

7 DRAIN
N 17

4000 05.055 SH.1/2


7
313.50

03 NOTES:

344.00
5000
PH7

1. ALL DIMENSIONS ARE IN MM, LEVELS AND NORTHING , EASTING ARE IN METERS, UNLESS
OIL SOAK PIT OTHERWISE SPECIFIED.
385

4.0(L)x5.0(W)x6.0(H)m 2. NO DIMENSION SHALL BE MEASURED FROM THE DRAWING.


AT EL. 328.30
RAMP

3. EXCAVATION PROFILE & SLOPES INDICATING ROCK SUPPORT MEASURES ETC. SHALL BE
02 REFERRED IN SEPARATE DRAWINGS.
15000
380

PH8

HEADER PIPE 650NB


(NOT IN ANDRITZ SCOPE
WEST SIDE 3 11500
343.75
375

Ø500 PIPE DEWATERING SYSTEM 05.055 SH.1/2


Ø500 PIPE DRAINAGE SYSTEM 3
Ø350 PIPE FLOOD SYSTEM
8000

Ø250 PIPE
01
346.75
370

DRAIN
304.30 REV.No. REVISION DESCRIPTION DRAWN CH'KED APP'D DATE
CHAMBER
PREFEASIBILITY STUDY INCEPT. & BASIC DESIGN CONSTRUCTION DESIGN
365

RAMP
360

316.30 FEASIBILITY STUDY TENDER DESIGN AS-BUILT DRAWINGS

E 20 328.30
5500 340.00 GREENKO AP01 IREP PRIVATE LIMITED
RAMP 340.30
358.00
MEIL - HES (PINNAPURAM PSP PROJECT) JV
346.75 346.00
366.00
355

CONSULTING ENGINEERS LIMITED


358.00
PIPE-4 352.00
STANDALONE PUMPED STORAGE COMPONENT OF PINNAPURAM IREP
376.00
POWERHOUSE COMPLEX
DRAINAGE SUMP
EAST SIDE OIL DRAIN PIT-1 COOLING WATER PIT-2
GENERAL ARRANGEMENT & ROCK SUPPORT
DRAINAGE SYSTEM 2.0(L)x2.0(W)x2.50(H)m 11.5(L)x8.0(W)x6.0(H)m 385 LAYOUT PLAN (SHEET 1 OF 2)
AT EL. 328.30 AT EL. 328.30 380
DESIGNED: MAP SCALE: 1:1000 FORMAT: A1
375
370 DRAWN: MTT 1:2000 [A3]
370
0
0

0
2820
0
2800

39
360

2830

CHECKED: JIT/TSK DRAWING No. REV. No.


2810
0

AFRY India Pvt. Ltd.


N 17
365

39
N 17

APPROVED: SSE
355

370

N 17
375

ISSUED FOR PLANNING AFRY.4649.05.055 P0


N 17
380

5
38

Tower-1, Stellar IT Park, C-25, Sector-62, Noida - India DATE: 22.10.2022


N:\Working Drawings\4649_Pinnapuram IREP\Drawing Under prepration\05-Powerhouse Complex, Draft Tube Tunnels\SUMP\SK.05.DRAIN.001 & 002_P1.dwg

SECTION 1-1 SECTION 2-2


0 2.5 5.0 m 0 2.5 5.0 m

B
POWER HOUSE

1 8
2000 500 8000 500 7100
1.7 1

500
304.30 304.30

DRAIN
500x500mm

500
500 500 BEAM

15°
304.30 6000 1950
0.6x0.6m
303.50 50MM THICK SHOTCRETE
DRAINAGE SUMP-2 (M-30) WITH 1 LAYER OF

5000
15°
BEAM 8.0(L)x4.0(W)x5.0(H)m WIREMESH Ø4X100X100mm (TYP.)
45°

0.6x0.6m 50MM THICK SHOTCRETE Ø25mm (Fe-550), FULLY GROUTED


3500
Ø32MM (FE-550), FULLY (M-30) WITH 1 LAYER OF SLOPE AS PER SITE ROCK ANCHORS, 4.0m LONG @
SLOPE AS PER SITE WIREMESH Ø4X100X100mm (TYP.) 299.00
GROUTED ROCK ANCHORS, 2.5x2.5m c/c, STAGGERED, 15°
300.50
10.0M LONG @ 1.5X1.5M C/C, D
STAGGERED, 45°

500
Ø25mm (Fe-550), FULLY GROUTED 100mm THICK PCC
500

DRAINAGE SUMP-1
10.0(L)x6.0(W)x3.5(H)m ROCK ANCHORS, 4.0m LONG @ 8
100mm THICK PCC AT EL. 304.30 2.5x2.5m c/c, STAGGERED, 15°
1
CONCRETE
RCC WALL
BACKFILL

SECTION 3-3 HOLD SECTION 4-4 SECTION 5-5 HOLD


0 2.5 5.0 m 0 2.5 5.0 m 0 2.5 5.0 m
4
1 8
OIL DRAIN PIT-1 A"
2250
2.0(L)x2.0(W)x2.50(H)m 1
2000 500 6000 500 OIL DRAIN PIT-2
328.30
DRAIN

832
328.30 2.0(L)x2.0(W)x2.50(H)m 8900 4
350

500

DRAIN 500x500mm

500
350
500x500mm
15°

328.30 1

15°

15°
BEAM
2500

0.6x0.6m 50mm THICK SHOTCRETE BEAM

15°

15°
(M-30) WITH 1 LAYER OF 50MM THICK SHOTCRETE 0.6x0.6m

3500

2500
WIREMESH Ø4X100X100mm (TYP.) (M-30) WITH 1 LAYER OF DRAINAGE SUMP-3
500

50MM THICK SHOTCRETE


6000

COOLING WATER PIT-2 WIREMESH Ø4X100X100mm (TYP.) 9.0(L)x6.0(W)x3.5(H)m SLOPE AS SLOPE AS OIL SOAK PIT-2 (M-30) WITH 1 LAYER OF
15°

500 2000 500 11.5(L)x8.0(W)x6.0(H)m AT EL. 328.30 PER SITE PER SITE 4.0(L)x5.0(W)x6.0(H)m WIREMESH Ø4X100X100mm (TYP.)

500

6000
100mm THICK PCC
Ø25mm (Fe-550), FULLY GROUTED 500 2000

500
ROCK ANCHORS, 4.0m LONG @ Ø32mm (FE-550), FULLY
Ø25mm (Fe-550), FULLY GROUTED ROCK 100mm THICK PCC Ø25mm (Fe-550), FULLY GROUTED
2.5x2.5m c/c, STAGGERED, 15° 100mm THICK PCC
500

GROUTED ROCK ANCHORS, ANCHORS, 8.0m LONG @ SLOPE AS ROCK ANCHORS, 4.0m LONG @
4.0m LONG @ 2.5x2.5m c/c, 1.5X1.5m c/c,STAGGERED, 15° PER SITE 2.5x2.5m c/c, STAGGERED, 15°

500
500 11500 500 Ø25mm (Fe-550), FULLY
STAGGERED, 15° (TYP.)
GROUTED ROCK ANCHORS,
100mm THICK PCC Ø32mm (Fe-550), FULLY GROUTED 4.0m LONG @ 2.5x2.5m c/c,
500 4000 500
ROCK ANCHORS, 6.0m LONG @ STAGGERED, 15° (TYP.)
2.0x2.0m c/c, STAGGERED, 15° 100mm THICK PCC

NOTES:
SECTION 6-6 HOLD
SECTION 7-7 HOLD 1. ALL DIMENSIONS ARE IN MM, LEVELS AND NORTHING , EASTING ARE IN METERS, UNLESS
OTHERWISE SPECIFIED.
0 2.5 5.0 m 0 2.5 5.0 m
2. NO DIMENSION SHALL BE MEASURED FROM THE DRAWING.
3. EXCAVATION PROFILE & SLOPES INDICATING ROCK SUPPORT MEASURES ETC. SHALL BE
A" REFERRED IN SEPARATE DRAWINGS.
A"

400
4 4
1000 7500 8900
1
500

328.30 1 328.30
500

15°
15°

REV.No. REVISION DESCRIPTION DRAWN CH'KED APP'D DATE

BEAM PREFEASIBILITY STUDY INCEPT. & BASIC DESIGN CONSTRUCTION DESIGN


50MM THICK SHOTCRETE 50mm THICK SHOTCRETE FEASIBILITY STUDY TENDER DESIGN AS-BUILT DRAWINGS
0.6x0.6m
(M-30) WITH 1 LAYER OF (M-30) WITH 1 LAYER OF
WIREMESH Ø4X100X100mm (TYP.) OIL SOAK PIT-1 WIREMESH Ø4X100X100mm (TYP.) GREENKO AP01 IREP PRIVATE LIMITED
COOLING WATER PIT-1
6000

4.0(L)x5.0(W)x6.0(H)m
6000

6.0(L)x9.0(W)x6.0(H)m
MEIL - HES (PINNAPURAM PSP PROJECT) JV
CONSULTING ENGINEERS LIMITED

Ø25mm (Fe-550), FULLY Ø25mm (Fe-550), FULLY GROUTED Ø25mm (Fe-550), FULLY Ø25mm (Fe-550), FULLY GROUTED
ROCK ANCHORS, 4.0m LONG @
STANDALONE PUMPED STORAGE COMPONENT OF PINNAPURAM IREP
GROUTED ROCK ANCHORS, SLOPE AS ROCK ANCHORS, 4.0m LONG @ GROUTED ROCK ANCHORS, SLOPE AS
4.0m LONG @ 2.5x2.5m c/c, PER SITE 2.5x2.5m c/c, STAGGERED, 15° (TYP.) 4.0m LONG @ 2.5x2.5m c/c,
STAGGERED, 15° (TYP.)
PER SITE 2.5x2.5m c/c, STAGGERED, 15° POWERHOUSE COMPLEX
STAGGERED, 15° (TYP.)
500

DRAINAGE SUMP
GENERAL ARRANGEMENT & ROCK SUPPORT
500

500 4000 500


500 6000 500
100mm THICK PCC SECTIONS (SHEET 2 OF 2)
100mm THICK PCC
DESIGNED: MAP SCALE: 1:100 FORMAT: A1
DRAWN: MTT/DCP 1:200 [A3]
CHECKED: JIT/TSK DRAWING No. REV. No.
AFRY India Pvt. Ltd. APPROVED: SSE
ISSUED FOR PLANNING Tower-1, Stellar IT Park, C-25, Sector-62, Noida - India DATE: 22.10.2022
AFRY.4649.05.055 P0