R-AFRY.4649.05.004_R1
01 November 2022
Contents
Summary .......................................................................................................... 4
List of Figures
Figure 1-1- Catchment Area Determination for the Powerhouse Sump ........................................ 5
Figure 1-2 : IDF Curves ........................................................................................................ 7
Figure 2-1- Sump Water/runoff disposal planned for West side of P/H ...................................... 11
Figure 2-2- Sump Water/runoff disposal planned for East side of P/H ....................................... 12
List of Tables
Table 1-1:Details of Catchment Areas and Sump Location ......................................................... 6
Table 1-2:Calculation of IDF curve for different return periods ................................................... 6
Table 1-3: IDF curve Table .................................................................................................... 7
Table 1-4: Computation table for Runoff from Diffetent Catchments ........................................... 8
Table 1-5: Computation table for Size of the Sumps ................................................................. 9
Annexures
Annexure I : Design storm for the Pinnapuram
Plates
1. POWERHOUSE COMPLEX – POWERHOUSE - DRAIN CATCHMENT & SUMP – PLAN
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 3/15
Report History
0 R-AFRY.4649.05.004 10.09.2022
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 4/15
Summary
The Powerhouse pit lies in the Drainage path of flood water/runoff from near-by hillocks. The Report
deals with
(i) the calculation of the Powerhouse Sump sizes to retain the runoff during the rainfall
events and its disposal by the pumping network,
(ii) Powerhouse Sump related planning to store, &
(iii) dispose the Runoffs coming from the near-by catchments.
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 5/15
Furthermore the 24 hr return period rainfall value for 100yr, 50yr, 25yr, and 5yr has been
converted into one (1) hr rainfall value for the corresponding years.
Rainfall for smaller duration than one (1) hour is worked out using formula as shown in
IRC-SP-13:
where
i = Rainfall intensity in t duration in mm/hr
F = Rainfall depth in T duration in mm
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 7/15
100
50
0
0 10 20 30 40 50 60 70 80 90 100 110
Time (minute)
The IDF curves for 100yr, 50yr, 25yr, and 5yr return period are prepared accordingly and
presented herewith in Figure 1-2 and table of IDF curve is presented in Table 1-3.
Considering the severity of the damage during the runoff from a rainfall event,
fifty (50) year return period rainfall intensity as 169.72 mm/hr has been
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 8/15
considered for the calculation of the runoff for five (5) minute duration (time of
concentration), refer Table 1-3.
Q=CIA
Where,
C = Coefficient of runoff
I = Rainfall Intensity
A = Catchment Area
Considering the impermiable cover at the power house pit, a runoff coefficient of 0.9 has
been considered for the estimation of runoff.
The computed runoffs from different catchments for a return period of 50yrs correspond
to 5 minute time of concentration have been presented below in Table 1-4.
Area of
S. Contributi Time of Rainfall Runoff Estimated
N Sump No. ng Concentra Intensity Coefficie Runoff
. Catchmen tion (tc) (I) nt (C) (Q)
t (A)
- - m2 Minute mm/hr - m3/s
Sump-4/
Water Pit-2
Total Elevatio
S.N Calculate Storage Runoff Proposed Capacit n
Sump No.
. d Runoff Time Volume Sump Size y of the
Sump
Q t Vr L W D Vs El.
- -
m3/s Minute m3 m m m m3 m
Sump-4/
Water Pit-2
After examining the Table 1-5, it is found that the storage capacity of the proposed Sumps
sizes are more than the total runoff volume generated in 5 minute duration. Hence, the
prosed sizes of the Sumps are adequate.
The storm water/runoff collected along the East Side power house ramp, from center of
the south side of powerhouse towards East and the storm water collected at Transformer
Hall at El. 328.3 will be collected into the Cooling Water Pit-2 of finished size 11.5 m(L) X
8.00 m(W) X 6.00 m(D), located at East corner of the Transformer hall. The cooling water
pit-2/Sump-4 will be used to collect the cooling water outlet from the machines (from
each Large Unit) & (from each Small Unit). The 50 Year return period storm water/runoff
of discharge of 0.71m3/s for five (5) minute duration (total runoff volume in 5
minutes=213m3) shall also be collected in the same pit, and pumped out to Tailpool as
shown in the drawing.
Considering the location and elevation of the Sump and site conditions, the runoff volume
stored in Sump-1 is proposed to be disposed into pool maintained in upstream of flood
retention dam proposed in the WEST side, by the suitable pumping arrangement. The
flood retention dam is proposed to retain the surface runoff from the West side catchment
during the flood event.
The runoff stored in Sump-2 is proposed to be discharged in to tail Pool as per the site
conditions by the suitable pumping arrangenets.
The runoff stored in Sump-3 is proposed to be discharged in to pool maintained in
upstream of flood retention dam proposed in the WEST side, by the suitable pumping
arrangement.
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 10/15
Considering the location and elevation of the Sump-4/Cooling Water Pit-2, the combined
runoff volume and cooling water form the TG units stored in cooling watetr pit-2 is
proposed to be disposed in to Tail pool, by the suitable pumping arrangement.
The runoff stored in Sump-5 is proposed to be discharged in to tail Pool, with common
piping arrangement as used for Sump-2.
The network planning of the pumping of water/runoff stored in different Sums have been
shown in the attached drawings as PLATES, attached at the end of the report.
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of Sumps and Pumping
Arrangement
R-AFRY.4649.05.004_R1.docx
Page 11/15
Figure 2-1- Sump Water/runoff disposal planned for West side of P/H
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of Sumps and Pumping
Arrangement
R-AFRY.4649.05.004_R1.docx
Page 12/15
Figure 2-2- Sump Water/runoff disposal planned for East side of P/H
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 13/15
ANNEXURES
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 14/15
Design Storm for the Pinnapuram PSP” as suggested by TCE-EDF, received vide email dated
02.12.2020.
Greenko Energy Projects Ltd.
Planning to tap Runoff at Power House Pit & Disposal by Provision of
Sumps and Pumping Arrangement
R-AFRY.4649.05.004_R1.docx
Page 15/15
PLATES
N:\Working Drawings\4649_Pinnapuram IREP\Drawing Under prepration\05-Powerhouse Complex, Draft Tube Tunnels\SUMP\SK.05.DRAIN.001 & 002_P1.dwg
E 20
400 5100
395
390
LAYOUT PLAN
38
360
38
0 25 50 m
5
0
365
37
5
405
370
E 20
5200
375
39
38
380
370 5
0
WEST SIDE
365
DRAINAGE SYSTEM
404.00
360 394.00
5
35
4
PIPE-2
DRAINAGE SUMP-3 384.00
355 9.0(L)x6.0(W)x3.5(H)m 378.00
HEADER PIPE 500NB P AT EL. 328.30
(NOT IN ANDRITZ SCOPE) M D C B A B' 368.00
A 328.30 358.00
R
6000
316.30 346.75
10 9000 346.00
SH.1/2
340.30
4
PIPE-1
SERVICE BAY
05.055
6000 1
A"
HEADER PIPE 650NB
A'
(NOT IN ANDRITZ SCOPE
RAMP
05.055 SH.1/2
328.30
1
10000
333.20 340.00
UNLOADING 338.00
2 BAY
05.055 SH.1/2
4000
CHAMBER
DRAINAGE SUMP-1
2 5
13.0(L)x6.0(W)x3.5(H)m
12.0(L)x6.0(W)x5.5(H)m 2Nos.
10.0(L)x6.0(W)x3.5(H)m
DRAIN
4000
DRAINAGE SUMP-5
09
2000
AT EL. 344.00
WEST SIDE 5
AT EL. 344.00
Ø500 PIPE DEWATERING SYSTEM
9500
346.75
343.75
5000
325.50
PH1
OIL SOAK PIT-2
35
DRAINAGE SUMP-2
5
4.0(L)x5.0(W)x6.0(H)m
08 9.5(L)x4.0(W)x5.0(H)m AT EL. 328.30
AT EL. 304.30 OIL DRAIN PIT-2
PH2
2.0(L)x2.0(W)x2.50(H)m
36
AT EL. 328.30
0
TRANSFORMER SUMP
06 COOLING WATER PIT-1 6.0 9.0 6.0 328.30
328.30
346.75
336.00
316.30
304.30
328.30
COOLING WATER PIT-2 11.5 8.0 6.0 328.30
CVT
PH4
LA
BPI
BPI
CONTROL BUILDING
67
POTHEAD YARD
OIL SOAK PIT 4.0 5.0 6.0 328.30
316.30
5
338.00
POWER HOUSE
BPI
CVT
FLOW
LA
BPI
344.00
318.30
CVT
BPI
BPI
LA
6000 OIL DRAIN PIT-1 2.0 2.0 2.5 328.30
05.055 SH.1/2
6 OIL DRAIN PIT-2 2.0 2.0 2.5 328.30
68
05
0
9000
CVT
BPI
BPI
BPI
LA
BPI
BPI
BPI
PH5
FLOW
CVT
LA
BPI
BPI
BPI
BPI
BPI
HOLD FOR TRANSFORMER
BPI
E 20 1000
5400
362.00
340.00
GA NOT FINALIZED
LA
BPI
BPI
BPI
BPI
BPI
BPI
CVT
COOLING WATER PIT-1
6.0(L)x9.0(W)x6.0(H)m
TRANSFORMER HALL
RAMP
04
68
AT EL. 328.30
5
PH6
LEGEND:
318.80
0
2790
7 DRAIN
N 17
03 NOTES:
344.00
5000
PH7
1. ALL DIMENSIONS ARE IN MM, LEVELS AND NORTHING , EASTING ARE IN METERS, UNLESS
OIL SOAK PIT OTHERWISE SPECIFIED.
385
3. EXCAVATION PROFILE & SLOPES INDICATING ROCK SUPPORT MEASURES ETC. SHALL BE
02 REFERRED IN SEPARATE DRAWINGS.
15000
380
PH8
Ø250 PIPE
01
346.75
370
DRAIN
304.30 REV.No. REVISION DESCRIPTION DRAWN CH'KED APP'D DATE
CHAMBER
PREFEASIBILITY STUDY INCEPT. & BASIC DESIGN CONSTRUCTION DESIGN
365
RAMP
360
E 20 328.30
5500 340.00 GREENKO AP01 IREP PRIVATE LIMITED
RAMP 340.30
358.00
MEIL - HES (PINNAPURAM PSP PROJECT) JV
346.75 346.00
366.00
355
0
2820
0
2800
39
360
2830
39
N 17
APPROVED: SSE
355
370
N 17
375
5
38
B
POWER HOUSE
1 8
2000 500 8000 500 7100
1.7 1
500
304.30 304.30
DRAIN
500x500mm
500
500 500 BEAM
15°
304.30 6000 1950
0.6x0.6m
303.50 50MM THICK SHOTCRETE
DRAINAGE SUMP-2 (M-30) WITH 1 LAYER OF
5000
15°
BEAM 8.0(L)x4.0(W)x5.0(H)m WIREMESH Ø4X100X100mm (TYP.)
45°
500
Ø25mm (Fe-550), FULLY GROUTED 100mm THICK PCC
500
DRAINAGE SUMP-1
10.0(L)x6.0(W)x3.5(H)m ROCK ANCHORS, 4.0m LONG @ 8
100mm THICK PCC AT EL. 304.30 2.5x2.5m c/c, STAGGERED, 15°
1
CONCRETE
RCC WALL
BACKFILL
832
328.30 2.0(L)x2.0(W)x2.50(H)m 8900 4
350
500
DRAIN 500x500mm
500
350
500x500mm
15°
328.30 1
15°
15°
BEAM
2500
15°
15°
(M-30) WITH 1 LAYER OF 50MM THICK SHOTCRETE 0.6x0.6m
3500
2500
WIREMESH Ø4X100X100mm (TYP.) (M-30) WITH 1 LAYER OF DRAINAGE SUMP-3
500
COOLING WATER PIT-2 WIREMESH Ø4X100X100mm (TYP.) 9.0(L)x6.0(W)x3.5(H)m SLOPE AS SLOPE AS OIL SOAK PIT-2 (M-30) WITH 1 LAYER OF
15°
500 2000 500 11.5(L)x8.0(W)x6.0(H)m AT EL. 328.30 PER SITE PER SITE 4.0(L)x5.0(W)x6.0(H)m WIREMESH Ø4X100X100mm (TYP.)
500
6000
100mm THICK PCC
Ø25mm (Fe-550), FULLY GROUTED 500 2000
500
ROCK ANCHORS, 4.0m LONG @ Ø32mm (FE-550), FULLY
Ø25mm (Fe-550), FULLY GROUTED ROCK 100mm THICK PCC Ø25mm (Fe-550), FULLY GROUTED
2.5x2.5m c/c, STAGGERED, 15° 100mm THICK PCC
500
GROUTED ROCK ANCHORS, ANCHORS, 8.0m LONG @ SLOPE AS ROCK ANCHORS, 4.0m LONG @
4.0m LONG @ 2.5x2.5m c/c, 1.5X1.5m c/c,STAGGERED, 15° PER SITE 2.5x2.5m c/c, STAGGERED, 15°
500
500 11500 500 Ø25mm (Fe-550), FULLY
STAGGERED, 15° (TYP.)
GROUTED ROCK ANCHORS,
100mm THICK PCC Ø32mm (Fe-550), FULLY GROUTED 4.0m LONG @ 2.5x2.5m c/c,
500 4000 500
ROCK ANCHORS, 6.0m LONG @ STAGGERED, 15° (TYP.)
2.0x2.0m c/c, STAGGERED, 15° 100mm THICK PCC
NOTES:
SECTION 6-6 HOLD
SECTION 7-7 HOLD 1. ALL DIMENSIONS ARE IN MM, LEVELS AND NORTHING , EASTING ARE IN METERS, UNLESS
OTHERWISE SPECIFIED.
0 2.5 5.0 m 0 2.5 5.0 m
2. NO DIMENSION SHALL BE MEASURED FROM THE DRAWING.
3. EXCAVATION PROFILE & SLOPES INDICATING ROCK SUPPORT MEASURES ETC. SHALL BE
A" REFERRED IN SEPARATE DRAWINGS.
A"
400
4 4
1000 7500 8900
1
500
328.30 1 328.30
500
15°
15°
4.0(L)x5.0(W)x6.0(H)m
6000
6.0(L)x9.0(W)x6.0(H)m
MEIL - HES (PINNAPURAM PSP PROJECT) JV
CONSULTING ENGINEERS LIMITED
Ø25mm (Fe-550), FULLY Ø25mm (Fe-550), FULLY GROUTED Ø25mm (Fe-550), FULLY Ø25mm (Fe-550), FULLY GROUTED
ROCK ANCHORS, 4.0m LONG @
STANDALONE PUMPED STORAGE COMPONENT OF PINNAPURAM IREP
GROUTED ROCK ANCHORS, SLOPE AS ROCK ANCHORS, 4.0m LONG @ GROUTED ROCK ANCHORS, SLOPE AS
4.0m LONG @ 2.5x2.5m c/c, PER SITE 2.5x2.5m c/c, STAGGERED, 15° (TYP.) 4.0m LONG @ 2.5x2.5m c/c,
STAGGERED, 15° (TYP.)
PER SITE 2.5x2.5m c/c, STAGGERED, 15° POWERHOUSE COMPLEX
STAGGERED, 15° (TYP.)
500
DRAINAGE SUMP
GENERAL ARRANGEMENT & ROCK SUPPORT
500