Summary of Experience Record
TOTAL WORD COUNT MANDATORY COMPETENCIES (LIMIT OF 1,500
WORDS)
Please record your summary of experience / training completed against your declared competencies.
Note: 4,000 Word Count Limit for Core Competencies and 1,500 Word Count Limit for Mandatory
Competencies (approximately 150 to 200 words per Level).
Competency &
Competency experience details
level
Mandatory Competencies
Accounting principles and procedures
Business planning
I have a basic understanding of business planning and how this essentially
contributes to meeting company aims and objectives. I would attend and contribute
during monthly team meetings at EC Harris where our head of client service would
discuss financial reports of the performance of each business sector, how teams
were performing, a SWOT analysis and any new contract wins. I also participated in a
research project to identify new Public Private Partnership opportunities for the
highways sector in the US which provided an insight into how EC Harris identified
Business planning new opportunities to win work. Monaghans provide an annual business update
Level 1 which includes a summary of the current economic climate and how this affects our
industry. Business objectives and targets are discussed which include relationships
with existing, new and potential clients. Potential opportunities and the new services
we can offer clients are also discussed. I appreciate how planning to maintain and
develop client relationships along with identifying new opportunities to provide
additional new services will help expand our service proposition and deliver business
growth.
Client care
When engaging with clients, colleagues and third parties I am always conscious to
take the time to identify my clients' needs and gain an understanding of what is
expected of me in my role as a Quantity Surveyor. I appreciate the importance of
Client care establishing and maintaining good client relationships and am always certain to act
Level 1 in a professional, polite and approachable manner at all times when dealing with my
clients.
IPart
haveofnever
clientused
care the Monaghans complaints
is understanding procedures
your clients’ but Iand
requirements am helping
aware oftothe
deliver
procedures which are in place for dealing with complaints
their goals. During my secondment at Network Rail within the first week should they arise.
I arranged a
meeting with my client to identify their objectives and set targets to work towards.
One of their main objectives was to ensure strict project financial control and cost
reporting were maintained on a portfolio of around 60 projects. This was achieved
Client care through using Oracle Projects software which I had no previous experience of using.
Level 2 I made every effort to develop my understanding and proficiency of using this
Communication and negotiation
software as quickly as possible to ensure this was achieved. I also held regular
meetings with my client utilising EC Harris' client performance feedback process to
monitor my performance and highlight any areas where I could improve. This
assisted in providing a further platform to understand my clients needs and allowed
Through
continuous myimprovement
academic studies and professional
to ensure career I were
their requirements have developed
fulfilled. a good
understanding of communication in both oral, written and presentation forms.
I am aware of the need to keep a clear audit trail via written communications. I also
appreciate oral communications in certain circumstances are more appropriate, for
example if an issue has arisen onsite it may be more appropriate to visit site with the
Communication and associated parties to review the issue and discuss face to face to find a solution. This
negotiation can subsequently be recorded in a written communication such as an email.
Level 1 It is important to understand that different clients have different communication
Irequirements/
have completed presentations
preferences, internallysome
for example in APC forums
clients likeon
to different topics. face
discuss matters I have
to
also
face presented cost plans
where possible, sometolike
clients, including
to discuss an internal
matters over thefit-out cost plan
telephone and to a
others
relatively inexperienced
prefer written client. This
communication. consisted
Tailoring of me providingbased
my communications copieson ofeach
the cost plan
client’s
and discussing
preferences the content, costs, exclusions and assumptions with the client
is essential.
ensuring they understood the document.
At Network Rail I chaired monthly financial reporting meetings with the client and
Communication and scheme project managers to discuss the progress of each scheme and update each
negotiation cost plan accordingly. I prepared the Oracle Projects reporting software to display
Conduct rules, ethicsthe
Level 2 andcost of work done,
professional forecasts and contingencies on screen and amended and
practice
discussed these with each project manager accordingly. I believe in doing this, I
developed my presentation, communication and negotiation skills to a high
standard.
I have further developed my negotiation skills through negotiating contract sums
and agreeing final accounts with contractors.
I have studied guidance notes around the RICS rules of conduct and completed an
ethical standards walkthrough to ensure that I act within the parameters of these
Conduct rules, rules within my role as a Quantity Surveyor. I recognise the importance of the rules
ethics and of conduct and global professional & ethical standards as they provide a platform for
professional standardisation, consistency of service and maintain professional standards of the
practice RICS and its members. I ensure my actions and behaviours are in accordance with
Level 1 these parameters at all times by acting with integrity, in a professional manner and
by
Withintreating others with respect. I understand what is in
expected of me as athe member of
During
the amy
RICS.
role
client as Quantity
meeting when Surveyor
presenting I amasure to act
costplan accordance
to construct twowithretail
parameters
concessions of the professional
within an established andretailer,
ethical istandards
was askedwhich are set by money
to reapportion the RICS. This
against
includes
the remaining
landlords scopeimpartial
of works and not biased
in order to gainto any construction
a greater organisationand
landlord contribution over
Conduct rules, another
Iunfairly
am aware when thatreviewing
reduce the
duecost of
to the tenders
natureand
fit-out works ensuring
for thethat
of construction I provide
client. I informed
projects, a high
conflicts standard
them may that I of
occur wasbut
ethics and
Conduct rules, service
unable
where
As to clients.
to reapportion
possible
a Quantity I appreciate
this needs
Surveyor, money to be
I receive the requirement
in avoided.
this manner
various I have
forms for
asofit confidentiality
would
worked have
on
data, from in
counted
projects
electronic my
whereas profession
serious in
documents
professional
ethics and respect
malpractice of client
contradictions
such as spreadsheets,cost plans,
andinconflicted
the drawn
photos capital
with expenditure
theprogrammes,
information
and RICS at ethical
tender budgets
standards
stage
hard copyand
has details
ofled
acting
documents of such
with
to conflictdevelopment
integrity,
during
as the
practice
professional projects.
acting inand
construction
reports For
a way example,
period I
that promoteshave
which could
correspondence compiled
andtrust
havein in
also capital
the
been
media expenditure
profession
avoided
formats and
by the
such budgets
treating
consultants
as CD's for
others
and TJX Europe
with
co-ordinating
flash drives.
Conflict avoidance,
Level 2 which
respect. areI the
highly
advised confidential.
them toItreapportion
was important that tothese documents were handled
practice
Conflict avoidance, the design
Likewise, better. Wherenot
information conflicts
I send have
out allmoney
is inarisen theon any
above gain
of my anprojects,
formats unfair
and weadvantage
for
alsoexample
issueover
management and management
carefully
the Landlord
over theandandandand
validity
dispute
thatof no
was one
sure
resolution
variationother
toonlinethan
present
claims,
procedures
I the
theproject
have costs
always team
accurately had to
managed access toaathem.
reflect
the process true I alsofair
and
through
Level 3 tenders drawings via an portal. At Monaghans, we have quality
dispute resolution appreciate the requirements for Professional Indemnity Insurance
value of the
effective
management landlords
communication
system, scope
which of works
anddictates
negotiation and to
how client
we reach
storeworks.
an
and Imanage
am always
amicable thisand
solution. the need
diligent
information and forand
management individuals
Dataprocedures conscious
If a conflict
data. When and
we firms
tocannot
abide
createbeto
by my be
resolved
a new covered
companiesbythis
job, for both
thepolicy
parties previous
ofinvolved and
not accepting
automatically creates current
agifts, professional
hospitality
via communication
job number and
and work.
orfolder
Level 1
Data management services
negotiation,which themight suggest
building improper
contract will obligations
have a mechanismand beforin being
breachdelivered,
dispute of the RICS
resolution,
on the system with pre-set folders depending on the service i.e. QS,
Level 1 ethical
which
PM, EA.standards.
could be
Electronic via arbitration
information or adjudication.
must be stored The
in JCT
these contract
folders also
which has
will a mediation
ensure it
Health and safety
clause
can be which states the
appropriately parties
located in should
both the give serious
near consideration
and distant future iftonecessary.
mediationOur which
is a form
email of alternative
system dispute resolution.
also automatically creates a folder for each new job for storing emails;
all received and sent emails must be stored in these folders, again to ensure
accessibility now and in the future. Monaghans quality management system also has
a system for creating folders for any hard copy information, paper, CD's, flash drives,
Idrawings,
have obtained
etc. a CSCS card (Construction Site Visitor) which has given me a good
understanding of health and safety through studying the CSCS book and passing the
test. I have also undertaken asbestos awareness training.
Health and safety I am aware that the construction industry is governed by the Health and Safety at
Level 1 Work Act 1974 and the CDM regulations. I also understand the importance of health
and safety in the construction industry due to the nature of the work undertaken. I
have also studied the RICS guidelines on surveying safely.
I am a regular site visitor and therefore ensure that I have been inducted
appropriately on each site I visit, I always wear my personal protective equipment,
ensure I read signage and be vigilant of dangers and risks around me.
I am aware of the requirement to complete method statements and risk
assessments for undertaking work to ensure that it is carried out in the most
Health and safety appropriate and safest manner possible with any potential risks identified.
Level 2 When working at Clugston Construction part of my role as an employee was to
Sustainability
report any unsafe working on site and offer feedback of how site safety could
potentially be improved through a take time procedure. I have ensured method
statements and risk assessments are returned by newly appointed subcontractors
prior to start on site.
Teamworking
good relationships working with the design teams and contractors. On secondment
at Network Rail, I worked within a large team of scheme project managers,
engineers,
I am awareplanners, that the New procurement Rules of Measurement managers anddefine commercial the various managers. stagesWithout of cost the
expertise
planning
II advised and
and contribution
that
Litton Properties this aligns of
on each
with
the thememberRIBA
cost implications of
work the team
stages,
of design it
from would order
changes not of have
cost been
estimates
atundertaking
work stage 1
possible have produced toformal
manage feasibility
aalarge cost
portfolio estimates to calculate
of2,development
projects. Communication the likely cost
and inability to adapt
at
for
retail stage
Towcester
store1, Road,
developments cost plans
mixed and at
use stages
retail
contributed 3 and
during 4 in addition
value of a to
brownfield
engineering pre and site.
and post By
designtender
Teamworking to
estimates
reviewing differentprior the dynamicsto
concept stages and 5.environments
information and clients is instrumentalrequirements to effectiveI wascost ableandtosuccessful
amend the
Level 1
team
team meetings.
working. These
When were
chairing subsequently
the monthly developed
financial into formal
report meetings forplansNetwork that are
My
order
used pre of and
cost postestimatecontract to experience
allow them in
to addition
make a to
well private
informed study has
investment helped me
decision in
Technical - Core Competencies
Rail,
understand
whether ittowasmonitor
toimportant
project
theIimportance
purchase to expenditure
the take
site. of aThisleadincluded
accurate
against
role in order
cost
as the
planning
advising to scheme
obtain
theas this the
client
progresses.
relevant
informson what theinformation
design
assumptions
For
from TJX the Europe
scheme produced
project a
managersfeasibility estimate
infinancial
order to inform them of capital
Design economics and development
Iand
expenditure amcostawareplanning
exclusions from stage
had
budget my and
been
academicassists
requirementsmade in
tothe
studies establish
at the and atorealistic
updatecost
control
professional
early stagesworking when
the
of the cost
limit.
experiencethe
reports
project. of the
information
in a timely
was
Level 1 but
IThrough
When
fundamental accurate
have developed
working manner.
onon
elements my During
understanding
a refurbishment
that makemy team
up of
project involvement
the
a contract various
on andsources
behalf of
how Leeds
they for
ofusingcost
Met TJX
areand dataEurope,
university,
used available
within the
Ia
limited.
meetings This
working
are developed
driven retail
by into
the a
projects
Project cost plan
I have
Manager as the
had who design
experience
discussesprogressedof a set various
itinerary more JCT detailed
where
Level 2 through
compiled
construction
information
contracts professional
a life
such cycle
project,
was asavailable
aninput training
cost
generally
Intermediatecomparison
to refineat by EC theHarris
to
BuildingEmployer,
theimplications
costs.and
inform Monaghans
theMain client
I alsoofundertook
Contract with on
Contractorwhich whether
Contractor's included
and
value engineering to
design the
purchase useI am
and of
a
required
internal
VRF
Subcontractors. AC to
cost
system provide
databases
over
Through a with
standard on
my the
previous
projectFan cost Coilcompany
unit
experience AC projects
system
and different
to
workshopsand reduce construction
externalI their
have sources
operating
an options,
such
awareness as
Level 3 exercises
Minor
procurement
My Works
project due to budget
Building
progress
involvement and constraints,
Contract.
has risk items.
developed ensuring
I have compiled my functionality
awareness and produced and
of theincluding quality
contract
various work were
documents
stages
price
costs.
of
maintained
and how books,
issued contracts BCIS
but and
set
essentially outmarket eachthe testing,
parties
costs all
rights
were of which
and
reduced can
obligations
creatinginform the
savings cost for planning
thethe payment
client.
Contract practice Advising
from
exercise
By design
undertaking onthese
being the most
an
accordingly
to undertaken.
completion appropriate
initial and
scoping
onthrough
Ichange
behalf
understand forms
visit
of
onscope of my
private
that
behalf
clients.
contract
carestudy
ofof isMy
needs
TJX an
IEurope,
have post
important
toto
contract
gained
be aspect
wasknowledge
Itaken when
able
duties
I of
towho
have
my ofjob.
reviewing
advise the
provisions,
IRIBA
included
Working have prepared
work on
mechanisms
carrying
small
stages. and out
and provided for
valuations
medium information
on
sized
and
projects
retail towhich
projectsthe works
in-house
has
I have given be
cost
advised
undertaken.
data
experience team
clients of
on feedon
whether
Level 1 cost
the
understand
the data,
cost
costs and as variants
risk
that such
implications
construction as specification,
associated
contracts with
are location,
an
governed existing time
by and
empty
the otherretail
Construction market
shell Act factors
unit andin
negotiating
Ito
can
Cork,
construction use
regularly theinto
influence
Ireland Minor
attendto
theWorks
variations,
costs.
allow
costmeetings
site
legislation.
database
the
dealing
Contract
Forclientexample
withensuring
toor
to retention
Intermediate
review
make the an
the information
progress
JCT
and Building
informed
2011
materials
and
suite
provided
undertake
decision
was
off site.
Contract onMet
updated
is
Byasreviewing
depending
valuations
whether
accurate
to reflect to and on the
when
Level 2 and
contract
When
their precise I
working
individual as
ensured possible
on athat to
the
refurbishment
requirements ensure
correctand users
retention
of
the benefit
lecture
project from
percentage
theatres
in question. the for cost
was
Leeds
When information
used when
working carrying
University,
at TK one
Maxx out
Ihave
proceed
the have
accordingly.
witnessed
advised
with
Construction on
the different
costwas
acquisition
Act andprojectsprogramme
amended of the at invarying
unit. implications
2011. Istages
have aoffor construction.
basic differing
awareness This
construction of thehas given
various
Level 3 valuations
of
Navan
me
solutions. the
an of client’s
on and
behalf
understanding subsequently
key
For example, ofrequirements
TJX of I was
how
havethe
Iin-house released
involved was
advised elementsto at
in
onthe the
install
thethe correct
acoustic
deferment
ofJCT a building
cost levels
difference panelling
of following
possession
inter-relate.between to Practical
achieve
of
For site
example
areview sound
variable and
Through
forms
Completion
proofing using
standardised
and and BCIS
hard the and contracts
defects
wearing liability
floor cost
such
finishes asinformation,
period due end Minor
to date.
the Ihigh
have Works
I system
have been
volume and able
negotiated of to
Intermediate
footfall. finalhow InI trends
Construction technology gained
how
refrigerant
within
suites
Icontrast a experience
steel
the
and
have managed frame
flow
construction
when air
the
the in
is assessing
connected
conditioning
tenderingindustry
different the
formstoas
process Main
the
system well
wouldon asContractors
foundations
and twin
location
thebe used
majority via
split andloss
taking holding
of and
inflation
my into expense
down
for a
factors.
account
projects, bolts,
proposed claim.
Using
factors
which have
hasthese
such
accounts
advised
rainscreen
building.
I am aware Marswith
when
This of TJX's
working
Petcare
cladding
allowed
the main supply
is on for
fixed
the types chain
Associated
collateral
to
client an
of towho
external
make
procurement are
warrantyBritish listed
anblockworkFoods
informed under
recommendations
routes onwalla JCT
the
decision
including via Framework
development
a to
bracket
on
their be
whether used Agreement.
of
system
advantages, a
to food
alongside
andof
Level 1 and
as
included
Whilst theprevious
procurement
agreeing
producing projects contract
contract I
route have insums worked
use,
documents the
through on I
client's have
both
I required
have to beenriskbeen
an profile able
agreed
able to
and benchmark
schedule
to being
gain their desire
of rateselements
to retain
and
processing
asingle
how
proceed flooring
disadvantages
my
control anstage
cost plans
of
facility,
package
internal
with
the the
toandstud ahow
ensure
design.
selective
key
subcontract
aquistionpartitionrequirement
risks
they
tendering. ofare an theywas
isasTender
constructed.
existing
apportioned
accurate. shell
documentation
achieve
to athe
unit a large
guarantee
whilst
parties normally toexperience
unobstructed
involved.accompany
aware
includes I of
havetheof
floor
but anis area
the
Level 2 liquidated
via
Ipurchase a portal
am aware
additional
appreciation ofdamages
frame
aof
that
costs resinbuilding
associated
the and
solution.
flooring
factors the
design I
with
thatprocedures
therefore
system. isa project
influenced
compulsory
determine to
appreciatefollow
which and once
that
lead
VRFprocurement
system practical
there
by legislation
requiredare completion
differing
route and
by isthe has not
design
regulations
the Landlord.
most
limited
been
Working
solutions to
issued on an
based invitation
bycommercial
ato the
on contract
the to tender,
different administrator.
factory extension,
types, uses information
I advised
and occupation schedule,
Mars Petcare
of contractual
buildings. to adopt details,
a types
My quality
post single
Level 3 Isuch haveas
appropriate
form of building
also
tender,advised regulations
use, on
forthe
instructions example cost and
to conditions
difference
client
tenderers, objectives of
between
drawings, planning different
surrounding permission.
specifications road
time, For
construction
andcost aexample,
and
pricing a
stage
contract
new
of an
performance. selective
building experience
entrance tendering
constructed
and working
car
The experienced park
available options route
in on
Ireland
where asSt opposed
Bedes
itwill
was need
for selecting and to
agreed tendering
Frederick
to have
with
a contractorfire
the solely
Gough
stopping
designer canwith
secondary
beto a
that previously
service
the
categorisedschools
original into
Procurement and tendering document.
Iused supplier I have
inasorder to create howaof levelthe procurement route in use can impact on the
havedepth
provided
penetrations
During
road
both
tender
developed
my exposure
competitive role
process. recorded
specification
TJX
my toknowledge
Quantity
and thewithin
was
negotiated
Europe
different
Surveyora fire
unnecessary
utilise forms
a at of
project
foundation
strategy ofpricing
Clugston
construction
financial
and pack
tendering. typescompetition.
to control
besuch
Construction
subsequently
management My signedasmethods
project I prepared
piling
reducedadvised
Ioff
route by and the
experience topad
with
on
through which
assigned
various
deliver
an anda APC
Level 1 contractors
attending
foundations
certifier
financial
saving
seminars for from
reports
the
have should
seminars
andthe be
andselected
external
building
during
client.
provided my
theanwall project
control forauthority.
construction tendering
constructionsinvolvement. ofsuch
phase Aand new managed
ofFromas
my brick
entrancethisand
projects, Ithis process
understand
toblockwork
a retail
these which
the
includedversus
development need to
At
included
control
glazed project
appointed and commencement
design
holding
curtain monitor team
post
walling. to
tender
costs Iunderstanding
am
provide always
interviews
throughout a technical
thesure
to
the
to
appoint
life of a
different
establish
design the at
construction the
tender methods
successful reporting
stage party
project,
ofin competitive
protocol
order
by
keeping to the
Level 2 affecting
producing
When
tendering
depending
maintain existing
working subcontract
available,
on
greater the highways
onquality
the
client redevelopment
compiling and will
liabilities
control. require
and
project to
Thisreport
issuingofa Batley
section
requirements.
means internally
tender there 278
Sports agreement
our &financial
documentation,
Network
is very Tennis
little Rail roombetween
commitments
centrenegotiation
utilised for the price
I compared
fixed
variance withand
considering
client
developer
forecast
the
tenderingcost informed
and and
margin the
parties client's
at
local
programme allhighway
against
and times.requirements.
each authority.
subcontract
implications
appointing the I have package.
associated
successful produced with During
contractor thetender myon reports
secondment
installationthe basis offor a
of TJXat
timber
the to
tender
Level 3 lump
between
recommend
Through sum contracts
thethe
attending specifications with
appointment
agained
professionallittle scope
of tenders
of Contractors
seminarfor change
received. on In
at Network on a
thecontrast,large
basis
Railof portfolio
Iof when
cost,
was of
working
quality smalland value
on a my
Network
cladding
returns.
projects,
refurbishment Rail
Isystem
have
the I managed
alsoagainst
reporting
of lecture athetrespa
procedure
theatresmonthly
experience for cost
panel
was of
Leeds reporting
alternative.
negotiated
operated Met on aprocess
forms
University,monthly Ifor aable
tendering
basis
experienced
to develop
portfolio
assums of have
through
itextract
would
how
Project Financial Control compliance
awareness & Cost Reporting
ofwith employer’s
managing contingencyrequirements and for
risk the installation
allowances, of
provisional smoke andvents
approximately
partnering
been
poorly unsuitable
defined 60
agreements toprojects
employer’sissue where utilising
reports mymore
requirements Oracle
clients Projects
have
frequently.
provides hadthe software.
a requirement
Working employer forThese TJXwithto reports
on undertake
fastcontrol
less advised
track aretail
Level 1 at
prime
the TK Maxx
client
continuous costs on Navan.
sums.
the
programme cost I
Theseadvised
of work
of Mars
allowances done
construction Petcare
to need
date, on
to
projects. the
be
forecast implications
monitored spend and
for that
expended
the resulted
following from
financial
Ischemes
over am aware
have
novating the which
design
advised
theirfrom typically
onandboth
designer creates
appropriate last athe
University
from 8awider
weeks,
methods andvariance
mythereofwork has
measurement been
inexperience
the aexpenditure.
price large
andof the scope forfor
aprinciples
specification
costing, change and
of
example withat
tenders
Level 2 appropriately
periods
Within
provisional
methods
received.
TK Maxx and
my of
I role a again
sums review
atand
measurement.
carried
Dundrum out
an
keeping
of
Monaghans posttheItender
quantities
additional am Itraditional
remaining client
have
that
aware been
can
informed
risk
interviews
bulkhead that
procurement
allowances.
responsible
sometimes
wasthe when
of the
New
required; account
Rules
working
route
For
for ratesTJX
of
toEurope
quantification
for
for for circa
Measurement
Mars
design
bulkheads I have
20%
Petcare
and
and of
build
costing
the
with
route
My
produced
of as
projectcost
construction at the start
involvement
reports
works of the
during
at has project
various demonstrated
the they
construction
stages were
of how in breach
costIisof
phase of the
inter-related
my contractual
projects with
to terms
time
inform and
the in
Level 3 contract
published
the tendering
elsewhere
place
quality by andsumby
inhow
issuing value.
the RICS
contractors
buildingInhave
instructions
important these were circumstances
toitsuperseded
determine
and
is included
to contacting
monitor inathese
the
which theproject.
athe reporting
Standard
party
pricing
novated
factors
have
Method
was toproduced
protocol
schedule.
designer
when be of of
appointed,
The order
weekly
Measurement
contractor
directly.
controlling
of cost
cost
including
cost.
client
estimates
reports of their
Itfor financial
Primark, position
TJX & Litton atclient
the agreed
properties periods,
ataccurate,
RIBA for
Istage example,
1.for These monthly
have aor
Quantification and Costing (SMM7).
From
weekly. ofwas
standardisation
submitted isadopted
costs important
Construction
working
Dependent onof tender
projects to
approximately
uponWorks keep
toreturns
in
the
the
understand
Irelandtwice
clients
to as
have well
the
Iprovide expensive
preference
updated.
methods
an
monitored and
asofthe advised
measurement
changes
procurement
like
rates TJXlike
included
in the to
route,
adopt
to ensure
comparison.
in
revised my
the the
building
reports
subsequently
standardised
correct
contract definitions
sum developed
change
analysis and request
and into
quantities
I formal
form
therefore arein cost
order
used
refuted plans
into the
theat
reduce stages the
quantification
costs and2,3 &
prolongation
advised 4 as
of the design
of
construction
that theagreeing
rates
Level 1 regulations
From
may my project
include, and the
animprove additional
experience
executive and costs associated
university studies with this toanupdate
I have awareness cost plans
of and
various
evolves.
variations
works.
contained
reports
standardised to and
with
ensure the
forms theycontract
of thesummary,
were
contract cost
sum
brought control
analysis
which
an of
toare
analysis
the the
were
used attention
of contingency
project
utilised
within of throughout
thetothe value client.
construction
and
the the risk
cost post status,
of the
industry,contract for
Level 2 approved
During
Istages.
am aware
change. my changes/
role
Agreeing ofJCT atthe
different instructions
Clugston
riskWorks, and
methods Construction and
contingency pending
of costing I produced changes,
allowances
construction the summary
at bills
the
works of such of provisional
quantities
commencement as utilisingfor aofsums, each
example
PC sums
Through
ground the
and
assisting
works progressMinor
the
subcontract against
project package Intermediate
these,
manager at risk on
Mars register,
variousand
Petcare Design
cash
schemes flowand
and dependent forBuild
forecast/
subsequently TJX suites
Europe and
comparisonI
quantified the
have
Level 3 project
previous
Selecting
basic is an important
similar
the
contractual projects
appropriate
mechanisms aspect
which
pricing of can my be
document
operated role atatvarious
rebased Monaghans.
for inflation
is generally stages These
ofand allowances
locationupon areform
factors
the ifand
of
against
gained
valued
constantly
necessary,
contract actual
experience
change reviewed
testing
utilised, expenditure
during ofand
the
for producing
the
market
example andIvia
post
updated status
contract
contract
advisedas the
enquiries ofBeyond
professional
instructions
stages.
schemeto Whenprogresses
suppliers,
Medispa fees.
under
working
in-house
to athe
by JCT
utilise for contract.
Intermediate
takingTJX
cost
a Europe
into
data,
pricing
Each form
I have
account
using
schedule
Technical - Optionalof contract
Competencies
Building
measured contains
Contract
and agreed 2011 mechanisms
Edition.
contract sums for payment,
During the construction
using anto changeschedule
agreed procedures,
of a retail dispute
development
of rates in cannot
addition for
outstanding
BCIS
with and
a Minor
resolution, price risk
Works
possession on
books eachsuch
JCT and project.
as
contract SPONS.
completion as opposed but may a Bill of Quantities
approach these as this
differently. Forif the beto
Contract Admin TK
other
Iused Maxx
havewith at
pricing
developed Dundrum
thisJCT methods
form. I issued
such
my understanding as an instruction
quotations of how from to the contractor
sub-contractors
riskscontains
are managed to install
and a
dayworks
and mitigated temporary
example
fire alarm thesystem Intermediate Building Contract provisions for&use ofthearates.
Bill
Level 1 works
throughout
I have
of
are not
negotiated
Quantities, lifeat
quantifiable
thesectional the ofthe the
value request
using
project.
completion
of
of construction the Landlord
labour,
Construction
and
material,
nominatedworks and
risks plant subsequently
could
atcontractors and
different overhead
relate stages tomanaged
whereas health
such profit
theas andfor
Minor
change
When
safety,
agreement control
working
cost,ofdoes time,
theprocedure
forcontract
Primarkorsum,
quality in accordance
onvariousthevariations
refurbishment
other with the
implications.
duringan andcontract
the extension terms
From attending
construction and
of Liverpool
stage conditions.
a and Church
Delever forthe I
final
Level 2 Works
ensured form
that TJX asnot. the Theemployercontracts will identify
remained compliant administrator,
with the paymentfor example
provisions
Street
workshop
account I attended
on Risk
agreements. a scoping
Management,
I have agreed visit toI amassess aware how
variations the risks
and associated
risk
final is accounts,
quantified with the project.
by the probability
valuing the change This
Level 3 Design
laid
included &in
outevent aBuild
the
review form
contractof references
the byrisk carrying an
register, employer’s
outasbestos
valuations agent
survey at to whereas
the and correct
FM the Intermediate
intervals
report and
to identify form
any
of the
appropriately
references a occurring
and
contract seeking and
administrator the
advice implications/
from whose other roleimpact
professionals
is essentially the project
if necessary.
to should
administrate thethe event
Risk Management issues subsequently
occur. with
Probabilitythe issued
existing payment
iscertificatesbuildings.
often shown and pay
During less
asinstructions
a percentage thiscertificates.
involvementorissued I was
categorised I involved
contributed as very high/ in the
to the high/
contract,
deferment
identification ensuring
of of possession
risks, on of
confirmed TKand Maxxwho Navan
wouldImplicationsby
take are
one week
ownership in accordance
due oftothe legal risk, with this
issues
suggested
Level 1 medium/
terms low/
contained very within low risk
the occurrence.
contract. These include but are
are often
not measured
limited to against
certificates
associated
mitigation
time and cost with
strategies agreement
impacts. and I also ofdeveloped
advised theon tenancy
themy agreement
potential
awareness and
implicationsof risk subsequentlyof timemethods
analysis andassessed
cost.such
Level 2 for
the
A keycompletion,
contractor's
part of my payments
entitlement
role when and to
working instructions.
claim loss
for TK and
Maxx expense.
is to agree the percentage
as the Monte Carlo Analysis which can create risk models.
Level 3 contingency
Through private allowancestudy I by have taking learned into how account the the differentlevel of outstandingroutes
procurement risk onallocatethe
project.
risk in varying This will ways.constantly
For example, be reviewed design and and adjusted
build routes as the project more
apportion progresses risk with and
the
the risk profile of
contractor, the scheme
whereas construction changes.management routes apportions more risk with
the employer.
2,042
3,415
Word Count
71
174
95
154
142
146
112
142
167
146
192
88
129
110
174
172
155
225
155
149
112 CHECK YOUR ENTRIES
182 AGAINST THE PATHWAY
129 GUIDE SPECIFIC TO YOUR
151
DISCIPLINE
136
196
152
147
175
189
106
134
170
157
145
0
152
126
0
STRUCTURED TRAINING SELECT PERIOD OF
1 YEAR
DURATION STRUCTURED TRAINING
FROM DROP DOWN
CANDIDATE TOTAL DAYS TRAINING
200
NAME: REQUIRED
Monday Monday, March 15, 2021 Construction technology 1 HSBC Site Visit to inspect building
Tuesday Tuesday, March 16, 2021 Optional 1 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, March 17, 2021 Optional 2 0.5 1 McDonalds Interim Valuation Issue
Thursday Thursday, March 18, 2021 Risk Management 0.5 2 Apple Update Risk Register
Monday Monday, March 22, 2021 Construction technology 1 HSBC Site Visit to inspect building
Tuesday Tuesday, March 23, 2021 Optional 1 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, March 24, 2021 Optional 2 0.5 1 McDonalds Interim Valuation Issue
Thursday Thursday, March 25, 2021 Risk Management 0.5 2 Apple Update Risk Register
Monday Monday, March 29, 2021 Construction technology 1 HSBC Site Visit to inspect building
Tuesday Tuesday, March 30, 2021 Optional 1 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, March 31, 2021 Optional 2 0.5 1 McDonalds Interim Valuation Issue
Thursday Thursday, April 01, 2021 Risk Management 0.5 2 Apple Update Risk Register
Monday Monday, April 05, 2021 Construction technology 1 HSBC Site Visit to inspect building
Tuesday Tuesday, April 06, 2021 Optional 1 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, April 07, 2021 Optional 2 0.5 1 McDonalds Interim Valuation Issue
Thursday Thursday, April 08, 2021 Risk Management 0.5 2 Apple Update Risk Register
Monday Monday, April 12, 2021 Construction technology 1 HSBC Site Visit to inspect building
Tuesday Tuesday, April 13, 2021 Optional 1 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, April 14, 2021 Optional 2 0.5 1 McDonalds Interim Valuation Issue
Thursday Thursday, April 15, 2021 Risk Management 0.5 2 Apple Update Risk Register
Monday Monday, April 19, 2021 Construction technology 1 HSBC Site Visit to inspect building
Tuesday Tuesday, April 20, 2021 Optional 1 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, April 21, 2021 Optional 2 0.5 1 McDonalds Interim Valuation Issue
Thursday Thursday, April 22, 2021 Risk Management 0.5 2 Apple Update Risk Register
Monday Monday, April 26, 2021 Construction technology 1 HSBC Site Visit to inspect building
Tuesday Tuesday, April 27, 2021 Optional 1 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, April 28, 2021 Optional 2 0.5 1 McDonalds Interim Valuation Issue
Thursday Thursday, April 29, 2021 Risk Management 0.5 2 Apple Update Risk Register
Monday Monday, May 03, 2021 Construction technology 1 HSBC Site Visit to inspect building
Tuesday Tuesday, May 04, 2021 Optional 1 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, May 05, 2021 Optional 2 0.5 1 McDonalds Interim Valuation Issue
Thursday Thursday, May 06, 2021 Risk Management 0.5 2 Apple Update Risk Register
Monday Monday, May 10, 2021 Construction technology 1 1 HSBC Site Visit to inspect building
Tuesday Tuesday, May 11, 2021 Optional 1 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, May 12, 2021 Optional 2 0.5 1 McDonalds Interim Valuation Issue
Thursday Thursday, May 13, 2021 Risk Management 0.5 2 Apple Update Risk Register
Monday Monday, May 17, 2021 Construction technology 1 HSBC Site Visit to inspect building
Tuesday Tuesday, May 18, 2021 Design economics and cost planning 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, May 19, 2021 Project Financial Control & Cost Reporting 0.5 1 McDonalds Interim Valuation Issue
Thursday Thursday, May 20, 2021 Risk Management 0.5 2 Apple Update Risk Register
Friday Friday, May 21, 2021 Contract practice 1 Tesco Compiling JCT contract
Monday Monday, May 24, 2021 Construction technology 1 HSBC Site Visit to inspect building
Tuesday Tuesday, May 25, 2021 Design economics and cost planning 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, May 26, 2021 Project Financial Control & Cost Reporting 0.5 1 McDonalds Interim Valuation Issue
Thursday Thursday, May 27, 2021 Risk Management 0.5 2 Apple Update Risk Register
Friday Friday, May 28, 2021 Contract practice 1 Tesco Compiling JCT contract
Monday Monday, May 31, 2021 Construction technology 1 HSBC Site Visit to inspect building
Tuesday Tuesday, June 01, 2021 Design economics and cost planning 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, June 02, 2021 Project Financial Control & Cost Reporting 0.5 1 McDonalds Interim Valuation Issue
Thursday Thursday, June 03, 2021 Risk Management 0.5 2 Apple Update Risk Register
Friday Friday, June 04, 2021 Contract practice 1 1 Tesco Compiling JCT contract
Monday Monday, June 07, 2021 Contract Admin 1 2 HSBC Site Visit to inspect building
Tuesday Tuesday, June 08, 2021 Procurement and tendering 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, June 09, 2021 Construction technology 2 McDonalds Interim Valuation Issue
Thursday Thursday, June 10, 2021 Construction technology 3 McDonalds Interim Valuation Issue
Friday Friday, June 11, 2021 Construction technology 4 McDonalds Interim Valuation Issue
Monday Monday, June 14, 2021 Contract Admin 1 2 HSBC Site Visit to inspect building
Tuesday Tuesday, June 15, 2021 Procurement and tendering 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, June 16, 2021 Construction technology 1 2 McDonalds Interim Valuation Issue
Thursday Thursday, June 17, 2021 Construction technology 3 McDonalds Interim Valuation Issue
Friday Friday, June 18, 2021 Construction technology 4 McDonalds Interim Valuation Issue
Monday Monday, June 21, 2021 Contract Admin 1 2 HSBC Site Visit to inspect building
Tuesday Tuesday, June 22, 2021 Procurement and tendering 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, June 23, 2021 Construction technology 1 2 McDonalds Interim Valuation Issue
Thursday Thursday, June 24, 2021 Construction technology 3 McDonalds Interim Valuation Issue
Friday Friday, June 25, 2021 Construction technology 4 McDonalds Interim Valuation Issue
Monday Monday, June 28, 2021 Contract Admin 1 2 HSBC Site Visit to inspect building
Tuesday Tuesday, June 29, 2021 Procurement and tendering 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, June 30, 2021 Construction technology 1 2 McDonalds Interim Valuation Issue
Thursday Thursday, July 01, 2021 Construction technology 3 McDonalds Interim Valuation Issue
Friday Friday, July 02, 2021 Construction technology 4 McDonalds Interim Valuation Issue
Monday Monday, July 05, 2021 Contract Admin 1 2 HSBC Site Visit to inspect building
Tuesday Tuesday, July 06, 2021 Procurement and tendering 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, July 07, 2021 Construction technology 1 2 McDonalds Interim Valuation Issue
Thursday Thursday, July 08, 2021 Construction technology 3 McDonalds Interim Valuation Issue
Friday Friday, July 09, 2021 Construction technology 4 McDonalds Interim Valuation Issue
Monday Monday, July 12, 2021 Contract Admin 1 2 HSBC Site Visit to inspect building
Tuesday Tuesday, July 13, 2021 Procurement and tendering 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, July 14, 2021 Construction technology 2 McDonalds Interim Valuation Issue
Thursday Thursday, July 15, 2021 Construction technology 3 McDonalds Interim Valuation Issue
Friday Friday, July 16, 2021 Construction technology 1 4 McDonalds Interim Valuation Issue
Monday Monday, July 19, 2021 Contract Admin 1 2 HSBC Site Visit to inspect building
Tuesday Tuesday, July 20, 2021 Procurement and tendering 1 2 NHS Cost plan updates at Stage 3 to Stage 4
Wednesday Wednesday, July 21, 2021 Construction technology 1 2 McDonalds Interim Valuation Issue
Thursday Thursday, July 22, 2021 Construction technology 1 3 McDonalds Interim Valuation Issue
Friday Friday, July 23, 2021 Construction technology 1 4 McDonalds Interim Valuation Issue
Construction technology 9
Risk Management 6
Contract Admin 7
Contract practice 1
Optional 1 9
Optional 2 4.5
STRUCTURED TRAINING
1 YEAR
DURATION
APC START
3/13/2021 TOTAL HOURS COMPLETE 1
DATE:
TOTAL HOURSREMAINING 47
Hours Learning
Day Date CPD Activity Type Type
Recorded Outcome
Asbestos Awareness
Training including
information on the
Monday Monday, March 15, 2021 Training Course 1 Formal
different types of
asbestos and where it can
be found.
0 0.5 1
17
%
17
%
Procurement and Project Financia
tendering & Cost Repo
Days
COMPETENCY TRACKE
Hours Complete vs Remaining Competancy Breakdown
inc remaining hours
17 2%
Contract practice Design economics and cost
planning
Procurement and tendering Project Financial Control &
Cost Reporting
Quantification and Costing of Risk Management
%
Construction Works
Remaining Days to complete
4% 15
%
Project Financial Control Quantification and
& Cost Reporting of Construction W
22%
Optional 1 Opt
0 0.1
0 0.1
RACKER
ompetancy Breakdown Competancy Hours Completed Breakdown
inc remaining hours 1
0.8
0.6
0.4
Contract Admin
2% 7%
0.2
Design economics and cost
planning 0
Project Financial Control &
Cost Reporting
Risk Management
15 15
% %
cation and Costing Risk Management
nstruction Works
11%
Optional 2
ENCE
R
plete
cs and cost
g
ement
0.9 1
0.9 1
% of experRemaining % Complete
9 22% 0.78
4.5 11% 0.89
9 22% 0.78
7 17% 0.83
1 2% 0.98
3 7% 0.93
7 17% 0.83
1.5 4% 0.96
6 15% 0.85
6 15% 0.85
40.5 0 100%
146
54 CPD Hours1
200 CPD Hours 48
MONTH 6
POPULATE DIARY & CPD ENTRIES
POPULATE SUMMARY OF EXPERIENCE (LEVEL 1 FOCUS)
POPULATE SOME LEVEL 2 EXPERIENCE IF POSSIBLE
BACKGROUND READING
SUPERVISOR & COUNSELLOR MEETING
REVIEW DIARY ENTRIES AND ADDRESS SHORTFALLS
AIM TO HAVE 50% OF LEVEL 1 POPULATED & SIGN OFF
MONTH 9
POPULATE DIARY & CPD ENTRIES
POPULATE SUMMARY OF EXPERIENCE LEVEL 1
START TO FOCUS ON LEVEL 2 ENTRIES ALSO
SUPERVISOR MEETING
REVIEW DIARY ENTRIES & ADDRESS SHORTFALLS
AROUND 75% OF LEVEL 1 ENTRIES POPULATED
AROUND 50% OF LEVEL 2 ENTRIES POPULATED
MONTH 12
POPULATE DIARY & CPD ENTRIES
BACKGROUND READING
SUPERVISOR & COUNSELLOR MEETING
ALL LEVEL 1 SIGNED OFF & AROUND 75% LEVEL 2
CPD LOG SHOULD SHOW 48 HOURS ACHIEVED
DISCUSS CASE STUDY AND SHORT LIST IDEAS
MONTH 15
POPULATE DIARY & CPD ENTRIES
BACKGROUND READING
AIM TO COMPLETE ALL LEVEL 2 ENTRIES
SUPERVISOR MEETING
REVIEW CASE STUDY DRAFT CONTENT
ASK FOR ANY PROPOSED AMENDMENTS
REVIEW DIARY ENTRIES & ADDRESS ANY SHORTFALLS
MONTH 18
POPULATE DIARY & CPD ENTRIES
FINALISE SUMMARY OF EXPERIENCE LEVEL 3
FINALISE WRITE UP OF CASE STUDY
SUPERVISOR & COUNSELLOR MEETING
THOROUGH REVIEW OF CASE STUDY
ASK FOR ANY PROPOSED AMENDMENTS
REQUEST LIST OF QUESTIONS USING SoE & CASE STUDY
MONTH 21
CONTINUE REVISION AROUND SoE & CASE STUDY
PRACTICE VERBAL Q&A WITH STUDY GROUND, FRIENDS
& FAMILY
PRACTICE PRESENTATION
USE LIST OF KEYWORDS
GOOD FOCUS ON RICS ETHICS, RULES OF CONDUCT &
PROFESSIONAL STANDARDS
MONTH 24
FOCUS ON FEEDBACK FROM MOCK INTERVIEWS
LOOK TO ADDRESS ANY WEAK AREAS
CONTINUE Q&A PRACTICE
BASE REVISION AROUND SUBMISSION DOCUMENTS
CONTINUE PRESENTATION PRACTICE
GOOD FOCUS ON RICS, RULES OF CONDUCT
ATTEND FINAL ASSESSMENT INTERVIEW