THREE OUT SYSTEM DETAILS

(To be submitted by 3rd of every month with Monthly HSE Report)


Format No.: EIL/ B224/HSE/19
Name of Contractor: Toyo Engineering India Pvt. Limited For the month of: December, 2020

Scope of work: DHDT-HGU Status as on: 31st December, 2020.

Instance of
Induction card warnings
S. NO Date Name of the violator Designation Gate pass number Violation
No.

(1st , 2nd & 3rd )

Mr. Baijnath found without Full Body


1 05.12.2022 Baijnath Tanti Supervisor HBDH/LI/IN.445 N.A Harness approx 4mtr at PR-4 DHDT.
1st

HBDH/LI/IN.405 Mr. Sonu using improper hand tools


2 22.12.2022 Sonu Kumar Helper N.A 1st
while elevation work.
Mr. Chandan has mis-communicate
3 22.12.2022 Chandan Kumar Helper HBDH/LI/IN.484 N.A with another respective while 1st
elevation work.

Cumulative Status:

For the Month Cumulative


1st Out
2nd Out
3rd Out
Total
Certified that all above details are correct.

Contractor’s Safety Officer Contractor’s RCM/Site In-charge

Signature: Signature:
Name: Radhekisan Name: Mohan Tarune

Date: 03.01.2021 Date: 03.01.2021


Recorded by

Radhakishan

Devendra Kr.

Devendra Kr.
une
DETAILS OF WORKMEN ACCOMODATION
(To be submitted by 3rd of every month with Monthly HSE Report)
Format No.: EIL/ B224/HSE/18
Name of Contractor: Toyo Engineering India Pvt. Limited For the month of: December, 2020

Scope of work: DHDT-HGU Status as on: 31st December, 2020.

Contractor / Address of Accommodation In- No. of workmen Adequate and Safe


No. of bath
Sr. No. Sub- Accommodatio charge Name & contact in the No. of rooms No. of toilets No. of urinals Drinking Water
rooms
contractor Name n number accommodation Facility (Yes / No)

Behind HP Petrol
1 Lloyd insulation pump Madina Pokar Ram 135 20 10 10 10 Yes
Pachhpadra

Certified that all above details are correct.

Contractor’s Safety Officer Contractor’s RCM/Site In-charge

Signature: Signature:

Name: Radhakishan Name: Mohan Tarune

Date: 03.01.2021 Date: 03.01.2021


DETAILS OF DRINKING WATER FACILITIES AT SITE
(To be submitted by 3rd of every month with Monthly HSE Report)
Format No.: EIL/ B224/HSE/17
Name of Contractor: Toyo Engineering India Pvt. Limited For the month of: December, 2020

Scope of work: DHDT-HGU Status as on: 31st December, 2020.

Portability Facilities
Identification no. of water Water Logging
Sl. No. Location checked or not adequate or Remarks
tank provided (Yes / No)
(Yes / No) not (Yes / No)

1 LLOYD /Water Tank /01 DHDT Fabrication yard Yes Yes No

Certified that all above details are correct.

Contractor’s Safety Officer Contractor’s RCM/Site In-charge

Signature: Signature:

Name: Radhekishan Name: Mohan Tarune

Date: 03.01.2021 Date: 03.01.2021


STATUS OF CALIBRATION CERTIFICATES (Safety Related Measuring / Testing Equipment’s)
(To be submitted by 3rd of every month with Monthly HSE Report)
Format No.: EIL/ B224/HSE/16
Name of Contractor:Toyo Engineering India Pvt. Limited For the month of: December, 2020.

Scope of work: DHDT-HGU Status as on: 31, December,2020.

Name of Toilets /Urinal (nos.) Labour Rest Shed


Sr. Contractor / Drinking Water
Remarks
No. Approved Sub Points (nos.)
contractor
Identification
Man Woman Area (m2)
No.

1 Lloyd Insulation 1 0 0 Rest Shed-1 10m2

Certified that all above details are correct.

Contractor’s Safety Officer Contractor’s RCM/Site In-charge

Signature: Signature:

Name: Radhakishan Name: Mohan Tarune


Date: 03.01.2021 Date: 03.01.2021
DETAILS OF DEPLYOMENT OF SAFETY PERSONNEL
(To be submitted by 3rd of every month with Monthly HSE Report)
Format No.: EIL/ B224/HSE/14
Name of Contractor: Toyo Engineering India Pvt. Limited For the month of: December, 2020

Scope of work: DHDT-HGU Status as on: 31st December, 2020.

Sr. Experience (in Qualification (HSC / Diploma /


Name Designation Contact No.
No. years) Degree with discipline + DIS with name of Institute)
1 RADHAKISHAN HSE SUPERVISOR 9588033142 9 BA + DIPLOMA IN INDUSTRIAL SAFETY
2 HARINDRA KUMAR HSE LEADS 8191932035 7
BITECH + ADVANCE DIPLOMA IN INDUSTRIAL SAFETY
3 GOVINDA JAISWAL HSE SUPERVISOR 8858238727 4.6 BSC + DIPLOMA IN INDUSTRIAL SAFETY

4 Devendra kumar HSE SUPERVISOR 9815886359 7 DIPLOMA IN MECHANICAL + DIPLOMA IN INDUSTRIAL SAFETY

10

11

12

13

14
15

16

17

18

Certified that all above details are correct.

Contractor’s Safety Officer Contractor’s RCM/Site In-charge

Signature: Signature:

Name: RADHAKISHAN Name: MOHAN TARUNE

Date: 03.01.2021 Date:


14
2020

020.

Date of
Deployment at
HRRP Site

22 Sep.2022

6 Dec.2022
MOHAN TARUNE

03.01.2021
STATUS OF CALIBRATION CERTIFICATES (Safety Related Measuring / Testing Equipment’s)
(To be submitted by 3rd of every month with Monthly HSE Report)
Format No.: EIL/ B224/HSE/13
Name of Contractor:Toyo Engineering India Pvt. Limited For the month of: December, 2020.

Scope of work: DHDT-HGU Status as on: 31st December, 2020.

Sr. Equipment Serial Calibration Due


Name of Equipment Identification Calibration Agency Name Calibration Certificate No. Calibration Date Remarks
No. Date
No.

1 Multi Gas Detector 210702521 VAROSA ENGG PVT LTD VAR-CAL-230-03/31 3/30/2022 3/29/2023 LLOYD

2 Coating Thickness Meter CES/F02 CALTECH ENGINEERING SERVICES CES/21-22/1374 3/4/2022 3/3/2023 LLOYD

3 HARDNESS TESTER 290920 CALTECH ENGINEERING SERVICES CES/21-22-1375 3/4/2022 3/3/2023 LLOYD

Certified that all above details are correct.

Contractor’s Safety Officer Contractor’s RCM/Site In-charge

Signature: Signature:

Name: Radhakishan Name: Mohan Tarune


Date: 03.01.2021 Date: 03.01.2021
DETAILS OF TEMPORARY ELECTRICAL BOOTH / INSTALLATION & DG SET
(To be submitted by 3rd of every month with Monthly HSE Report)
Format No.: EIL/ B224/HSE/12
Name of Contractor: Toyo Engineering India Pvt. Limited For the month of: December, 2020

Scope of work: DHDT-HGU Status as on: 31st December, 2020.

Types of Electrical Identification No. Physical Earthing Fire


ELCB Status
Sr. No. Installation Capacity Identification No. tagged/punched Condition Provided Extinguisher(Y Remarks
(OK/ NOT OK)
(DG & DB) (YES/NO) (OK/NOT OK) (YES/NO) ES/NO)

1 DG 30KWA/415V LLOYD/DG/01 YES OK OK YES YES DHDT

2 DG 30KWA/415V LLOYD/DG/02 YES OK OK YES YES DHDT

3 PDB 440 VOLTS LLOYD/PDB/03 YES OK OK YES YES DHDT

4 PDB 440 VOLTS LLOYD/PDB/02 YES OK OK YES YES DHDT

5 PDB 440 VOLTS LLOYD/PDB/01 YES OK OK YES YES DHDT


LLOYD/EXTENSION
6 Extension Board YES OK OK NO YES DHDT
BOARD/01
LLOYD/EXTENSION
7 Extension Board YES OK OK NO YES DHDT
BOARD/02
8

10

11

12

13

14

15
16

17

18

19

20

21

Certified that all above details are correct.

Contractor’s Safety Officer

Signature:

Name:
Contractor’s RCM/Site In-charge
Date:
Signature:

Radhakishan Name: Mohan Tarune

03.01.2021 Date: 03.01.2021


LIST OF LIFTING TOOLS/ TACKLES
(To be submitted by 3rd of every month with Monthly HSE Report)
Format No.: EIL/ B224/HSE/11
Name of Contractor: Toyo Engineering India Pvt. Limited For the month of: December, 2020

Scope of work: DHDT-HGU Status as on: 31st december, 2020.

Sr. No. Name of Types of Lifting Capacity Identification No. Registration Physical Date of Date of Remarks
Contractor / Equipment / Tools & (Regn. No. / Serial No.) No. /Serial No. Condition Inspection Validity (TPI)
Approved Tackles / Pressure plate available (OK/NOT OK) (TPI)
Subcontractor Vessel (YES/NO)

1
LLOYD Single Rope Pulley-01 1 Ton SGP-1 OK 06.08.2022 05.08.2023
2
LLOYD Single Rope Pulley-02 1 Ton SGP-2 OK 06.08.2022 05.08.2023
3
LLOYD Single Rope Pulley-03 1 Ton SGP-3 OK 06.08.2022 05.08.2023
4

10

11

12

13

14

15

16

17

18
19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44
45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70
71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96
97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

121

122
123

124

125

126

127

128

129

130

131

132

133

134

135

136

137

138

139

140

141

142

143

144

145

Certified that all above documents are valid and duly inspected by us.

Contractor’s Safety Officer Contractor’s RCM/Site In-charge


Signature: Signature:

Name: Jayanta Ghosh Name: Anand Sundararajan

Date: 03.01.2021 Date: 03.01.2021


LIST OF VEHICLES / EQUIPMENTS
(To be submitted by 3rd of every month with Monthly HSE Report)
Format No.: EIL/ B224/HSE/10
Name of Contractor: Toyo Engineering India Pvt. Limited For the month of: December, 2020

Scope of work: DHDT-HGU Status as on: 31th December, 2020.


Equipment / Valid Till Date License Valid Till Date
S. No. Agency Identification No. Driver Name Type Remarks
Vehicle Type FC PUC Insurance Road Tax Permit License Eye Test
30/06/2028(NT)
1 M/s Lloyd Ins Mahindra Bol-Camper RJ04-GB 0509 12/6/2024 1/6/2024 26/06/2023 27/06/2023 Rajasthan Permt Ganga Ram NT+T 23/09/2024(T) 2/12/2022
RJ2021-SC-0056A- 12/07/2037(NT)
2 M/s Lloyd Ins Bus RJ01-PA-4382 11/1/2023 10/7/2022 10/1/2023 NT+T 15/06/2022
252 Mula Ram 29/12/2025(T)
05/12/2036(NT)
3 M/s Lloyd Ins Bolero Pickup RJ04-GC-1647 7/8/2023 5/2/2023 25/07/2023 31/03/2043 NA Prema Ram NT+T 22/03/2027(T) 8/6/2022
09/05/2033(NT)
4 M/s Lloyd Ins Croser RJ39-TA-0599 4/10/2024 4/10/2023 4/10/2023 Lift Time Tax 16/10/2027 Pokra Ram NT+T 16/12/2025(T)
27/10/2030(NT)
5 M/s Lloyd Ins TATA407 RJ04-GB-6657 5/9/2023 9/3/2023 15/07/2023 15/07/2033 Rajasthan Permt Purkha Ram NT+T 7/6/2022
02/08/2027(T)
6

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28
29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61
62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94
95

96

97

98

99

100

101

Certified that all above documents are valid and duly inspected by us.

Contractor’s Safety Officer

Contractor’s RCM/Site In-charge

Signature:
Signature:
Name: Radhakishan
Name: Mohan Tarune
Date: 03.01.2021
Date: 03.01.2021
STATUS OF STATUTORY DOCUMENTS
(To be submitted by 3rd of every month with Monthly HSE Report)
Format No.: EIL/ B224/HSE/09
Name of Contractor: Toyo Engineering India Pvt. Limited For the month of: December,2020.

Scope of work: DHDT-HGU Status as on: 31st December, 2020

Description Document / Policy No. Document / Policy Document / Policy Remarks


Issue Date Validity No. of
Sr. No. persons
covered

Labour License
30042203043628 03.05.2022 17.04.2023 125 M/s Lloyd Ins

Migrant Labour License


2 NA NA NA NA NA
Registration under BOCW Act
a. Fire Proofing UNDER PROCESS NA NA NA M/s Lloyd Ins
b. Insulation a. BOCW/ALCJODHPUR/2022/R-38 a.08/01/2022 NA a.125
b. BOCW/ALCJODHPUR/2022/R-52 M/s Lloyd Ins
b.200
3 b.05/08/2022

Registration under PF Act

GJ/SRT/30384
3/9/1996 NA NA M/s Lloyd Ins
4

Registration under ESI Act

5
Registration under ESI Act

15310166710011000
17/12/2020 NA NA M/s Lloyd Ins
5

Employee Compensation Insurance 2280077369


12/5/2022 11/5/2023 500 M/s Lloyd Ins

Contractor All Risk (CAR) Policy (EAR)


7 NA NA NA NA M/s Lloyd Ins
Third Party Liability Insurance NA NA NA NA M/s Lloyd Ins

Signature: Signature:

Name: Radhakishan Name: Mohan Tarune

Date: 03.01.2021 Date: 03.01.2021


DETAILS OF MOTIVATIONAL PROGRAM
(To be submitted by 3rd of every month with Monthly HSE Report)
Format No.: EIL/ B224/HSE/05
Name of Contractor: Toyo Engineering India Pvt. Limited For the month of: November,2022.

Scope of work: DHDT-HGU Status as on: 30th November, 2022

Sr. No. Date Name Gate Pass/ Induction No. Designation Reason for Selection Remarks

1 03.12.2022 Manoj Yadav 173 Mason for good work practice. LLYOD

2 03.12.2022 Kunjush mukhiya 435 Asst. mason for best PPE's used at work place. LLYOD

3 03.12.2022 Prabhu Paswan 504 Helper for good work practice. LLYOD

4 03.12.2022 Ajit Kr. Singh 244 Helper Good housekeeping maintain at work place. LLYOD

5 03.12.2022 Phulchan Kumar 503 Helper for good work practice. LLYOD

6 03.12.2022 Chandan Kumar 484 Helper for best PPE's used at work place. LLYOD

7 03.12.2022 Deepak Sah 27 Fitter for good work practice. LLYOD

10

18
Certified that all above details are correct.
Unsafe Act Unsafe Conditions
S. No Hazard Categories Till Last Current Till Last Current
Total Total
Month Month Month Month

1 Personal Protective Equipment 33 33 0 0

2 Housekeeping 1 1 19 19
3 Working at Height 0 0 3 3
4 Scaffold 16 16 27 27
5 Confined Space 2 2 1 1
6 Excavation 0 0 0 0
7 Tools & Equipment 0 0 3 3
8 Work Permit 2 2 0 0
9 Hazardous Materials 0 0 11 11
10 Lifting & Rigging 1 1 0 0
11 Electricity 0 0 16 16
12 Traffic & Road Safety 9 9 1 1
13 Environmental Protection 0 0 0 0
14 Fire Protection 0 0 0 0
15 Others 0 0 0 0
TOTAL 0 64 64 0 81 81
Note: Observation Register(s) are to be maintained at the site which will be periodically
reviewed by EIL Engineers.
Unsafe Acts Unsafe Conditions
Total Month
Detected Complied Pending Detected Complied Pending

Till Last
33 Month
Current
20 Month 64 64 0 81 81 0
3 TOTAL 0 0 0 0 0 0
43
3 #REF! #REF!
0
3 #REF! #REF! #REF! #REF!
2
11 #REF! #REF! #REF! #REF!
1
16
#REF! #REF! #REF! #REF!
10
0
#REF! #REF! #REF!
0
0
145

You might also like