The Guide:

5 Steps to 
Construction 
Cost Control  
The Guide: 5 Steps to Construction Cost Control

Table of Contents

3 Introduction

4 Lay the foundation:


How to successfully control construction costs

8 Identify common overruns:


The most common causes of cost overruns in construction projects

14 Upgrade from spreadsheets:


Manage construction costs in the cloud and ditch the spreadsheet

20 Understand and leverage the benefits of technology:


Managing construction costs can lower insurance premiums

24 Cost code pro tips:


Get started on the right track with the right tools

2
Introduction
Do your projects operate with low margin and high risk of overrun? You can better control
your project costs with improved visibility of real-time information. Improving your
cost control can transform your projects, lowering risk and increasing profitability.

Are you looking for that definitive how-to guide that will lay the
foundation for a successful cost management transition?

Here is a 5-step guide to data-drive, cloud-based cost control. Use this guide as your
blueprint for visualising and guiding your construction cost management strategy and plan.

Step 1 Lay the foundation: How to successfully control construction costs

Step 2 Identify common overruns: The most common causes


of cost overruns in construction projects

Step 3 Upgrade from spreadsheets: Manage construction


costs in the cloud and ditch the spreadsheet

Step 4 Understand and leverage the benefits of technology:


Managing construction costs can lower insurance premiums

Step 5 Cost code pro tips: Get started on the right track with the right tools

Straight-forward and informative, this actionable guide will provide


you with a blueprint for your cost management plan.

3
The Guide: 5 Steps to Construction Cost Control

Lay the foundation: How to successfully


control construction costs

Construction cost control is critical to Managing construction budgets


ensuring that projects are successful. clearly presents a number of
The better handle you have on your costs, challenges to organisations, but the
the higher the likelihood that a project will good news is that there are ways to
be delivered on time, within scope, and on keep your costs under control.
budget — a win for everyone involved.

Budget control is even more important


in today’s uncertain environment,
as construction professionals face
new pressures, including labour
shortages and rising material costs.

Unfortunately, managing your project


finances is a major challenge for most
organisations, and industry data shows that
just 31% of projects come within 10% of
the original budget. The issue is even more
pronounced in larger projects; according
to McKinsey, 95% of megaprojects
become delayed or over budget.

4
The Top Challenges with Using Inflexible or “One and preconstruction. A study published in
Size Fits All” Solutions the International Journal of Innovation,
Construction Cost Control Every construction project is different. Management and Technology identified
Why exactly do so many projects There’s always a unique blend of “frequent design change” as one of the top
go over budget? Below are some of participants — owners, architects, causes of overruns. Not having clearly defined
the top challenges that come with engineers, contractors, subcontractors, objectives and scope leads to an increase in
managing construction costs. suppliers — who bring their own costs and change orders, which results in overruns.
schedules to the table. Because of this, cost
Lack of Integration Between Systems As such, it’s critical to get teams, costs,
is often the lowest common denominator for
The lack of integration between and expectations aligned early on in your
everything that occurs on a project — from
systems is one of the problem factors projects. If you don’t get the design and
design, quality, schedule, materials, etc.
in construction cost management preconstruction phases right, you’ll likely run
Problems arise when you don’t have a into cost issues as the project progresses.
Too often, teams handle budgets using
cost management system that’s flexible
separate Excel documents and financial
enough to handle the various participants
ERP systems — neither of which are
and components in a project. In other
built for construction professionals.
words, while you need repeatable systems
Stakeholders then have to deal with
and procedures, make sure your system
multiple documents and different
has enough room for customisation.
systems, which makes cost control even
more difficult and time consuming. Frequent Changes to the Project
Construction projects are never
Not having a central system for cost
static; changes that impact costs can
management also results in teams
happen on a daily basis. Overruns
working in silos, so there’s poor
occur when teams fail to forecast,
communication between stakeholders.
react, and adjust to these changes.
All that results in unreliable response times
These cost control issues are often rooted
and convoluted processes involving a
in ineffective management during the
variety of vendors, systems, and products.
early stages of a project — i.e., design

5
The Guide: 5 Steps to Construction Cost Control

How to Gain Control of A centralised system also provides a Ideally, you should be able to create
single source of truth, so stakeholders multiple project-level markup configurations
Construction Costs can have one reliable hub for data. to apply during the change order process
Now that we’ve discussed the challenges and build a document template library to
with cost management, let’s look at Finally, a tightly connected cost
generate contractors that populate with
how you can overcome them. management system can offer a real-
information directly from the system.
time view of your project’s financial
The best way to gain control over your health, so you can make better decisions Automated Workflows
construction finances is to have a central and forecast costs more accurately. Finding ways to increase productivity is
cost management system that provides critical in construction. Ideally, you want
flexibility and customisation to meet All in all, having a cost control system
a cost management solution that can help
changing and unique project needs. Here that’s centralised and connects with
automate manual tasks like elevating an
are the key attributes of a solid construction other construction platforms helps teams
RFI to a potential change order, moving
cost management system that keeps your achieve more predictability when it comes
change orders through the approval
projects running on time and within budget. to cash flow and profitability projections.
process, generating contracts, and payment
This, in turn, leads to more efficient
applications with a few clicks of a button.
Connected and Centralised projects and a healthier bottom line.
Cost Management It is even better if the solution allows you
A tightly integrated cost management Customisable Structures
to improve consistency and transparency
system is essential if you want to get your and Terminology
of company-defined processes across
budget under control. It’s critical that You want a construction cost management
projects by creating custom approval
the system that you’re using to record, solution that adjusts to your unique
workflows. Utilising a decision-based
calculate, and forecast costs is connected processes. So, equip your team with a
workflow engine, teams can automate the
to the other related applications that you’re solution that lets you customise structures
routing of internal approvals for Owner
using. Doing so keeps multiple moving parts and terminology used throughout the
Change Orders, Supplier Change Orders, and
in sync, eliminates the need for double- system to suit your needs and preferences.
Contracts based on specific conditions.
entry, and helps teams be more efficient. A robust cost management tool will allow
It’s important to make sure the cost
When you centralise the management you to rename the tabs to reflect the
management solution you select not
of all cost activities, you ensure that terminology you use, set up custom budget
only allows you to automate processes
your construction data is connected structures that work with any accounting
but keeps a detailed log of the items
and auto-updates across the system and work breakdown structure, and
activity for future reference.
platform to offer an accurate view create custom calculated budget columns.
of the project’s financial health.

6
Collaborative but Configurable Controls Certain tools can even allow you to Gain Control of Your Costs
Collaboration is important in construction. configure and optimise each view based
But in order for teams to effectively on the information most relevant to the
with Autodesk Build
work together, stakeholders should stakeholders. For example, executives can Getting teams on board a robust cost
be given enough visibility into the view cross-project cost information in a management system is the first step to
project’s costs and progress. dashboard format to quickly see areas of improving your budgets and forecasts.
risk, concern, and general project health. Autodesk Build gives you all the tools
That said, you don’t want to give everyone you need to achieve better cost control.
the same view and level control. Giving By having these capabilities in place, you’ll It helps you stay on top of your costs
people unnecessary information or too not only be able to bring teammates into throughout the entire project lifecycle
much control can cause confusion. the system, but you’ll have the ability to — including tracking change orders,
invite owners and suppliers to collaborate, managing supplier contracts and more.
For this reason, you need to adopt tools
which further streamlines your projects.
that can help you manage users and With Autodesk Build, you get a centralised
their permissions. See to it that your and flexible solution that leads the way
system enables you to grant or restrict for more accurate data visibility and
access based on each person’s role. better collaboration. This enables project
Having the ability to provide “read only” participants to achieve higher levels of
access or features that allow you to hide transparency and accountability, ultimately
certain information comes in handy. helping keep your projects on track.

7
The Guide: 5 Steps to Construction Cost Control

Identify common overruns:


The most common causes of cost
overruns in construction projects
How Proper Planning budgets being set improperly from
the beginning of the project.
Can Help Keep Your Although extreme weather or forces beyond
Project on Budget human control can impact budgets, in
It’s safe to say that cost overruns in most cases, a project’s overrun is a result
construction projects have become an of inaccurate analysis or planning before
industry-wide norm. In fact, according to a building even starts. In parallel with better
study from KPMG, just 31% of all projects planning, technology can also help to
came within 10% of the budget in the past 3 reduce the common problems or elements
years. However, with project budgets being that contribute to cost overruns, ensuring
scrutinised more than ever and overall you can maximise efficiency and profits.
industry productivity remaining a constant
To help you keep overruns at a
concern, construction professionals can’t
minimum, below, we highlight some
really afford to accept the new normal.
of the most common cost overruns in
To know how to address cost overruns in construction projects to be mindful of
construction projects, it’s important to and provide some useful strategies and
understand the root of the problem. Often, implementations you can take today
overruns hint at deeper issues in project to keep your project within budget.
management and from schedules and

8
1. Inaccurate project estimates Even though preconstruction and design
While many of a project’s stakeholders are services may contribute up to as much
eager to get the project’s building started, as 15% of your budget, if this process
if you have faulty schedules and budgets can successfully identify potential issues
to begin with, your project is heading before construction actually begins, that
for an overrun from day one. Due to the 15% will be nothing compared to the
competitive nature of the tendering process, money saved on the process down the line.
estimates may suffer from wrongful Due to the opportunity for cost savings,
expectations of the scope of work included preconstruction is considered just as
in the project. In many cases, some projects important as the building phase as it truly
will also be estimated on a one size fits all lays the groundwork for a complex project.
basis, with chances of exceeding that initial A solid planning phase before breaking
estimate high. Therefore, it’s vital to your ground ensures that you will have a
project’s success to do your due diligence in better process of documentation, less
the preconstruction phase and be accurate confusion between administrators,
and realistic about project deadlines and and a solid project schedule, all
costs from architects and contractors. helping to reduce future expenses.
Estimating the project accurately can even
be started in the RFP process. This is the
opportunity where architects, contractors
and owners can express their concerns
over budget and timelines of the project.
If either of the parties appears to be
unrealistic about timing or budget, this
should be an immediate red flag that the
project is heading straight for an overrun.

9
The Guide: 5 Steps to Construction Cost Control

2. Serious Project Design Errors Alternatively, to enable contractors and completed. Additional requirements will
Even if you allocate proper time and subcontractors to build according to generally result in higher costs, which
resources for accurate budget and the design specifications, owners and will obviously add to the original project
schedule estimates in the preconstruction contractors should agree on the specific budget. The additional time, manpower
planning stage, if your design plans are Scope of Work and performance duties in and materials required to complete a new
defective, you’ll inevitably be destined the contract phase. This documentation initiative may also have to be classified
for cost overruns in construction should include clear references to as a cost overrun if the improvements
projects. A design deficiency is a poorly all project specifications on design affect other aspects of the project.
designed, inaccurate or incomplete plan. documents, warranties of the exact work
Consequently, changes can usually be
Deficiencies are so common and a pain to be completed by contractors, a risk
best addressed in the contract phase,
point for owners and designers alike that allocation chart or definition and a process
when a variation can be added to specify
a study from Engineers Daily estimated for unforeseen issues. Most importantly,
procedures and budget needed, should a
that design errors accounted for 38% of this contract should define the dispute
change occur. If it isn’t addressed ahead
construction disputes. At the same time, resolution and/or mediation process, if
of time, contractors might increase
incomplete or incorrect plans almost disagreements happen during construction
their total cost of a contract up front
always result in substandard work from the so hefty legal fees aren’t added in addition
in anticipation of changes, or disputes
contractors completing the work, which to other overruns that could occur.
could arise if they didn’t adequately
can result in legal battles down the line.
By adding an extra level of security plan for the overrun to begin with.
Fortunately, these kinds of disagreements to ensure designs are correct and
If you use certain construction software,
are completely avoidable in many situations. expectations are clear, projects won’t
you may have the ability to simulate
In the design phase itself, construction have to suffer from overruns due to
different solutions for scope changes and
software can help reduce the risk of errors corrective work in the construction phase.
budget accordingly in the preconstruction
or incomplete designs by ensuring everyone
3. Not Planning for Change Orders phase. Calculating different solutions ahead
is on the same page. Project management is
Often in conjunction with design errors, of time will be a much easier process,
much better served with software that can
change orders are another very common and you may be able to find a new level of
incorporate real time changes into account.
reason for cost overruns in construction functionality while reducing the number
If the project experiences an unexpected
projects. A change order occurs when an of extra resources used. Although scope
change in its scope or one of its process,
owner or contractor realises that a design changes may be necessary, they should
it is much easier to plug those design
isn’t working or might try to introduce be managed proactively and considered
changes into a dynamic digital model of the
new specs, fixes or requirements after ahead of time to reduce the likelihood of
landscape than to redraw models on paper.
initial models and budgets have been cost overruns in construction projects.

10
4. Administration Errors Instead of adding more to your admin team,
Even with solid designs and no project equip them with the right tools. Project
changes, your project could still experience management software can help play the
overruns if project administrators aren’t role of multiple administrators. Unlike
up to speed with your project’s progress. traditional administration, software gives a
When even small errors occur between skeleton crew the ability to view the project
the administration team, the results can from multiple angles, keeping up with many
be catastrophic. Furthermore, if lines of possible scenarios at once. Concepts can
communication between administrators are be changed digitally and compared side by
limited, problems that occur on one aspect side to previous iterations of the project.
of a project may not even become known to When it comes to human errors in invoicing,
other project managers until it is too late. accounting and delivery monitoring that
Many contractors and owners believe that could contribute to overruns, software can
the best solution for bad administration also help to reduce this risk. Administrative
is to simply increase the size of the errors are rather easy to avoid with a
administration team. The logic goes, with software system that guarantees the
more people on the job, administrators will accuracy of all project documents and gives
be able to focus specifically on their area of alarms for deliveries. With the full extra
the project. However, this might not be the support digitally, administrators will have
best solution in the long run as increasing visibility and flexibility into a project to keep
the number of people in administration operations and logistics running smoothly.
could lead to collaboration failures that will
almost certainly involve a cost overrun.

11
The Guide: 5 Steps to Construction Cost Control

5. Poor Site Management Improving on-site communication with 6. Not Hiring the Right Team
Design integrity, equipment condition construction software can reduce some Let’s say that everything has been
and quality control are just a few of the of the issues with site management. With estimated correctly, the project plans
many aspects of a project that need to software, calculations and designs can be are flawless and scope change is being
be kept on track during construction. referred to digitally for a more accurate managed effectively. Outside of all of
Unfortunately, this does not always go as reading and different scenarios can be that, overruns are still likely to occur if
planned leading to severe cost overruns tested side by side to see which will the team executing the work is not up to
in construction projects. Personalities bring the better outcome. Because digital a certain level of standards. Poor and less
clash just as often as a project’s site calculations are assured to be precise experienced subcontractors can cause
changes unexpectedly. An inherent trust (based on accurate inputs, of course) costly mistakes, delays and errors, even
gap between owners and contractors may and software designs can be trusted to with impeccable designs and plans.
already exist because of the natural conflict accurately depict on-site descriptions,
Unfortunately, when hiring subcontractors,
of interest between the two parties and it decisions can be made quickly based on
many general contractors do not adequately
can have devastating impacts on a project’s solid information, not office politics.
qualify their project teams. Whether
momentum. That being said, even if both
they are trying to work with the lowest
sides maintain a professional relationship,
The right software also provides more tender or are just leveraging existing
some projects are just too large to keep
opportunity for collaboration. Online access relationships, using the wrong team
up with every site change and news may
to designs and scenarios allows for greater opens contractors up to massive risk.
travel too slowly across departments.
communication from remote locations.
Contractors who go through the extra steps
Decisions can be made while project
to ensure subcontractor qualification will
leaders are on-site, looking at an issue
reduce the probability of experiencing
directly. Faster communication also leads
significant cost overruns in construction.
to better decisions, as real-time insight can
Today, fast and easy-to-use digital solutions
address a situation before it snowballs into
are available to streamline qualifications.
a bigger issue and impacts the budget.

12
Fixing Cost Overruns in Construction
Projects Once and For All
Systematically reducing cost overruns
should be a priority in your planning, if it
is not already. Taking the time to evaluate
the reasons for your own cost overruns
and incorporating the right solutions will
bolster your ability to execute complex
projects with greater control. You also
take home a bigger piece of the pie for
your planning efforts, so why leave money
just sitting on the table? Through proper
planning and with the assistance of
construction productivity software, you’ll
start to significantly reduce overruns in
your projects and bring in more profits.
Don’t just accept the new normal of cost
overrun in your construction projects
– make sure that you have the right
planning solutions and software to help
complete your next project within budget.

13
The Guide: 5 Steps to Construction Cost Control

Upgrade from spreadsheets:


Manage construction costs in the
cloud and ditch the spreadsheet
Why Excel Could Be Hurting sophisticated and easy-to-use software.
The days of tracking, management
Your Construction Company and accountability with pure Excel in
Do you get frustrated with an Excel budget construction companies are ending–with
template, schedule planner or other form mobile and cloud-based construction
of construction management sheet? Do software stepping in to take its place.
you start to see red at every #REF! and
#N/A you see? Do you grit your teeth every If you’re continuing to use an Excel
time you have to enter the same data in budget template or other spreadsheets
multiple sheets? Are your formulas spitting in your construction company, your
out numbers that just don’t make sense? project could be suffering from serious
Take a deep breath and consider this; a and avoidable inefficiencies. Excel and
construction company without Excel. spreadsheets should no longer be a part
of your construction tech suite. Instead,
In the past, Excel was a game changer. make the switch to mobile construction
In fact, released originally in 1985, software to increase your project
Excel is nearly 33 years old, and the productivity. Below, we’ll explain some
time has come for your company to of the major flaws of having Excel in your
push this software into retirement. organisation, as well as how and why you
should make the switch to construction
Similar to how accounting paper ledgers
productivity software (CPS) instead.
served a purpose before the dawn of
digital, they are no longer effective and
relevant to modern accountants with

14
The Achilles Heel of Excel You most likely invested time to even and Fannie Mae, have lost billions due to
achieve a basic level of proficiency in Excel Excel mistakes. Chances are, if you have a
At one point or another, we’re betting you
and you probably feel at least somewhat spreadsheet, you have at least one mistake.
had to “learn” to use Excel. Some of us
comfortable with and perhaps protective The issue is so common that according to a
learned it at school, some of us took a class
of the tool. Nonetheless, there are some study from Carnegie Mellon, approximately
in college and others were just tutored by
serious flaws with the program that you’re 94% of spreadsheets have errors.
Professor Google and the school of trial
overlooking in lieu of your software loyalty.
and error. No matter how in-depth your In a large construction project, one small
studies into Excel took you, it most likely Human Errors: Manual Mistakes data entry could end up easily costing your
gives you a feeling of dread when someone Mistakes happen, and as humans, we’re company millions, and maybe even billions.
mentions the next big Excel “killer” to far from perfect. However, when human Just a slip of a finger could cause you to
you. “You mean I need to learn how to use error occurs in business documents, they incorrectly quote materials, underestimate
something like Excel–all over again?” can have a monstrous effect. In just one labour costs or create massive scheduling
instance from 2012, a single keystroke confusions–none of which will help you
error in Excel caused the organisers of the achieve optimum efficiency in the long-
London 2012 Olympics to oversell 10,000 term. Alternatively, construction software
extra tickets for swimming events. If you can provide the essential system of
think this is just one freak incident, think checks and balances that your current
again. Other companies like JP Morgan Excel spreadsheets and budget templates
cannot ensure. With easy-to-use systems
and templates, already tailor-made
with construction projects in mind, you
don’t have to worry if you’ve forgotten a
critical step in one of your functions.

15
The Guide: 5 Steps to Construction Cost Control

Those Who Are Excel Experts… What Are These Submittal Things?: information because of the software’s
And the Rest of Us: Usability Gap Lack of Industry Knowledge failure to communicate–even with itself.
Who doesn’t have to start a Google search Although a powerful program, Excel The manual intensity opens your project
every time they want to create a Pivot Table is only a general tool. The software is to massive inconsistencies and problems
or even a somewhat complicated function? not tailored for builders’ unique needs, if you’re relying on spreadsheets only in
Generally, Excel users can be clearly and it depends entirely on the user to project, personnel or budget tracking.
divided into two groups of users: experts make it work. For technology to truly
The lack of automation from Excel can be
and everyone else. The gap between these help the construction industry, it has to
particularly draining in the construction
two groups proves that Excel has a major understand what information builders use.
industry. As just one example, the amount
usability gap. Some know the program like Construction productivity software works
of time it takes to compile submittals
the back of their hand and can create a for builders because it’s made specifically
manually in Excel can take days, even
construction budget template with Excel with the construction industry mind.
weeks. However, with certain construction
in their sleep, while others feel like they’re
Even if you can squeeze some of the software, you can start to automate some
asleep behind the wheel when they need
information you need for projects out of these previously daunting manual
to add in any function that’s not basic.
of Excel, if anything goes wrong, who tasks–with a high degree of accuracy
If you’re one of the many people who are you going to call? It’s doubtful that and consistency. For instance, PlanGrid’s
just doesn’t feel like they completely even the best Excel support specialist Automatic Submittal Log helps project
know the Microsoft software, don’t feel is going to be able to provide you with teams create a submittals log in minutes.
embarrassed. Excel is a powerful tool, valuable instructions if they don’t truly Imagine the time you could save and how
but it’s not for everyone, and it’s far understand your needs in the construction much risk would be reduced if you were
from intuitive. On the other hand, the business. Alternatively, if you have the able to safely automate certain processes
right construction productivity software right construction software, you’ll have with minimal effort? Basically, all projects
helps to level the usability playing field. the right training and support team behind can benefit from certain automation
With clean and user-friendly interfaces, it to help you when you most need it. features that CPS can only provide.
construction productivity software like
Enter and Repeat: Manual Entry Who Updated Cell B3?: No
Autodesk Build makes it easy for all team
Are you able to count the hours you have Room for Collaboration
members to access and use, from owner
wasted in manual data entry in Excel? Although you might have access to a
to field worker. When everyone can use
Depending on your job role, it could even shared drive with all your important
and easily view information from the same
add up to hours a week. Many construction spreadsheets available for your multiple
software, both technology adoption and
administrators often need to update individuals to access in your company, an
productivity will increase on your projects.
multiple spreadsheets with the same Excel doc is really not made for more than

16
one person to use. The platform seriously Hackers ♥ Excel: Poor Security
lacks the ability for project stakeholders to Where do your Excel files live? Most likely,
communicate and collaborate. Even if team they’re directly on your computer’s hard
members are both doing their diligence to drive or company-wide shared drive.
update cells together, there’s no way to know Even if you’re the only one accessing your
what has changed in real-time. Furthermore, computer’s files or it’s password protected,
unless you’re saving multiple versions of a your documents are far from secure.
spreadsheet (another huge headache on its Consider how easily Excel sheets can be
own), users can only see one version and copied and distributed. If you have critical
have no reference to new changes. Unless or confidential company or project data, in
you explicitly tell them, it’s a shot in the dark hackers minds, you’re practically wearing
for your team members to know you made a flashing sign saying, “hey, come steal
an update to the project tracking sheet. my data.” Even beyond the risk of theft,
Excel is not secure just due to the fact
On another note, say you’re in the field
that you could easily lose all your data in a
and notice something that needs to be
second from a hard drive crash or oblivious
changed or noted. How are you going to
coworker hitting the delete button.
get this information in your Excel sheet?
We’re guessing you will most likely have If it’s not already, security should be
to wait till you’re back in the office or a major concern for your construction
trailer, open your computer and hope you company. The right construction software
made enough mental notes to make the offers enhanced security for your most
change correctly. Lack of mobility in Excel critical project data. If you’re making the
also makes it an inefficient program for switch to construction software, make
projects that need constant monitoring sure you go for mobile software with
of progress and changes. With mobile cloud-based project management for
construction software, changes are not only enhanced security. Another consideration
easy to make in the field, but teams can be is SSO integration, a feature your IT
alerted on project changes critical to their department will be thanking you for later.
individual job duties in real-time, ensuring
the project moves along productively.

17
The Guide: 5 Steps to Construction Cost Control

When Is It Time to you’ve been using the well-known


communication technology called email?
Switch Your Excel
Budget Template? If you’re still not convinced, here’s a quick
checklist to show if it’s time to switch
If you weren’t aware already, you now
you Excel budget template, scheduler,
know a few of the many downfalls
project tracker spreadsheets or more to
of Excel. However, you still might be
construction productivity software:
thinking, “but I like Excel–do I really
need to make the switch?” Well, here’s • Your company has data, lots of it
a question: would you ever revert back • You need user controls–or in other
to writing handwritten notes, memos words, you only want certain people
and frequent calls to coworkers after to view and edit certain data

• Your project success depends


on real-time field updates

• Your systems and software to “talk,”


or share and analyse data

• Your company is growing–either in


employees or you’re taking on more projects

If you checked off one or more of the


above, and we’re guessing you did, it’s
time to make the switch. Excel can no
longer handle all the complexities of

18
construction. The time has come to adopt the software company is offering–even for their own data transfers and give
construction software, but where to begin? better if you can consult with a real sales them key deliverable dates to meet.
representative. Also, don’t forget to ask for
Tech Swap: How to the opinions of a variety of team members
Keep in mind that making the switch
from your construction Excel budget
Get Started Making who will actually be using the software on
template, schedule tracker or other
the Switch to CPS a day-to-day basis. You’ll want to shop for
project sheet doesn’t have to be
software that benefits your entire team–
Making the shift from your Excel budget completely overwhelming. With the
not just the field and not just the trailer.
template to modern construction software right plan and system, the transition
doesn’t happen overnight. Nonetheless, with Out With the Old, In With the New: will be relatively painless.
the right goals, team and plan, the switch Making the Transition to CPS
Need more tips to successfully implement
doesn’t have to be a massive undertaking. Once you’ve chosen the right software
new technology? Check out: Experts
Here are a few things you should be for your company, the real fun begins–
Share Tips for Successful Construction
considering when making the transition: depending on how you look at it. Before you
Technology Implementation
throw caution to the wind and just make
Choices, Choices…Choices: the leap to an entirely new system, start
Finding the Right Software Say Goodbye to Your Excel
to create a project plan. Get leadership
The way your company operates and how and staff buy-in, gather a dedicated Budget Template for Good
projects are managed is probably slightly project team to help facilitate the shift and Take a moment of silence and say your
if not dramatically different from your schedule trainings. All of these factors will goodbyes to Excel, at least for your
competitors. As a result, your needs might contribute to your workers’ adoption of the business. We promise you’ll never look
require a different construction software technology–key element in successfully back. But in all seriousness, it’s time to
solution from the next company. seeing an ROI from your software. When manage out Excel in your company for
Start by identifying your company’s it comes to transitioning your actual data, good. It’s time to get rid of your Excel
individual needs and figuring who exactly make sure you know exactly what needs budget template and project management
needs to view and edit project data. to be transferred from your spreadsheets tracking spreadsheets for good.
Starting here will help you identify and to CPS. Finally, hold your staff accountable
narrow down the key features your CPS
should have. If you’re down to two or three
options, opt-in for any trials and demos

19
The Guide: 5 Steps to Construction Cost Control

Understand and leverage the benefits


of technology: Managing construction
costs can lower insurance premiums
Reducing Project Risk Good construction insurance can protect Contractors seeking lower premiums must
firms from the dire consequences of systematically reduce their risk and back up
with the Right Tech client disputes, but sometimes premiums their actions with the right documentation.
Construction is a high-risk industry. can be prohibitively expensive. For To do this, it’s essential to have the right
In addition to workplace safety smaller construction companies working technology. With the right systems and
concerns, construction firms must on tight margins, high premiums can software, construction firm owners create
also grapple with client disputes and stand in the way of company growth. a safer culture for workers on projects.
miscommunications. The global average
value of construction disputes was A typical insurance premium may cost Software can also be used to create
€27.2 million, according to Arcadis’ 2020 between 1 and 4% of the total cost of more effective communication processes
Global Construction Disputes Report. construction for a project. In a tight market, between workers and management.
where contractors are competitive with Fewer miscommunications and
Disputes cause a number of disruptions one another, the higher-cost premiums accidents can lead to a reduction in
during construction projects. Depending can put some firms out of business or construction insurance claims.
on the nature of the dispute and how it is force others to make poor decisions
handled, the result might be project delays, So, how can the right technology have such
about using lower quality insurance.
broken contracts and even litigation. a big impact on a contractor’s insurance
Premium costs are based, in part, on claim premium? Let’s explore six major risks that
history. Therefore, reducing the number of construction software helps to reduce.
claims made on the insurance policy helps
keep the premiums low and puts more
money back in the hands of the contractor.

20
6 Risks Mitigated with Technology can also reduce the time it
takes to resolve defects, by providing the
Construction Software right documentation. For instance, tools
What are the significant risks that like Autodesk Build and BIM 360 help teams
can be alleviated with the right better track all asset related information
technology? Here are six that can be organised in a central location. Teams
mitigated today with the help of the can quickly access relevant documents,
right mobile construction software. flag and respond to defects, and initiate
faster inspections and testing.
1. Defect
A construction defect can be a costly 2. Subcontractor Default
claim that could require additional work When subcontractors are unable to perform
and money to fix. In some cases, defects on a project, contractors are sometimes held
can even cause harm to a contractor responsible for the resulting loss of time or
or a member of the general public. materials–known as subcontractor default.

Some defects occur because of a problem Subcontractors default when they take
with the manufacturer’s product, while on too much work or payments from
other defects arise because of failure other projects have been delayed. Vetting
to perform a repair or remodel properly. and hiring quality subcontractors with
Defects also happen as a result of mistakes prequalification tools like TradeTapp is
or errors in the planning and design stages. essential for reducing subcontractor
default. Both brokers and carriers in the
Technology reduces the risk of a defect
construction insurance industry, such as
happening due to a failure to perform
McGriff Seibels & Williams and AXA XL,
a repair or remodel properly. By arming
have endorsed TradeTapp and its ability
contractors with better data and access to
to minimise risk by subsidising access to
the information they need, construction
the application for their Subcontractor
teams are able to avoid the mistakes
Default Insurance customers.
that would lead to injuries and claims.

21
The Guide: 5 Steps to Construction Cost Control

3. Claims Discovery Delay If the damage is not the contractor’s These flagged requirements provide
Contractors are responsible for their fault, documentation can sometimes you with the information you need to
work, even long after the project wraps prove this to those who would turn to discuss their impact on the budget,
up. If a defect is discovered months the contractor for answers. Alternatively, scope, or timeline with your client
after the contractor last sets foot on software can sometimes help ensure that before it turns to litigation.
the jobsite, that contractor is still liable damage is not created in the first place.
Connected construction software that
for the damage the error caused.
By giving teams the correct information bridges the office and field teams also can
In the past, contractors found it difficult when building begins, cloud-based ensure contract compliance. By creating
to defend themselves or clarify their software can prevent contractors a collaborative environment and enabling
actions when a problem occurred. from making the mistakes that would information sharing between all project
Software that improves documentation lead to this property damage. stakeholders, software ensures that rework
and provides all information accurately and coordination issues are much less
5. Contract Compliance
could help the contractor avoid litigation. likely to arise. Overall, the right solution
Due to rework and coordination issues,
helps mitigate job costs and helps ensure
For contractors, the Assets module in the majority of projects experience some
the smooth completion of each project.
Autodesk Build and BIM 360 offers the degree of schedule and cost overrun.
ability to align project assets to the With the enormous scope of work and
model, ensuring all teams have up-to-date level of detail necessary on projects, it’s
information, and also provides a digital trail easy for one small thing to slip through
of what issues have been resolved during the cracks—especially with scope creep
installation. These new capabilities also from change orders and spec updates. The
help minimise future risk and litigation by resulting ballooning schedules and costs
tying a historical record to each asset. can cause disputes and litigation between
property owners and their contractors.
4. Property Damage
Occasionally, contractors cause damage Insurance leader Aon recommends Pype
to the property they are remodeling to help address contract compliance by
or improving. Once again, thorough ensuring accuracy and fostering clarity
documentation through construction of scope throughout the entire project
software can help reduce this risk. lifecycle. For instance, Pype AI, included
in AutoSpecs, applies the experience from
millions of projects to search your specs for
missing requirements.

22
6. Safety Risks Reduce Insurance Costs
Safety issues and incidents can raise your
insurance costs. Insurance firm’s use your
with the Right Software
experience modification rating (EMR) to Many different types of construction
calculate your premium for workers comp software can help reduce project risk.
coverage. With a good safety record and lower Often, the best software can reduce
EMR, your firm will pay less in premiums. your firm’s chances of an accident or
a miscommunication by enhancing
A strong safety culture and qualified collaboration and documentation.
subcontractors are foundational for
reducing overall safety risks and issues. Autodesk Construction Cloud allows
Technology can further solidify the success contractors to mitigate their risk and
of safety programs and new innovations improve project outcomes through
can even proactively reduce risk. For reduced defects, enhanced digital
instance, machine learning technology, like documentation, and improved access to
Construction IQ in the Autodesk Construction data from construction to operations.
Cloud platform, is an emerging way that
firms are identifying and managing risks.
Construction IQ scans project data and
identifies high-risk areas that impact
design, quality, safety, or project controls.

The machine learning capabilities in


Construction IQ can be used with partner
integrations like Smartvid.io to identify
safety risks. This data can be sorted and
viewed by location, and help contractors
gain valuable insights into subcontractor
safety practices, target recurring hazards,
and prioritise projects or business
units that need particular attention.

23
The Guide: 5 Steps to Construction Cost Control

Cost code pro tips:


Get started on the right
track with the right tools
In 2020, the value of commercial This is where construction cost codes
construction amounted to approximately come into play. Construction firms
€5.1 trillion globally. Given the continually can use cost codes to document,
changing nature of construction projects, categorise, and analyse costs
accurately managing and executing efficiently. How do cost codes work,
construction costs is critical to the project’s and what do you need to know
financial outcome. A key piece is having about creating a code list in your
the ability to see and compare how much organisation? Keep reading to find out.
specific items or tasks cost so you can
correctly forecast and manage cash flow.

24
8472-001.03.30.00.0.SUB

8472 001 03.30.00 0 SUB

Projcet # Sub Job Cost Code Sequence Cost Type


(E.g. Building A, (E.g. Work Classification If they wanted to use same (E.g. Material, Subcontractor, etc.)
Building B, Phase 1, 2) such as CSI, NRM, SMM) budget code more than once,
this is a differentiator 0, 1,2, etc.

Construction cost codes example.

The Basics of Construction Using cost codes to organise and Using industry standard codes helps
categorise costs provides better ensure that outside organisations can
Cost Codes visibility into the costs associated with easily interpret them. However, firms may
Construction firms use cost codes to divide specific projects, jobs, and tasks. prefer to generate a completely custom
costs into specific categories. These codes list that suits their individual project and
are typically represented by numeric or Firms can analyse these costs to
departmental needs in some instances.
alphanumeric values and often form part improve future estimating, budgeting,
of an overall budget code and a key piece and forecasting on similar projects. The RICS has created the ICMS, which
of a work breakdown structure (WBS). is a great initiative aiming to bring a
The format of cost codes often varies across
A good WBS may utilise multiple worldwide standard to construction.
firms and geographies. For example, in the
classifications and information to US, they are often based on the Construction Below is an example of a full budget
inform what task is being done (e.g., Specifications Institute (CSI) codes, and code used by accounting and the cost
cost code structure such as CSI), to in the UK, the New Rules of Measurement management system which are generally
what (e.g., elemental breakdown such as (NRM) and then often customised to some made up of smaller segments of information.
Uniformat), where (location breakdown extent to suit the particular company. Some companies have many segments,
structure (LBS)), and by whom. and some only one or two, but typically,
cost code and cost type are common.

25
The Guide: 5 Steps to Construction Cost Control

The Benefits of Using With cost codes, there’s no room for These codes also fit into a central cost
misinterpretation. The codes are based management strategy. Firms can pinpoint
Construction Cost Codes to on a series of standard classifications, where costs are being generated, which
Plan, Budget, and Analyse which makes it simple for the construction activities generate the most costs, and
With cost codes, firms can efficiently management software to identify the which costs can be linked to profits.
account for all costs associated with desired firms and data. This simplicity
Profitability
projects. These cost structures offer keeps things efficient, repeatable, and
Firms often have multiple large-scale
insights into where and how expenses are replicable. The codes help to develop
projects running concurrently. The nature
generated and the ability to compare. While processes that can be measured
of the industry presents challenges in
there are many benefits to using cost codes, and refined based on results.
determining which tasks are actually
the majority of them lie in standardisation,
Overall, the standardisation of cost generating profits. Cost codes are essential
cost control, analysis, and profitability.
codes is essential to saving time, raising for organising data around tasks, activities,
Standardisation productivity, reducing mistakes, increasing employees, equipment, and projects. This
Of course, cost codes aren’t the only way scalability, and building efficiencies. information can be used early in the project
to divide costs into categories. However, to identify where money is being wasted
Cost Control
standardisation is important. For example, and where it is being generated. Early
Construction firms must have a handle on
using descriptive phrases rather than identification can help to set projects on
costs to maintain budgets, deadlines, and
codes leaves room for error. Someone the right track and increase profitability.
scope across projects. This is especially
inputting the costs may use a slightly
true in today’s times of economic In the long term, firms can also leverage
different phrase than the next person
uncertainty, fluctuating markets, and labor data around cost codes to determine
searching for the data. As you can imagine,
challenges. With cost codes, firms can which activities to invest in for greater
this makes for a confusing experience for
quickly associate expenses with projects profitability. Likewise, firms may choose
anyone on the hunt for necessary data.
and activities as well as with outcomes. to alter or streamline activities that are
heavy on costs but light on profits.

26
How to Implement using software like Autodesk Construction That data can be used to generate advanced
Cloud’s cost management toolset is the insights into cost control workflows. These
Cost Codes in a import master lists. For example, you can insights are ideal for strategic decision-
Construction Project do a one-time import of a cost code master making and continuous improvement.
Once you create your cost codes, list, so you have every possible cost code
Improve Cost Control with
how do you implement them on a you may ever need. This allows you to
Cost Codes Today
construction project for best results? slice and dice your data flexibly and saves
Are you ready to bring more standardisation
you time by not requiring you to build in
Adopt the Right Cost and efficiency to your cost control
groupings before importing your budget.
Management Solution workflows? Learn more about how you can
First, you need a solid project cost Define Objectives and Scope Early bring more flexibility and control into your
management solution that allows for Next, consider that changes are one of the cost management workflows, including cost
flexibility and customisation in how main constants of construction. They can codes, with Autodesk Construction Cloud.
your codes are built. The nature of each completely derail your budget and schedule
project will vary across stakeholders, if you cannot forecast and respond to them.
their processes, and costs. For instance, early design changes are one of
the biggest drivers of overruns. It’s important
With Autodesk Construction Cloud’s to define objectives and scope as early as
robust cost management capabilities, possible in the project so you can prevent
you can flexibly customise your budget change orders. Doing so requires early
structures, including segments such as alignment and consistent communication
cost codes, sequence, and cost type, and across stakeholders and teams.
create hierarchical build-ups. For each
segment, you can choose whether the Still, a financial management solution
information will be shown as part of the that locks you into rigid processes and
code, in its own column, or hidden for components won’t work for the ever-changing
information only. You can select the number nature of construction. Look for customisable
of digits and delimiter between each solutions so you can easily integrate new
segment value. But, one of the benefits of stakeholders and processes as needed.

27
The Guide: 5 Steps to Construction Cost Control

See the Future of Connected Construction


construction.autodesk.com

Our industry requires solutions that connect their information, teams, and technology —breaking down data silos and disconnected
processes that hinder true transformation. As we navigate the ever-present push to do more with less, we need to uncover new
ways of working, enhance connected digital workflows, and incorporate advanced analytics. To support us on this journey of
transformation, we must lean into tools that connect construction — from design to plan, build, handover, and operations.

Built on a unified platform and common data environment, Autodesk Construction Cloud is a powerful and complete
portfolio of construction management products that empowers general contractors, specialty trades, designers and
owners to drive better business outcomes. Autodesk Construction Cloud combines advanced technology, a unique builders
network and predictive insights to connect teams, workflows and data across the entire building lifecycle.

While the industry experiences


unprecedented transformation, our
mission remains the same: to help
construction teams meet the world’s
rapidly expanding building and
infrastructure needs while making
construction more predictable, safe,
and sustainable. And we’ve remained
steadfast in our promise to deliver the
industry’s most compelling solutions,
connecting data, teams and workflows
from the field. This is our commitment
to connected construction.

28
Autodesk is changing how the world is
designed and made. Our technology spans
architecture, engineering, construction,
product design, manufacturing, media, and
entertainment, empowering innovators
everywhere to solve challenges big
and small. From greener buildings to
smarter products to more mesmerising
blockbusters, Autodesk software helps
our customers to design and make a
better world for all. For more information
visit autodesk.com/construction.

Connect with ACS

© 2021 Autodesk. All Rights Reserved.

UK & EMEA United States Australia & APAC


+44 808 1892 253 +1 (866) 475-3802 AUS +61 1800 314 435
acs.emea@autodesk.com construction.autodesk.com acs.apac@autodesk.com
construction.autodesk.co.uk construction.autodesk.com.au

You might also like