You are on page 1of 2

 

Call Setup Success Rate (PS)_MTN(%)


RNC Region Owner 8-Jun 9-Jun 10-Jun 11-Jun 12-Jun 13-Jun

OWZRNC5 PHC Emakhu Mark 99.54 99.5 99.46 99.44 99.37 99.5

OWZRNC6 PHC Emakhu Mark 99.52 99.41 99.44 99.37 99.5 99.45

Handover Success Rate (CS IRAT U2G)_MTN(%)


RNC Region Owner 8-Jun 9-Jun 10-Jun 11-Jun 12-Jun 13-Jun

OWZRNC5 PHC Emakhu Mark 97.47 97.33 97.25 97.34 97.46 97.51

OWZRNC6 PHC Emakhu Mark 97.65 97.49 97.72 97.59 97.35 97.57

 CE congestion_MTN(#)
RNC Region Owner 8-Jun 9-Jun 10-Jun 11-Jun 12-Jun 13-Jun

OWZRNC6 PHC Emakhu Mark 589 873 1011 525 1242 361

Code congestion_MTN(#)
RNC Region Owner 8-Jun 9-Jun 10-Jun 11-Jun 12-Jun 13-Jun
OWZRNC6 PHC Emakhu Mark 0 63 141 29 0 53
e (PS)_MTN(%)
14-Jun Comment

1.High Mean Jitter Delay on sites CR0141 CR0142 CR0146 mapped to CP


T2340 affecting major 3G KPIs in OWZRNC5//affected by high utilization of a 1+0
radio link with capacity of 185Mbps between T2577 to T2979//SDT-20230530-
99.48
00000409
2.High failed RAB assignment setup for the PS domain due to downlink power
resource congestion on site AK0078O and R.CPICH Power tuning done.
High Failed RAB assignment setup for the PS domain due to Code congestion on
99.37
site CR0427 sector 1 U and X.HS Codes tuning done.Monitoring

RAT U2G)_MTN(%)
14-Jun Comment
2341GB/GE failing on CS IRAT to 2G Nbr 2374B due to physical channel
97.45
failures.Soft reset done on the 2G counterpart.monitoring
CR2513W failing on CS IRAT to 2G Nbr CR2513F due to physical channel
97.27
failures.Soft reset done on the 2G counterpart.monitoring

MTN(#)
14-Jun Comment
High Failed RAB assignment setup for the PS domain due to uplink CE
959 Congestion and Suspected Faulty BPN2 Board mapped to U900 Band of site
T2393//SDT-20230615-00000236

MTN(#)
14-Jun Comment
1318 Due to traffic spikes on CR0427 sector 1 U and X.HS Codes tuning done.Monitoring