Professional Documents
Culture Documents
Technical Training
Woodward Inc.
TM
1
About me…
Professional experience:
-Control and automation projects for Moto generators, Steam turbine and
Compressors.
-Startup experience on many Woodward equipment.
2
Agenda
3
Agenda
4
System Overview
• Governor Cabinet.
GOVERNOR CABINET OVERVIEW (4082-5536) Fotos
(5)5
PROPRIETARY INFORMATION
System Overview
• Functional Description.
Standard applications MPU ACT THEORY
• Definition and explanation of Process Speed
Control and Process Inlet Demand Control.
FUNCTION BLOCK DIAGRAM (9971-3778)
• Start Curves.
K-101 (8005SM331-13925 )
K-301 (8005SM331-11925 )
K-302 (8005SM331-12925 )
(6)6
PROPRIETARY INFORMATION
Operation
(7)7
PROPRIETARY INFORMATION
Operation
(8)8
PROPRIETARY INFORMATION
Operation
• 505/505E (K-101/K-302)
(9)9
PROPRIETARY INFORMATION
Operation
• 505/505E (K-101/K-302)
RUN
10
(10)
PROPRIETARY INFORMATION
Maintenance
• Test Procedure.
K-101
K-301 (OPE-I-300-16)
K-302 (OPE-I-300-17)
11
(11)
PROPRIETARY INFORMATION
Alarm and Shutdow
• 505/505E
505 (85017V1 Page 137)
• MicroNet Plus
(HMI) (8005SM331-11617_4 Page 7)
• ProTech-GII
MANUAL (26709 Page: 165)
12
(12)
PROPRIETARY INFORMATION
Operation
13
(13)
PROPRIETARY INFORMATION
Operation
14
(14)
PROPRIETARY INFORMATION
Operation
15
(15)
PROPRIETARY INFORMATION
Operation
16
(16)
PROPRIETARY INFORMATION
Q&A
Questions !
17
(17)
PROPRIETARY INFORMATION
THANKS!
E-mail: pablo.belloni@woodward.com
Website: www.woodward.com
18
19