Mill Monthly Report June 2021
Mill Monthly Report June 2021
Reported to BOD
Copy to Managers
A. OPERATING SUMMARY
1. Highlight Production
Pulp Machine production on July 2021 was 41,909 Adt, which is unfavorable by 1,576 Adt from
the Monthly Performance 40,333 Adt, unfavorable by 734 Adt from the monthly high
performance 42,643 Adt also unfavorable by 4,740 Adt from the Monthly budget 37,169 Adt.
Acacia MPB (Monthly Production Budget) = 7,980 Adt, Actual = 4,937 Adt.
Pellita MPB (Monthly Production Budget) = 29,189 Adt, Actual = 36,971 Adt.
2. Topic Operation
The topic operations during July 2021 are:
a. Pulp Machine circulation and sheet break:
Total circulation on Jul-21 was 2H50M due to:
Folding machine line #1 problem 32M
Slitter no 5 jammed sheet jump to pulper 47M
Slitter no 8 loose 28M
Replace relay #1 & shaft conveyor #2 (7650) 1H3M
c. Jun 3rd, 2021 at 08:05 Stopped Pulp Machine based on Opportunity schedule. Main job:
Replaced Pick up felt, bed and fly knife, vacuum pump #1, and bearing of circulation fan
#31 and #102 but fail so only re-alignment for both fans. Started machine on 23:15 and
Sheet production at 02:13 (DT 18H8M). Other’s plant stopped as follow:
- ClO2 production stopped at 08:00~21:00 based on schedule, Opportunity job: Acid
cleaning Chlorate cell, replaced chlorate cell #1 and #2, installed “Y” strainer on
Chilled water line, replaced steam bundle gasket of weak ClO3 Evaporator and
replaced cell cover gasket of Chlorate cell #26 (DT 13H).
d. Jun 6th, 2021 at 15:10~21:35 Bleaching plant stopped due to Gland packing of D0 tower
was leaking and boxed up to plug the leaking by plate (DT 6H25M). Last replacement of
Gland packing was Nov-20 ASD and after inspected on Mar-21 MSD indicate shaft sleeve
has little worn out and planning to replaced next Nov-21 ASD.
Meanwhile Washing plant at 18:37~22:28 stopped due to Brown stock HDT level was high
(DT 3H51M).
e. Jun 18th, 2021, all plants stopped due to high inventory after Pulp machine sheet
break and unsuccessful 12 times feeding (sheet moving to front side and break at inside
Dryer).
Countermeasure has done:
- Checked turning roll speed (OK).
- Cone circulation fan #67 was touching with blade and take out.
- Sprocket chain turning roll was loose and re-tighten.
- Replaced switch panel turning roll.
- Tape threading top pulley was fall down and fixed back.
- Tried to reduce the tension due to consider pulp quality after long time circulation (see
the start stop time at sheet break report above).
f. Jun 21st, 2021 at 12:55~16:39 Washing plant stopped due to Dilution pump 421-G-2530
coupling was broken and caused high consistency at Pre O2 press dilution conveyor. Then
contactor and thermal overload for 421-G-1550 Pre O2 Shredder conveyor was burnt (DT
3H44M). Countermeasure has done: Replaced contactor and thermal overload of motor
Pre O2 press dilution conveyor, replaced coupling of dilution pump 421-G-2530 and
Flushing the line to TRPE.
g. Jun 23rd, 2021, all plants stopped due to high inventory after Pulp machine sheet
break (see the start stop time at sheet break report above).
- Digester stopped at 17:05~04:40 (DT 11H35M).
h. Jun 25th, 2021 until Jun 26th, 2021, Production was not achieved due to many times Pulp
machine circulation by Bale marker line #1 problem (data not change). After inspected
found that communication to forte was failure. Replaced cable on Jul 26th, 2021 and
waiting next opportunity on Jul 19th, 2021 to calibrate.
Jul 10th, 2021 at 07:34 Pulp machine sheet break due to 3rd top press felt was cut off
and the cut off felt that bring by broke conveyor to the wet end pulper.
Countermeasure has done: Replaced 3rd top & bottom press felt and empty out the
Wet end pulper to removed cut of felt. Job have finished at 17:00. Pulp machine
started at 20:08 and sheet production at 23:23 after three times feeding fail (DT
15H49M).
Jul 11th, 2021 at 13:29 Twin Roll Press Evolution (TRPE) tripped due to high pressure
torque and speed going to zero then by passed. At 02:35 on Jul 12th, 2021 started
TRPE with water but after check found that bearing DS movable roll was broken.
Stopped TRPE at 13:36 to replace the bearing and finished on Jul 13th, 2021 at 03:00.
Started water run at 06:17 and on line with pulp at 08:50. However, unfortunately
found leak at ND bearing fix roll, MMD will pay attention and keep follow up.
Jul 13th, 2021 at 08:30 Stopped Electro Static Precipitator (ESP) #3 of Recovery Boiler
(RB) due to Yokogawa replaced the terminal board. Started again ESP #3 at 17:30
(DT 9H).
Jul 13th, 2021 at 04:19~05:39 CA plant tripped due to control valve PIC-2780 Chlorine
to hypo air regulator valve was leaking.
Mill Monthly Report – June 2021 Page 4
3. Result of Operation
a. Production
b. Key indicator
4. SAFETY ISSUE
Checked fire hydrant and fire extinguisher at Mill site and follow-up if found some
abnormality.
Measured working permit and gases contain for vessel entry permit.
Conduct safety representative, training, sharing by Siloam hospital regarding vaccine.
Gave safety induction to PT NPE (21), PT SAA (6), PT Herissa (8), PT Indo Scale (7), PT.
Radian (3), PT. IBM (2), PT Media (3), PT. Citra Trikarya Mandiri (4), PT. SMCC (13) dan
PT Pratama Graha (1) and PT. Yogma (11).
Do safety inspection at Gate XII
BOD Safety Patrol at area Admind Building (Truba), Fabrication Shop, MMD Shop and EID
Shop, Chip Screen and Chip pile
Checked Emergency Evacuation System at MCC Room Cooking and Bleaching, result
good condition.
Checked fire alarm system at Cooking and Bleaching, result good condition
Checked safety shower at Cooking and Bleaching, result good condition
Mill Monthly Report – June 2021 Page 6
Checked Hoist Crane at Top Separator, Digester Elevator, Loading Dock #1, #2, #3 and
Forklift at Pulp Warehouse, result good condition.
Accompany Manpower Department and third party for renewal operational permit for Lift
and Transport Equipment, Pressure Vessel, Tank, Boiler, Fire Equipment Installation,
Electrical Installation and Lighting Rod Installation.
Support and help CWD team due to van belt burn at bark Crusher #4 caused by van belt
slip from pulley.
B. DEPARTMENT ISSUE
a. CWD issue
- Continue repairing Log yard #10, #20, #30, #40, and #50. Follow up by POD and EGD.
- Jun 2nd, 2021 at 20:27 Screw reclaimer #4 stopped due to casing gearbox was
damage. Countermeasure has done: Replaced gearbox, coupling, chain transmission
and housing bearing, then inspected bolt screw to sprocket. Started Screw reclaimer
#4 on Jun 9th, 2021 at 21:30.
- Jun 8th,2021 at 20:30 Screw reclaimer #7 stopped due to bearing of screw was
damage. Started screw reclaimer #7 on Jun 8th, 2021 at 18:00.
- Truck scale #4 was down due the bridge construction fault (Load cell foundation was
broken, and H-beam was bending). Replacing the bridge construction started on Jun
4th, 2021 this month and continue until now.
- Jun 30th, 2021 Truck scale #5 started after replacement of the load cell. Truck
scale #5 was down since May 6th, 2021 due to lighting while heavy rain and on May
10th, 2021 started to replaced load cell (total 10 pcs).
- CWD production below than target due to production slowly based on Log inventory.
b. CWD Production
d. CWD Graph
100
97
94
91
88
85
82
79
76
73
70
Apr 16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22
100
90
80
70
60
50
40
30
20
Apr 16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr -21 May-21 Jun- 21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22
100
90
80
70
60
50
Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar20 Mar21 Mar22
3.0
2.6
2.2
1.8
1.4
1.0
Apr17- Apr18- Apr19- Apr20- Apr 21- Apr-21 May-21 Jun- 21 Jul-21 Aug- 21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 M ar22
2.6
2.2
1.8
1.4
1.0
Apr16- Apr 17- Apr18- Apr19- Apr20- Apr21- Apr-21 M ay-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar 17 Mar18 Mar 19 Mar20 Mar21 Mar 22
a. PDD issue
10 1,401 1,400 1 71
At 18:30 sheet break at inside dryer. At 21:00 - 22:47
four times feeding sheet to dryer unsuccses.
At 23.45 feeding to dryer. At 00:54 sheet production.
11 1,021 1,400 -379 -309
Machine circulation 12 minutes due to fly cutter not
working properly. At 04:00 started Pellita CW PEFC
chips feeding to digester.
At 00:00 started Pellita - CW PEFC pulp production.
12 1,386 1,400 -14 64 Machine circulation 12 minutes due to switching pulp
production from Acacia UCW to Pellita CW PEFC.
13 1,404 1,400 4 107
Net Production 37,787 4,316 33,472 -1,242 -3,479 Acacia 6,673 1,195
Daily Average 1,260 1,279 1,257
Pellita 113,280 1,326
Acacia Pellita YTD
Budget On Varia nce to
Operating Days 30 Accumulation Actua l Daily Average
Da te budget
Percentage
6.0 24 Total
Monthly Budget 39,115 7,980 31,135 June, 2021 37,787 1,260 39,115 -1,328 96.6%
April, 2021 -
Net Production 37,787 4,316 33,472 March, 2022
119,953 1,318 118,643 1,310 101.1%
6 PB RT 378 - -
Use 291.7 T by backup liquor
8,12,13,18,19,2
firing by inventory less due to
2,23,24-Jun-
7 RB Solar 293.6 350.7 96.3 PM/Digester stop, 1.5 T by
2021
change pump schedule
Black
8 RB 63,960 - -
liquor
Use 14.6 T by backup power by
PM/Digester stop
2,9,10,11,12,18
(10,11,18,19,21,22,23-Jun-21),
19,21,22,23,30-
9 DG Solar 20.8 24.9 2.7 T by backup during repair
Jun-2021
HF#5 (12-Jun-21), 3.6 T by
warming up (2,9,30-Jun-21)
10 LK MFO - - - - NA
Use 77,798 MMBtu as fuel
11 LK NG 77,798 84,254
normally
Use 7.6 T by backup gasses
firing during Digester stop, repair 4,8,19,23,24,30
12 NCG Solar 7.6 9.1 quench body (4,18,19,23,24,30- -Jun-2021
Jun-21)
* Bark, RT and Fiber unit in BDT, Black liquor unit in TDS and PKS unit in Green Ton.
* High Fiber, PKS and Rubber tree consumption due to a lack of bark inventory (less chipping
production since Apr 21st, 2021 due to low log inventory) and also maximized Power boiler load
while HBL shortage (Many times Cooking stopped and reduced rate due to Pulp machine
problem).
* High Solar consumption due to back up while shortage HBL inventory.
b. RPD issue
a. CPD Issue
- High weak acid temperature & Low HCl #2 product concentration due to suspect
top carbon block was plug up by broken glass while inner and outer tube broken.
Countermeasure: Temporary weak acid temperature kept less than 65 oC and increase
HCl #1 product concentration to 33~33.5%. Countermeasure to be done: Overhaul the
unit on the next ASD Nov-22.
- ClO2 absorber #2 tray segment #1 and #2 were damage (include bottom tray support).
Countermeasure to be done: Replace absorber tray bottom support (PO 24124, ETA
Oct-21 for 3 segments) and Replace weak Cl2 blower #1 (PO /TEL/ 025848, ETA Oct-
21).
- Strong ClO3 Chiller performance due to Chlorate chiller HE dirty by chilled water pipe
got corrosion. Countermeasure to be done: Replace the pipe with SS material on the
next ASD Nov-21.
- High vibration stage #1 Air compressor O 2 plant due to Rotor impeller was un-
balance that will affect to trip and risk to continue to run the unit. Counter measure:
Purchase new set rotor impeller stage #1 (PO 22316, ETA End of Jun-21).
- Chiller Unit #1 was low performance as lifetime issue and need to re-new absorption
chiller (PO 23381, ETA End of Aug-21).
- ClO2 Production were stopped 3 times on June 2021 due to T/R DC permissive
tripped by interlock to problem at HCl synthesis unit #1. Many countermeasures have
done such as follows:
Jun 2nd, 2021 Replaced DI module channel, Reset PLC panel and cleaning
touchscreen display.
Jun 6th, 2021 Check sight tube of flame detector and cleaning sight glass of flame
detector.
b. CPD Production
High Dirt,
100%
High Dirt 31 100 31 100 - Pulp Machine just started up due to opprtunity shut down
Total - - 31 31 100
b. Abnormality Report
Total abnormality reports issued to the process were 55 reports, with six (6) items of which
had more than 5% appearance such are accept chip after chipper #1#2#3, accept chip
after chipper #4, accept chip after chipper #5, free Cl2 of HCl production, total titratable
alkali of green liquor and reduction efficiency of smelt.
a. Environmental issue
- Project land fill #6 has started on October 2020 (progress 73.54% per Jul 8th,2021),
delayed 26.46% compare to plan 100% due to rainy season, land slide, waiting material
leached layer and remove black and grey soil.
- On Apr 1st, 2021 Embankment of Land fill #5 was land slide at position beside of Project
land fill #6. Repairing work by SMCC and EGD on progress 18.5% behind of
schedule as 39.6%.
b. Amdal Parameter
All environment parameters of treated effluent meet the standards as per AMDAL
requirement.
Note: Ash moisture 53%, Dreg moisture 42%, Sludge Cake moisture 67%.
Total Production
MTD
Actual Budget Var
Production Total (ADT) 37,787 39,115 ▲1,328
Production AM (ADT) 4,316 7,980 ▲3,664
Production AM /Day (ADT) 1,279 1,330 ▲51
Production Pellita (ADT) 33,472 31,135 +2,336
Production Pellita / Day (ADT) 1,257 1,297 ▲40
COGM (US$/ADT) 444.87 485.60 +40.72
Wood Cost (US$/ADT) 213.06 246.88 +33.82
Other variable cost (US$/ADT) 58.58 52.39 ▲6.18
Fixed Cost (US$/ADT) 173.24 186.33 +13.09
2. Fixed cost :
The major variance came from :
a. Maintenance Expense +$263 - mainly came from :
- timing issue by +$243,
- unutilized budget by +$133,
- unbudgeted and over budget by ▲$113
b. Mill Overhead - Insurance : ▲$26
c. Mill Overhead - Others : +$431 - mainly came from unutilized budget and lower than budget by +$355, timing issue by +$76
d. Contracted Work : +$21
e. Depreciation : +$80
f. Others : ▲$27
Table 2.1. Carry over CAPEX FY2020 to FY2021 Status and Progress
D. ATTACHMENT
ClO2 consumption
H2O2
10
0
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22
70
67.6 67.4
66.6 66.5 66.1 66.1 66.5
65.8 65.6
65
60
55
50
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22
PULP QUALITY
100
95
90
85
80
Avg Avg Avg Avg Avg Avg Apr-21 May- Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- 21
Mar17 Mar18 Mar19 Mar20 M ar21 Mar22
1,000
800
600
400
200
0
Avg Avg Avg Avg Avg Avg Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec- 21 Jan-22 Feb-22 Mar-22
Apr16- Apr17- Apr18- Apr 19- Apr20- Apr21-
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22
60
40
20
0
Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar19 Mar20 Mar21 M ar22
80
60
40
20
0
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 M ar 21 Mar22
80.0
60.0
40.0
20.0
0.0
Apr16- Apr 17- Apr18- Apr19- Apr 20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22
10
0
Apr17- Apr18- Apr19- Apr20- Apr 21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar- 22
Mar18 Mar19 M ar20 Mar21 Mar22
10
0
Apr17- Apr 18- Apr19- Apr20- Apr21- Apr -21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22
0
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22
0
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22
0
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov- 21 Dec- 21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22
0
Avg Avg Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec- 21 Jan-22 Feb-22 M ar-22
Apr16- Apr17- Mar19 Mar20 Mar21 Mar22
Mar17 Mar18
6, 000
4, 000
2, 000
0
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov- 21 Dec-21 Jan-22 Feb- 22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22
6, 000
4, 000
2, 000
0
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar- 22
Mar18 Mar19 Mar20 Mar21 Mar22
6, 000
4, 000
2, 000
0
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar 17 Mar18 Mar19 Mar20 Mar21 Mar22
180
160
140
120
100
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22
160
140
120
100
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 M ay-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar17 Mar18 M ar19 Mar20 Mar21 Mar22
200
150
100
50
0
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22
91
90
89
88
Apr 17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22
92
91
90
89
88
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul- 21 Aug-21 Sep-21 Oct-21 Nov- 21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22
91
90
89
88
Apr15- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May- Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar16 Mar18 Mar19 Mar20 Mar21 Mar22 21
12
10
6
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22
14
12
10
6
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22
0
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May- Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22 21
0
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22
0
Apr17- Apr-21 May - J un- J ul-21 Aug- Sep- Oc t - Nov - Dec - J an- Feb- Mar-
Mar18 Apr18- Apr19- Apr20- Apr21- 21 21 21 21 21 21 21 22 22 22
Mar19 Mar20 Mar21 Mar22
0
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22
0. 50
0. 40
0. 30
0. 20
0. 10
0. 00
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 M ar19 Mar20 Mar21 Mar22
0. 3
0. 2
0. 1
0. 0
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22
0.15
0.10
0.05
0.00
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22
THE END…..