1. Highlight Production

Pulp Machine production on July 2021 was 41,909 Adt, which is unfavorable by 1,576 Adt from
the Monthly Performance 40,333 Adt, unfavorable by 734 Adt from the monthly high
performance 42,643 Adt also unfavorable by 4,740 Adt from the Monthly budget 37,169 Adt.
Acacia MPB (Monthly Production Budget) = 7,980 Adt, Actual = 4,937 Adt.
Pellita MPB (Monthly Production Budget) = 29,189 Adt, Actual = 36,971 Adt.

Performance base Acacia Pellita Remark

3.6 27.4 Actual


Operating Days 31
6.0 23 Budget
Monthly Budget 37,169 7,980 29,189
Net Production 41,909 4,937 36,971
Daily Average 1,352 1,386 1,347

2. Topic Operation
The topic operations during July 2021 are:
a. Pulp Machine circulation and sheet break:
Total circulation on Jul-21 was 2H50M due to:
Folding machine line #1 problem 32M
Slitter no 5 jammed sheet jump to pulper 47M
Slitter no 8 loose 28M
Replace relay #1 & shaft conveyor #2 (7650) 1H3M

There were 2 times sheet break on Jul-21:


Duration Pulp
No. Date Reason Counter Measure
(Time) Species
Pulp machine sheet break
07:34~23:23 caused by 3rd top press felt Replace 3rd top and
1. 10-Jul-21 Pellita
(DT 15H49M) torn and went into the wet bottom press felt.
end pulper.
Cleaning inside dryer
08:09~12:45 Pulp machine Scheduled
2. 20-Jul-21 from cigar and pulp Pellita
(DT 28H36M) opportunity stop machine.
peeling.
b. Jun 2nd, 2021 at 09:30 Stopped Lime kiln due to spark coming out at kiln drive. Found that
the rubber coupling was damage and replaced it then did re-alignment. Started Kiln
heating up at 13:35 and at 15:40 Started feeding (DT 6H10M). On Jun 3rd, 2021 check
kiln vibration 2.69 mm/s while speed 1.75 rpm (still acceptance to operate).

c. Jun 3rd, 2021 at 08:05 Stopped Pulp Machine based on Opportunity schedule. Main job:
Replaced Pick up felt, bed and fly knife, vacuum pump #1, and bearing of circulation fan
#31 and #102 but fail so only re-alignment for both fans. Started machine on 23:15 and
Sheet production at 02:13 (DT 18H8M). Other’s plant stopped as follow:
- ClO2 production stopped at 08:00~21:00 based on schedule, Opportunity job: Acid
cleaning Chlorate cell, replaced chlorate cell #1 and #2, installed “Y” strainer on
Chilled water line, replaced steam bundle gasket of weak ClO3 Evaporator and
replaced cell cover gasket of Chlorate cell #26 (DT 13H).

Mill Monthly Report – June 2021 Page 2


- Bleaching plant stopped at 08:05~19:20 based on schedule to repaired D0 mixer
foundation, unplugged distributor D0 and EO pulp press and replaced nose MC pump
G-0150 (DT 11H15M).
- Cooking plant stopped blowing at 08:50~11:35 took opportunity to repaired WL
line/LP-steam line to LP feeder and repaired C-1000 rubber skirt (DT 2H45M).
- Washing plant stopped at 09:45~13:25 took opportunity stopped to unplug sampler
post O2 kappa (DT 3H35M).

d. Jun 6th, 2021 at 15:10~21:35 Bleaching plant stopped due to Gland packing of D0 tower
was leaking and boxed up to plug the leaking by plate (DT 6H25M). Last replacement of
Gland packing was Nov-20 ASD and after inspected on Mar-21 MSD indicate shaft sleeve
has little worn out and planning to replaced next Nov-21 ASD.
Meanwhile Washing plant at 18:37~22:28 stopped due to Brown stock HDT level was high
(DT 3H51M).

e. Jun 18th, 2021, all plants stopped due to high inventory after Pulp machine sheet
break and unsuccessful 12 times feeding (sheet moving to front side and break at inside
Dryer).
Countermeasure has done:
- Checked turning roll speed (OK).
- Cone circulation fan #67 was touching with blade and take out.
- Sprocket chain turning roll was loose and re-tighten.
- Replaced switch panel turning roll.
- Tape threading top pulley was fall down and fixed back.
- Tried to reduce the tension due to consider pulp quality after long time circulation (see
the start stop time at sheet break report above).

Others plant also stopped and started as follows:


- ClO2 plant stopped at 09:14~14:10, stopped again at 17:00~02:10 (total DT 14H6M).
Opportunity jobs: Cleaning plate strong ClO3 Chiller Heat Exchanger and flush weak
Cl2 recycle header ClO2 Generator.
- Digester stopped at 11:35~02:12 (DT 14H37M).
- Washing Plant stopped at 15:30~01:30 (DT 10H).
- Bleaching plant stopped at 15:30~00:10 (DT 8H40M). Opportunity job: Welding HP
sealing water line and replaced vacuum pump D1/D2 press standpipe.

f. Jun 21st, 2021 at 12:55~16:39 Washing plant stopped due to Dilution pump 421-G-2530
coupling was broken and caused high consistency at Pre O2 press dilution conveyor. Then
contactor and thermal overload for 421-G-1550 Pre O2 Shredder conveyor was burnt (DT
3H44M). Countermeasure has done: Replaced contactor and thermal overload of motor
Pre O2 press dilution conveyor, replaced coupling of dilution pump 421-G-2530 and
Flushing the line to TRPE.

g. Jun 23rd, 2021, all plants stopped due to high inventory after Pulp machine sheet
break (see the start stop time at sheet break report above).
- Digester stopped at 17:05~04:40 (DT 11H35M).

Mill Monthly Report – June 2021 Page 3


- Washing Plant stopped at 15:32~03:00 (DT 11H28M).
- Bleaching plant stopped at 11:40~01:00 (DT 13H20M).

h. Jun 25th, 2021 until Jun 26th, 2021, Production was not achieved due to many times Pulp
machine circulation by Bale marker line #1 problem (data not change). After inspected
found that communication to forte was failure. Replaced cable on Jul 26th, 2021 and
waiting next opportunity on Jul 19th, 2021 to calibrate.

i. Update of the month:


Jul 9th, 2021 at 03:12 Power boiler tripped due to tube pipe of furnace wall was
leaking.
Counter measure has done:
- Tubes replacement Jobs: Left sidewall 13 tubes has replaced (No. #76~#88), Right
sidewall one tube rebuilt (No. #80)
- Refractory Jobs: Left side 1.8 m x 1.6 m, Right side 0.6 m x 0.6 m
- On Jul 10th, 2021 at 09:00 all jobs has finished and continue to X ray.
- Started to hydro test at 22:53 but delayed due to strainer of Boiler feed water pump
#1 & #2 need to cleaning.
- Continued hydro test on Jul 11th, 2021 at 02:50 and finished at 06:00.
- Power boiler started heating at 06:45 and synchronized to T/G at 11:00 (DT
55H48M).
Countermeasure to be done:
- Improve tube inspection during Shutdown.
- Improve refractory installation especially at sand feeding side (invite vendor).
- Follow refractory drying curve, according to maintenance manual book during
repairing/heating up.
Meanwhile Pulp machine also load shedding at 03:14, started at 13:18 (DT 10H4M).

Jul 10th, 2021 at 07:34 Pulp machine sheet break due to 3rd top press felt was cut off
and the cut off felt that bring by broke conveyor to the wet end pulper.
Countermeasure has done: Replaced 3rd top & bottom press felt and empty out the
Wet end pulper to removed cut of felt. Job have finished at 17:00. Pulp machine
started at 20:08 and sheet production at 23:23 after three times feeding fail (DT
15H49M).

Meanwhile others plant also stopped due to high inventory as follows:


- Bleaching plant stopped at 10:20~00:10 (DT 13H50M).
- Washing plant stopped at 15:32~01:27 (DT 9H55M).
- ClO2 plant stopped at 21:50~00:54 (DT 3H4M).

Jul 11th, 2021 at 13:29 Twin Roll Press Evolution (TRPE) tripped due to high pressure
torque and speed going to zero then by passed. At 02:35 on Jul 12th, 2021 started
TRPE with water but after check found that bearing DS movable roll was broken.
Stopped TRPE at 13:36 to replace the bearing and finished on Jul 13th, 2021 at 03:00.
Started water run at 06:17 and on line with pulp at 08:50. However, unfortunately
found leak at ND bearing fix roll, MMD will pay attention and keep follow up.

Jul 13th, 2021 at 08:30 Stopped Electro Static Precipitator (ESP) #3 of Recovery Boiler
(RB) due to Yokogawa replaced the terminal board. Started again ESP #3 at 17:30
(DT 9H).

Jul 13th, 2021 at 04:19~05:39 CA plant tripped due to control valve PIC-2780 Chlorine
to hypo air regulator valve was leaking.
Mill Monthly Report – June 2021 Page 4
3. Result of Operation
a. Production

This Month Year to Date


Particular Unit
Actual Plan % of Plan Actual Plan % of Plan
A. PDD
1. Pulp Machine (AM) Adt 4,316 7,980 54 6,673 23,940 28
2. Pulp Machine (EP) Adt 33,472 30,672 109 113,280 94,240 120
3. Pulp Machine (AM+EP) Adt 37,788 38,652 98 119,953 118,180 102
4. Cooking plant (AM) Adt 4,540 8,400 54 7,020 25,200 28
5. Cooking plant (EP) Adt 35,566 32,286 110 119,463 99,200 120
6. Cooking plant (AM+EP) Adt 40,106 40,686 99 126,483 124,400 102
B. CPD
1. ClO2 t 660 714 92.4 2,177 2,178 99.9
C. RPD
1. Steam t 310,226 324,656 95.6 948,097 984,736 96.3
2. Power MWh 37,236 38,333 97,1 115,968 116,270 99.7
3. Mill water M3 2,506,043 2,542,488 98.6 7,616,013 7,711,789 98.8
4. White liquor M3 134,373 140,815 95.4 416,239 427,114 97.5
5. Heavy black liquor t 63,960 62,584 102.2 203,220 189,829 107.1

b. Key indicator

This Month Year to Date


Particular Unit
Actual Plan Remark Actual Plan Remark
A. CWD              
1. Log to chip yield (AM) % 0 89.0 X 80.99 89.0 X
2. Log to Pulp Ratio (AM) Ratio 2.34 2.15 X 2.52 2.15 X
3. Log to chip yield (EP) % 95.06 92.2 O 93.74 92.2 O
4. Log to Pulp Ratio (EP) Ratio 2.02 2.23 O 2.06 2.23 O
5. Solar fuel consumption Li/Adt 1.29 1 X 1.16 1 X
B. PDD  
1. Cooking plant yield (AM) % 49.6 49.5 O 45.3 49.5 X
2. Cooking plant yield (EP) % 49.2 45.5 O 48.9 45.5 O
3. ClO2 consumption Kg/Adt 17.3 18.4 O 18.4 18.4 O
4. H2O2 consumption Kg/Adt 1.6 2.0 O 3.0 2.0 X
5. WL consumption (AM) M3/Adt 3.5 3.4 X 3.3 3.4 O
6. WL consumption (EP) M3/Adt 3.3 4.1 O 3.3 4.1 O
7. Kappa No. std. deviation Kg/Adt 1.2 0.8 X 1.2 0.8 X
8. Pulp reject Kg/Adt 17.2 36.0 O 19.2 36.0 O
9. Soda loss 2nd post pulp press % 4.9 9.0 O 6.1 9.0 O
C. CPD  
1. CA DC power MWH/T. NaOH 2.73 2.62 X 2.75 2.62 X
2. ClO2 DC power MWH/TClO2 7.6 8.8 O 8.4 8.8 O
3. Raw Salt Kg/Adt 28.0 31 O 28.3 32 O

Mill Monthly Report – June 2021 Page 5


4. 48% NaOH Kg/Adt 12.3 14 O 13.6 14 O
5. 98% H2SO4 Kg/Adt 0.4 0.6 O 0.42 0.6 O
6. Alpha cellulose Kg/Adt 0.002 0.005 O 0.001 0.005 O
7. Na2CO3 Kg/Adt 0.066 0.082 O 0.066 0.082 O
8. Na2SO3 Kg/Adt 0.043 0.06 O 0.04 0.06 O
9. Flocculant PA 312 Gr/Adt 0.0003 0.0015 O 0.0003 0.0015 O
D. RPD              
1. White liquor TSS ppm 44.1 <100 O 47.3 <100 O
2. White liquor AA gpl 99.5 >96 O 99.9 >96 O
3. White liquor sulfidity % 27.7 25~35 O 26.2 25~35 O
4. Lime mud dryness % 65.6 >60 O 66.0 >60 O
5. Lime purity % 87.3 >75 O 86.1 >75 O
6. Mill water consumption M3/Adt 58.4 <65 O 59.2 <65 O
7. Heavy Black Liquor Burnt T/Adt 1.69 >1.6 X 1.69 >1.6 X
8. Solar consumption Li/Adt 10.18 <2.955 X 5.09 <2.955 X
9. MFO consumption Li/Adt 1.32 <2.2108 O 1.07 <2.2108 O

Note: X = below planning, O = met planning

* No chipping AM on June 2021.


* High Solar consumption at CWD due to increasing rental Heavy equipment for BC #3 and Hauling bark
from outside.
* High WL consumption for AM due to there was mix with Pellita.
* Kappa Number standard deviation was above target due to big variation of Chip bulk density and difficult
to control Chip bin level.
* High CA DC power due to some of CA cell has over lifetime and replacement will continue the next ASD.
* High solar consumption for back up while plant start stop by Pulp machine problem and BL shortage.

4. SAFETY ISSUE

Working Accident Occurred:


 Zero Accident and Fire for June 2021

Highlights, Issues and Action Plans:

 Checked fire hydrant and fire extinguisher at Mill site and follow-up if found some
abnormality.
 Measured working permit and gases contain for vessel entry permit.
 Conduct safety representative, training, sharing by Siloam hospital regarding vaccine.
 Gave safety induction to PT NPE (21), PT SAA (6), PT Herissa (8), PT Indo Scale (7), PT.
Radian (3), PT. IBM (2), PT Media (3), PT. Citra Trikarya Mandiri (4), PT. SMCC (13) dan
PT Pratama Graha (1) and PT. Yogma (11).
 Do safety inspection at Gate XII
 BOD Safety Patrol at area Admind Building (Truba), Fabrication Shop, MMD Shop and EID
Shop, Chip Screen and Chip pile
 Checked Emergency Evacuation System at MCC Room Cooking and Bleaching, result
good condition.
 Checked fire alarm system at Cooking and Bleaching, result good condition
 Checked safety shower at Cooking and Bleaching, result good condition
Mill Monthly Report – June 2021 Page 6
 Checked Hoist Crane at Top Separator, Digester Elevator, Loading Dock #1, #2, #3 and
Forklift at Pulp Warehouse, result good condition.
 Accompany Manpower Department and third party for renewal operational permit for Lift
and Transport Equipment, Pressure Vessel, Tank, Boiler, Fire Equipment Installation,
Electrical Installation and Lighting Rod Installation.
 Support and help CWD team due to van belt burn at bark Crusher #4 caused by van belt
slip from pulley.

B. DEPARTMENT ISSUE

1. Chip & Wood Department (CWD)

a. CWD issue
- Continue repairing Log yard #10, #20, #30, #40, and #50. Follow up by POD and EGD.
- Jun 2nd, 2021 at 20:27 Screw reclaimer #4 stopped due to casing gearbox was
damage. Countermeasure has done: Replaced gearbox, coupling, chain transmission
and housing bearing, then inspected bolt screw to sprocket. Started Screw reclaimer
#4 on Jun 9th, 2021 at 21:30.
- Jun 8th,2021 at 20:30 Screw reclaimer #7 stopped due to bearing of screw was
damage. Started screw reclaimer #7 on Jun 8th, 2021 at 18:00.
- Truck scale #4 was down due the bridge construction fault (Load cell foundation was
broken, and H-beam was bending). Replacing the bridge construction started on Jun
4th, 2021 this month and continue until now.
- Jun 30th, 2021 Truck scale #5 started after replacement of the load cell. Truck
scale #5 was down since May 6th, 2021 due to lighting while heavy rain and on May
10th, 2021 started to replaced load cell (total 10 pcs).
- CWD production below than target due to production slowly based on Log inventory.

b. CWD Production

This Month Year to Date


Particular Unit % of
Actual Plan % of Plan Actual Plan
Plan
A. CWD              
1. Log received EP BDt 79,164 75,000 106 172,878 199,000 87
2. Log received AM BDt 6,253 22,600 28 18,146 51,800 35
Total Log receive BDt 85,417 97,600 88 191,023 250,800 76
3. Log consumed to chipping EP BDt 65,033 69,584 93 187,769 211,652 89
4. Log consumed to chipping AM BDt 0 17,177 0 16,041 51,530 31
Total Log consumed BDt 65,033 86,761 75 203,811 263,182 77
5. Chip production EP BDt 61,822 64,157 96 173,851 195,143 89
6. Chip production AM BDt 0 15,287 0 13,015 45,862 28
Total Chip production BDt 61,822 79,444 78 186,866 241,005 78
7. Chip to digester EP BDt 64,903 64,157 101 219,905 195,143 113
8. Chip to digester AM BDt 8,239 15,287 54 13,015 45,862 28
Total Chip to digester BDt 73,142 79,444 92 232,920 241,005 97

c. CWD Production Rate and Running Time

Mill Monthly Report – June 2021 Page 7


Running Running Rate Rate
Production (Bdt/month) Work D/Month
Hours/Month Hours/Day (Bdt/day) (Bdt/hour)
Line
A E Dow
AM EP Total AM EP AM EP AM EP AM EP
M P n
15,67 15,67 3
I - Bark 0 0 0 0.0 412.7 0.0 13.8 0 523 0 38
8 8 0
3
I - Debark 0 21 21 0           0 1 0 0
0
13,52 13,52 3
II - Bark 0 0 0 0.0 394.4 0.0 13.1 0 451 0 34
9 9 0
II - 17,92 17,92 3
0 0           0 598 0 0
Debark 6 6 0
3
III 0 7,649 7,649 0 0 0.0 449.2 0.0 15.0 0 255 0 17
0
3
IV 0 7,019 7,019 0 0 0.0 463.2 0.0 15.4 0 234 0 15
0
V 0 0 0 0 0 30 0.0 0.0 0.0 0.0 0 0 0 0
61,82 61,82
  0       0.0 1719.5         0 104
2 2

d. CWD Graph

Chiping Yield (%), Acacia Mangium

100

97

94

91

88

85

82

79

76

73

70
Apr 16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22

Chiping Yield (%), Eucalyptus Pellita

100

90

80

70

60

50

40

30

20
Apr 16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr -21 May-21 Jun- 21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22

Mill Monthly Report – June 2021 Page 8


Chiping Yield (%), EP (De-barked)

100

90

80

70

60

50
Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar20 Mar21 Mar22

Log s to Pulp Ratio, Acacia Mangium

3.0

2.6

2.2

1.8

1.4

1.0
Apr17- Apr18- Apr19- Apr20- Apr 21- Apr-21 May-21 Jun- 21 Jul-21 Aug- 21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 M ar22

Logs to Pulp Ratio, Eucalyptus Pellita


3.0

2.6

2.2

1.8

1.4

1.0
Apr16- Apr 17- Apr18- Apr19- Apr20- Apr21- Apr-21 M ay-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar 17 Mar18 Mar 19 Mar20 Mar21 Mar 22

Mill Monthly Report – June 2021 Page 9


2. Production Department (PDD)

a. PDD issue

Cooking & Bleaching (CB)


- Found many metal gram from D1/D2, EO & 1 st post pulp press instead the oil leaking
from bearing seal since Apr-21 and added oil around 40 liters/week (1st press), 60
liters/week (EO press), and 60 liters/week (D2 press) then decided to replaced oil back
to Bechem on Jun 3rd, 2021. Currently still adding oil about 15 liters/4days (D2 press),
5 liters/4 days (EO Press), and 1st post 5 liters per week.
Bearing spare status: two pcs available, two pcs ETA, May-21 open PR to purchase
four pcs plan to replace Nov-21.
- Update Spare of Mechanical seal for MC-pump TRPE stand pipe. For new spare
one set still PO (PO 24115, ETA Mill site 10-Aug-21 John crane). New spare of contact
face and casing stationer from Rolon that was arrived on May-21 had already used.
Now available spare is contact face (graphite), and casing stationary.

Pulp Machine (PM)


- After check and repair until Jul 10th, 2021, Circulation fans status were 64 fans in
good condition, 26 fans were alarm #1, 11 fans were alarm #2 (No. #7, #17, #24, #31,
#43, #44, #49, #51, #73, #91 & #102) and 3 fans were not running (No. #30, #46 &
#100).

Effluent Treatment plant (ETP)


- The Aerator #7, #11 and #12 were still down due to screw impeller was unbalance,
cone was broken, and motor got low megger. Need to speed up spare by MMD and
POD PO 24576, ETA Mill site 10-Sep-21).
- On May 2nd, 2021 empty out the holding pond area was started due to planning to
clearing and dredging the pond for normalize the function as previously (waiting JS
approval).

b. Daily Production Result

Mill Monthly Report – June 2021 Page 10


Pulp Production Progress Report
June, 2021
Variance to
Ne t PM Daily Target variance Daily Budget Remark
(ADt) (ADt)
Da te Production
(ADt) AM = 1330
Quantity Quality
Ta rget Variance Pellita = 1297
1 1,421 1,400 21 124

2 1,400 1,300 100 103

At 08:05 Machine stopped base on opportunity shut


PB- grade 31.382 ADMT due to high dirt (machine
3 270 400 -130 -1,027 down schedule. At 23:15 Machine start, at 01:12
just start up)
feeding to dyer and at 02:13 sheet production.
Machine circulation 36 minutes due to fly cutter not
4 1,407 1,450 -43 109
working properly.

5 1,527 1,500 27 230


Machine circulation 120 minutes due to low bleach
HDT level. At 15:10 - 21:35 D0 stage until 02nd press
stopped due to gland packing 431-G-0105 discharge
6 1,243 1,500 -257 -55
D0 tower was problem. At 12:00 started AM-UCW
chips feeding to digester. At 22:30 started Pellita CW
PEFC chips feeding to digester.
At 18:30 started Acacia UCW pulp production.
At 01:00 started Pellita CW/PEFC pulp production.
7 1,359 1,400 -41 53
Machine circulation 17 minutes due to fly cutter not
working properly.
Pulp production was revised from 1,499.150 ADMT to
1492.594 ADMT by subtraction 6.556 ADMT due to
8 1,493 1,450 43 195
bale scale and forte line #1 were problem . At 22:00
started Acacia-UCW chips feeding to digester.

9 1,457 1,400 57 148 At 21:30 started Acacia UCW pulp production.

10 1,401 1,400 1 71
At 18:30 sheet break at inside dryer. At 21:00 - 22:47
four times feeding sheet to dryer unsuccses.
At 23.45 feeding to dryer. At 00:54 sheet production.
11 1,021 1,400 -379 -309
Machine circulation 12 minutes due to fly cutter not
working properly. At 04:00 started Pellita CW PEFC
chips feeding to digester.
At 00:00 started Pellita - CW PEFC pulp production.
12 1,386 1,400 -14 64 Machine circulation 12 minutes due to switching pulp
production from Acacia UCW to Pellita CW PEFC.
13 1,404 1,400 4 107

14 1,510 1,450 60 212

15 1,525 1,450 75 228

16 1,512 1,450 62 215


At 13:48 sheet break due to vacum pump 471G4182
17 522 1,450 -928 -775
tripped.
At 08:36 - 09:54 two times feeding sheet to dryer
unsuccses. At 11:03 feeding to dryer.
At 11:57 sheet production. At 15:05 sheet break at
18 522 500 22 -775
second press. At 17:23 - 20:35 five times feeding
sheet to dryer unsuccses. At 21:26 feeding to dryer.
At 22:33 sheet production
19 1,456 1,400 56 158

20 1,483 1,450 33 186

At 01:48 sheet break due to dance roll problem.


At 04:42 - 06:43 three times feeding sheet to dryer
unsuccses. At 12:55-16:39 washing plant trip due to
21 1,233 1,450 -217 -64
421-G-1550 (Pre O2 pulp press shredd. Conveyor)
suddenly high current due 421 G 2530 (dillution to Pre
O2 pulp press) coupling broken
At 09:48 - 11:01 two times feeding sheet to dryer
unsuccses due to sheet moving to operater side and
22 838 800 38 -460
tape threeding jammed. At 15:00 feeding to dryer.
At 15:55 sheet production

At 08:35 sheet break at inside dryer due to much


cigar. At 21:47 - 22:23 two times feeding sheet to
dryer unsuccses. At 23:21 feeding to dryer.
23 489 600 -111 -808 At 23:58 sheet production. At 17:10-04:40 digester
stop blowing. At 15:32-03:00 washing stop due to BS
HDT high level. At 11:40-01:00 bleach plant flushing &
stop due to high level bleach HDT.

24 1,505 1,450 55 208


Machine circulation 191 minutes due to bale marker
25 1,197 1,450 -253 -100
line #1 have a problem.
Machine circulation 195 minutes due to bale marker
26 1,167 1,350 -183 -131
line #1 have a problem.

27 1,497 1,500 -3 200

28 1,504 1,480 24 186

29 1,519 1,480 39 189

30 1,520 1,480 40 190

Tota l 37,787 39,590 -1,803 -1,328 Monthly Achievement : 96.6%

Operating Days 30.0 3.4 26.6 Variance to Actual Da ily Average


Va ria nce to
high YTD Accumula tion
Performance
Perform ance bas e 39,029 Acacia Pellita Performa nce

Net Production 37,787 4,316 33,472 -1,242 -3,479 Acacia 6,673 1,195
Daily Average 1,260 1,279 1,257
Pellita 113,280 1,326
Acacia Pellita YTD
Budget On Varia nce to
Operating Days 30 Accumulation Actua l Daily Average
Da te budget
Percentage
6.0 24 Total

Monthly Budget 39,115 7,980 31,135 June, 2021 37,787 1,260 39,115 -1,328 96.6%
April, 2021 -
Net Production 37,787 4,316 33,472 March, 2022
119,953 1,318 118,643 1,310 101.1%

3. Recovery and Power Department (RPD)

Mill Monthly Report – June 2021 Page 11


a. Fuel Consumption

Actual Usage Budget


No Area Fuel Reason and Time Date
Ton MMBTU KL KL MMBTU
NA
1 PB Solar   19.3  
Use 34.5 T by RB reduce load/BL 1,7,8,11,1318,1
inventory less by PM/Digester 9,21,22,23,24,2
stop, 4.0 T by backup bark firing 5,26,30-Jun-
due to conveyor#3700 & pocket 2021
2 PB MFO 45.5   49.7 86.5  
drive plug up, 3.0 T by
maintenance purposes repair
screw silo#1 & Drag conveyor #1,
4.0 T by bark loader problem
3 PB Bark 11,161 - -

4 PB Fiber 3,779 - 1,565*

5 PB PKS 756 - 391*

6 PB RT 378 - -
Use 291.7 T by backup liquor
8,12,13,18,19,2
firing by inventory less due to
2,23,24-Jun-
7 RB Solar 293.6   350.7 96.3   PM/Digester stop, 1.5 T by
2021
change pump schedule

Black
8 RB 63,960 - -
liquor
Use 14.6 T by backup power by
PM/Digester stop
2,9,10,11,12,18
(10,11,18,19,21,22,23-Jun-21),
19,21,22,23,30-
9 DG Solar 20.8   24.9     2.7 T by backup during repair
Jun-2021
HF#5 (12-Jun-21), 3.6 T by
warming up (2,9,30-Jun-21)

10 LK MFO -    - - - NA  
Use 77,798 MMBtu as fuel
11 LK NG   77,798     84,254  
normally
Use 7.6 T by backup gasses
firing during Digester stop, repair 4,8,19,23,24,30
12 NCG Solar 7.6   9.1     quench body (4,18,19,23,24,30- -Jun-2021
Jun-21)

Use 1,163 MMBtu as fuel


13 NCG NG   1,163     1,252  
normally
MFO  45.5 -  49.7 86.5      
Solar 322   385 202      
NG   77,798     84,254    
Total Black
63,960
liquor
Bark 11,161
Fiber 3,779 1,565*
PKS 756 391*
RT 378

* Bark, RT and Fiber unit in BDT, Black liquor unit in TDS and PKS unit in Green Ton.
* High Fiber, PKS and Rubber tree consumption due to a lack of bark inventory (less chipping
production since Apr 21st, 2021 due to low log inventory) and also maximized Power boiler load
while HBL shortage (Many times Cooking stopped and reduced rate due to Pulp machine
problem).
* High Solar consumption due to back up while shortage HBL inventory.

b. RPD issue

Mill Monthly Report – June 2021 Page 12


Power Boiler (PB)
-Raw water pump #1 not working properly.
Countermeasure: Replaced module RW pump#1 with new one but on Jun 24 th, 2021
pumps tripped 4 times and on Jun 28th, 2021, replaced 1GBT module for R, S, T of the
pump

Recausticizing Plant (RL)


- On Jun 11th at Lime kiln ESP at field #2 alarm Ans- and suspect a short circuit. On Jun
12th, 2021 at 14:40~18:10 stopped Lime mud feeding to replace the relay for
communication to DCS, but after check transformer still low megger and decided to
check inside ESP and found 1 electrode out of contact with the collecting plate causing
a short circuit.

Recovery Boiler (RB)


- Jun 9th, 2021 PT. TEL has meeting with Andrizt regarding ESP #3 performance with
topic as follows:
Andrizt gave explanation about ID fan #3 backpressure.
Decided to conduct performance test on Jul 7th until 9th, 2021.
Yokogawa also replaced terminal board on Jul 13th, 2021.
- On Jun 28th, 2021 HBL tank #2 was a blockage and the agitator tripped. Isolated and
empty out the tank and cleaning inside. After the agitator rotate and cleaned the level
sensor, the HBL tank #2 was close and still continue soaking by Hot water normally.

4. Chemical Plant Department (CPD)

a. CPD Issue
- High weak acid temperature & Low HCl #2 product concentration due to suspect
top carbon block was plug up by broken glass while inner and outer tube broken.
Countermeasure: Temporary weak acid temperature kept less than 65 oC and increase
HCl #1 product concentration to 33~33.5%. Countermeasure to be done: Overhaul the
unit on the next ASD Nov-22.
- ClO2 absorber #2 tray segment #1 and #2 were damage (include bottom tray support).
Countermeasure to be done: Replace absorber tray bottom support (PO 24124, ETA
Oct-21 for 3 segments) and Replace weak Cl2 blower #1 (PO /TEL/ 025848, ETA Oct-
21).
- Strong ClO3 Chiller performance due to Chlorate chiller HE dirty by chilled water pipe
got corrosion. Countermeasure to be done: Replace the pipe with SS material on the
next ASD Nov-21.
- High vibration stage #1 Air compressor O 2 plant due to Rotor impeller was un-
balance that will affect to trip and risk to continue to run the unit. Counter measure:
Purchase new set rotor impeller stage #1 (PO 22316, ETA End of Jun-21).
- Chiller Unit #1 was low performance as lifetime issue and need to re-new absorption
chiller (PO 23381, ETA End of Aug-21).
- ClO2 Production were stopped 3 times on June 2021 due to T/R DC permissive
tripped by interlock to problem at HCl synthesis unit #1. Many countermeasures have
done such as follows:
Jun 2nd, 2021 Replaced DI module channel, Reset PLC panel and cleaning
touchscreen display.
Jun 6th, 2021 Check sight tube of flame detector and cleaning sight glass of flame
detector.

Mill Monthly Report – June 2021 Page 13


Jun 7th, 2021 Replaced flame detector, replaced solenoid H2 safety valve and
replaced H2 relay.

b. CPD Production

5. Marketing & Quality Department (MQD)

a. Pulp Quality Pass Rate


Prime grade pass rate is 99.92 %, favorable of the target of 99.00%.

Pulp Down Grade, June 2021

High Dirt,
100%

Pulp Down Grade, June 2021


Month to Date
Particulars Acacia Pellita Total Remarks
ADt % ADt % ADt %

High Dirt 31 100 31 100 - Pulp Machine just started up due to opprtunity shut down

Total - - 31 31 100

b. Abnormality Report
Total abnormality reports issued to the process were 55 reports, with six (6) items of which
had more than 5% appearance such are accept chip after chipper #1#2#3, accept chip
after chipper #4, accept chip after chipper #5, free Cl2 of HCl production, total titratable
alkali of green liquor and reduction efficiency of smelt.

Mill Monthly Report – June 2021 Page 14


c. Pulp Physical Properties
Pulp Quality Acacia Mangium
This Month This Year
Particular Unit
Actual Plan % Plan Actual Plan % Plan
A. Prime Garade:
*)
1. Prime Gade (A + H) ADt 100.0 99.0 101.0 97.4 99.0 98.4
B. Basic Characteristic:
2. Brightness % ISO 90.4 89.0 102 90.0 89.0 101
2 2
3. Dirt mm /m 0.3 2.0 100 0.4 2.0 100
4. Viscosity mPas 11.7 8.0 146 11.1 8.0 139
5. DCM Extractives % 0.04 - 100 0.24 - 100
C. Physical Properties:
6. Tensile Index Nm/gr 71.0 70.0 101 68.7 70.0 98
2
7. Burst Index kPam /gr 4.7 4.5 104 4.6 4.5 102
2
8. Tear Index mNm /gr 8.3 7.3 114 8.1 7.3 111
9. PFI Beating time 3,286 - 100 3,143 - 100

Pulp Quality Pellita


This Month This Year
Particular Unit
Actual Plan % Plan Actual Plan % Plan
A. Prime Garade:
*)
1. Prime Gade (A + H) ADt 99.9 99.0 100.9 99.9 91.5 109.1
B. Basic Characteristic:
2. Brightness % ISO 90.2 89.0 101 90.1 89.0 101
2 2
3. Dirt mm /m 0.2 2.0 100 0.3 2.0 100
4. Viscosity mPas 11.1 8.0 139 10.3 8.0 129
5. DCM Extractives % 0.08 - 0.12 -
C. Physical Properties:
6. Tensile Index Nm/gr 66.6 68.0 98 66.0 68.0 97
2
7. Burst Index kPam /gr 4.3 4.0 108 4.2 4.0 105
2
8. Tear Index mNm /gr 9.4 7.3 129 9.1 7.3 125
9. PFI Beating time 3,667 - 100 3,667 - 100

Total Production (Acacia Mangium + Pellita)


This Month This Year
Particular Unit
Actual Plan % Plan Actual Plan % Plan
*)
1. Prime Gade (A + H) ADt 99.9 99.0 100.9 99.7 99.0 100.7

Mill Monthly Report – June 2021 Page 15


6. Environment Department (END)

a. Environmental issue
- Project land fill #6 has started on October 2020 (progress 73.54% per Jul 8th,2021),
delayed 26.46% compare to plan 100% due to rainy season, land slide, waiting material
leached layer and remove black and grey soil.
- On Apr 1st, 2021 Embankment of Land fill #5 was land slide at position beside of Project
land fill #6. Repairing work by SMCC and EGD on progress 18.5% behind of
schedule as 39.6%.

b. Amdal Parameter
All environment parameters of treated effluent meet the standards as per AMDAL
requirement.

This Month This Month


Particular Unit
Actual Plan % of Plan Actual Plan % of Plan
A. Efflent Load
1. Volume m3/ADt 56 85 66 55 85 65
2. TSS kg/ADt 1 8.5 12 1 8.5 10
3. COD kg/ADt 8 29.75 27 3 29.75 11
4. BOD kg/ADt 0.4 8.5 4 0 8.5 4
5. AOX kg/ADt 0.1 1.5 9 0 1.5 7
B. Effluent Quality
1. TSS mg/lt 18 100 18 16 100 16
2. COD mg/lt 142 350 41 170 350 49
3. BOD mg/lt 7 100 7 6 100 6
4. AOX mg/lt 2.2 29.0 8 2 29.0 7
C. Power Air Emission*
1. Total Partuculate mg/Nm3 187 230 81 117 230 51
2. SOX mg/Nm3 1 800 0 26 800 3
3. NOX mg/Nm3 281 1000 28 168 1000 17
D. Recovery Air Emission*
1. Total Particulate mg/Nm3 35 230 15 67 230 29
2. TRS mg/Nm3 4.6 10 46 5 10 46
E. Lime Kiln Air Emission*
1. Total Particulate mg/Nm3 84 350 24 102 350 29
2. TRS mg/Nm3 5 28 18 8 28 27
F. Solid Waste to Landfill #5
1. Sludge BD ton 234 350 67 323 350 92
2. Dregs BD ton 1,431 1,000 143 1,257 1,000 126
3. Pulp Reject BD ton 0 650 0 0 650 0
4. Ash** BD ton 356 500 71 321 500 64

Note: Ash moisture 53%, Dreg moisture 42%, Sludge Cake moisture 67%.

* Testing by internal lab every 3-month, last testing on May-2021.


* Ash uses as a solidification material.

Mill Monthly Report – June 2021 Page 16


C. COST ISSUE

1. Monthly Cost Review

Results Highlights for the Month of (MTD) June 2021

Total Production
MTD
Actual Budget Var
Production Total (ADT) 37,787 39,115 ▲1,328
Production AM (ADT) 4,316 7,980 ▲3,664
Production AM /Day (ADT) 1,279 1,330 ▲51
Production Pellita (ADT) 33,472 31,135 +2,336
Production Pellita / Day (ADT) 1,257 1,297 ▲40
COGM (US$/ADT) 444.87 485.60 +40.72
Wood Cost (US$/ADT) 213.06 246.88 +33.82
Other variable cost (US$/ADT) 58.58 52.39 ▲6.18
Fixed Cost (US$/ADT) 173.24 186.33 +13.09

1. Variable cost : Average Acacia & Pellita


a. Wood cost Acacia : +$24.31 /ADT mainly came from log unit price
b. Wood cost Pellita : +$23.29 /ADT mainly came from log unit usage
c. Chemical : ▲$0.34 /ADT
d. Energy : ▲$5.35 /ADT mainly came from Diesel Oil and Palm Oil Fibrous unit usage
e. Packing cost : ▲$0.65 /ADT
f. Others : +$0.15 /ADT mainly came from operating supplies

Amount (US$1,000) Unit Cost (US$/ADT)


Actual Budget Var Actual Budget Var
Production Total (ADT) 37,787 39,115 ▲1,328 - - -
Variable Cost Total 10,264 11,706 +1,442 271.64 299.27 +27.63
Wood Cost (Acacia) 1,359 2,707 +1,348 314.87 339.18 +24.31
Wood Cost (Pellita) 6,692 6,950 +258 199.93 223.22 +23.29
Wood Cost Total 8,051 9,657 +1,606 213.06 246.88 +33.82
Chemical 631 640 +9 16.70 16.36 ▲0.34
Energy 1,295 1,131 ▲164 34.28 28.92 ▲5.35
Packing 120 99 ▲21 3.19 2.53 ▲0.65
Others 167 179 +12 4.42 4.57 +0.15
Others Variable Cost 2,213 2,049 ▲164 58.58 52.39 ▲6.18

2. Fixed cost :
The major variance came from :
a. Maintenance Expense +$263 - mainly came from :
- timing issue by +$243,
- unutilized budget by +$133,
- unbudgeted and over budget by ▲$113
b. Mill Overhead - Insurance : ▲$26
c. Mill Overhead - Others : +$431 - mainly came from unutilized budget and lower than budget by +$355, timing issue by +$76
d. Contracted Work : +$21
e. Depreciation : +$80
f. Others : ▲$27

Amount (US$1,000) Unit Cost (US$/ADT)


Variance
Actual Budget Var Volume Usage
from budget
Fixed Cost 6,546 7,288 +742 +13.09 ▲6.55 +19.63
Maintenance Expense 1,045 1,309 +263 +5.79 ▲1.18 +6.97
Mill Overhead - Insurance 163 137 ▲26 ▲0.81 ▲0.12 ▲0.69
Mill Overhead - Others 654 1,085 +431 +10.43 ▲0.97 +11.40
Contracted Work 233 254 +21 +0.33 ▲0.23 +0.56
Depreciation 2,712 2,792 +80 ▲0.40 ▲2.51 +2.11
Others 1,739 1,712 ▲27 ▲2.25 ▲1.54 ▲0.71

Mill Monthly Report – June 2021 Page 17


2. CAPEX REVIEW

Table 2.1. Carry over CAPEX FY2020 to FY2021 Status and Progress

Mill Monthly Report – June 2021 Page 18


Mill Monthly Report – June 2021 Page 19
Table 2.2. New Capex FY2020 Status and Progress

Graph of Capex CIP

Mill Monthly Report – June 2021 Page 20


3. Log Procurement and Data

Summary Wood Receipt


Period : May 2021 and June 2021
May-21 June-21
Vendor Unit Cost Unit Cost
Qty (BDT) Amount ($) Qty (BDT) Amount ($)
($/BDT) ($/BDT)
Accacia Mangium - Total Log 5,550.44 113.09 627,703.68 6,253.13 101.11 632,279.63
Tra ns porter 11.16% 41.41 229,844.91 7.32% 44.62 279,013.28
Adjus ment (0.02) (95.44) 0.91 5,716.70
Total 154.48 857,453.15 146.65 917,009.61
Pellita - Total Log 44,166.75 76.45 3,376,765.79 79,163.75 74.65 5,909,549.69
Tra ns porter 88.84% 21.96 969,900.34 92.68% 23.99 1,899,488.38
Adjus ment - - 0.29 23,137.67
Total 98.41 4,346,666.13 98.94 7,832,175.74
Grand Total Log 49,717.19 80.54 4,004,469.47 85,416.88 76.59 6,541,829.32
Tra ns porter 100.00% 24.13 1,199,745.25 100.00% 25.50 2,178,501.66
Adjus ment (0.00) (95.44) 0.34 28,854.37
Total 104.67 5,204,119.28 102.43 8,749,185.35

D. ATTACHMENT

Mill Monthly Report – June 2021 Page 21


GRAPH OF MAJOR ITEMS REGARDING MILL OPERATION

ClO2 consumption

H2O2

H2O2 Consumption (kg/ADt), Total

10

0
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22

Lime mud dryness

Lime Mud Dryness (%)


75

70
67.6 67.4
66.6 66.5 66.1 66.1 66.5
65.8 65.6
65

60

55

50
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22

PULP QUALITY

Mill Monthly Report – June 2021 Page 22


Prime grade Pass-Rate (%), AM + Pellita
105

100

95

90

85

80
Avg Avg Avg Avg Avg Avg Apr-21 May- Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- 21
Mar17 Mar18 Mar19 Mar20 M ar21 Mar22

Pulp Down grade (ADMT), AM + Pellita


1,200

1,000

800

600

400

200

0
Avg Avg Avg Avg Avg Avg Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec- 21 Jan-22 Feb-22 Mar-22
Apr16- Apr17- Apr18- Apr 19- Apr20- Apr21-
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22

Tensile Index at 200 CSF (Nm/g), AM controlled w ood


80

60

40

20

0
Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar19 Mar20 Mar21 M ar22

Tensile Index at 300 ml CSF (Nm/g) AM uncontrolled wood

80

60

40

20

0
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 M ar 21 Mar22

Mill Monthly Report – June 2021 Page 23


Tensile Index at 300 ml CSF (Nm/g), Pellita

80.0

60.0

40.0

20.0

0.0
Apr16- Apr 17- Apr18- Apr19- Apr 20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22

Tear Index at 300 ml CSF (m Nm2/g), AM Controlled Wood

10

0
Apr17- Apr18- Apr19- Apr20- Apr 21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar- 22
Mar18 Mar19 M ar20 Mar21 Mar22

Tear Index at 300 ml CSF (mN.m2/g) AM Uncontrolled Wood

10

0
Apr17- Apr 18- Apr19- Apr20- Apr21- Apr -21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22

Tear Index at 300 ml CSF (mN.m2/g), Pellita


10

0
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22

Mill Monthly Report – June 2021 Page 24


Burst Index at 300 ml CSF (kPa m2/g) AM Controlled Wood

0
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22

Burst Index at 300 ml CSF (kPa m2/g) AM Un-controlled Wodd

0
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov- 21 Dec- 21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22

Burst Index at 300 ml CSF (kPa m2/g), Pellita

0
Avg Avg Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec- 21 Jan-22 Feb-22 M ar-22
Apr16- Apr17- Mar19 Mar20 Mar21 Mar22
Mar17 Mar18

PFI Beating Revolution to Obtain 300 ml CSF (rev.) AM Controlled Wood

6, 000

4, 000

2, 000

0
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov- 21 Dec-21 Jan-22 Feb- 22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22

Mill Monthly Report – June 2021 Page 25


PFI Beating Revolution to Obtain 300 ml CSF (rev.) AM Un-controlled Wood

6, 000

4, 000

2, 000

0
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar- 22
Mar18 Mar19 Mar20 Mar21 Mar22

PFI Beating Revolution to Obtain 300 ml CSF (rev.) Pellita

6, 000

4, 000

2, 000

0
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar 17 Mar18 Mar19 Mar20 Mar21 Mar22

Bulk Density of Chip to Digester (kgBD/m3), AM Controlled Wood

180

160

140

120

100
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22

Bulk Density of Chip to Digester (kgBD/m3), AM Un-controlled Wood


180

160

140

120

100
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 M ay-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar17 Mar18 M ar19 Mar20 Mar21 Mar22

Mill Monthly Report – June 2021 Page 26


Bulk Density of Chip to Digester (kgBD/m3), Pellita

200

150

100

50

0
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22

Brightness Pulp Sheet (%ISO) , AM Controlled Wood


92

91

90

89

88
Apr 17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22

Brightness Pulp Sheet (%ISO), AM Un-controlled Wood

92

91

90

89

88
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul- 21 Aug-21 Sep-21 Oct-21 Nov- 21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22

Brightness Pulp Sheet (%ISO), Pellita


92

91

90

89

88
Apr15- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May- Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar16 Mar18 Mar19 Mar20 Mar21 Mar22 21

Mill Monthly Report – June 2021 Page 27


Viscosity Pulp Sheet (mPas), AM Controlled Wood
14

12

10

6
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22

Viscosity Pulp Sheet (mPas), AM Un-controlled Wood)

14

12

10

6
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22

Viscosity Pulp Sheet (mPas), Pellita


12

0
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May- Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22 21

Dirt Pulp Sheet (mm2/m2), AM controlled Wood

0
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22

Mill Monthly Report – June 2021 Page 28


Dirt Pulp Sheet (mm2/m2), AM Un-controlled Wood
3

0
Apr17- Apr-21 May - J un- J ul-21 Aug- Sep- Oc t - Nov - Dec - J an- Feb- Mar-
Mar18 Apr18- Apr19- Apr20- Apr21- 21 21 21 21 21 21 21 22 22 22
Mar19 Mar20 Mar21 Mar22

Dirt Pulp Sheet (mm2/m2), Pellita

0
Apr16- Apr17- Apr18- Apr19- Apr20- Apr21- Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21
Mar17 Mar18 Mar19 Mar20 Mar21 Mar22

DCM Extractives (%), AM Controlled Wood

0. 50

0. 40

0. 30

0. 20

0. 10

0. 00
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 M ar19 Mar20 Mar21 Mar22

DCM Extractives (%), AM Un-Controlled Wood


0. 4

0. 3

0. 2

0. 1

0. 0
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22

Mill Monthly Report – June 2021 Page 29


DCM Extractives (%), Pellita
0.20

0.15

0.10

0.05

0.00
Apr17- Apr18- Apr19- Apr20- Apr21- Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
Mar18 Mar19 Mar20 Mar21 Mar22

THE END…..