PROJECT:
MSE - PM 2
REF. NO. DRAWING : REVISION
STR - PM & SP
Superbeam (2023-06-08) R0
NOTE :
TULANGAN ATAS 21 D25 TULANGAN ATAS 21 D25 TULANGAN ATAS 21 D25 TULANGAN ATAS 21 D25
BEGEL D13-100 BEGEL D13-100 BEGEL D13-100 BEGEL D13-100
EM 42
ELV +6.870
87 87 87 87 87 87 87
EM 41 80
B1-1 80
B1-1 80
B1-1 80
B1-1
80
B3-1 80
B3-1 80
B3-1
ELV +5.326
ELV +5.100 7020 7080 70140 70 70 70 70
10 30 40 50 60 70 90 100 110 120 130 150 160 170 180 190 200 210 220 230 240 250 255 MB 1 MB 1
1
B4-1 B4-1 B4-1 B4-1 1 B4-1 10 20 30 40 50 B4-1 70 12 B4-1 130
MB 1 MB 1 EKSTRA 16 D13 MB 1 MB 1 EKSTRA 16 D13 EKSTRA 16 60
D13 80 90 100 110 120 140 150 16156
EKSTRA D13 KEYPLAN :
ELV +4.076 MB 1 TULANGAN BAWAH 24 D25 TULANGAN BAWAH 24 D25 TULANGAN BAWAH 24 D25 TULANGAN BAWAH 24 D25
60 60 60 60 60 60 60
MB 1 MB 1
C6 50 EM 02
C6 50 C6 50 C9 50 C6 50 C6 50 C6 50
MB 1 MB 1
TULANGAN UTAMA 38 D25 TULANGAN UTAMA 38 D25 TULANGAN UTAMA 38 D25 TULANGAN UTAMA 38 D28 TULANGAN UTAMA 38 D25 TULANGAN UTAMA 38 D25 TULANGAN UTAMA 38 D25
40 40 40 40 40 40 40 K K
EM 01 EM 01 EM 01 EM 01 C'
B3A
C6
B1-1
C6
B1-1
C6
B1-1
C9
B1-1
C6
B3-1
C6
B3-1
C6
B3-1 B2-1 B2-1 B2-1 B1-1
C'
ED
G B' A B' G
B7
SPE
30 30 30 30 30 30 30
SEE
B3A
B1-1 B1-1 B1-1 B1-1 B3-1 B3-1 B3-1 B2-1 B2-1 B2-1 B1-1
BEGEL D10-100 BEGEL D10-100 BEGEL D10-100 BEGEL D10-100 BEGEL D10-100 BEGEL D10-100 BEGEL D10-100 A' C6 C6 C6 C9 C6 C6 C6 A'
D D
9' 10' 11' 12' 13' 14' 15' 16' 17' 18' 19' 20'
ELV ±0.000 20 20 20 20 20 20 20 13 14 15 16 17 18 19 20 21 22
D22-100 D22-100 D22-100 D22-100 D22-100 D22-100 DENAH BALOK PAPER MACHINE
SKALA 1 : 100
TUSUK KONDE TUSUK KONDE TUSUK KONDE TUSUK KONDE TUSUK KONDE TUSUK KONDE TUSUK KONDE
∅30 ∅30 ∅30 ∅30 ∅30 ∅30 ∅30
RABATAN 50MM RABATAN 50MM RABATAN 50MM RABATAN 50MM RABATAN 50MM RABATAN 50MM
10' 11' 12' 13' 14' 15' 16' PT. MANAJEMEN KONSULTAN
UTAMA
CHECKED BY : DATE :
13 14 15 16 17 18 19 20
MAIN CONTRACTOR :
SHOP DRAWING
DRAWING TITLE :
03
SCALE : DATE :
DRAWN BY : CHECKED BY :
(DEVY) (DANANG)