Baseline Baseline
Baseline
Window 1
Boiler Erection & Turbine Hall Steel +78 Days
(Jan. 16-Jul. 16)
Window 2
Turbine Hall Steel & ESP +25 Days
(Jul. 16-Nov.
Nov-1616)
Window 3
Alloy Approval
Alloy Piping Vendor Pipe & Delivery +50 Days
(Nov. 16-Sep. 17)
Window
Window 4
(Sep. 17-Feb. 18) AlloyAlloy
PipePipe
Delivery +124 Days
Window 5
FGD
FGD Fire
Fire +131 Days
(Feb. 18-Jul. 18)
Window 6
Close
Close Cycle
Cycle Cooling
Cooling Water
Water System
System +41 Days
(Jul. 18-Oct. 18)
Window 7
Construction Punchlist
Construction Punchlist &&System
SystemCloseout
Closeout +71 Days
(Oct. 18-Apr. 19)
Window 8
Commissioning +144 Days
(Apr. 19-Apr. 20)
to
2015
2017
May-19
May-18
Mar-20
May-20
Mar-19
Nov-19
Nov-18
Mar-18
Sep-19
Jan-19
Jan-20
Sep-18
Jan-18
Jul-19
Jul-18