You are on page 1of 18

6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6

01 02 03 04 05

06 07 08 09 10

REF.‐ ‐‐‐ 11 12 13 14 15

16 17 18 19 20
REF.‐ ST‐140008
21 22 23 24 25

KEY PLAN
M NOTES:

1‐ Do not scale from drawing
2‐ All dimensions are in m.m & levels in meters. unless noted   
    otherwise.all dimensions to be verified on site & approved by
    the engineer.
Ma 3‐ This drawing should be read in conjunction with other   
     relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional 
     accuracy of the works. dimensions to be checked on‐site 
     prior to commencement.
5‐ The main contractor is responsible for the coordination of 
     services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
     top &bottom unless noted otherwise.
7‐ All hollow core slabs have toping 80 mm. with mesh A393 
     unless noted otherwise.

LEGENDS:

X7 PATTERN DESCRIPTION

K MOVEMENT JOINT

CONCRETE SHRINKAGE STRIPS

RETAINING WALL

CAST IN SITU COLUMN AND WALL
X6
CAST IN SITU SLAB

J CAST IN SITU BEAM

CAST IN SITU
TRANSFER BEAM

PRECAST
TRANSFER BEAM

X5a
PRECAST COLUMN AND WALL

PLANTED CAST IN SITU 
COLUMN AND WALL

PLANTED PRECAST 
H COLUMN AND WALL

X4

X3
G

No. DATE BY REVISION APD

DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:

F
X2

LEAD DESIGN CONSULTANT:

X1
gmp International
Spain GmbH

PROJECT:
X0
E JEDDAH CENTRAL DEVELOPMENT STADUIM

TITLE:

Stadium Floor plan & Reinforcement ‐  level 00 ‐  Pitch
level plan‐ Part 08
REF.‐ ST‐140008
SCALE: CHECKED: APPROVED:
A0: 1:100 Checker Approver
PROJECT No: DESIGNED: DRAWN: DATE:
JE22001 Designer Author MAY‐2023
REF.‐ ‐‐‐
DRAWING No: REV:

STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130008
FILE NAME:

STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001

D C JCDC

01 02 03 04 05

06 07 08 09 10

REF.‐ ‐‐‐ 11 12 13 14 15

16 17 18 19 20
REF.‐ ST‐140018
21 22 23 24 25

KEY PLAN
NOTES:

1‐ Do not scale from drawing
X0

2‐ All dimensions are in m.m & levels in meters. unless noted   
    otherwise.all dimensions to be verified on site & approved by
    the engineer.
3‐ This drawing should be read in conjunction with other   
     relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional 
     accuracy of the works. dimensions to be checked on‐site 
     prior to commencement.
5‐ The main contractor is responsible for the coordination of 
     services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
     top &bottom unless noted otherwise.
7‐ All hollow core slabs have toping 80 mm. with mesh A393 
     unless noted otherwise.

LEGENDS:

PATTERN DESCRIPTION

MOVEMENT JOINT

CONCRETE SHRINKAGE STRIPS

RETAINING WALL

CAST IN SITU COLUMN AND WALL

CAST IN SITU SLAB

CAST IN SITU BEAM


CAST IN SITU
TRANSFER BEAM

PRECAST
TRANSFER BEAM

PRECAST COLUMN AND WALL

PLANTED CAST IN SITU 
COLUMN AND WALL

PLANTED PRECAST 
COLUMN AND WALL

No. DATE BY REVISION APD

DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:

LEAD DESIGN CONSULTANT:

gmp International
Spain GmbH

M´a
PROJECT:

JEDDAH CENTRAL DEVELOPMENT STADUIM


TITLE:

Stadium Floor plan & Reinforcement ‐  level 00 ‐  Pitch
level plan‐ Part 18
REF.‐ ST‐140018
SCALE: CHECKED: APPROVED:
A0: 1:100 Checker Approver
PROJECT No: DESIGNED: DRAWN: DATE:
REF.‐ ‐‐‐ JE22001 Designer Author MAY‐2023
DRAWING No: REV:

STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130018
FILE NAME:

STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001

C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100

06 07 08 09 10

REF.‐ ‐‐‐ 11 12 13 14 15

16 17 18 19 20

21 22 23 24 25

KEY PLAN
NOTES:

1‐ Do not scale from drawing
E´ X0 2‐ All dimensions are in m.m & levels in meters. unless noted   
    otherwise.all dimensions to be verified on site & approved by
    the engineer.
3‐ This drawing should be read in conjunction with other   

3800
     relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional 
     accuracy of the works. dimensions to be checked on‐site 
     prior to commencement.
X1 5‐ The main contractor is responsible for the coordination of 
9100

     services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
     top &bottom unless noted otherwise.

4300
7‐ All hollow core slabs have toping 80 mm. with mesh A393 
     unless noted otherwise.

X2

10200
9100

LEGENDS:

PATTERN DESCRIPTION

MOVEMENT JOINT
G´ X3
CONCRETE SHRINKAGE STRIPS

RETAINING WALL

8000
9100

CAST IN SITU COLUMN AND WALL

CAST IN SITU SLAB

X4 CAST IN SITU BEAM


CAST IN SITU
TRANSFER BEAM

5375
PRECAST
TRANSFER BEAM

PRECAST COLUMN AND WALL
X5a
9100

PLANTED CAST IN SITU 
COLUMN AND WALL

PLANTED PRECAST 
COLUMN AND WALL

7575

X6

6250
18200

X7

+4.65
S.C.L.

  S.S.
MESH REINF 400mm
T16 @200 T&B No. DATE BY REVISION APD
BOTH DIRECTIONS
DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:
T16@200
L= 4000
T16@200
L= 4000


4000

4000
LEAD DESIGN CONSULTANT:
6300

RK‐30

gmp International
Spain GmbH

M´a
PROJECT:
2800

JEDDAH CENTRAL DEVELOPMENT STADUIM
RK‐31


TITLE:

Stadium Floor plan & Reinforcement ‐  level 01 ‐ Basement
mezzanine plan ‐ Part 18

SCALE: CHECKED: APPROVED:


A0: 1:100 Checker Approver
PROJECT No: DESIGNED: DRAWN: DATE:
REF.‐ ‐‐‐ JE22001 Designer Author MAY‐2023
DRAWING No: REV:

STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130118
FILE NAME:

STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001

C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6 01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100

06 07 08 09 10

REF.‐ ST‐130203 11 12 13 14 15
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

PCTB‐01

PCTB‐01

PCTB‐01

PCTB‐01

PCTB‐01

PCTB‐01

PCTB‐01

PCTB‐01

PCTB‐01

PCTB‐01
PCLB‐01

PCLB‐01
16 17 18 19 20
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
21 22 23 24 25

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 KEY PLAN
M NOTES:

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 1‐ Do not scale from drawing
2‐ All dimensions are in m.m & levels in meters. unless noted   
2800

    otherwise.all dimensions to be verified on site & approved by
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
    the engineer.
Ma 3‐ This drawing should be read in conjunction with other   
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320      relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional 
     accuracy of the works. dimensions to be checked on‐site 
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
     prior to commencement.
5‐ The main contractor is responsible for the coordination of 
PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03
PCLB‐03

PCLB‐03
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320      services into the works as may be required.
6300

6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320      top &bottom unless noted otherwise.
HCS 320
7‐ All hollow core slabs have toping 80 mm. with mesh A393 
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320      unless noted otherwise.
HCS 320 HCS 320

HCS 320 HCS 320 HCS 320 HCS 320


HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320 HCS 320
L HCS 320
HCS 320
HCS 400 HCS 320 HCS 320
  S.S.
HCS 400
HCS 320
HCS 320 HCS 320 HCS 320
200mm
HCS 320 HCS 320 HCS 400 HCS 320 HCS 320 HCS 320 HCS 400 HCS 320 HCS 320
  S.S. B‐01 B‐01

B‐01

B‐01
200mm   S.S.
200mm
HCS 320 HCS 320 HCS 400 HCS 320 HCS 320 HCS 320 HCS 400 HCS 320 HCS 320

HCS 320 HCS 320 HCS 400 HCS 320 HCS 320 HCS 320 HCS 400 HCS 320 HCS 320


PCTB‐13

PCTB‐20

PCTB‐14

PCTB‐14

PCTB‐13
9100

HCS 320 HCS 320
HCS 320 HCS 400 HCS 320 HCS 320 HCS 320 HCS 400 HCS 320
HCS 320 HCS 320

B‐01
B‐01
HCS 320 HCS 400 HCS 320 HCS 320 HCS 320 HCS 400 HCS 320 LEGENDS:
HCS 320 HCS 320

HCS 320 HCS 400 HCS 320 HCS 320 HCS 320 HCS 400 HCS 320


HCS 320 B‐01 B‐01 HCS 320
PATTERN DESCRIPTION
HCS 320 HCS 400 HCS 320 HCS 320 HCS 320 HCS 400 HCS 320
HCS 320 HCS 320
K HCS 320 HCS 320 HCS 320
MOVEMENT JOINT
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 X7
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 CONCRETE SHRINKAGE STRIPS

PCTB‐12

PCTB‐12

PCTB‐12

PCTB‐12
PCTB‐12

PCTB‐12

PCTB‐12

PCTB‐12

PCTB‐12

PCTB‐12
PCLB‐10

PCLB‐10

6250
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
RETAINING WALL
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
9100

HCS 320 HCS 320 HCS 320 HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 CAST IN SITU COLUMN AND WALL


HCS 320 HCS 320 HCS 320 HCS 320
X6
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
CAST IN SITU SLAB
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

J HCS 320
HCS 320
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
HCS 320
HCS 320
CAST IN SITU BEAM
PCTB‐11

PCTB‐11

PCTB‐11

PCTB‐11

PCTB‐11

PCTB‐11

PCTB‐11

PCTB‐11

PCTB‐11

PCTB‐11
PCLB‐10

PCLB‐10

7575
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 CAST IN SITU
TRANSFER BEAM
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320 HCS 320
HCS 320
PRECAST
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
TRANSFER BEAM
HCS 320 HCS 320
9100

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 X5a


HCS 320 HCS 320 HCS 320 HCS 320 PRECAST COLUMN AND WALL
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
PLANTED CAST IN SITU 
PCTB‐12

PCTB‐12

PCTB‐12

PCTB‐12

PCTB‐12

PCTB‐12

PCTB‐12

PCTB‐12

PCTB‐12

PCTB‐12
PCLB‐10

PCLB‐10
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 COLUMN AND WALL
HCS 320 HCS 320 HCS 320 HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 PLANTED PRECAST 


HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
H COLUMN AND WALL
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
X4
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320

13375
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


HCS 320 HCS 320 HCS 320 HCS 320
9100

PCTB‐01

PCTB‐01

PCTB‐01

PCTB‐01

PCTB‐01

PCTB‐01

PCTB‐01

PCTB‐01
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

G X3
9100

10200
No. DATE BY REVISION APD

DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:

F
X2

4300
LEAD DESIGN CONSULTANT:
9100

X1
gmp International
Spain GmbH

3794
PROJECT:

E X0 JEDDAH CENTRAL DEVELOPMENT STADUIM

TITLE:

Stadium Floor plan & Reinforcement ‐  level 02 ‐ Premium
Access ‐ Part 08

SCALE: CHECKED: APPROVED:


A0: 1:100 Checker Approver
PROJECT No: DESIGNED: DRAWN: DATE:
JE22001 Designer Author MAY‐2023
REF.‐ ‐‐‐
DRAWING No: REV:

STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130208
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
FILE NAME:

STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001

D C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100 01 02 03 04 05

06 07 08 09 10

REF.‐ ‐‐‐ 11 12 13 14 15

16 17 18 19 20

21 22 23 24 25

KEY PLAN
NOTES:

1‐ Do not scale from drawing
E´ X0 2‐ All dimensions are in m.m & levels in meters. unless noted   
    otherwise.all dimensions to be verified on site & approved by
    the engineer.
3‐ This drawing should be read in conjunction with other   
     relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional 
     accuracy of the works. dimensions to be checked on‐site 
     prior to commencement.

8100
5‐ The main contractor is responsible for the coordination of 
9100

     services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
     top &bottom unless noted otherwise.
7‐ All hollow core slabs have toping 80 mm. with mesh A393 
     unless noted otherwise.

X2

10100
9100

LEGENDS:

PATTERN DESCRIPTION

PCLB‐11 MOVEMENT JOINT
G´ HCS 320
X3
HCS 320 CONCRETE SHRINKAGE STRIPS

  S.S.
HCS 320
300mm   S.S.
300mm RETAINING WALL
PCTB‐01

PCTB‐01

PCTB‐01
PCTB‐08

PCTB‐08
PCLB‐01

HCS 320

PCTB‐03

PCTB‐03
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320

8100
9100

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 CAST IN SITU COLUMN AND WALL

PCLB‐01
  S.S.   S.S.

PCTB‐01
HCS 320
HCS 320 HCS 320 300mm HCS 320 300mm HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
CAST IN SITU SLAB
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCLB‐11 PCLB‐11
HCS 320
HCS 320
HCS 320 HCS 320
HCS 320
HCS 320
HCS 320
HCS 320 HCS 320 X4 CAST IN SITU BEAM
HCS 320 HCS 320
HCS 320 HCS 320
H´ HCS 400 HCS 400
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 CAST IN SITU
HCS 320 HCS 320 TRANSFER BEAM
PCTB‐12

PCTB‐20

PCTB‐20

PCTB‐12

PCTB‐12

PCTB‐20

PCTB‐20

PCTB‐12

PCTB‐12
HCS 400 HCS 400
PCLB‐01

PCLB‐01

5375
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐12

HCS 320 HCS 320
HCS 400 HCS 400 PRECAST
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 TRANSFER BEAM
HCS 320 HCS 400 HCS 400 HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


PRECAST COLUMN AND WALL
X5a
9100

HCS 320 HCS 320 HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


HCS 320
HCS 320 PLANTED CAST IN SITU 
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
COLUMN AND WALL
HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 PLANTED PRECAST 
PCTB‐11

PCTB‐11

PCTB‐11

PCTB‐11

PCTB‐11

PCTB‐11

PCTB‐11

PCTB‐11

PCTB‐11

PCTB‐11
PCLB‐01

PCLB‐01
HCS 320
COLUMN AND WALL

7575
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
J´ HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

X6
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
9100

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐12

PCTB‐12

PCTB‐12

PCTB‐08

PCTB‐08

PCTB‐08

PCTB‐08

PCTB‐12

PCTB‐12

PCTB‐12
PCLB‐01

PCLB‐01
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

6250
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCRB‐07 PCRB‐07

HCS 320 HCS 320 HCS 320 HCS 320 +7.53 HCS 320 +7.53 HCS 320 HCS 320 HCS 320 HCS 320
S.C.L. S.C.L.
B‐04 PCRB‐07
K´   S.S. HCS 320   S.S. HCS 320 HCS 320 HCS 320 X7
PCRB‐07 PCRB‐07 400mm 400mm

HCS 320 HCS 320 HCS 320 HCS 320

+7.53 HCS 320 HCS 320 HCS 320 HCS 320


B‐01 B‐03 PCRB‐07 PCRB‐07 B‐03 B‐01
B‐01

B‐03
S.C.L.
HCS 320 HCS 320
B‐04
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
PCTB‐08

PCTB‐08

PCTB‐13

PCTB‐13
HCS 320
  S.S.
9100

200mm No. DATE BY REVISION APD


HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
DRAWING STATUS:
HCS 320 RIBA STAGE 4 ‐ 50% DETAILED DESIGN
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
STADIUM
PCRB‐07 HCS 320 HCS 320 CLIENT:
HCS 320 HCS 320 HCS 320 HCS 320
PCRB‐10

PCLB‐20
+6.00   S.S.   S.S.   S.S.   S.S.   S.S.
B‐01

B‐01

B‐01

B‐01

B‐01

B‐01
S.C.L. HCS 320
200mm 200mm 200mm 200mm 200mm HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCRB‐10
L´ HCS 320

HCS 320 HCS 320 HCS 320 HCS 320


HCS 320 HCS 400 HCS 400 HCS 320

HCS 320 HCS 320 HCS 320 HCS 320


HCS 320 HCS 400 HCS 400 HCS 320
PCTB‐20

PCTB‐20

PCTB‐17

PCTB‐17

PCTB‐20

PCTB‐20

PCTB‐17
PCLB‐15

PCLB‐03
LEAD DESIGN CONSULTANT:
6300

HCS 320 HCS 320 HCS 320 HCS 320


HCS 320 HCS 400 HCS 400 HCS 320

PCTB‐09
HCS 320 HCS 320 HCS 320

gmp
HCS 320 HCS 320
HCS 320 HCS 400 HCS 400 HCS 320 International
Spain GmbH
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 400 HCS 400 HCS 320
M´a
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 400 HCS 400 HCS 320 PROJECT:
2800

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


HCS 320 HCS 400 HCS 400 HCS 320 JEDDAH CENTRAL DEVELOPMENT STADUIM

M´ HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


HCS 320 HCS 400 HCS 400 HCS 320
TITLE:

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


HCS 320 HCS 400 HCS 400 HCS 320 Stadium Floor plan & Reinforcement ‐  level 02 ‐ Premium
Access ‐ Part 18
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐15

PCTB‐15

PCTB‐16

PCTB‐16

PCTB‐15

PCTB‐15

PCTB‐16

PCTB‐15
PCLB‐14

PCLB‐01
HCS 320 HCS 400 HCS 400 HCS 320
SCALE: CHECKED: APPROVED:
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 A0: 1:100 Checker Approver
HCS 320 HCS 400 HCS 400 HCS 320
PROJECT No: DESIGNED: DRAWN: DATE:
REF.‐ ST‐130222 HCS 320 JE22001 Designer Author MAY‐2023
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 400 HCS 400 HCS 320 DRAWING No: REV:

STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130217
FILE NAME:

STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001

C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100

06 07 08 09 10

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
REF.‐ ST‐130303 11 12 13 14 15
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

PCTB‐16
PCTB‐16

PCTB‐16

PCTB‐16

PCTB‐16

PCTB‐16

PCTB‐16

PCTB‐16

PCTB‐16

PCTB‐16
PCLB‐14

PCLB‐14
16 17 18 19 20
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
21 22 23 24 25

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 KEY PLAN
M NOTES:

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 1‐ Do not scale from drawing
2‐ All dimensions are in m.m & levels in meters. unless noted   
2800

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320     otherwise.all dimensions to be verified on site & approved by


HCS 320 HCS 320 HCS 320 HCS 320
    the engineer.
PCRB‐02 PCRB‐05 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐05 PCRB‐02
Ma 3‐ This drawing should be read in conjunction with other   
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320      relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional 
HCS 320 HCS 320   S.S. HCS 320 HCS 320      accuracy of the works. dimensions to be checked on‐site 
HCS 320 HCS 320 HCS 320 HCS 320 400mm HCS 320      prior to commencement.

PCTB‐27
PCRB‐05 PCRB‐05 PCRB‐05 PCRB‐05
MESH REINF 5‐ The main contractor is responsible for the coordination of 

PCTB‐27
MESH REINF

PCTB‐03

PCTB‐03
PCLB‐15

PCLB‐11

PCLB‐11

PCLB‐15
T16 @200 T&B HCS 320 HCS 320 T16 @200 T&B      services into the works as may be required.
HCS 320 HCS 320 HCS 320

PCTB‐26
PCTB‐26
6300

BOTH DIRECTIONS BOTH DIRECTIONS 6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200


PCTB‐27

PCRB‐05 PCRB‐05
PCRB‐02

PCRB‐02
HCS 320 HCS 320      top &bottom unless noted otherwise.
HCS 320
HCS 320 PCRB‐01 MESH REINF MESH REINF PCRB‐01 HCS 320 7‐ All hollow core slabs have toping 80 mm. with mesh A393 
T16 @200 T&B HCS 320 HCS 320 +12.97 T16@200 T16 @200 T&B
T16@200 HCS 320 L= 4000      unless noted otherwise.
BOTH DIRECTIONS L= 4000 S.C.L. BOTH DIRECTIONS

6000

6000
HCS 320 HCS 320 HCS 320 HCS 320

T16@200
L= 4000

T16@200
L= 4000
HCS 320

L HCS 320
PCRB‐05
HCS 320 HCS 320 HCS 320
  S.S. PCRB‐05
HCS 320
200mm
HCS 320 HCS 320 HCS 320 HCS 320
B‐01   S.S.
+12.97 +12.97   S.S. HCS 320 200mm
4000 4000
S.C.L. S.C.L. 200mm B‐01
HCS 320 HCS 320 HCS 320   S.S. HCS 320
  S.S.   S.S. HCS 320 400mm   S.S.
400mm 400mm 400mm
HCS 320 HCS 320 HCS 320 HCS 320
PCRB‐05

PCRB‐05
PCTB‐14

PCTB‐14

PCTB‐25
PCLB‐11

HCS 320
9100

HCS 320 HCS 320 MESH REINF MESH REINF


HCS 320 HCS 320
MESH REINF MESH REINF T16 @200 T&B T16 @200 T&B
T16 @200 T&B T16 @200 T&B HCS 320

B‐01

B‐01
BOTH DIRECTIONS BOTH DIRECTIONS
BOTH DIRECTIONS BOTH DIRECTIONS LEGENDS:
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320

HCS 320 HCS 320 T16@200


HCS 320 T16@200 HCS 320
B‐01 B‐01 L= 4000
T16@200 L= 4000 HCS 320 T16@200
L= 3000 L= 3000 PATTERN DESCRIPTION
L= 4000

L= 4000
T16@200

T16@200
HCS 320 HCS 320 HCS 320 HCS 320
3000

4000

4000

3000
K X7
T16@200
L= 3000

T16@200
L= 3000
HCS 320
HCS 320 HCS 320 MOVEMENT JOINT
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320
3000 HCS 320 HCS 320
3000
HCS 320 4000 HCS 320 HCS 320 4000 HCS 320
CONCRETE SHRINKAGE STRIPS
HCS 320

PCTB‐01
PCRB‐05

PCRB‐05
PCTB‐02

PCTB‐02

PCTB‐03
PCLB‐05

PCLB‐11

PCLB‐05

6250
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 +12.97 +12.97
S.C.L. S.C.L. RETAINING WALL
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
9100

HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 CAST IN SITU COLUMN AND WALL
PCRB‐05 PCRB‐05 HCS 320 PCRB‐05 PCRB‐05
HCS 320 HCS 320 HCS 320 HCS 320
PCRB‐10 PCRB‐10 PCRB‐10 PCRB‐10 PCRB‐10
X6
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 CAST IN SITU SLAB
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320

J HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 CAST IN SITU BEAM
HCS 320
PCTB‐02

PCTB‐02

PCTB‐05

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐05

PCTB‐02

PCTB‐02
PCLB‐07

PCLB‐07

7575
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 CAST IN SITU
TRANSFER BEAM
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
PRECAST
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 TRANSFER BEAM
HCS 320
9100

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
X5a
HCS 320 PRECAST COLUMN AND WALL
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

PLANTED CAST IN SITU 
COLUMN AND WALL

5375
PLANTED PRECAST 
H COLUMN AND WALL

X4
9100

8000
G X3
9100

10200
No. DATE BY REVISION APD

DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:

F
X2

4300
LEAD DESIGN CONSULTANT:
9100

X1
gmp International
Spain GmbH

3794
PROJECT:

E X0 JEDDAH CENTRAL DEVELOPMENT STADUIM

TITLE:

Stadium Floor plan & Reinforcement ‐  level 03 ‐ Lower
Concourse ‐ Part 08

SCALE: CHECKED: APPROVED:


A0: 1:100 Checker Approver
PROJECT No: DESIGNED: DRAWN: DATE:
JE22001 Designer Author MAY‐2023
REF.‐ ST‐130318
DRAWING No: REV:

STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130308
FILE NAME:

STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001

C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100

06 07 08 09 10

REF.‐ ‐‐‐ 11 12 13 14 15

16 17 18 19 20

21 22 23 24 25

KEY PLAN
NOTES:

1‐ Do not scale from drawing
E´ X0 2‐ All dimensions are in m.m & levels in meters. unless noted   
    otherwise.all dimensions to be verified on site & approved by
    the engineer.
3‐ This drawing should be read in conjunction with other   

3800
     relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional 
     accuracy of the works. dimensions to be checked on‐site 
     prior to commencement.
X1 5‐ The main contractor is responsible for the coordination of 
9100

     services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
     top &bottom unless noted otherwise.

4300
7‐ All hollow core slabs have toping 80 mm. with mesh A393 
     unless noted otherwise.

X2

10200
9100

LEGENDS:

PATTERN DESCRIPTION

MOVEMENT JOINT
G´ X3
CONCRETE SHRINKAGE STRIPS

RETAINING WALL

8000
9100

CAST IN SITU COLUMN AND WALL

CAST IN SITU SLAB

RK‐02
X4 CAST IN SITU BEAM


CAST IN SITU
TRANSFER BEAM

5375
PRECAST
TRANSFER BEAM

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


HCS 320 HCS 320 HCS 320
PRECAST COLUMN AND WALL
X5a
9100

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
PLANTED CAST IN SITU 
COLUMN AND WALL
PCTB‐02

PCTB‐02
HCS 320

PCTB‐02
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
PLANTED PRECAST 
PCTB‐02

PCTB‐02

PCTB‐05

PCTB‐02

PCTB‐02
PCLB‐07

PCLB‐07
HCS 320 HCS 320 HCS 320 PCRB‐10 PCRB‐10 PCRB‐10 PCRB‐10 PCRB‐10 HCS 320 HCS 320 HCS 320 COLUMN AND WALL

7575
HCS 320 HCS 320 HCS 320

PCTB‐02
HCS 320

PCTB‐05
J´ ?
HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320
HCS 320
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
HCS 320
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCRB‐05 HCS 320
HCS 320
PCRB‐05 X6
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 400
PCRB‐01 HCS 320 PCRB‐01
9100

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


PCTB‐20

  S.S.   S.S.

PCTB‐20
PCTB‐03

PCTB‐01

PCTB‐20

PCTB‐02

PCTB‐02

PCTB‐20

PCLB‐11
PCLB‐05

PCLB‐11

PCLB‐05
HCS 320 200mm 200mm

6250
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCRB‐01 PCRB‐01
HCS 320
?
HCS 320 HCS 320 HCS 400 HCS 320 HCS 320 HCS 400 HCS 320 HCS 320
T16@200 HCS 320 T16@200 T16@200
L= 3000 HCS 320 HCS 400 HCS 320 HCS 400 HCS 320 L= 3000 L= 3000
HCS 320 PCRB‐05 HCS 320
HCS 320
HCS 320
PCRB‐07 PCRB‐05
3000

3000

3000
K´ X7
T16@200
L= 3000

T16@200
L= 3000

T16@200
L= 3000
PCRB‐01 HCS 320
HCS 320 PCRB‐01 HCS 320
HCS 320 HCS 320
+12.97
S.C.L. HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
3000 3000 3000
+12.97
HCS 320
S.C.L. B‐03 B‐03 B‐03 B‐01
B‐03

HCS 320 +12.97 HCS 320

B‐01
  S.S. HCS 320 HCS 320
S.C.L.
400mm HCS 320
PCTB‐25

PCRB‐01

PCRB‐01

PCLB‐11

PCLB‐11
HCS 320   S.S. HCS 320
HCS 320 HCS 320   S.S.
9100

200mm
MESH REINF 400mm No. DATE BY REVISION APD
PCLB‐16

PCLB‐16
HCS 320
T16 @200 T&B
? HCS 320 HCS 320 HCS 320 HCS 320 DRAWING STATUS:
BOTH DIRECTIONS
HCS 320 RIBA STAGE 4 ‐ 50% DETAILED DESIGN
MESH REINF
HCS 320 HCS 320 HCS 320 HCS 320 STADIUM
T16 @200 T&B
HCS 320 CLIENT:
PCRB‐09

BOTH DIRECTIONS
  S.S.
HCS 320 HCS 320
PCRB‐09

PCLB‐20
HCS 320 T16@200   S.S. 200mm   S.S. HCS 320
B‐01

B‐01

B‐01

B‐01

B‐01

B‐01
  S.S.
T16@200
L= 3000

L= 3000 200mm 200mm HCS 320


200mm HCS 320 PCRB‐01 HCS 320
3000

3000


L= 3000
T16@200

HCS 320 PCRB‐10 PCRB‐01 HCS 320 HCS 320


HCS 320 HCS 320 PCRB‐10
T16@200 HCS 320
HCS 320 L= 3000 HCS 400 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320

3000 HCS 400 PCRB‐05 PCRB‐05 HCS 320


HCS 320 HCS 320 MESH REINF HCS 320
HCS 320 HCS 320 T12 @200 T&B
PCTB‐21

PCTB‐03

PCTB‐03

PCTB‐03
PCLB‐15

PCLB‐21

PCLB‐11

PCLB‐11

PCLB‐15
PCLB‐11
PCRB‐01 MESH REINF PCRB‐02 LEAD DESIGN CONSULTANT:
BOTH DIRECTIONS
6300

  S.S.   S.S. T12 @200 T&B


HCS 320 BOTH DIRECTIONS HCS 320 HCS 320 HCS 320 HCS 320
PCRB‐05 200mm 200mm
? PCRB‐01   S.S. PCRB‐02
PCRB‐02
gmp

PCTB‐03
HCS 320 HCS 320 400mm HCS 320
HCS 320 HCS 400 HCS 320 HCS 320 HCS 320 International
HCS 320
Spain GmbH
HCS 400
HCS 320 HCS 320 PCRB‐05 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCRB‐05
M´a PCRB‐02 HCS 320 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 PROJECT:
HCS 320 HCS 320 HCS 320
2800

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 JEDDAH CENTRAL DEVELOPMENT STADUIM
TRB‐0


HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 TITLE:

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 Stadium Floor plan & Reinforcement ‐  level 03 ‐ Lower
Concourse ‐ Part 18
PCTB‐16

PCTB‐16

PCTB‐16

PCTB‐16

PCTB‐16

PCTB‐16

PCTB‐16

PCTB‐16

PCTB‐16
PCLB‐14

PCLB‐14
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
SCALE: CHECKED: APPROVED:
A0: 1:100 Checker Approver
? HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PROJECT No: DESIGNED: DRAWN: DATE:
REF.‐ ST‐130323 JE22001 Designer Author MAY‐2023
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 DRAWING No: REV:

STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130318
FILE NAME:

STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001

C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
01 02 03 04 05

06 07 08 09 10

REF.‐ ST‐130403 11 12 13 14 15

16 17 18 19 20

21 22 23 24 25

KEY PLAN
M NOTES:

1‐ Do not scale from drawing
2‐ All dimensions are in m.m & levels in meters. unless noted   
2800

    otherwise.all dimensions to be verified on site & approved by
PCTRB‐06 PCRB‐01 PCTRB‐07 PCTRB‐07 PCTRB‐06 PCTRB‐06 PCTRB‐06 PCTRB‐07 PCTRB‐07 PCRB‐01 PCTRB‐06     the engineer.
Ma 3‐ This drawing should be read in conjunction with other   
     relevant arch, structural, mechanical and electrical drawings.
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
4‐ The main contractor is responsible for the dimensional 
     accuracy of the works. dimensions to be checked on‐site 
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320      prior to commencement.
5‐ The main contractor is responsible for the coordination of 
PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02
PCLB‐01

PCLB‐01
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320      services into the works as may be required.
6300

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320      top &bottom unless noted otherwise.
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 7‐ All hollow core slabs have toping 80 mm. with mesh A393 
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320      unless noted otherwise.

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

L HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


HCS 320
  S.S.
200mm   S.S.
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 200mm HCS 320 HCS 320 HCS 320
  S.S.
B‐01 HCS 320 B‐01
200mm
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 +17.77
+17.77
S.C.L. S.C.L.
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
PCTB‐18

PCTB‐13

PCTB‐18

PCTB‐18

PCTB‐13

PCTB‐18
9100

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


HCS 320

B‐01

B‐01
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 LEGENDS:
HCS 320
B‐01 B‐01
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
PATTERN DESCRIPTION
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
K HCS 400 HCS 400 HCS 400 X7 MOVEMENT JOINT
HCS 400
HCS 400 HCS 400 HCS 400 HCS 400 HCS 400 HCS 400
HCS 400
HCS 400 HCS 400 HCS 400
HCS 400
HCS 400 HCS 400 HCS 400 HCS 400 HCS 400 HCS 400
HCS 400 CONCRETE SHRINKAGE STRIPS
HCS 400 HCS 400 HCS 400 HCS 400

PCTB‐13

PCTB‐13

PCTB‐13

PCTB‐13
PCTB‐13

PCTB‐13

PCTB‐13

PCTB‐13

PCTB‐13

PCTB‐13
PCLB‐04

PCLB‐04

6250
HCS 400 HCS 400 HCS 400 HCS 400 HCS 400 HCS 400
HCS 400
HCS 400 HCS 400 HCS 400 HCS 400
RETAINING WALL
HCS 400 HCS 400 HCS 400 HCS 400 HCS 400 HCS 400
9100

HCS 400
HCS 400 HCS 400 HCS 400 HCS 400

HCS 400 HCS 400 HCS 400 HCS 400 HCS 400 HCS 400 CAST IN SITU COLUMN AND WALL


HCS 400
HCS 400 HCS 400 HCS 400 HCS 400
X6
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
CAST IN SITU SLAB
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320

J HCS 320 HCS 320 HCS 320


HCS 320 HCS 320
HCS 320
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 CAST IN SITU BEAM

7575
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 CAST IN SITU
HCS 320 HCS 320 HCS 320 HCS 320
TRANSFER BEAM
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PRECAST
TRANSFER BEAM
9100

X5a
PRECAST COLUMN AND WALL

PLANTED CAST IN SITU 
COLUMN AND WALL

5375
PLANTED PRECAST 
H COLUMN AND WALL

X4
9100

8100
G X3
9100

10100
No. DATE BY REVISION APD

DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:

F
X2

4300
LEAD DESIGN CONSULTANT:
9100

X1
gmp International
Spain GmbH

3794
PROJECT:

E X0 JEDDAH CENTRAL DEVELOPMENT STADUIM

TITLE:

Stadium Floor plan & Reinforcement ‐  level 04 ‐ Skybox
level ‐ Part 08

SCALE: CHECKED: APPROVED:


A0: 1:100 Checker Approver
PROJECT No: DESIGNED: DRAWN: DATE:
JE22001 Designer Author MAY‐2023
REF.‐ ‐‐‐
DRAWING No: REV:

STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130408
FILE NAME:

STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001

C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6 01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100

06 07 08 09 10

REF.‐ ‐‐‐ 11 12 13 14 15

16 17 18 19 20

21 22 23 24 25

KEY PLAN
NOTES:

1‐ Do not scale from drawing
E´ X0 2‐ All dimensions are in m.m & levels in meters. unless noted   
    otherwise.all dimensions to be verified on site & approved by
    the engineer.
3‐ This drawing should be read in conjunction with other   

3800
     relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional 
     accuracy of the works. dimensions to be checked on‐site 
     prior to commencement.
X1 5‐ The main contractor is responsible for the coordination of 
9100

     services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
     top &bottom unless noted otherwise.

4300
7‐ All hollow core slabs have toping 80 mm. with mesh A393 
     unless noted otherwise.

X2

10200
9100

LEGENDS:

PATTERN DESCRIPTION

MOVEMENT JOINT
G´ X3
CONCRETE SHRINKAGE STRIPS

RETAINING WALL

8000
9100

CAST IN SITU COLUMN AND WALL

CAST IN SITU SLAB

X4 CAST IN SITU BEAM


CAST IN SITU
TRANSFER BEAM

5375
PRECAST
TRANSFER BEAM

  S.S.
PRECAST COLUMN AND WALL
200mm
X5a
9100

PLANTED CAST IN SITU 
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
COLUMN AND WALL
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 PLANTED PRECAST 
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 COLUMN AND WALL

7575
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
J´ HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
X6
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 400 HCS 400 HCS 400 HCS 320 HCS 400 HCS 400
9100

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


HCS 400 HCS 400 HCS 400 HCS 320 HCS 400 HCS 400
PCTB‐13

PCTB‐13

PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐13
PCLB‐04

PCLB‐04
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

6250
HCS 400 HCS 400 HCS 400 HCS 320 HCS 400 HCS 400

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


HCS 400 HCS 400 HCS 400 HCS 320 HCS 400 HCS 400

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


HCS 400 HCS 320
HCS 400 HCS 400 HCS 400 HCS 400

K´ PCRB‐07
HCS 320
HCS 320
HCS 320
HCS 320 X7
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

HCS 320 HCS 320
+17.77 B‐03 B‐03 B‐03 B‐03
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

B‐03
S.C.L.
HCS 320 HCS 320
PCTB‐01

PCTB‐18

PCTB‐18

PCTB‐25

PCTB‐25
HCS 320 HCS 320   S.S. HCS 320 HCS 320 HCS 320 HCS 320
9100

B‐03

200mm
No. DATE BY REVISION APD
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 DRAWING STATUS:
HCS 320 RIBA STAGE 4 ‐ 50% DETAILED DESIGN
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 STADIUM
HCS 320
CLIENT:
HCS 320   S.S.

PCLB‐20
HCS 320
PCRB‐09

HCS 320 HCS 320 HCS 320 HCS 320 200mm HCS 320 HCS 320


B‐01

B‐01

B‐01

B‐01

B‐01

B‐01
  S.S.   S.S.
200mm 200mm
HCS 320 +17.77 HCS 320
PCRB‐02 S.C.L. PCRB‐02 HCS 320
L´ HCS 320 HCS 320 HCS 320
HCS 320
HCS 320 HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320 HCS 320
PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03
PCLB‐07

PCLB‐07
LEAD DESIGN CONSULTANT:
6300

HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320

PCTB‐03
HCS 320

PCTB‐03
gmp
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 International
Spain GmbH
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
M´a
PCTRB‐06 PCRB‐01 PCTRB‐07 PCTRB‐06 PCTRB‐06 PCB‐04 PCTRB‐06 PCTRB‐06 PCTRB‐07 PCRB‐01 PCTRB‐06 PROJECT:
2800

JEDDAH CENTRAL DEVELOPMENT STADUIM


TITLE:

Stadium Floor plan & Reinforcement ‐  level 04 ‐ Skybox
level ‐ Part 18

SCALE: CHECKED: APPROVED:


A0: 1:100 Checker Approver
PROJECT No: DESIGNED: DRAWN: DATE:
REF.‐ ST‐130423 JE22001 Designer Author MAY‐2023
DRAWING No: REV:

STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130418
FILE NAME:

STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
SBS‐1
ST‐900006
C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100

06 07 08 09 10

REF.‐ ST‐130503 11 12 13 14 15

16 17 18 19 20

21 22 23 24 25

KEY PLAN
NOTES:

1‐ Do not scale from drawing
2‐ All dimensions are in m.m & levels in meters. unless noted   
    otherwise.all dimensions to be verified on site & approved by
PCRB‐03 PCRB‐03 PCRB‐07 PCTRB‐07 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCTRB‐07 PCRB‐07 PCRB‐03 PCRB‐03     the engineer.
Ma 3‐ This drawing should be read in conjunction with other   
HCS 400      relevant arch, structural, mechanical and electrical drawings.
HCS 320 HCS 320 HCS 400 HCS 400 HCS 320 HCS 400 HCS 320 HCS 320
  S.S. 4‐ The main contractor is responsible for the dimensional 
400.0mm   S.S. HCS 400      accuracy of the works. dimensions to be checked on‐site 
HCS 400 400.0mm
HCS 320 HCS 320 HCS 400 HCS 320 HCS 400 HCS 320 HCS 320      prior to commencement.
HCS 400 MESH REINF MESH REINF HCS 400 5‐ The main contractor is responsible for the coordination of 
PCTB‐17

PCTB‐20

PCTB‐20

PCTB‐20

PCTB‐20

PCTB‐17
PCLB‐07

PCLB‐04

PCLB‐04

PCLB‐04

PCLB‐11

PCLB‐07
T16 @200 T&B T16 @200 T&B      services into the works as may be required.
6300

HCS 320 HCS 320 HCS 400 HCS 320 HCS 400 HCS 320 HCS 320


BOTH DIRECTIONS BOTH DIRECTIONS 6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
HCS 400 HCS 400      top &bottom unless noted otherwise.
HCS 320 HCS 320 HCS 400 HCS 320 HCS 400 HCS 320 HCS 320 7‐ All hollow core slabs have toping 80 mm. with mesh A393 
HCS 400 HCS 400      unless noted otherwise.
HCS 320 HCS 400 HCS 320
HCS 320 HCS 400 HCS 320 HCS 320
HCS 400 HCS 400 HCS 400
L HCS 400
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320
  S.S. HCS 400
HCS 400 HCS 400 HCS 400
200.0mm
B‐01 HCS 320 HCS 320
HCS 320 HCS 320 B‐01 HCS 320

B‐01

B‐01
HCS 400   S.S. HCS 400
HCS 400 HCS 400
200.0mm
HCS 320 HCS 320
HCS 320 HCS 320   S.S. HCS 320
HCS 400 HCS 400
HCS 400 200.0mm HCS 400
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320
PCTB‐20

PCTB‐20

PCTB‐03

PCTB‐03

PCTB‐20

PCTB‐20
HCS 400 HCS 400
9100

HCS 400 HCS 400
HCS 320 HCS 320
HCS 320 HCS 320   S.S. HCS 320
HCS 400 HCS 400
HCS 400   S.S. 200.0mm HCS 400
200.0mm HCS 320 HCS 320 LEGENDS:
HCS 320 HCS 320 HCS 320
HCS 400 HCS 400
HCS 400 B‐01 B‐01 HCS 400
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320
HCS 400 HCS 400
HCS 400 HCS 400 PATTERN DESCRIPTION
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320
K HCS 400 HCS 320 HCS 320 HCS 400
X7 MOVEMENT JOINT
HCS 320
HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320

HCS 320 HCS 320 HCS 320


HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 CONCRETE SHRINKAGE STRIPS
HCS 320 HCS 320 HCS 320

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02
PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02
PCLB‐07

PCLB‐07
HCS 320 HCS 320 HCS 320

6250
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
HCS 320
RETAINING WALL
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
9100

HCS 320 HCS 320 HCS 320


HCS 320
PCLB‐07 PCLB‐07 PCLB‐07 PCLB‐07
HCS 320 HCS 320 HCS 320
  S.S. HCS 320 HCS 320   S.S. HCS 320 CAST IN SITU COLUMN AND WALL
  S.S. HCS 320   S.S.
200.0mm 200.0mm
HCS 320 HCS 320 HCS 320
200.0mm 200.0mm X6
HCS 320 HCS 320 HCS 320
HCS 320
PCTB‐03 PCTB‐03 PCTB‐03 PCTB‐03 CAST IN SITU SLAB
HCS 320 HCS 320
  S.S.   S.S. HCS 320   S.S.   S.S.
HCS 320 HCS 320 HCS 320
PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03

PCTB‐03
HCS 320
PCLB‐07

PCLB‐07
200.0mm 200.0mm HCS 320 HCS 320 200.0mm 200.0mm

J PCTB‐03 HCS 320 PCTB‐03 HCS 320


HCS 320 HCS 320
PCTB‐03 HCS 320
PCTB‐03 CAST IN SITU BEAM
PCRB‐01 PCRB‐01
HCS 320

7575
HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐03 PCTB‐03 PCTB‐03 PCTB‐03
  S.S.   S.S. CAST IN SITU
PCRB‐02 400.0mm 400.0mm
PCRB‐02 TRANSFER BEAM
PCRB‐02 PCRB‐02

PCRB‐02 PRECAST
PCRB‐02 PCRB‐02 PCRB‐02 TRANSFER BEAM
9100

X5a
PRECAST COLUMN AND WALL

PLANTED CAST IN SITU 
COLUMN AND WALL

5375
PLANTED PRECAST 
H COLUMN AND WALL

X4
9100

8100
G X3
9100

10100
No. DATE BY REVISION APD

DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:

F
X2
5300

4300
LEAD DESIGN CONSULTANT:

X1
gmp International
Spain GmbH
3800

3794
PROJECT:

E X0 JEDDAH CENTRAL DEVELOPMENT STADUIM

TITLE:

Stadium Floor plan & Reinforcement ‐  level 05 ‐ Upper
Concourse ‐ Part 08

SCALE: CHECKED: APPROVED:


A0: 1:100 Checker Approver
PROJECT No: DESIGNED: DRAWN: DATE:
JE22001 Designer Author MAY‐2023
REF.‐ ‐‐‐
DRAWING No: REV:

STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130508
FILE NAME:

STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001

C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6 01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100

06 07 08 09 10

REF.‐ ‐‐‐ 11 12 13 14 15

16 17 18 19 20

21 22 23 24 25

KEY PLAN
NOTES:

1‐ Do not scale from drawing
E´ X0 2‐ All dimensions are in m.m & levels in meters. unless noted   
    otherwise.all dimensions to be verified on site & approved by
    the engineer.
3‐ This drawing should be read in conjunction with other   

3800
     relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional 
     accuracy of the works. dimensions to be checked on‐site 
     prior to commencement.
X1 5‐ The main contractor is responsible for the coordination of 
9100

     services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
     top &bottom unless noted otherwise.

4300
7‐ All hollow core slabs have toping 80 mm. with mesh A393 
     unless noted otherwise.

X2

10200
9100

LEGENDS:

PATTERN DESCRIPTION

MOVEMENT JOINT
G´ X3
CONCRETE SHRINKAGE STRIPS

RETAINING WALL

8000
9100

CAST IN SITU COLUMN AND WALL

CAST IN SITU SLAB

X4 CAST IN SITU BEAM


CAST IN SITU
TRANSFER BEAM

5375
PRECAST
TRANSFER BEAM

PRECAST COLUMN AND WALL
X5a
9100

PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PLANTED CAST IN SITU 


PCRB‐02 COLUMN AND WALL

  S.S.
  S.S.
400.0mm
PCRB‐02 PLANTED PRECAST 
PCTB‐03 PCTB‐03 400.0mm PCTB‐03 PCTB‐03 COLUMN AND WALL

7575
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320
PCLB‐04 PCRB‐01
J´ HCS 320 HCS 320

PCTB‐01
PCTB‐01

PCTB‐01

PCTB‐01
PCLB‐01

PCLB‐01
PCTB‐01
HCS 320 HCS 320
PCTB‐03 HCS 320 PCTB‐03 PCTB‐03 PCTB‐03

PCTB‐01
  S.S.   S.S.   S.S.   S.S.
HCS 320 200.0mm HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 200.0mm HCS 320 200.0mm
200.0mm

PCTB‐03 PCTB‐03 HCS 320 HCS 320


PCTB‐03 PCTB‐03
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
  S.S.
200.0mm
  S.S.
200.0mm
  S.S.
200.0mm
  S.S.
200.0mm
X6
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

PCLB‐07 PCLB‐07 PCLB‐07 PCLB‐07


9100

HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02
PCLB‐03

PCLB‐03
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

K´ HCS 400
HCS 320 PCRB‐01 HCS 320
PCRB‐05 HCS 320 HCS 320
HCS 320
HCS 400

HCS 400 HCS 320 HCS 320 HCS 320 HCS 400


HCS 320 HCS 320

HCS 400 HCS 320   S.S. HCS 320 HCS 320 HCS 400


HCS 320 B‐01 B‐01 HCS 320
  S.S.   S.S.
B‐03

B‐03
400.0mm
200.0mm 200.0mm
HCS 400 HCS 320 HCS 320 HCS 320 HCS 400
HCS 320 HCS 320
PCTB‐20

PCTB‐25

PCTB‐20
PCLB‐14

PCLB‐14

MESH REINF
9100

  S.S.   S.S. T16 @200 T&B   S.S. No. DATE BY REVISION APD


HCS 400 HCS 320 HCS 320 HCS 320 HCS 400
HCS 320 200.0mm 200.0mm BOTH DIRECTIONS 200.0mm HCS 320
DRAWING STATUS:
HCS 320 HCS 320 RIBA STAGE 4 ‐ 50% DETAILED DESIGN
HCS 400 HCS 320 HCS 400
HCS 320 HCS 320 STADIUM
HCS 320 HCS 320
PCRB‐09

CLIENT:
HCS 400 HCS 320 HCS 320 HCS 320 HCS 400
PCRB‐09

HCS 320 HCS 320

PCLB‐20
  S.S.   S.S.
B‐01

B‐01

B‐01

B‐01

B‐01

B‐01
HCS 320 HCS 320
HCS 400 200.0mm 200.0mm
HCS 400
HCS 320 PCRB‐05 HCS 320
PCRB‐02 PCRB‐10
L´ HCS 400
HCS 320 HCS 320
HCS 400
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

  S.S.
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 200.0mm HCS 320
PCTB‐03

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐03
PCLB‐03

PCLB‐03
LEAD DESIGN CONSULTANT:
6300

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

HCS 320

PCTB‐02
gmp
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 International
Spain GmbH
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

M´a
PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCTRB‐06 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PROJECT:
2800

JEDDAH CENTRAL DEVELOPMENT STADUIM


TITLE:

Stadium Floor plan & Reinforcement ‐  level 05 ‐ Upper
Concourse ‐ Part 18

SCALE: CHECKED: APPROVED:


A0: 1:100 Checker Approver
PROJECT No: DESIGNED: DRAWN: DATE:
REF.‐ ST‐130523 JE22001 Designer Author MAY‐2023
DRAWING No: REV:

STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130518
FILE NAME:

SBS‐1 STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
ST‐900006

C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100

06 07 08 09 10

REF.‐ ‐‐‐ 11 12 13 14 15

16 17 18 19 20

21 22 23 24 25

KEY PLAN
NOTES:

1‐ Do not scale from drawing
E´ X0 2‐ All dimensions are in m.m & levels in meters. unless noted   
    otherwise.all dimensions to be verified on site & approved by
    the engineer.
3‐ This drawing should be read in conjunction with other   

3800
     relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional 
     accuracy of the works. dimensions to be checked on‐site 
     prior to commencement.
X1 5‐ The main contractor is responsible for the coordination of 
9100

     services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
     top &bottom unless noted otherwise.

4300
7‐ All hollow core slabs have toping 80 mm. with mesh A393 
     unless noted otherwise.

X2

10200
9100

LEGENDS:

PATTERN DESCRIPTION

MOVEMENT JOINT
G´ X3
CONCRETE SHRINKAGE STRIPS

RETAINING WALL

8000
9100

CAST IN SITU COLUMN AND WALL

CAST IN SITU SLAB

X4 CAST IN SITU BEAM


CAST IN SITU
TRANSFER BEAM

5375
PRECAST
TRANSFER BEAM

PRECAST COLUMN AND WALL
X5a
9100

PLANTED CAST IN SITU 
COLUMN AND WALL

PLANTED PRECAST 
COLUMN AND WALL

7575

PCRB‐01 PCRB‐01

X6
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320

  S.S.   S.S. HCS 320


  S.S.   S.S.
9100

HCS 320 HCS 320 400.0mm 400.0mm HCS 320 HCS 320


400.0mm 400.0mm
HCS 320
PCRB‐01 PCRB‐01
PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02
PCLB‐03

PCLB‐03
PCTB‐02

PCTB‐02
HCS 320 HCS 320 HCS 320 HCS 320

6250
HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


HCS 320
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320

K´ HCS 320 X7
PCRB‐01 PCRB‐05 PCRB‐01
HCS 320

  S.S.
200.0mm HCS 320
B‐01
B‐03

MESH REINF HCS 320
T16 @200 T&B
PCRB‐05

PCRB‐05

PCLB‐04
  S.S.
BOTH DIRECTIONS
9100

200.0mm HCS 320 No. DATE BY REVISION APD

DRAWING STATUS:
HCS 320
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
HCS 320 STADIUM
PCRB‐05
PCRB‐09

CLIENT:
HCS 320
  S.S.   S.S.   S.S.
B‐01

B‐01

B‐01

B‐01

B‐01

B‐01
200.0mm 200.0mm 200.0mm

PCRB‐01 HCS 320

PCRB‐01

LEAD DESIGN CONSULTANT:
6300

gmp International
Spain GmbH

M´a
PROJECT:
2800

JEDDAH CENTRAL DEVELOPMENT STADUIM


TITLE:

Stadium Floor plan & Reinforcement ‐  level 06 ‐ Media
Mezzanine ‐ Part 18

SCALE: CHECKED: APPROVED:


A0: 1:100 Checker Approver
PROJECT No: DESIGNED: DRAWN: DATE:
REF.‐ ‐‐‐ JE22001 Designer Author MAY‐2023
DRAWING No: REV:

STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130618
FILE NAME:

STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001

C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100

06 07 08 09 10

REF.‐ ST‐130703 11 12 13 14 15

16 17 18 19 20

21 22 23 24 25

KEY PLAN
M NOTES:

1‐ Do not scale from drawing
2‐ All dimensions are in m.m & levels in meters. unless noted   
2800

    otherwise.all dimensions to be verified on site & approved by
PCRB‐03 PCRB‐03 PCRB‐09 PCTRB‐07 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCTRB‐07 PCRB‐09 PCRB‐03 PCRB‐03     the engineer.
Ma HCS 320
3‐ This drawing should be read in conjunction with other   
     relevant arch, structural, mechanical and electrical drawings.
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
4‐ The main contractor is responsible for the dimensional 
HCS 320
     accuracy of the works. dimensions to be checked on‐site 
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320      prior to commencement.
HCS 320 5‐ The main contractor is responsible for the coordination of 

PCRB‐01

PCRB‐01
  S.S.

PCTB‐03

PCTB‐12

PCTB‐12

PCTB‐12

PCTB‐12

PCTB‐03
PCLB‐07

PCLB‐07

PCLB‐06

PCLB‐07
200.0mm      services into the works as may be required.
HCS 320 200.0mm
6300

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
HCS 320
HCS 320      top &bottom unless noted otherwise.
1750.18 2180
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 7‐ All hollow core slabs have toping 80 mm. with mesh A393 
HCS 320 HCS 320      unless noted otherwise.
HCS 320 HCS 320
HCS 320 PCTRB‐07 PCTRB‐06 HCS 320 PCTRB‐06 PCTRB‐07 HCS 320
HCS 320 HCS 320
L
HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320

1250
HCS 320 HCS 320
  S.S.
  S.S.
200.0mm
HCS 320 HCS 320 HCS 320 200.0mm HCS 320 HCS 320
HCS 320 HCS 320

1400.6
HCS 320 HCS 320
700
HCS 320 HCS 320 HCS 320 HCS 320

PCTB‐13
HCS 320
HCS 320 HCS 320
HCS 320 HCS 320
PCRB‐10 PCRB‐10 PCRB‐10 PCRB‐10 PCRB‐10

1268
HCS 320 HCS 320

PCTB‐13

PCTB‐13
  S.S.
PCTB‐13

PCTB‐13

PCTB‐13
  S.S.   S.S. PCRB‐10 PCRB‐10   S.S.   S.S.
2815.5 HCS 320 200.0mm HCS 320
9100

200.0mm 200.0mm 200.0mm 200.0mm

PCLB‐20

PCLB‐20
HCS 320 HCS 320

2000
PCRB‐10 HCS 320 PCRB‐10 PCRB‐10 PCRB‐10 HCS 320 PCRB‐10
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 LEGENDS:
HCS 320   S.S. PCRB‐10 PCRB‐10   S.S. HCS 320
200.0mm 1903.09 HCS 320 HCS 320
200.0mm
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 PATTERN DESCRIPTION


HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

K PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 X7 MOVEMENT JOINT


PCRB‐02

CONCRETE SHRINKAGE STRIPS

6250
RETAINING WALL
9100

CAST IN SITU COLUMN AND WALL
X6
CAST IN SITU SLAB

J CAST IN SITU BEAM

7575
CAST IN SITU
TRANSFER BEAM

PRECAST
TRANSFER BEAM
9100

X5a
PRECAST COLUMN AND WALL

PLANTED CAST IN SITU 
COLUMN AND WALL

5375
PLANTED PRECAST 
H COLUMN AND WALL

X4
9100

8100
G X3
9100

10100
No. DATE BY REVISION APD

DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:

F
X2

4300
LEAD DESIGN CONSULTANT:
9100

X1
gmp International
Spain GmbH

3794
PROJECT:

E X0 JEDDAH CENTRAL DEVELOPMENT STADUIM

TITLE:

Stadium Floor plan & Reinforcement ‐  level 07 ‐ Technical
ring ‐ Part 08

SCALE: CHECKED: APPROVED:


A0: 1:100 Checker Approver
PROJECT No: DESIGNED: DRAWN: DATE:
JE22001 Designer Author MAY‐2023
REF.‐ ‐‐‐
DRAWING No: REV:

STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130708
FILE NAME:

STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001

C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6 01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100

06 07 08 09 10

REF.‐ ‐‐‐ 11 12 13 14 15

16 17 18 19 20

21 22 23 24 25

KEY PLAN
NOTES:

1‐ Do not scale from drawing
E´ X0 2‐ All dimensions are in m.m & levels in meters. unless noted   
    otherwise.all dimensions to be verified on site & approved by
    the engineer.
3‐ This drawing should be read in conjunction with other   

3800
     relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional 
     accuracy of the works. dimensions to be checked on‐site 
     prior to commencement.
X1 5‐ The main contractor is responsible for the coordination of 
9100

     services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
     top &bottom unless noted otherwise.

4300
7‐ All hollow core slabs have toping 80 mm. with mesh A393 
     unless noted otherwise.

X2

10200
9100

LEGENDS:

PATTERN DESCRIPTION

MOVEMENT JOINT
G´ X3
CONCRETE SHRINKAGE STRIPS

RETAINING WALL

8000
9100

CAST IN SITU COLUMN AND WALL

CAST IN SITU SLAB

X4 CAST IN SITU BEAM


CAST IN SITU
TRANSFER BEAM

5375
PRECAST
TRANSFER BEAM

PRECAST COLUMN AND WALL
X5a
9100

PLANTED CAST IN SITU 
COLUMN AND WALL

PLANTED PRECAST 
COLUMN AND WALL

7575

X6
9100

6250
PCRB‐02 PCRB‐02 PCRB‐01 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02
K´ X7
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

  S.S.   S.S.   S.S. HCS 320


  S.S.
HCS 320 200.0mm HCS 320 200.0mm HCS 320
HCS 320 200.0mm HCS 320 HCS 320 200.0mm HCS 320
HCS 320
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
PCRB‐10 PCRB‐10 PCRB‐10 HCS 320 PCRB‐10
HCS 320 HCS 320
PCTB‐13

PCTB‐13

PCTB‐13

PCTB‐13

PCTB‐13
  S.S. PCRB‐10
HCS 320
9100

PCLB‐20
  S.S.   S.S. 200.0mm   S.S.   S.S.   S.S.   S.S.
200.0mm   S.S.   S.S. No. DATE BY REVISION APD
200.0mm 200.0mm 200.0mm 200.0mm 200.0mm HCS 320
HCS 320 HCS 320 200.0mm 200.0mm
HCS 320 DRAWING STATUS:
PCRB‐10 RIBA STAGE 4 ‐ 50% DETAILED DESIGN
PCRB‐10 PCRB‐10 HCS 320
HCS 320 HCS 320 PCRB‐10 PCRB‐10 STADIUM
HCS 320 HCS 320
HCS 320 HCS 320
PCRB‐09

HCS 320 CLIENT:
HCS 320

PCLB‐20
HCS 320
PCRB‐09

HCS 320 HCS 320 HCS 320   S.S. HCS 320


HCS 320
B‐01

B‐01

B‐01

B‐01

B‐01

B‐01
HCS 320
200.0mm
HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

HCS 320 PCTRB‐07 PCTRB‐07 HCS 320 HCS 320 HCS 320 HCS 320 PCTRB‐07 PCTRB‐07 HCS 320
HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


PCTB‐12

PCTB‐12

PCTB‐12

PCTB‐12
PCLB‐07

PCLB‐06

PCLB‐07

PCLB‐07

PCLB‐06

PCLB‐07
HCS 320 LEAD DESIGN CONSULTANT:
6300

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

HCS 320

gmp
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
International
HCS 320 Spain GmbH
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
M´a
PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐01 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PROJECT:
2800

JEDDAH CENTRAL DEVELOPMENT STADUIM


TITLE:

Stadium Floor plan & Reinforcement ‐  level 07 ‐ Technical
ring ‐ Part 18

SCALE: CHECKED: APPROVED:


A0: 1:100 Checker Approver
PROJECT No: DESIGNED: DRAWN: DATE:
REF.‐ ST‐130723 JE22001 Designer Author MAY‐2023
DRAWING No: REV:

STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130718
FILE NAME:

STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001

C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100

06 07 08 09 10

REF.‐ ST‐130803 11 12 13 14 15

16 17 18 19 20

21 22 23 24 25

KEY PLAN
M NOTES:

1‐ Do not scale from drawing
2‐ All dimensions are in m.m & levels in meters. unless noted   
2800

    otherwise.all dimensions to be verified on site & approved by
    the engineer.
Ma 3‐ This drawing should be read in conjunction with other   
     relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional 
     accuracy of the works. dimensions to be checked on‐site 
     prior to commencement.
5‐ The main contractor is responsible for the coordination of 
     services into the works as may be required.
6300

6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
     top &bottom unless noted otherwise.
7‐ All hollow core slabs have toping 80 mm. with mesh A393 
     unless noted otherwise.

PCRB‐02 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐02

L HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320

PCTB‐13

PCTB‐13

PCTB‐13

PCTB‐13
PCLB‐07

PCLB‐07
PCTB‐13

PCTB‐13

PCTB‐13

PCTB‐13

PCTB‐13

PCTB‐13
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
9100

HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 LEGENDS:
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 PATTERN DESCRIPTION
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

K PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 MOVEMENT JOINT

CONCRETE SHRINKAGE STRIPS

RETAINING WALL
9100

CAST IN SITU COLUMN AND WALL

CAST IN SITU SLAB

J CAST IN SITU BEAM

CAST IN SITU
TRANSFER BEAM

PRECAST
TRANSFER BEAM
9100

PRECAST COLUMN AND WALL

PLANTED CAST IN SITU 
COLUMN AND WALL

PLANTED PRECAST 
H COLUMN AND WALL

X4
9100

G X3
9100

No. DATE BY REVISION APD

DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:

LEAD DESIGN CONSULTANT:
9100

gmp International
Spain GmbH

PROJECT:

E JEDDAH CENTRAL DEVELOPMENT STADUIM

TITLE:

Stadium Floor plan & Reinforcement ‐  level 08 ‐ VOC ‐ Part


08

SCALE: CHECKED: APPROVED:


A0: 1:100 Checker Approver
PROJECT No: DESIGNED: DRAWN: DATE:
JE22001 Designer Author MAY‐2023
REF.‐ ‐‐‐
DRAWING No: REV:

STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130808
FILE NAME:

STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001

C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100

06 07 08 09 10

REF.‐ ‐‐‐ 11 12 13 14 15

16 17 18 19 20

21 22 23 24 25

KEY PLAN
NOTES:

1‐ Do not scale from drawing
E´ X0 2‐ All dimensions are in m.m & levels in meters. unless noted   
    otherwise.all dimensions to be verified on site & approved by
    the engineer.
3‐ This drawing should be read in conjunction with other   

3800
     relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional 
     accuracy of the works. dimensions to be checked on‐site 
     prior to commencement.
X1 5‐ The main contractor is responsible for the coordination of 
9100

     services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
     top &bottom unless noted otherwise.

4300
7‐ All hollow core slabs have toping 80 mm. with mesh A393 
     unless noted otherwise.

X2

10200
9100

LEGENDS:

PATTERN DESCRIPTION

MOVEMENT JOINT
G´ X3
CONCRETE SHRINKAGE STRIPS

RETAINING WALL

8000
9100

CAST IN SITU COLUMN AND WALL

CAST IN SITU SLAB

X4 CAST IN SITU BEAM


CAST IN SITU
TRANSFER BEAM

5375
PRECAST
TRANSFER BEAM

PRECAST COLUMN AND WALL
X5a
9100

PLANTED CAST IN SITU 
COLUMN AND WALL

PLANTED PRECAST 
COLUMN AND WALL

7575

X6
9100

6250
PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02
K´ X7
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐24

PCTB‐03

PCTB‐03

PCTB‐24
HCS 320
PCTB‐13

HCS 320 HCS 320 HCS 320 HCS 320


HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
PCRB‐10 PCRB‐10
HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
PCTB‐13

PCTB‐08

PCTB‐08

PCTB‐13

PCTB‐13

PCLB‐01
HCS 320 HCS 320 HCS 320
PCLB‐07

PCLB‐20
9100

HCS 320 HCS 320   S.S. HCS 320 HCS 320 No. DATE BY REVISION APD


200.0mm HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 DRAWING STATUS:
HCS 320 RIBA STAGE 4 ‐ 50% DETAILED DESIGN
HCS 320 HCS 320 HCS 320
HCS 320
PCRB‐10 HCS 320 HCS 320 HCS 320 PCRB‐10 STADIUM
PCTB‐13

PCRB‐10

HCS 320 CLIENT:
HCS 320 HCS 320 HCS 320

PCLB‐20
  S.S. HCS 320

2799.94
+35.61 HCS 320 HCS 320 HCS 320 200.0mm

B‐01

B‐01

B‐01
B‐01

B‐01

B‐01

S.C.L. HCS 320

1429.94
HCS 320
HCS 320 +34.41
HCS 320 HCS 320
S.C.L.
L´ HCS 320 HCS 320 HCS 320 HCS 320

PCRB‐02 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐02
HCS 400 HCS 400 HCS 400 HCS 400 HCS 400

HCS 400 HCS 400 HCS 400 HCS 400 HCS 400

LEAD DESIGN CONSULTANT:
PCTB‐04

PCTB‐04

PCTB‐04

PCTB‐04
PCLB‐04

PCLB‐04
6300

HCS 400 HCS 400 HCS 400 HCS 400 HCS 400

gmp
HCS 400 HCS 400 HCS 400 HCS 400 HCS 400
International
Spain GmbH
HCS 400 HCS 400 HCS 400 HCS 400 HCS 400

M´a
PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐01 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PROJECT:
2800

JEDDAH CENTRAL DEVELOPMENT STADUIM


TITLE:

Stadium Floor plan & Reinforcement ‐  level 08 ‐ VOC ‐ Part


18

SCALE: CHECKED: APPROVED:


A0: 1:100 Checker Approver
PROJECT No: DESIGNED: DRAWN: DATE:
REF.‐ ST‐130823 JE22001 Designer Author MAY‐2023
DRAWING No: REV:

STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130818
FILE NAME:

STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001

C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
01 02 03 04 05

06 07 08 09 10

REF.‐ ‐‐‐ 11 12 13 14 15

16 17 18 19 20

21 22 23 24 25

KEY PLAN
M NOTES:

1‐ Do not scale from drawing
2‐ All dimensions are in m.m & levels in meters. unless noted   
2800

    otherwise.all dimensions to be verified on site & approved by
PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03     the engineer.
Ma 3‐ This drawing should be read in conjunction with other   
HCS 320      relevant arch, structural, mechanical and electrical drawings.
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
4‐ The main contractor is responsible for the dimensional 
HCS 320      accuracy of the works. dimensions to be checked on‐site 
     prior to commencement.
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
5‐ The main contractor is responsible for the coordination of 
PCLB‐07

PCLB‐07
PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02
HCS 320      services into the works as may be required.
6300

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320


6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
     top &bottom unless noted otherwise.
HCS 320 7‐ All hollow core slabs have toping 80 mm. with mesh A393 
HCS 320 HCS 320 HCS 320 RTB‐2 HCS 320 HCS 320 HCS 320
ST‐900002      unless noted otherwise.
HCS 320
HCS 320 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 HCS 320 HCS 320 HCS 320 HCS 320 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 HCS 320

L HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 RTB‐3 HCS 320 HCS 320
ST‐900002 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
+42.25 HCS 320
+42.25 HCS 320
S.C.L. S.C.L. HCS 320
HCS 320 HCS 320 HCS 320
HCS 320

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02
PCLB‐07

PCLB‐07
PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02

PCTB‐02
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
9100

HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320

HCS 320 LEGENDS:
HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
HCS 320 PATTERN DESCRIPTION
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

K PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 MOVEMENT JOINT
RTB‐1
ST‐900002

CONCRETE SHRINKAGE STRIPS

RETAINING WALL
9100

CAST IN SITU COLUMN AND WALL

CAST IN SITU SLAB

J CAST IN SITU BEAM

CAST IN SITU
TRANSFER BEAM

PRECAST
TRANSFER BEAM
9100

PRECAST COLUMN AND WALL

PLANTED CAST IN SITU 
COLUMN AND WALL

PLANTED PRECAST 
H COLUMN AND WALL

X4
9100

X3
G
9100

No. DATE BY REVISION APD

DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:

LEAD DESIGN CONSULTANT:
9100

gmp International
Spain GmbH

PROJECT:

E JEDDAH CENTRAL DEVELOPMENT STADUIM

TITLE:

Stadium Floor plan & Reinforcement ‐  level 09 ‐ Roof
terrace ‐ Part 08

SCALE: CHECKED: APPROVED:


A0: 1:100 Checker Approver
PROJECT No: DESIGNED: DRAWN: DATE:
JE22001 Designer Author MAY‐2023
REF.‐ ‐‐‐
DRAWING No: REV:

STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130908
FILE NAME:

STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001

C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100

06 07 08 09 10

REF.‐ ‐‐‐ 11 12 13 14 15

16 17 18 19 20

21 22 23 24 25

KEY PLAN
NOTES:

1‐ Do not scale from drawing
E´ 2‐ All dimensions are in m.m & levels in meters. unless noted   
    otherwise.all dimensions to be verified on site & approved by
    the engineer.
3‐ This drawing should be read in conjunction with other   
     relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional 
     accuracy of the works. dimensions to be checked on‐site 
     prior to commencement.
5‐ The main contractor is responsible for the coordination of 
9100

     services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
     top &bottom unless noted otherwise.
7‐ All hollow core slabs have toping 80 mm. with mesh A393 
     unless noted otherwise.


9100

LEGENDS:

PATTERN DESCRIPTION

MOVEMENT JOINT
G´ X3
CONCRETE SHRINKAGE STRIPS

RETAINING WALL

8000
9100

CAST IN SITU COLUMN AND WALL

CAST IN SITU SLAB

X4 CAST IN SITU BEAM


CAST IN SITU
TRANSFER BEAM

PRECAST
TRANSFER BEAM

PRECAST COLUMN AND WALL
9100

PLANTED CAST IN SITU 
COLUMN AND WALL

PLANTED PRECAST 
COLUMN AND WALL


9100

PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02

HCS 320 HCS 320 HCS 320 HCS 400 HCS 320 HCS 320 HCS 320 HCS 400 HCS 320 HCS 320
PCTB‐20

PCTB‐20

PCTB‐20

PCTB‐20
HCS 320 HCS 320 HCS 320
HCS 320 HCS 400 HCS 320 HCS 320 HCS 320 HCS 400 HCS 320
HCS 320   S.S.
HCS 320 HCS 400 HCS 400 HCS 320
HCS 320 HCS 320 HCS 320 400.0mm
HCS 320 HCS 320 HCS 320
HCS 320 PCRB‐01 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐02

PCTB‐08

PCTB‐18

PCTB‐18

PCTB‐02
PCLB‐11
PCLB‐09

MESH REINF
PCLB‐07

PCLB‐07
HCS 320
9100

T16 @200 T&B
HCS 320 HCS 320 No. DATE BY REVISION APD
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 BOTH DIRECTIONS HCS 320
DRAWING STATUS:
HCS 320 PCRB‐01 HCS 320 RIBA STAGE 4 ‐ 50% DETAILED DESIGN
HCS 320 HCS 320 HCS 320 HCS 320 +42.25
HCS 320 HCS 320 STADIUM
S.C.L.
+42.25 CLIENT:
HCS 320 HCS 320 HCS 320
HCS 320 S.C.L. HCS 320 HCS 320 HCS 320 HCS 320

HCS 320 HCS 320 HCS 320


HCS 320 PCRB‐03 PCRB‐03 HCS 320 HCS 320 HCS 320 PCRB‐03 PCRB‐03 HCS 320

HCS 320 PCRB‐03 PCRB‐03 HCS 320 HCS 320 HCS 320 PCRB‐03 PCRB‐03 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

LEAD DESIGN CONSULTANT:
PCTB‐18

PCTB‐18

PCTB‐18

PCTB‐18

PCTB‐18

PCTB‐18
PCLB‐07

PCLB‐07
PCLB‐10

PCLB‐10
6300

HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

HCS 320 HCS 320

gmp
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
International
Spain GmbH
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320

M´a
PCRB‐03 PCRB‐03 PCRB‐04 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PROJECT:
PCRB‐04
2800

JEDDAH CENTRAL DEVELOPMENT STADUIM


TITLE:

Stadium Floor plan & Reinforcement ‐  level 09 ‐ Roof
terrace ‐ Part 18

SCALE: CHECKED: APPROVED:


A0: 1:100 Checker Approver
PROJECT No: DESIGNED: DRAWN: DATE:
REF.‐ ‐‐‐ JE22001 Designer Author MAY‐2023
DRAWING No: REV:

STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130918
FILE NAME:

STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001

C JCDC

You might also like