Professional Documents
Culture Documents
01 02 03 04 05
06 07 08 09 10
REF.‐ ‐‐‐ 11 12 13 14 15
16 17 18 19 20
REF.‐ ST‐140008
21 22 23 24 25
KEY PLAN
M NOTES:
1‐ Do not scale from drawing
2‐ All dimensions are in m.m & levels in meters. unless noted
otherwise.all dimensions to be verified on site & approved by
the engineer.
Ma 3‐ This drawing should be read in conjunction with other
relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional
accuracy of the works. dimensions to be checked on‐site
prior to commencement.
5‐ The main contractor is responsible for the coordination of
services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
top &bottom unless noted otherwise.
7‐ All hollow core slabs have toping 80 mm. with mesh A393
unless noted otherwise.
LEGENDS:
X7 PATTERN DESCRIPTION
K MOVEMENT JOINT
CONCRETE SHRINKAGE STRIPS
RETAINING WALL
CAST IN SITU COLUMN AND WALL
X6
CAST IN SITU SLAB
J CAST IN SITU BEAM
CAST IN SITU
TRANSFER BEAM
PRECAST
TRANSFER BEAM
X5a
PRECAST COLUMN AND WALL
PLANTED CAST IN SITU
COLUMN AND WALL
PLANTED PRECAST
H COLUMN AND WALL
X4
X3
G
DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:
F
X2
LEAD DESIGN CONSULTANT:
X1
gmp International
Spain GmbH
PROJECT:
X0
E JEDDAH CENTRAL DEVELOPMENT STADUIM
TITLE:
Stadium Floor plan & Reinforcement ‐ level 00 ‐ Pitch
level plan‐ Part 08
REF.‐ ST‐140008
SCALE: CHECKED: APPROVED:
A0: 1:100 Checker Approver
PROJECT No: DESIGNED: DRAWN: DATE:
JE22001 Designer Author MAY‐2023
REF.‐ ‐‐‐
DRAWING No: REV:
STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130008
FILE NAME:
STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
D C JCDC
D´
01 02 03 04 05
06 07 08 09 10
REF.‐ ‐‐‐ 11 12 13 14 15
16 17 18 19 20
REF.‐ ST‐140018
21 22 23 24 25
KEY PLAN
NOTES:
1‐ Do not scale from drawing
X0
E´
2‐ All dimensions are in m.m & levels in meters. unless noted
otherwise.all dimensions to be verified on site & approved by
the engineer.
3‐ This drawing should be read in conjunction with other
relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional
accuracy of the works. dimensions to be checked on‐site
prior to commencement.
5‐ The main contractor is responsible for the coordination of
services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
top &bottom unless noted otherwise.
7‐ All hollow core slabs have toping 80 mm. with mesh A393
unless noted otherwise.
F´
LEGENDS:
PATTERN DESCRIPTION
MOVEMENT JOINT
G´
CONCRETE SHRINKAGE STRIPS
RETAINING WALL
CAST IN SITU COLUMN AND WALL
CAST IN SITU SLAB
CAST IN SITU BEAM
H´
CAST IN SITU
TRANSFER BEAM
PRECAST
TRANSFER BEAM
PRECAST COLUMN AND WALL
PLANTED CAST IN SITU
COLUMN AND WALL
PLANTED PRECAST
COLUMN AND WALL
J´
K´
DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:
L´
LEAD DESIGN CONSULTANT:
gmp International
Spain GmbH
M´a
PROJECT:
JEDDAH CENTRAL DEVELOPMENT STADUIM
M´
TITLE:
Stadium Floor plan & Reinforcement ‐ level 00 ‐ Pitch
level plan‐ Part 18
REF.‐ ST‐140018
SCALE: CHECKED: APPROVED:
A0: 1:100 Checker Approver
PROJECT No: DESIGNED: DRAWN: DATE:
REF.‐ ‐‐‐ JE22001 Designer Author MAY‐2023
DRAWING No: REV:
STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130018
FILE NAME:
STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
06 07 08 09 10
REF.‐ ‐‐‐ 11 12 13 14 15
16 17 18 19 20
21 22 23 24 25
KEY PLAN
NOTES:
1‐ Do not scale from drawing
E´ X0 2‐ All dimensions are in m.m & levels in meters. unless noted
otherwise.all dimensions to be verified on site & approved by
the engineer.
3‐ This drawing should be read in conjunction with other
3800
relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional
accuracy of the works. dimensions to be checked on‐site
prior to commencement.
X1 5‐ The main contractor is responsible for the coordination of
9100
services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
top &bottom unless noted otherwise.
4300
7‐ All hollow core slabs have toping 80 mm. with mesh A393
unless noted otherwise.
X2
F´
10200
9100
LEGENDS:
PATTERN DESCRIPTION
MOVEMENT JOINT
G´ X3
CONCRETE SHRINKAGE STRIPS
RETAINING WALL
8000
9100
CAST IN SITU COLUMN AND WALL
CAST IN SITU SLAB
X4 CAST IN SITU BEAM
H´
CAST IN SITU
TRANSFER BEAM
5375
PRECAST
TRANSFER BEAM
PRECAST COLUMN AND WALL
X5a
9100
PLANTED CAST IN SITU
COLUMN AND WALL
PLANTED PRECAST
COLUMN AND WALL
7575
J´
X6
6250
18200
X7
+4.65
S.C.L.
S.S.
MESH REINF 400mm
T16 @200 T&B No. DATE BY REVISION APD
BOTH DIRECTIONS
DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:
T16@200
L= 4000
T16@200
L= 4000
L´
4000
4000
LEAD DESIGN CONSULTANT:
6300
RK‐30
gmp International
Spain GmbH
M´a
PROJECT:
2800
JEDDAH CENTRAL DEVELOPMENT STADUIM
RK‐31
M´
TITLE:
Stadium Floor plan & Reinforcement ‐ level 01 ‐ Basement
mezzanine plan ‐ Part 18
STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130118
FILE NAME:
STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6 01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
06 07 08 09 10
REF.‐ ST‐130203 11 12 13 14 15
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐01
PCTB‐01
PCTB‐01
PCTB‐01
PCTB‐01
PCTB‐01
PCTB‐01
PCTB‐01
PCTB‐01
PCTB‐01
PCLB‐01
PCLB‐01
16 17 18 19 20
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
21 22 23 24 25
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 KEY PLAN
M NOTES:
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 1‐ Do not scale from drawing
2‐ All dimensions are in m.m & levels in meters. unless noted
2800
otherwise.all dimensions to be verified on site & approved by
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
the engineer.
Ma 3‐ This drawing should be read in conjunction with other
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional
accuracy of the works. dimensions to be checked on‐site
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
prior to commencement.
5‐ The main contractor is responsible for the coordination of
PCTB‐03
PCTB‐03
PCTB‐03
PCTB‐03
PCTB‐03
PCTB‐03
PCTB‐03
PCTB‐03
PCTB‐03
PCTB‐03
PCLB‐03
PCLB‐03
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 services into the works as may be required.
6300
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 top &bottom unless noted otherwise.
HCS 320
7‐ All hollow core slabs have toping 80 mm. with mesh A393
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 unless noted otherwise.
HCS 320 HCS 320
B‐01
B‐01
200mm S.S.
200mm
HCS 320 HCS 320 HCS 400 HCS 320 HCS 320 HCS 320 HCS 400 HCS 320 HCS 320
PCTB‐20
PCTB‐14
PCTB‐14
PCTB‐13
9100
HCS 320 HCS 320
HCS 320 HCS 400 HCS 320 HCS 320 HCS 320 HCS 400 HCS 320
HCS 320 HCS 320
B‐01
B‐01
HCS 320 HCS 400 HCS 320 HCS 320 HCS 320 HCS 400 HCS 320 LEGENDS:
HCS 320 HCS 320
PCTB‐12
PCTB‐12
PCTB‐12
PCTB‐12
PCTB‐12
PCTB‐12
PCTB‐12
PCTB‐12
PCTB‐12
PCTB‐12
PCLB‐10
PCLB‐10
6250
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
RETAINING WALL
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
9100
J HCS 320
HCS 320
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
HCS 320
HCS 320
CAST IN SITU BEAM
PCTB‐11
PCTB‐11
PCTB‐11
PCTB‐11
PCTB‐11
PCTB‐11
PCTB‐11
PCTB‐11
PCTB‐11
PCTB‐11
PCLB‐10
PCLB‐10
7575
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 CAST IN SITU
TRANSFER BEAM
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320 HCS 320
HCS 320
PRECAST
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
TRANSFER BEAM
HCS 320 HCS 320
9100
PCTB‐12
PCTB‐12
PCTB‐12
PCTB‐12
PCTB‐12
PCTB‐12
PCTB‐12
PCTB‐12
PCTB‐12
PCLB‐10
PCLB‐10
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 COLUMN AND WALL
HCS 320 HCS 320 HCS 320 HCS 320
13375
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐01
PCTB‐01
PCTB‐01
PCTB‐01
PCTB‐01
PCTB‐01
PCTB‐01
PCTB‐01
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
G X3
9100
10200
No. DATE BY REVISION APD
DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:
F
X2
4300
LEAD DESIGN CONSULTANT:
9100
X1
gmp International
Spain GmbH
3794
PROJECT:
E X0 JEDDAH CENTRAL DEVELOPMENT STADUIM
TITLE:
Stadium Floor plan & Reinforcement ‐ level 02 ‐ Premium
Access ‐ Part 08
STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130208
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
FILE NAME:
STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
D C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100 01 02 03 04 05
06 07 08 09 10
REF.‐ ‐‐‐ 11 12 13 14 15
16 17 18 19 20
21 22 23 24 25
KEY PLAN
NOTES:
1‐ Do not scale from drawing
E´ X0 2‐ All dimensions are in m.m & levels in meters. unless noted
otherwise.all dimensions to be verified on site & approved by
the engineer.
3‐ This drawing should be read in conjunction with other
relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional
accuracy of the works. dimensions to be checked on‐site
prior to commencement.
8100
5‐ The main contractor is responsible for the coordination of
9100
services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
top &bottom unless noted otherwise.
7‐ All hollow core slabs have toping 80 mm. with mesh A393
unless noted otherwise.
X2
F´
10100
9100
LEGENDS:
PATTERN DESCRIPTION
PCLB‐11 MOVEMENT JOINT
G´ HCS 320
X3
HCS 320 CONCRETE SHRINKAGE STRIPS
S.S.
HCS 320
300mm S.S.
300mm RETAINING WALL
PCTB‐01
PCTB‐01
PCTB‐01
PCTB‐08
PCTB‐08
PCLB‐01
HCS 320
PCTB‐03
PCTB‐03
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
8100
9100
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 CAST IN SITU COLUMN AND WALL
PCLB‐01
S.S. S.S.
PCTB‐01
HCS 320
HCS 320 HCS 320 300mm HCS 320 300mm HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
CAST IN SITU SLAB
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCLB‐11 PCLB‐11
HCS 320
HCS 320
HCS 320 HCS 320
HCS 320
HCS 320
HCS 320
HCS 320 HCS 320 X4 CAST IN SITU BEAM
HCS 320 HCS 320
HCS 320 HCS 320
H´ HCS 400 HCS 400
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 CAST IN SITU
HCS 320 HCS 320 TRANSFER BEAM
PCTB‐12
PCTB‐20
PCTB‐20
PCTB‐12
PCTB‐12
PCTB‐20
PCTB‐20
PCTB‐12
PCTB‐12
HCS 400 HCS 400
PCLB‐01
PCLB‐01
5375
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐12
HCS 320 HCS 320
HCS 400 HCS 400 PRECAST
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 TRANSFER BEAM
HCS 320 HCS 400 HCS 400 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 PLANTED PRECAST
PCTB‐11
PCTB‐11
PCTB‐11
PCTB‐11
PCTB‐11
PCTB‐11
PCTB‐11
PCTB‐11
PCTB‐11
PCTB‐11
PCLB‐01
PCLB‐01
HCS 320
COLUMN AND WALL
7575
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
J´ HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
X6
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
9100
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐12
PCTB‐12
PCTB‐12
PCTB‐08
PCTB‐08
PCTB‐08
PCTB‐08
PCTB‐12
PCTB‐12
PCTB‐12
PCLB‐01
PCLB‐01
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
6250
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCRB‐07 PCRB‐07
HCS 320 HCS 320 HCS 320 HCS 320 +7.53 HCS 320 +7.53 HCS 320 HCS 320 HCS 320 HCS 320
S.C.L. S.C.L.
B‐04 PCRB‐07
K´ S.S. HCS 320 S.S. HCS 320 HCS 320 HCS 320 X7
PCRB‐07 PCRB‐07 400mm 400mm
B‐03
S.C.L.
HCS 320 HCS 320
B‐04
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
PCTB‐08
PCTB‐08
PCTB‐13
PCTB‐13
HCS 320
S.S.
9100
PCLB‐20
+6.00 S.S. S.S. S.S. S.S. S.S.
B‐01
B‐01
B‐01
B‐01
B‐01
B‐01
S.C.L. HCS 320
200mm 200mm 200mm 200mm 200mm HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCRB‐10
L´ HCS 320
PCTB‐20
PCTB‐17
PCTB‐17
PCTB‐20
PCTB‐20
PCTB‐17
PCLB‐15
PCLB‐03
LEAD DESIGN CONSULTANT:
6300
PCTB‐09
HCS 320 HCS 320 HCS 320
gmp
HCS 320 HCS 320
HCS 320 HCS 400 HCS 400 HCS 320 International
Spain GmbH
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 400 HCS 400 HCS 320
M´a
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 400 HCS 400 HCS 320 PROJECT:
2800
PCTB‐15
PCTB‐16
PCTB‐16
PCTB‐15
PCTB‐15
PCTB‐16
PCTB‐15
PCLB‐14
PCLB‐01
HCS 320 HCS 400 HCS 400 HCS 320
SCALE: CHECKED: APPROVED:
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 A0: 1:100 Checker Approver
HCS 320 HCS 400 HCS 400 HCS 320
PROJECT No: DESIGNED: DRAWN: DATE:
REF.‐ ST‐130222 HCS 320 JE22001 Designer Author MAY‐2023
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 400 HCS 400 HCS 320 DRAWING No: REV:
STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130217
FILE NAME:
STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
06 07 08 09 10
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
REF.‐ ST‐130303 11 12 13 14 15
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐16
PCTB‐16
PCTB‐16
PCTB‐16
PCTB‐16
PCTB‐16
PCTB‐16
PCTB‐16
PCTB‐16
PCTB‐16
PCLB‐14
PCLB‐14
16 17 18 19 20
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
21 22 23 24 25
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 KEY PLAN
M NOTES:
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 1‐ Do not scale from drawing
2‐ All dimensions are in m.m & levels in meters. unless noted
2800
PCTB‐27
PCRB‐05 PCRB‐05 PCRB‐05 PCRB‐05
MESH REINF 5‐ The main contractor is responsible for the coordination of
PCTB‐27
MESH REINF
PCTB‐03
PCTB‐03
PCLB‐15
PCLB‐11
PCLB‐11
PCLB‐15
T16 @200 T&B HCS 320 HCS 320 T16 @200 T&B services into the works as may be required.
HCS 320 HCS 320 HCS 320
PCTB‐26
PCTB‐26
6300
PCRB‐05 PCRB‐05
PCRB‐02
PCRB‐02
HCS 320 HCS 320 top &bottom unless noted otherwise.
HCS 320
HCS 320 PCRB‐01 MESH REINF MESH REINF PCRB‐01 HCS 320 7‐ All hollow core slabs have toping 80 mm. with mesh A393
T16 @200 T&B HCS 320 HCS 320 +12.97 T16@200 T16 @200 T&B
T16@200 HCS 320 L= 4000 unless noted otherwise.
BOTH DIRECTIONS L= 4000 S.C.L. BOTH DIRECTIONS
6000
6000
HCS 320 HCS 320 HCS 320 HCS 320
T16@200
L= 4000
T16@200
L= 4000
HCS 320
L HCS 320
PCRB‐05
HCS 320 HCS 320 HCS 320
S.S. PCRB‐05
HCS 320
200mm
HCS 320 HCS 320 HCS 320 HCS 320
B‐01 S.S.
+12.97 +12.97 S.S. HCS 320 200mm
4000 4000
S.C.L. S.C.L. 200mm B‐01
HCS 320 HCS 320 HCS 320 S.S. HCS 320
S.S. S.S. HCS 320 400mm S.S.
400mm 400mm 400mm
HCS 320 HCS 320 HCS 320 HCS 320
PCRB‐05
PCRB‐05
PCTB‐14
PCTB‐14
PCTB‐25
PCLB‐11
HCS 320
9100
B‐01
B‐01
BOTH DIRECTIONS BOTH DIRECTIONS
BOTH DIRECTIONS BOTH DIRECTIONS LEGENDS:
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
L= 4000
T16@200
T16@200
HCS 320 HCS 320 HCS 320 HCS 320
3000
4000
4000
3000
K X7
T16@200
L= 3000
T16@200
L= 3000
HCS 320
HCS 320 HCS 320 MOVEMENT JOINT
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320
3000 HCS 320 HCS 320
3000
HCS 320 4000 HCS 320 HCS 320 4000 HCS 320
CONCRETE SHRINKAGE STRIPS
HCS 320
PCTB‐01
PCRB‐05
PCRB‐05
PCTB‐02
PCTB‐02
PCTB‐03
PCLB‐05
PCLB‐11
PCLB‐05
6250
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 +12.97 +12.97
S.C.L. S.C.L. RETAINING WALL
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
9100
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 CAST IN SITU COLUMN AND WALL
PCRB‐05 PCRB‐05 HCS 320 PCRB‐05 PCRB‐05
HCS 320 HCS 320 HCS 320 HCS 320
PCRB‐10 PCRB‐10 PCRB‐10 PCRB‐10 PCRB‐10
X6
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 CAST IN SITU SLAB
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
J HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 CAST IN SITU BEAM
HCS 320
PCTB‐02
PCTB‐02
PCTB‐05
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐05
PCTB‐02
PCTB‐02
PCLB‐07
PCLB‐07
7575
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 CAST IN SITU
TRANSFER BEAM
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
PRECAST
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 TRANSFER BEAM
HCS 320
9100
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
X5a
HCS 320 PRECAST COLUMN AND WALL
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PLANTED CAST IN SITU
COLUMN AND WALL
5375
PLANTED PRECAST
H COLUMN AND WALL
X4
9100
8000
G X3
9100
10200
No. DATE BY REVISION APD
DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:
F
X2
4300
LEAD DESIGN CONSULTANT:
9100
X1
gmp International
Spain GmbH
3794
PROJECT:
E X0 JEDDAH CENTRAL DEVELOPMENT STADUIM
TITLE:
Stadium Floor plan & Reinforcement ‐ level 03 ‐ Lower
Concourse ‐ Part 08
STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130308
FILE NAME:
STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
06 07 08 09 10
REF.‐ ‐‐‐ 11 12 13 14 15
16 17 18 19 20
21 22 23 24 25
KEY PLAN
NOTES:
1‐ Do not scale from drawing
E´ X0 2‐ All dimensions are in m.m & levels in meters. unless noted
otherwise.all dimensions to be verified on site & approved by
the engineer.
3‐ This drawing should be read in conjunction with other
3800
relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional
accuracy of the works. dimensions to be checked on‐site
prior to commencement.
X1 5‐ The main contractor is responsible for the coordination of
9100
services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
top &bottom unless noted otherwise.
4300
7‐ All hollow core slabs have toping 80 mm. with mesh A393
unless noted otherwise.
X2
F´
10200
9100
LEGENDS:
PATTERN DESCRIPTION
MOVEMENT JOINT
G´ X3
CONCRETE SHRINKAGE STRIPS
RETAINING WALL
8000
9100
CAST IN SITU COLUMN AND WALL
CAST IN SITU SLAB
RK‐02
X4 CAST IN SITU BEAM
H´
CAST IN SITU
TRANSFER BEAM
5375
PRECAST
TRANSFER BEAM
PCTB‐02
HCS 320
PCTB‐02
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
PLANTED PRECAST
PCTB‐02
PCTB‐02
PCTB‐05
PCTB‐02
PCTB‐02
PCLB‐07
PCLB‐07
HCS 320 HCS 320 HCS 320 PCRB‐10 PCRB‐10 PCRB‐10 PCRB‐10 PCRB‐10 HCS 320 HCS 320 HCS 320 COLUMN AND WALL
7575
HCS 320 HCS 320 HCS 320
PCTB‐02
HCS 320
PCTB‐05
J´ ?
HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320
HCS 320
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
HCS 320
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCRB‐05 HCS 320
HCS 320
PCRB‐05 X6
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 400
PCRB‐01 HCS 320 PCRB‐01
9100
S.S. S.S.
PCTB‐20
PCTB‐03
PCTB‐01
PCTB‐20
PCTB‐02
PCTB‐02
PCTB‐20
PCLB‐11
PCLB‐05
PCLB‐11
PCLB‐05
HCS 320 200mm 200mm
6250
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCRB‐01 PCRB‐01
HCS 320
?
HCS 320 HCS 320 HCS 400 HCS 320 HCS 320 HCS 400 HCS 320 HCS 320
T16@200 HCS 320 T16@200 T16@200
L= 3000 HCS 320 HCS 400 HCS 320 HCS 400 HCS 320 L= 3000 L= 3000
HCS 320 PCRB‐05 HCS 320
HCS 320
HCS 320
PCRB‐07 PCRB‐05
3000
3000
3000
K´ X7
T16@200
L= 3000
T16@200
L= 3000
T16@200
L= 3000
PCRB‐01 HCS 320
HCS 320 PCRB‐01 HCS 320
HCS 320 HCS 320
+12.97
S.C.L. HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
3000 3000 3000
+12.97
HCS 320
S.C.L. B‐03 B‐03 B‐03 B‐01
B‐03
B‐01
S.S. HCS 320 HCS 320
S.C.L.
400mm HCS 320
PCTB‐25
PCRB‐01
PCRB‐01
PCLB‐11
PCLB‐11
HCS 320 S.S. HCS 320
HCS 320 HCS 320 S.S.
9100
200mm
MESH REINF 400mm No. DATE BY REVISION APD
PCLB‐16
PCLB‐16
HCS 320
T16 @200 T&B
? HCS 320 HCS 320 HCS 320 HCS 320 DRAWING STATUS:
BOTH DIRECTIONS
HCS 320 RIBA STAGE 4 ‐ 50% DETAILED DESIGN
MESH REINF
HCS 320 HCS 320 HCS 320 HCS 320 STADIUM
T16 @200 T&B
HCS 320 CLIENT:
PCRB‐09
BOTH DIRECTIONS
S.S.
HCS 320 HCS 320
PCRB‐09
PCLB‐20
HCS 320 T16@200 S.S. 200mm S.S. HCS 320
B‐01
B‐01
B‐01
B‐01
B‐01
B‐01
S.S.
T16@200
L= 3000
3000
L´
L= 3000
T16@200
PCTB‐03
PCTB‐03
PCTB‐03
PCLB‐15
PCLB‐21
PCLB‐11
PCLB‐11
PCLB‐15
PCLB‐11
PCRB‐01 MESH REINF PCRB‐02 LEAD DESIGN CONSULTANT:
BOTH DIRECTIONS
6300
PCTB‐03
HCS 320 HCS 320 400mm HCS 320
HCS 320 HCS 400 HCS 320 HCS 320 HCS 320 International
HCS 320
Spain GmbH
HCS 400
HCS 320 HCS 320 PCRB‐05 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCRB‐05
M´a PCRB‐02 HCS 320 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 PROJECT:
HCS 320 HCS 320 HCS 320
2800
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 JEDDAH CENTRAL DEVELOPMENT STADUIM
TRB‐0
M´
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 TITLE:
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 Stadium Floor plan & Reinforcement ‐ level 03 ‐ Lower
Concourse ‐ Part 18
PCTB‐16
PCTB‐16
PCTB‐16
PCTB‐16
PCTB‐16
PCTB‐16
PCTB‐16
PCTB‐16
PCTB‐16
PCLB‐14
PCLB‐14
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
SCALE: CHECKED: APPROVED:
A0: 1:100 Checker Approver
? HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PROJECT No: DESIGNED: DRAWN: DATE:
REF.‐ ST‐130323 JE22001 Designer Author MAY‐2023
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 DRAWING No: REV:
STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130318
FILE NAME:
STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
01 02 03 04 05
06 07 08 09 10
REF.‐ ST‐130403 11 12 13 14 15
16 17 18 19 20
21 22 23 24 25
KEY PLAN
M NOTES:
1‐ Do not scale from drawing
2‐ All dimensions are in m.m & levels in meters. unless noted
2800
otherwise.all dimensions to be verified on site & approved by
PCTRB‐06 PCRB‐01 PCTRB‐07 PCTRB‐07 PCTRB‐06 PCTRB‐06 PCTRB‐06 PCTRB‐07 PCTRB‐07 PCRB‐01 PCTRB‐06 the engineer.
Ma 3‐ This drawing should be read in conjunction with other
relevant arch, structural, mechanical and electrical drawings.
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
4‐ The main contractor is responsible for the dimensional
accuracy of the works. dimensions to be checked on‐site
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 prior to commencement.
5‐ The main contractor is responsible for the coordination of
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCLB‐01
PCLB‐01
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 services into the works as may be required.
6300
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐13
PCTB‐18
PCTB‐18
PCTB‐13
PCTB‐18
9100
B‐01
B‐01
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 LEGENDS:
HCS 320
B‐01 B‐01
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
PATTERN DESCRIPTION
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
K HCS 400 HCS 400 HCS 400 X7 MOVEMENT JOINT
HCS 400
HCS 400 HCS 400 HCS 400 HCS 400 HCS 400 HCS 400
HCS 400
HCS 400 HCS 400 HCS 400
HCS 400
HCS 400 HCS 400 HCS 400 HCS 400 HCS 400 HCS 400
HCS 400 CONCRETE SHRINKAGE STRIPS
HCS 400 HCS 400 HCS 400 HCS 400
PCTB‐13
PCTB‐13
PCTB‐13
PCTB‐13
PCTB‐13
PCTB‐13
PCTB‐13
PCTB‐13
PCTB‐13
PCTB‐13
PCLB‐04
PCLB‐04
6250
HCS 400 HCS 400 HCS 400 HCS 400 HCS 400 HCS 400
HCS 400
HCS 400 HCS 400 HCS 400 HCS 400
RETAINING WALL
HCS 400 HCS 400 HCS 400 HCS 400 HCS 400 HCS 400
9100
HCS 400
HCS 400 HCS 400 HCS 400 HCS 400
7575
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 CAST IN SITU
HCS 320 HCS 320 HCS 320 HCS 320
TRANSFER BEAM
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PRECAST
TRANSFER BEAM
9100
X5a
PRECAST COLUMN AND WALL
PLANTED CAST IN SITU
COLUMN AND WALL
5375
PLANTED PRECAST
H COLUMN AND WALL
X4
9100
8100
G X3
9100
10100
No. DATE BY REVISION APD
DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:
F
X2
4300
LEAD DESIGN CONSULTANT:
9100
X1
gmp International
Spain GmbH
3794
PROJECT:
E X0 JEDDAH CENTRAL DEVELOPMENT STADUIM
TITLE:
Stadium Floor plan & Reinforcement ‐ level 04 ‐ Skybox
level ‐ Part 08
STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130408
FILE NAME:
STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6 01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
06 07 08 09 10
REF.‐ ‐‐‐ 11 12 13 14 15
16 17 18 19 20
21 22 23 24 25
KEY PLAN
NOTES:
1‐ Do not scale from drawing
E´ X0 2‐ All dimensions are in m.m & levels in meters. unless noted
otherwise.all dimensions to be verified on site & approved by
the engineer.
3‐ This drawing should be read in conjunction with other
3800
relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional
accuracy of the works. dimensions to be checked on‐site
prior to commencement.
X1 5‐ The main contractor is responsible for the coordination of
9100
services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
top &bottom unless noted otherwise.
4300
7‐ All hollow core slabs have toping 80 mm. with mesh A393
unless noted otherwise.
X2
F´
10200
9100
LEGENDS:
PATTERN DESCRIPTION
MOVEMENT JOINT
G´ X3
CONCRETE SHRINKAGE STRIPS
RETAINING WALL
8000
9100
CAST IN SITU COLUMN AND WALL
CAST IN SITU SLAB
X4 CAST IN SITU BEAM
H´
CAST IN SITU
TRANSFER BEAM
5375
PRECAST
TRANSFER BEAM
S.S.
PRECAST COLUMN AND WALL
200mm
X5a
9100
PLANTED CAST IN SITU
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
COLUMN AND WALL
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 PLANTED PRECAST
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 COLUMN AND WALL
7575
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
J´ HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐13
PCTB‐03
PCTB‐03
PCTB‐03
PCTB‐03
PCTB‐03
PCTB‐03
PCTB‐03
PCTB‐13
PCLB‐04
PCLB‐04
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
6250
HCS 400 HCS 400 HCS 400 HCS 320 HCS 400 HCS 400
K´ PCRB‐07
HCS 320
HCS 320
HCS 320
HCS 320 X7
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
+17.77 B‐03 B‐03 B‐03 B‐03
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
B‐03
S.C.L.
HCS 320 HCS 320
PCTB‐01
PCTB‐18
PCTB‐18
PCTB‐25
PCTB‐25
HCS 320 HCS 320 S.S. HCS 320 HCS 320 HCS 320 HCS 320
9100
B‐03
200mm
No. DATE BY REVISION APD
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 DRAWING STATUS:
HCS 320 RIBA STAGE 4 ‐ 50% DETAILED DESIGN
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 STADIUM
HCS 320
CLIENT:
HCS 320 S.S.
PCLB‐20
HCS 320
PCRB‐09
B‐01
B‐01
B‐01
B‐01
B‐01
S.S. S.S.
200mm 200mm
HCS 320 +17.77 HCS 320
PCRB‐02 S.C.L. PCRB‐02 HCS 320
L´ HCS 320 HCS 320 HCS 320
HCS 320
HCS 320 HCS 320
PCTB‐03
PCTB‐03
PCTB‐03
PCTB‐03
PCTB‐03
PCTB‐03
PCTB‐03
PCLB‐07
PCLB‐07
LEAD DESIGN CONSULTANT:
6300
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐03
HCS 320
PCTB‐03
gmp
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 International
Spain GmbH
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
M´a
PCTRB‐06 PCRB‐01 PCTRB‐07 PCTRB‐06 PCTRB‐06 PCB‐04 PCTRB‐06 PCTRB‐06 PCTRB‐07 PCRB‐01 PCTRB‐06 PROJECT:
2800
JEDDAH CENTRAL DEVELOPMENT STADUIM
M´
TITLE:
Stadium Floor plan & Reinforcement ‐ level 04 ‐ Skybox
level ‐ Part 18
STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130418
FILE NAME:
STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
SBS‐1
ST‐900006
C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
06 07 08 09 10
REF.‐ ST‐130503 11 12 13 14 15
16 17 18 19 20
21 22 23 24 25
KEY PLAN
NOTES:
1‐ Do not scale from drawing
2‐ All dimensions are in m.m & levels in meters. unless noted
otherwise.all dimensions to be verified on site & approved by
PCRB‐03 PCRB‐03 PCRB‐07 PCTRB‐07 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCTRB‐07 PCRB‐07 PCRB‐03 PCRB‐03 the engineer.
Ma 3‐ This drawing should be read in conjunction with other
HCS 400 relevant arch, structural, mechanical and electrical drawings.
HCS 320 HCS 320 HCS 400 HCS 400 HCS 320 HCS 400 HCS 320 HCS 320
S.S. 4‐ The main contractor is responsible for the dimensional
400.0mm S.S. HCS 400 accuracy of the works. dimensions to be checked on‐site
HCS 400 400.0mm
HCS 320 HCS 320 HCS 400 HCS 320 HCS 400 HCS 320 HCS 320 prior to commencement.
HCS 400 MESH REINF MESH REINF HCS 400 5‐ The main contractor is responsible for the coordination of
PCTB‐17
PCTB‐20
PCTB‐20
PCTB‐20
PCTB‐20
PCTB‐17
PCLB‐07
PCLB‐04
PCLB‐04
PCLB‐04
PCLB‐11
PCLB‐07
T16 @200 T&B T16 @200 T&B services into the works as may be required.
6300
B‐01
B‐01
HCS 400 S.S. HCS 400
HCS 400 HCS 400
200.0mm
HCS 320 HCS 320
HCS 320 HCS 320 S.S. HCS 320
HCS 400 HCS 400
HCS 400 200.0mm HCS 400
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320
PCTB‐20
PCTB‐20
PCTB‐03
PCTB‐03
PCTB‐20
PCTB‐20
HCS 400 HCS 400
9100
HCS 400 HCS 400
HCS 320 HCS 320
HCS 320 HCS 320 S.S. HCS 320
HCS 400 HCS 400
HCS 400 S.S. 200.0mm HCS 400
200.0mm HCS 320 HCS 320 LEGENDS:
HCS 320 HCS 320 HCS 320
HCS 400 HCS 400
HCS 400 B‐01 B‐01 HCS 400
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320
HCS 400 HCS 400
HCS 400 HCS 400 PATTERN DESCRIPTION
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320
K HCS 400 HCS 320 HCS 320 HCS 400
X7 MOVEMENT JOINT
HCS 320
HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCLB‐07
PCLB‐07
HCS 320 HCS 320 HCS 320
6250
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
HCS 320
RETAINING WALL
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
9100
PCTB‐03
PCTB‐03
PCTB‐03
PCTB‐03
PCTB‐03
HCS 320
PCLB‐07
PCLB‐07
200.0mm 200.0mm HCS 320 HCS 320 200.0mm 200.0mm
7575
HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐03 PCTB‐03 PCTB‐03 PCTB‐03
S.S. S.S. CAST IN SITU
PCRB‐02 400.0mm 400.0mm
PCRB‐02 TRANSFER BEAM
PCRB‐02 PCRB‐02
PCRB‐02 PRECAST
PCRB‐02 PCRB‐02 PCRB‐02 TRANSFER BEAM
9100
X5a
PRECAST COLUMN AND WALL
PLANTED CAST IN SITU
COLUMN AND WALL
5375
PLANTED PRECAST
H COLUMN AND WALL
X4
9100
8100
G X3
9100
10100
No. DATE BY REVISION APD
DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:
F
X2
5300
4300
LEAD DESIGN CONSULTANT:
X1
gmp International
Spain GmbH
3800
3794
PROJECT:
E X0 JEDDAH CENTRAL DEVELOPMENT STADUIM
TITLE:
Stadium Floor plan & Reinforcement ‐ level 05 ‐ Upper
Concourse ‐ Part 08
STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130508
FILE NAME:
STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6 01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
06 07 08 09 10
REF.‐ ‐‐‐ 11 12 13 14 15
16 17 18 19 20
21 22 23 24 25
KEY PLAN
NOTES:
1‐ Do not scale from drawing
E´ X0 2‐ All dimensions are in m.m & levels in meters. unless noted
otherwise.all dimensions to be verified on site & approved by
the engineer.
3‐ This drawing should be read in conjunction with other
3800
relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional
accuracy of the works. dimensions to be checked on‐site
prior to commencement.
X1 5‐ The main contractor is responsible for the coordination of
9100
services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
top &bottom unless noted otherwise.
4300
7‐ All hollow core slabs have toping 80 mm. with mesh A393
unless noted otherwise.
X2
F´
10200
9100
LEGENDS:
PATTERN DESCRIPTION
MOVEMENT JOINT
G´ X3
CONCRETE SHRINKAGE STRIPS
RETAINING WALL
8000
9100
CAST IN SITU COLUMN AND WALL
CAST IN SITU SLAB
X4 CAST IN SITU BEAM
H´
CAST IN SITU
TRANSFER BEAM
5375
PRECAST
TRANSFER BEAM
PRECAST COLUMN AND WALL
X5a
9100
S.S.
S.S.
400.0mm
PCRB‐02 PLANTED PRECAST
PCTB‐03 PCTB‐03 400.0mm PCTB‐03 PCTB‐03 COLUMN AND WALL
7575
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320
PCLB‐04 PCRB‐01
J´ HCS 320 HCS 320
PCTB‐01
PCTB‐01
PCTB‐01
PCTB‐01
PCLB‐01
PCLB‐01
PCTB‐01
HCS 320 HCS 320
PCTB‐03 HCS 320 PCTB‐03 PCTB‐03 PCTB‐03
PCTB‐01
S.S. S.S. S.S. S.S.
HCS 320 200.0mm HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 200.0mm HCS 320 200.0mm
200.0mm
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCLB‐03
PCLB‐03
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
K´ HCS 400
HCS 320 PCRB‐01 HCS 320
PCRB‐05 HCS 320 HCS 320
HCS 320
HCS 400
B‐03
400.0mm
200.0mm 200.0mm
HCS 400 HCS 320 HCS 320 HCS 320 HCS 400
HCS 320 HCS 320
PCTB‐20
PCTB‐25
PCTB‐20
PCLB‐14
PCLB‐14
MESH REINF
9100
CLIENT:
HCS 400 HCS 320 HCS 320 HCS 320 HCS 400
PCRB‐09
HCS 320 HCS 320
PCLB‐20
S.S. S.S.
B‐01
B‐01
B‐01
B‐01
B‐01
B‐01
HCS 320 HCS 320
HCS 400 200.0mm 200.0mm
HCS 400
HCS 320 PCRB‐05 HCS 320
PCRB‐02 PCRB‐10
L´ HCS 400
HCS 320 HCS 320
HCS 400
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
S.S.
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 200.0mm HCS 320
PCTB‐03
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐03
PCLB‐03
PCLB‐03
LEAD DESIGN CONSULTANT:
6300
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
PCTB‐02
gmp
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 International
Spain GmbH
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
M´a
PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCTRB‐06 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PROJECT:
2800
JEDDAH CENTRAL DEVELOPMENT STADUIM
M´
TITLE:
Stadium Floor plan & Reinforcement ‐ level 05 ‐ Upper
Concourse ‐ Part 18
STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130518
FILE NAME:
SBS‐1 STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
ST‐900006
C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
06 07 08 09 10
REF.‐ ‐‐‐ 11 12 13 14 15
16 17 18 19 20
21 22 23 24 25
KEY PLAN
NOTES:
1‐ Do not scale from drawing
E´ X0 2‐ All dimensions are in m.m & levels in meters. unless noted
otherwise.all dimensions to be verified on site & approved by
the engineer.
3‐ This drawing should be read in conjunction with other
3800
relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional
accuracy of the works. dimensions to be checked on‐site
prior to commencement.
X1 5‐ The main contractor is responsible for the coordination of
9100
services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
top &bottom unless noted otherwise.
4300
7‐ All hollow core slabs have toping 80 mm. with mesh A393
unless noted otherwise.
X2
F´
10200
9100
LEGENDS:
PATTERN DESCRIPTION
MOVEMENT JOINT
G´ X3
CONCRETE SHRINKAGE STRIPS
RETAINING WALL
8000
9100
CAST IN SITU COLUMN AND WALL
CAST IN SITU SLAB
X4 CAST IN SITU BEAM
H´
CAST IN SITU
TRANSFER BEAM
5375
PRECAST
TRANSFER BEAM
PRECAST COLUMN AND WALL
X5a
9100
PLANTED CAST IN SITU
COLUMN AND WALL
PLANTED PRECAST
COLUMN AND WALL
7575
J´
PCRB‐01 PCRB‐01
X6
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐02
PCTB‐02
PCTB‐02
PCLB‐03
PCLB‐03
PCTB‐02
PCTB‐02
HCS 320 HCS 320 HCS 320 HCS 320
6250
HCS 320
K´ HCS 320 X7
PCRB‐01 PCRB‐05 PCRB‐01
HCS 320
S.S.
200.0mm HCS 320
B‐01
B‐03
MESH REINF HCS 320
T16 @200 T&B
PCRB‐05
PCRB‐05
PCLB‐04
S.S.
BOTH DIRECTIONS
9100
DRAWING STATUS:
HCS 320
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
HCS 320 STADIUM
PCRB‐05
PCRB‐09
CLIENT:
HCS 320
S.S. S.S. S.S.
B‐01
B‐01
B‐01
B‐01
B‐01
B‐01
200.0mm 200.0mm 200.0mm
PCRB‐01 HCS 320
L´
PCRB‐01
LEAD DESIGN CONSULTANT:
6300
gmp International
Spain GmbH
M´a
PROJECT:
2800
JEDDAH CENTRAL DEVELOPMENT STADUIM
M´
TITLE:
Stadium Floor plan & Reinforcement ‐ level 06 ‐ Media
Mezzanine ‐ Part 18
STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130618
FILE NAME:
STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
06 07 08 09 10
REF.‐ ST‐130703 11 12 13 14 15
16 17 18 19 20
21 22 23 24 25
KEY PLAN
M NOTES:
1‐ Do not scale from drawing
2‐ All dimensions are in m.m & levels in meters. unless noted
2800
otherwise.all dimensions to be verified on site & approved by
PCRB‐03 PCRB‐03 PCRB‐09 PCTRB‐07 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCTRB‐07 PCRB‐09 PCRB‐03 PCRB‐03 the engineer.
Ma HCS 320
3‐ This drawing should be read in conjunction with other
relevant arch, structural, mechanical and electrical drawings.
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
4‐ The main contractor is responsible for the dimensional
HCS 320
accuracy of the works. dimensions to be checked on‐site
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 prior to commencement.
HCS 320 5‐ The main contractor is responsible for the coordination of
PCRB‐01
PCRB‐01
S.S.
PCTB‐03
PCTB‐12
PCTB‐12
PCTB‐12
PCTB‐12
PCTB‐03
PCLB‐07
PCLB‐07
PCLB‐06
PCLB‐07
200.0mm services into the works as may be required.
HCS 320 200.0mm
6300
1250
HCS 320 HCS 320
S.S.
S.S.
200.0mm
HCS 320 HCS 320 HCS 320 200.0mm HCS 320 HCS 320
HCS 320 HCS 320
1400.6
HCS 320 HCS 320
700
HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐13
HCS 320
HCS 320 HCS 320
HCS 320 HCS 320
PCRB‐10 PCRB‐10 PCRB‐10 PCRB‐10 PCRB‐10
1268
HCS 320 HCS 320
PCTB‐13
PCTB‐13
S.S.
PCTB‐13
PCTB‐13
PCTB‐13
S.S. S.S. PCRB‐10 PCRB‐10 S.S. S.S.
2815.5 HCS 320 200.0mm HCS 320
9100
PCLB‐20
PCLB‐20
HCS 320 HCS 320
2000
PCRB‐10 HCS 320 PCRB‐10 PCRB‐10 PCRB‐10 HCS 320 PCRB‐10
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 LEGENDS:
HCS 320 S.S. PCRB‐10 PCRB‐10 S.S. HCS 320
200.0mm 1903.09 HCS 320 HCS 320
200.0mm
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320
CONCRETE SHRINKAGE STRIPS
6250
RETAINING WALL
9100
CAST IN SITU COLUMN AND WALL
X6
CAST IN SITU SLAB
J CAST IN SITU BEAM
7575
CAST IN SITU
TRANSFER BEAM
PRECAST
TRANSFER BEAM
9100
X5a
PRECAST COLUMN AND WALL
PLANTED CAST IN SITU
COLUMN AND WALL
5375
PLANTED PRECAST
H COLUMN AND WALL
X4
9100
8100
G X3
9100
10100
No. DATE BY REVISION APD
DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:
F
X2
4300
LEAD DESIGN CONSULTANT:
9100
X1
gmp International
Spain GmbH
3794
PROJECT:
E X0 JEDDAH CENTRAL DEVELOPMENT STADUIM
TITLE:
Stadium Floor plan & Reinforcement ‐ level 07 ‐ Technical
ring ‐ Part 08
STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130708
FILE NAME:
STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6 01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
06 07 08 09 10
REF.‐ ‐‐‐ 11 12 13 14 15
16 17 18 19 20
21 22 23 24 25
KEY PLAN
NOTES:
1‐ Do not scale from drawing
E´ X0 2‐ All dimensions are in m.m & levels in meters. unless noted
otherwise.all dimensions to be verified on site & approved by
the engineer.
3‐ This drawing should be read in conjunction with other
3800
relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional
accuracy of the works. dimensions to be checked on‐site
prior to commencement.
X1 5‐ The main contractor is responsible for the coordination of
9100
services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
top &bottom unless noted otherwise.
4300
7‐ All hollow core slabs have toping 80 mm. with mesh A393
unless noted otherwise.
X2
F´
10200
9100
LEGENDS:
PATTERN DESCRIPTION
MOVEMENT JOINT
G´ X3
CONCRETE SHRINKAGE STRIPS
RETAINING WALL
8000
9100
CAST IN SITU COLUMN AND WALL
CAST IN SITU SLAB
X4 CAST IN SITU BEAM
H´
CAST IN SITU
TRANSFER BEAM
5375
PRECAST
TRANSFER BEAM
PRECAST COLUMN AND WALL
X5a
9100
PLANTED CAST IN SITU
COLUMN AND WALL
PLANTED PRECAST
COLUMN AND WALL
7575
J´
X6
9100
6250
PCRB‐02 PCRB‐02 PCRB‐01 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02
K´ X7
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐13
PCTB‐13
PCTB‐13
PCTB‐13
S.S. PCRB‐10
HCS 320
9100
PCLB‐20
S.S. S.S. 200.0mm S.S. S.S. S.S. S.S.
200.0mm S.S. S.S. No. DATE BY REVISION APD
200.0mm 200.0mm 200.0mm 200.0mm 200.0mm HCS 320
HCS 320 HCS 320 200.0mm 200.0mm
HCS 320 DRAWING STATUS:
PCRB‐10 RIBA STAGE 4 ‐ 50% DETAILED DESIGN
PCRB‐10 PCRB‐10 HCS 320
HCS 320 HCS 320 PCRB‐10 PCRB‐10 STADIUM
HCS 320 HCS 320
HCS 320 HCS 320
PCRB‐09
HCS 320 CLIENT:
HCS 320
PCLB‐20
HCS 320
PCRB‐09
B‐01
B‐01
B‐01
B‐01
B‐01
HCS 320
200.0mm
HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
L´
HCS 320 PCTRB‐07 PCTRB‐07 HCS 320 HCS 320 HCS 320 HCS 320 PCTRB‐07 PCTRB‐07 HCS 320
HCS 320
PCTB‐12
PCTB‐12
PCTB‐12
PCLB‐07
PCLB‐06
PCLB‐07
PCLB‐07
PCLB‐06
PCLB‐07
HCS 320 LEAD DESIGN CONSULTANT:
6300
HCS 320
gmp
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
International
HCS 320 Spain GmbH
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
M´a
PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐01 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PROJECT:
2800
JEDDAH CENTRAL DEVELOPMENT STADUIM
M´
TITLE:
Stadium Floor plan & Reinforcement ‐ level 07 ‐ Technical
ring ‐ Part 18
STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130718
FILE NAME:
STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
06 07 08 09 10
REF.‐ ST‐130803 11 12 13 14 15
16 17 18 19 20
21 22 23 24 25
KEY PLAN
M NOTES:
1‐ Do not scale from drawing
2‐ All dimensions are in m.m & levels in meters. unless noted
2800
otherwise.all dimensions to be verified on site & approved by
the engineer.
Ma 3‐ This drawing should be read in conjunction with other
relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional
accuracy of the works. dimensions to be checked on‐site
prior to commencement.
5‐ The main contractor is responsible for the coordination of
services into the works as may be required.
6300
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
top &bottom unless noted otherwise.
7‐ All hollow core slabs have toping 80 mm. with mesh A393
unless noted otherwise.
PCRB‐02 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐02
L HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
PCTB‐13
PCTB‐13
PCTB‐13
PCTB‐13
PCLB‐07
PCLB‐07
PCTB‐13
PCTB‐13
PCTB‐13
PCTB‐13
PCTB‐13
PCTB‐13
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
9100
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 LEGENDS:
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 PATTERN DESCRIPTION
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
K PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 MOVEMENT JOINT
CONCRETE SHRINKAGE STRIPS
RETAINING WALL
9100
CAST IN SITU COLUMN AND WALL
CAST IN SITU SLAB
J CAST IN SITU BEAM
CAST IN SITU
TRANSFER BEAM
PRECAST
TRANSFER BEAM
9100
PRECAST COLUMN AND WALL
PLANTED CAST IN SITU
COLUMN AND WALL
PLANTED PRECAST
H COLUMN AND WALL
X4
9100
G X3
9100
DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:
LEAD DESIGN CONSULTANT:
9100
gmp International
Spain GmbH
PROJECT:
E JEDDAH CENTRAL DEVELOPMENT STADUIM
TITLE:
STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130808
FILE NAME:
STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
06 07 08 09 10
REF.‐ ‐‐‐ 11 12 13 14 15
16 17 18 19 20
21 22 23 24 25
KEY PLAN
NOTES:
1‐ Do not scale from drawing
E´ X0 2‐ All dimensions are in m.m & levels in meters. unless noted
otherwise.all dimensions to be verified on site & approved by
the engineer.
3‐ This drawing should be read in conjunction with other
3800
relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional
accuracy of the works. dimensions to be checked on‐site
prior to commencement.
X1 5‐ The main contractor is responsible for the coordination of
9100
services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
top &bottom unless noted otherwise.
4300
7‐ All hollow core slabs have toping 80 mm. with mesh A393
unless noted otherwise.
X2
F´
10200
9100
LEGENDS:
PATTERN DESCRIPTION
MOVEMENT JOINT
G´ X3
CONCRETE SHRINKAGE STRIPS
RETAINING WALL
8000
9100
CAST IN SITU COLUMN AND WALL
CAST IN SITU SLAB
X4 CAST IN SITU BEAM
H´
CAST IN SITU
TRANSFER BEAM
5375
PRECAST
TRANSFER BEAM
PRECAST COLUMN AND WALL
X5a
9100
PLANTED CAST IN SITU
COLUMN AND WALL
PLANTED PRECAST
COLUMN AND WALL
7575
J´
X6
9100
6250
PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02
K´ X7
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐24
PCTB‐03
PCTB‐03
PCTB‐24
HCS 320
PCTB‐13
PCTB‐08
PCTB‐08
PCTB‐13
PCTB‐13
PCLB‐01
HCS 320 HCS 320 HCS 320
PCLB‐07
PCLB‐20
9100
PCRB‐10
HCS 320 CLIENT:
HCS 320 HCS 320 HCS 320
PCLB‐20
S.S. HCS 320
2799.94
+35.61 HCS 320 HCS 320 HCS 320 200.0mm
B‐01
B‐01
B‐01
B‐01
B‐01
B‐01
S.C.L. HCS 320
1429.94
HCS 320
HCS 320 +34.41
HCS 320 HCS 320
S.C.L.
L´ HCS 320 HCS 320 HCS 320 HCS 320
PCRB‐02 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐02
HCS 400 HCS 400 HCS 400 HCS 400 HCS 400
LEAD DESIGN CONSULTANT:
PCTB‐04
PCTB‐04
PCTB‐04
PCTB‐04
PCLB‐04
PCLB‐04
6300
gmp
HCS 400 HCS 400 HCS 400 HCS 400 HCS 400
International
Spain GmbH
HCS 400 HCS 400 HCS 400 HCS 400 HCS 400
M´a
PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐01 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PROJECT:
2800
JEDDAH CENTRAL DEVELOPMENT STADUIM
M´
TITLE:
STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130818
FILE NAME:
STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
01 02 03 04 05
06 07 08 09 10
REF.‐ ‐‐‐ 11 12 13 14 15
16 17 18 19 20
21 22 23 24 25
KEY PLAN
M NOTES:
1‐ Do not scale from drawing
2‐ All dimensions are in m.m & levels in meters. unless noted
2800
otherwise.all dimensions to be verified on site & approved by
PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 the engineer.
Ma 3‐ This drawing should be read in conjunction with other
HCS 320 relevant arch, structural, mechanical and electrical drawings.
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
4‐ The main contractor is responsible for the dimensional
HCS 320 accuracy of the works. dimensions to be checked on‐site
prior to commencement.
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
5‐ The main contractor is responsible for the coordination of
PCLB‐07
PCLB‐07
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
HCS 320 services into the works as may be required.
6300
L HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 RTB‐3 HCS 320 HCS 320
ST‐900002 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
+42.25 HCS 320
+42.25 HCS 320
S.C.L. S.C.L. HCS 320
HCS 320 HCS 320 HCS 320
HCS 320
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCLB‐07
PCLB‐07
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
PCTB‐02
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
9100
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 LEGENDS:
HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
HCS 320 HCS 320 HCS 320 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
HCS 320
HCS 320 PATTERN DESCRIPTION
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
K PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 MOVEMENT JOINT
RTB‐1
ST‐900002
CONCRETE SHRINKAGE STRIPS
RETAINING WALL
9100
CAST IN SITU COLUMN AND WALL
CAST IN SITU SLAB
J CAST IN SITU BEAM
CAST IN SITU
TRANSFER BEAM
PRECAST
TRANSFER BEAM
9100
PRECAST COLUMN AND WALL
PLANTED CAST IN SITU
COLUMN AND WALL
PLANTED PRECAST
H COLUMN AND WALL
X4
9100
X3
G
9100
DRAWING STATUS:
RIBA STAGE 4 ‐ 50% DETAILED DESIGN
STADIUM
CLIENT:
LEAD DESIGN CONSULTANT:
9100
gmp International
Spain GmbH
PROJECT:
E JEDDAH CENTRAL DEVELOPMENT STADUIM
TITLE:
Stadium Floor plan & Reinforcement ‐ level 09 ‐ Roof
terrace ‐ Part 08
STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130908
FILE NAME:
STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
C JCDC
6´ 5´ 4´ 3´ 2´ 1´ X 1 2 3 4 5 6
01 02 03 04 05
9100 9100 9100 9100 9100 4550 4550 9100 9100 9100 9100 9100
06 07 08 09 10
REF.‐ ‐‐‐ 11 12 13 14 15
16 17 18 19 20
21 22 23 24 25
KEY PLAN
NOTES:
1‐ Do not scale from drawing
E´ 2‐ All dimensions are in m.m & levels in meters. unless noted
otherwise.all dimensions to be verified on site & approved by
the engineer.
3‐ This drawing should be read in conjunction with other
relevant arch, structural, mechanical and electrical drawings.
4‐ The main contractor is responsible for the dimensional
accuracy of the works. dimensions to be checked on‐site
prior to commencement.
5‐ The main contractor is responsible for the coordination of
9100
services into the works as may be required.
6‐ For solid slabs thickness 20cm. or 30cm. use mesh T12@200
top &bottom unless noted otherwise.
7‐ All hollow core slabs have toping 80 mm. with mesh A393
unless noted otherwise.
F´
9100
LEGENDS:
PATTERN DESCRIPTION
MOVEMENT JOINT
G´ X3
CONCRETE SHRINKAGE STRIPS
RETAINING WALL
8000
9100
CAST IN SITU COLUMN AND WALL
CAST IN SITU SLAB
X4 CAST IN SITU BEAM
H´
CAST IN SITU
TRANSFER BEAM
PRECAST
TRANSFER BEAM
PRECAST COLUMN AND WALL
9100
PLANTED CAST IN SITU
COLUMN AND WALL
PLANTED PRECAST
COLUMN AND WALL
J´
9100
PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02 PCRB‐02
K´
HCS 320 HCS 320 HCS 320 HCS 400 HCS 320 HCS 320 HCS 320 HCS 400 HCS 320 HCS 320
PCTB‐20
PCTB‐20
PCTB‐20
PCTB‐20
HCS 320 HCS 320 HCS 320
HCS 320 HCS 400 HCS 320 HCS 320 HCS 320 HCS 400 HCS 320
HCS 320 S.S.
HCS 320 HCS 400 HCS 400 HCS 320
HCS 320 HCS 320 HCS 320 400.0mm
HCS 320 HCS 320 HCS 320
HCS 320 PCRB‐01 HCS 320
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
PCTB‐02
PCTB‐08
PCTB‐18
PCTB‐18
PCTB‐02
PCLB‐11
PCLB‐09
MESH REINF
PCLB‐07
PCLB‐07
HCS 320
9100
T16 @200 T&B
HCS 320 HCS 320 No. DATE BY REVISION APD
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 BOTH DIRECTIONS HCS 320
DRAWING STATUS:
HCS 320 PCRB‐01 HCS 320 RIBA STAGE 4 ‐ 50% DETAILED DESIGN
HCS 320 HCS 320 HCS 320 HCS 320 +42.25
HCS 320 HCS 320 STADIUM
S.C.L.
+42.25 CLIENT:
HCS 320 HCS 320 HCS 320
HCS 320 S.C.L. HCS 320 HCS 320 HCS 320 HCS 320
LEAD DESIGN CONSULTANT:
PCTB‐18
PCTB‐18
PCTB‐18
PCTB‐18
PCTB‐18
PCTB‐18
PCLB‐07
PCLB‐07
PCLB‐10
PCLB‐10
6300
HCS 320 HCS 320
gmp
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
International
Spain GmbH
HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320 HCS 320
M´a
PCRB‐03 PCRB‐03 PCRB‐04 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PCRB‐03 PROJECT:
PCRB‐04
2800
JEDDAH CENTRAL DEVELOPMENT STADUIM
M´
TITLE:
Stadium Floor plan & Reinforcement ‐ level 09 ‐ Roof
terrace ‐ Part 18
STA‐SCE‐S4‐06‐054‐100‐00‐DR‐ ST‐130918
FILE NAME:
STA‐SCE‐S4‐06‐054‐SPX‐ZZ‐M2‐ST‐000001
C JCDC