Professional Documents
Culture Documents
PROJECTION FOR CONTRACT C-3470 71
PROJECTION FOR CONTRACT C-3470 71
PROJECTION FOR CONTRACT C-3470/71 (STATCOM-LSP+HVAC WORKS) IN MAY/JUNE 2023- Date-9th May 2023 /REV-01
5 3471 GI Conduits and Accessories LPO-231367 LS 20,000.00 AMAD BAEED 1 0.25 5,000.00 Partial Qty Delivered - - -
Balance qty to be
6 3471 Supports LPO-231464 LS 2,000.00 AIRWAVE /AMAD BAEED 1 0.5 1,000.00 - - -
Delivered
- - - - - - - - - - - - - -
12 3470 UPVC Drain Pipes ? LS 540 Moiz Trading 1 - - - 1 540 Full Qty. to be delivered
FPO-230020
FPO-230019
FPO-230018
FPO-230017
FPO-230014 - we receive yesterday Balance Qty to be
13 3470 Damper, Diffusers & Grilles LS 68,392.00 Air Master #REF! - - - 0.5 34,196
sound attenuators from AIR Master Delivered
FPO-230013
FPO-230011
230006-VCD dated 13.02.2023.
230010-MVCD 07.03.2023
14 3470 Duct Heaters LPO-230895 Nos. 8,619.00 Ideal Project Link, GEC 9 - - - 9 8,619 Full Qty. to be delivered
LPO-224473
15 3470 Ventilation Fans Nos. 31,945.00 Ideal Project Link, ELTA 39 - - - 29 31,945 Full Qty. to be delivered
LPO-230484 DATED 13-02-2023
Full Qty. to be
16 3470 Control Wiring & BMS Accessories MAC not approved LS 23,625 Amad Baeed 1 1 23,600 - - -
delivered
Full Qty. to be
19 3470 Third party testing for HVAC LS 6,950.00 - 1 1 6,950.00 - - -
delivered
Page 1 of 2
Date: 07/18/2023
PROJECTION FOR CONTRACT C-3470/71 (STATCOM-LSP+HVAC WORKS) IN MAY/JUNE 2023- Date-9th May 2023 /REV-01
The given delivery dates are tendative only and It is as per the quotaions received and discussions with suppliers
Page 2 of 2