PROJECTION FOR CONTRACT C-3470/71 (STATCOM-LSP+HVAC WORKS) IN MAY/JUNE 2023- Date-9th May 2023 /REV-01
MAY-2023 JUNE-2023
Total Qty
Material/ Subcontract Required on Site
S. No. Contract No. PO NUMBER Unit Rate (BHD) Supplier
Description up to July -23 as
on 07.05.2023 Total Amount Total Amount
Quantity required Remarks Quantity required Remarks
(BHD) (BHD)
5 3471 GI Conduits and Accessories LPO-231367 LS 20,000.00 AMAD BAEED 1 0.25 5,000.00 Partial Qty Delivered - - -
Balance qty to be
6 3471 Supports LPO-231464 LS 2,000.00 AIRWAVE /AMAD BAEED 1 0.5 1,000.00 - - -
Delivered
- - - - - - - - - - - - - -
12 3470 UPVC Drain Pipes NEED MRQ NO LS 540 Moiz Trading 1 - - - 1 540 Full Qty. to be delivered
FPO-230020 / FPO-230019/FPO-
Balance Qty to be
13 3470 Damper, Diffusers & Grilles 230018/FPO-230017/FPO- LS 68,392.00 Air Master #REF! - - - 0.5 34,196
Delivered
230014/FPO-230013/FPO-230011
14 3470 Duct Heaters LPO-230895 Nos. 8,619.00 Ideal Project Link, GEC 9 - - - 9 8,619 Full Qty. to be delivered
15 3470 Ventilation Fans LPO-224473/LPO-230484 Nos. 31,945.00 Ideal Project Link, ELTA 39 - - - 29 31,945 Full Qty. to be delivered
Full Qty. to be
16 3470 Control Wiring & BMS Accessories NEED MRQ NO LS 23,625 Amad Baeed 1 1 23,600 - - -
delivered
Full Qty. to be
19 3470 Third party testing for HVAC LS 6,950.00 - 1 1 6,950.00 - - -
delivered
Page 1 of 2
Date: 10/07/2023
PROJECTION FOR CONTRACT C-3470/71 (STATCOM-LSP+HVAC WORKS) IN MAY/JUNE 2023- Date-9th May 2023 /REV-01
MAY-2023 JUNE-2023
Total Qty
Material/ Subcontract Required on Site
S. No. Contract No. PO NUMBER Unit Rate (BHD) Supplier
Description
The given delivery dates are tendative only and It is as per the quotaions received and discussions with suppliers up to July -23 as
on 07.05.2023
Page 2 of 2