You are on page 1of 1

Daily Drilling Report

Laporan Pengeboran Harian

Drill Uniit : Lokasi


Tanggal : Shift Day / Night

ID Hole Kedalaman ID Hole Kedalaman


No O/W No O/W Waktu Aktifitas No Keterangan
Lubang No Aktual Lubang No Aktual
1 73 06.00 - 06.10 OPERATIONAL STANDBY (OS)
2 74 06.10 - 06.20 1 No Operator/ Tidak ada Operator
3 75 06.20 - 06.30 2 Safety Talk
4 76 06.30 - 06.40 3 Shift Change
5 77 06.40 - 06.50 4 Istirahat / Meals
6 78 06.50 - 07.00 5 Travel Before Blasting (Sebelum Blasting)
7 79 07.00 - 07.10 6 Blasting
8 80 07.10 - 07.20 7 Travel After Blasting (Setelah Blasting)
9 81 07.20 - 07.30 8 Weather (Hujan Deras, Petir, Kabut)
10 82 07.30 - 07.40 9 Pray Time (Sholat Jumat)
11 83 07.40 - 07.50 10 Public Holiday (Libur Hari Raya)
12 84 07.50 - 08.00 11 Planned Standby (Inc. Kondisi Tidak Aman)
13 85 08.00 - 08.10 12 Clean Up Unit / Opportunity Maintenance
14 86 08.10 - 08.20 OPERATING DELAY (OD)
15 87 08.20 - 08.30 13 Pre-Start
16 88 08.30 - 08.40 14 Bench Preparation
17 89 08.40 - 08.50 15 Refueling
18 90 08.50 - 09.00 16 Daily Service (15 minutes)
19 91 09.00 - 09.10 17 Tramming to another bench (Travel)
20 92 09.10 - 09.20 18 Tramming to change rod
21 93 09.20 - 09.30 19 Waiting Mark Up (Survey)
22 94 09.30 - 09.40 20 Waiting Mine Geo for Sampling
23 95 09.40 - 09.50 21 Change Drill Bit/Ganti Bit
24 96 09.50 - 10.00 22 Change Drill Rod/Pipe/ Ganti Pipa
25 97 10.00 - 10.10 23 Add Water Injection
26 98 10.10 - 10.20 24 Drilling Stuck/ Pipa Stuck
27 99 10.20 - 10.30 25 Travel from Workshop
28 100 10.30 - 10.40 WORKING TIME (WT)
29 101 10.40 - 10.50 26 Drilling/Bor
30 102 10.50 - 11.00 27 Re-drill/Bor Ulang
31 103 11.00 - 11.10 28 Move to another holes
32 104 11.10 - 11.20 DOWNTIME (DT)
33 105 11.20 - 11.30 29 Service Schedule
34 106 11.30 - 11.40 30 Cleaning for Scheduled Maintenance
35 107 11.40 - 11.50 31 Wait for Parts
36 108 11.50 - 12.00 32 Waiting Mechanic
37 109 12.00 - 12.10 33 Breakdown
38 110 12.10 - 12.20 34 Waiting Support Equipment (ST, CT)
39 111 12.20 - 12.30 35 Mechanic Inspection
40 112 12.30 - 12.40 36 Travel to Workshop for repair
41 113 12.40 - 12.50
42 114 12.50 - 01.00 CATATAN :
43 115 01.00 - 01.10 Consumable Change:
44 116 01.10 - 01.20
45 117 01.20 - 01.30
46 118 01.30 - 01.40
47 119 01.40 - 01.50
48 120 01.50 - 02.00
49 121 02.00 - 02.10
50 122 02.10 - 02.20
51 123 02.20 - 02.30
52 124 02.30 - 02.40
53 125 02.40 - 02.50
54 126 02.50 - 03.00
55 127 03.00 - 03.10 ID Pipa/Bit Tinggal atau Patah dalam lubang:
56 128 03.10 - 03.20
57 129 03.20 - 03.30
58 130 03.30 - 03.40
59 131 03.40 - 03.50
60 132 03.50 - 04.00
61 133 04.00 - 04.10
62 134 04.10 - 04.20
63 135 04.20 - 04.30
64 136 04.30 - 04.40
65 137 04.40 - 04.50
66 138 04.50 - 05.00
67 139 05.00 - 05.10 Travel:
68 140 05.10 - 05.20
69 141 05.20 - 05.30
70 142 05.30 - 05.40
71 143 05.40 - 05.50
72 144 05.50 - 06.00
ENGINE HOURS PERCUSSION HOURS
Start : Start :
Finish : Finish : Meter Drill = meter Penambahan Solar = Liter
Checked By:
TOTAL : TOTAL : Meter Re-drill = meter
1 1
Drill Shift Operator 2 Drill Assistance 2
Note: Laporan ini harus di isi setiap hari, pengisiannya lebih detail dan jika ada pertanyaan mengenai penulisan laporan ini tanyakan ke Supervisor /
Superintendent dan Drill & Blast Engineer Team Supervisor
Kolom O / W : Keterangan material tiap lubang, ORE atau WASTE dan jika ada tambahan informasi mengenai detail pengeboran

Page 1 of 1