CONTRACT ID : 20IO0079

PROJECT NAME : CONSTRUCTION OF DAPDAP FLOOD CONTROL PROTECTION


WORKS, BRGY. DAPDAP, ALANG-ALANG, LEYTE
CONTRACTOR : SUNWEST CONST. AND DEV.T CORP.
TIME SCALE PERT / CPM DIAGRAM

407(8) 407(8)
LEAN CONCRETE LEAN CONCRETE

B.15(1) 1712(1) 1712(1)


4 DETOUR / ACCESS ROAD
7 10 BED COURSE GRANULAR MATERIAL 12 13 23 BED COURSE GRANULAR MATERIAL 25 26
21 CD 26 CD
14 42 35 63 63 79 26 CD 89 105 99 115 173 199 199 225 209 235
10 CD 10 CD

B.5, B.9
PROJECT
BILLBOARD,
B.4(10) 1700(1) B.4(10) 1700(1)
MOBILIZATION
MISC. SURVEY CLEARING AND
B.9 MISC. SURVEY CLEARING AND
& STAKING GRUBBING 405(1)a2 MOB / DEMOB
& STAKING GRUBBING 405(1)a2 B.9
1701(1) STRUCTURAL 1701(1) STRUCTURAL
UNSUITABLE 1704(1)b CONC. 14 days UNSUITABLE 1704(1)b CONC. 14 days
MOB /
1 2 3 5 8 11 14 15 16 18 21 24 27 DEMOB 28
LEGEND : CRITICAL PATH 0 0 4CD 4 4 10CD 14 14 9CD 23 23
EXCAVATION

40CD 63 63
EMBANKMENT FROM BORROW

39CD
102 102 13CD 115 115 124 124 10CD 134 134 9CD 143 143
EXCAVATION

30CD 173 173


EMBANKMENT FROM BORROW

48 CD
221 221 14 CD 235 235
5CD 240 240

9CD

10 CD 404(1)a ,
404(1)a , 404(1)b
404(1)b REINFORCING STEEL G40,

6 1717(2)a1 9 REINFORCING STEEL G40,


1717(2)a1 22
REINFORCING STEEL G60
SHEET PILES (STEEL) REINFORCING STEEL G60 19 SHEET PILES (STEEL) 25CD
39CD 25CD 25CD
23 38 62 77 143 173 173 211
B.7(2)
OCCUPATIONAL SAFETY & HEALTH PROGRAM ,

240 CD

PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL : APPROVED :

PAGE 1 OF 1
FRANK NIKKERSON B. BARCENA DANIEL A. ESTIGOY SANDY T. PUA NAJIB D. DILANGALEN, CEO VI NERIE D. BUENO, CESO III
AUTHORIZED REPRESENTATIVE PROJECT ENGINEER CHIEF , CONSTRUCTION DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
SUNWEST CONSTRUCTION AND DEVELOPMENT CORP. DPWH REGION 8 DPWH REGION 8 DPWH REGION 8 DPWH REGION 8