Professional Documents
Culture Documents
407(8) 407(8)
LEAN CONCRETE LEAN CONCRETE
B.5, B.9
PROJECT
BILLBOARD,
B.4(10) 1700(1) B.4(10) 1700(1)
MOBILIZATION
MISC. SURVEY CLEARING AND
B.9 MISC. SURVEY CLEARING AND
& STAKING GRUBBING 405(1)a2 MOB / DEMOB
& STAKING GRUBBING 405(1)a2 B.9
1701(1) STRUCTURAL 1701(1) STRUCTURAL
UNSUITABLE 1704(1)b CONC. 14 days UNSUITABLE 1704(1)b CONC. 14 days
MOB /
1 2 3 5 8 11 14 15 16 18 21 24 27 DEMOB 28
LEGEND : CRITICAL PATH 0 0 4CD 4 4 10CD 14 14 9CD 23 23
EXCAVATION
40CD 63 63
EMBANKMENT FROM BORROW
39CD
102 102 13CD 115 115 124 124 10CD 134 134 9CD 143 143
EXCAVATION
48 CD
221 221 14 CD 235 235
5CD 240 240
9CD
10 CD 404(1)a ,
404(1)a , 404(1)b
404(1)b REINFORCING STEEL G40,
240 CD
PAGE 1 OF 1
FRANK NIKKERSON B. BARCENA DANIEL A. ESTIGOY SANDY T. PUA NAJIB D. DILANGALEN, CEO VI NERIE D. BUENO, CESO III
AUTHORIZED REPRESENTATIVE PROJECT ENGINEER CHIEF , CONSTRUCTION DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
SUNWEST CONSTRUCTION AND DEVELOPMENT CORP. DPWH REGION 8 DPWH REGION 8 DPWH REGION 8 DPWH REGION 8