PROJECT TITLE

B5 B4 B3 B2 B1 PROJECT OWNER

Cairo University - Facutly of Engineering

12.32°
5cm Gravel

1705
6cm Sand CONSULTANT
Stone Copping 7cm Inclined PC
PL 13.50
5cm Thermal Insulation
4mm DPM
RC Slab GRC Cladding
12.90

Level 9
Group 9:

1200
12.90 Abdullah Lasheen
12.00
Mostafa Mohamed Mohmed
Mostafa Mohamed Sabry
Youssef Essam
3700

Youssef Tamer

1200
Gypsum
Board
4000

4000
2cm Tiles
Stone Copping

1200
PL 9.80 2cm Mortar
6cm Sand
GRC Cladding 7cm Inclined PC 2cm Tiles
5cm Thermal Insulation 2cm Mortar CONTRACTOR
600

4mm DPM FFL 8.90 6cm Sand GRC Cladding


RC Slab RC SLab

1200
Roof Floor Level
700

GRC Cladding
8.90
7.90

700

700

700
600

1200
600

FL6.98
6.98

700

700

700
Gypsum
Board
GENERAL NOTES
4000

4000
Aluminum

3700

3700
1200

1200
Cladding
2300

2300

2300
2cm Tiles
2cm Mortar
1250

GRC Cladding

1200
6cm Sand FFL 4.90
GRC Cladding 4.85 RC SLab
First Floor Level
4.90
600

3.90

1200
700

700

700
22305

22305
700

FL 2.98

700

700
Gypsum
Board

1200
4000

4000
2900

3700

3700
3000

Aluminum
2650

Railing

2300

2300

1200
2cm Tiles
1.35 2cm Mortar
6cm Sand FFL 0.90 GRC Cladding
RC SLab
450

Ground Floor Level


KEY PLAN

1225
0.90
150 750
900

900
Street Level
1500
0.00
FL -1.02
3100

3100
2200

2cm Tiles
2cm Mortar
6cm Sand FFL -3.10
RC SLab
1st Basement
-3.10
4000

4000
1
3600

3700

A301

Epoxy Layer FFL -7.10


RC
2nd Basement
100

-7.10

Section A-A
1 1 : 50
No. REVISION APP'D DATE

LOCATION : AL-ALAMEIN NEW CITY

DATE : 11/17/22

PROJECT NO. : 001

VERSION :

FILE NAME : BC4-GR9-DD-ZZ-CM-AR

BUILDING N0. : B02

DRAWN BY : Youssef Tamer

SCALE : As indicated

DRAWING TITLE:

Section A-A

DRAWING NUMBER:

A301