You are on page 1of 5
Republic of the Philippines = Department of Environment and Natural Resources & ENVIRONMENTAL MANAGEMENT BUREAU | Sis DENR Compound, Visayas Avenue, Diiman, Quezon City 1116 —=— — Telephone Nos.: 927-15-17, 28.37-42 Email: emb@emio. gov ph Vest us at http:fwwwemb.govph DEC 2 9 2003 ECC-LDBW-0909-0106 Mr. Pedrito S. Suministrado Proprietor ANGELS’ PIGGERY FARM Barangay Malaya Nagcarian, Laguna Angel's Farm Piggery Project ‘Subject Environmental Compliance Certificate (ECC) Dear Mr. Suministrado: This refers to your Environmental Compliance Certificate (ECC) application for the Angel's Farm Piggery Project located in Barangay Malaya, Nagcarlan, Laguna After satisfying the requirements of the said application and upon recommendation of the Environmental Management Bureau, this Department has decided to grant an ECC for the aforesaid project With the issuance of this ECC, you are expected to implement the measures presented in the Initial Environmental Examination Checklist, intended to protect and mitigate the project's adverse impacts on community health, welfare and the environment. Environmental considerations shall be incorporated in all phases and aspects of the project. You may proceed with project implementation after securing all the necessary permits from the concerned government agencies. This Office will be monitoring the project periodically to ensure compliance with the stipulations cited in the attached ECC. Please be guided accordingly. Very truly yours, soll |. AMADOR Director Protect the environment... Protect lif. - Republic of the Phil < Department of Environment and Natural Resources & ENVIRONMENTAL MANAGEMENT BUREAU. — DENR Compound, Visayas Avenue, Diiman, Quezon City 1116 —_— Telephone Nos.: 927-15-17, 928-37-42 —=— Email: emb@emb.govph Visi us at htp:fwwwem.govph ENVIRONMENTAL COMPLIANCE CERTIFICATE (Issued under Presidential Decree 1586) ECC-LDBW-0909-0106 THIS IS TO CERTIFY THAT ANGELS’ PIGGERY FARM as represented by Mr. Pedrito S. Suministrado, its Proprietor, has been granted this Environmental Compliance Certificate (ECC) for the Angel's Farm Piggery Project by the Department of Environment and Natural Resources (DENR), through the Environmental Management Bureau ~ Central Office (EMB-CO). SUBJECT ONLY to the conditions and restrictions set-out in this ECC and in the attached document labeled as Annex A and Annex B. PROJECT DESCRIPTION | This ECC covers the Angel’s Farm Piggery Project with a total covered area of 512 m? located in Barangay Malaya, Nagcarlan, Laguna. The project involves breeding, fattening/finishing and marketing of hogs with a maximum of 261 heads at a given time. It shall include a biogas reactor which will collect and convert hogs manure to produce electricity. The ECC js issued in compliance to the requirements of Presidential Decree No. 1586, in accordance to Department Administrative Order No. 2003-30. The Bureau, however, is not precluded from reevaluating, adding, removing, and correcting any deficiencies or errors that may be found to be inconsistent with the Revised Procedural Manual of DAO 2003-30 after issuance of this ECC. Issued at EMB-CO, DENE Campound, Visayas Avenue, Diliman, Quezon City, this ee oy ot ante ee DECC 2000) Recommending Approval: 2. OL, WIN C. CONCEPEION Coordinator Laguna De Bay Region ~ EIA Team Approved: sa AS aaoor Director Protect the environment... Protect life. . SWORN STATEMENT OF THE PROJECT PROPONENT |, Pedrito S. Suministrado, Proprietor of Angels’ Piggery Farm and proponent of this ‘Angel's Farm Piggery Project located in Barangay Malaya, Nagearlan, Laguna takes full responsibility in complying with all conditions contained in this Environmental Compliance Certificate (ECC). PEDRITO S. SUMINISTRADO TIN NO. Subscribed and sworn to before me this , the above-named affiant taking oath presenting Residence Certificate No. , issued on at Signature of Notarizing Officer Doc. No. Page No. Book No. Series of oN 0108 Pay Piggery Project ery Fa Annex A |. CONDITIONS: ‘A. ENVIRONMENTAL MANAGEMENT & MONITORING PLAN (EMMoP) The proponent shall ensure that all commitments, appropriate mitigating/enhancing measures and monitoring requirements especially those contained in the /nitial Environmental Examination Checklist shall be instituted and strictly implemented throughout the project implementation including but not limited to the following: 1. Construction of an adequate drainage system and treatment facility to ensure that wastewater generated from the farm shall not contaminate the ground and surface waters and conform to DENR effluent standards; 2. Adequate green buffer zone with appropriate species of fast growing trees shall be planted at the project perimeter particularly in areas facing the community; 3. Implementation of sanitation measures and solid wastes management systems including good housekeeping practices such as handling and disposal of pig manure, carcass, etc. throughout the project cycle to minimize generation of objectionable odor that may cause nuisance to the immediate environs; 4. A Pollution Control Officer (PCO) shall be appointed to effectively handle, implement and manage environment-related aspects of the project, conduct setf- monitoring activities and submit ECC Compliance Monitoring Report (CMR) semi- annually to EMB-CALABARZON; B. GENERAL CONDITIONS 5. The project operations shall conform to the applicable provisions of R. A. 6969 (Toxic Substances, Hazardous Waste Control Act of 1990), R. A. 8749 (Philippine Clean Air Act of 1999), R. A. 9003 (Ecological Solid Waste Management Act of 2000), and R. A. 9275 (Philippine Clean Water Act of 2004); 6. The proponent shall initiate tree planting activities within the open spaces for aestethic and environmental purposes and report of which shall be submitted to EMB-CALABARZON, ll, RESTRICTIONS: The Proponent must adhere to the following restrictions: 7. Observe the "No Tree-Cutting Policy’ of the Department of Environment and Natural Resources in all phases of project implementation; and 8. Incase of transfer of ownership/management tum-over of this project, these same conditions and restrictions shall apply, unless this ECC is revised in writing. In such case, the transferee shall be required to notify the EMB within fifteen (15) days. Pursuant to Section 9.0 of P. D. 1586, non-compliance with any of the provisions of this ECC shall be sufficient cause for its cancellation or ‘suspension and/or imposition of a fine in an amount not to exceed Fifty Thousand Pesos (PhP 50,000.00) thereof. OR# 5859788 d Date 09-24-2009 Processing Fee ; PhP4,000.00 ) Annex B PROJECT ASSESSMENT PLANNING TOOL For the assistance of the Proponent, other DENR Divisions/Bureaus, other concerned government agencies and LGUs in the management of the project and for better Coordination in mitigation of the impacts of the project on its surrounding areas and to the environment. The following are the requirements to the parties and authorities concerned for proper action and integration into their decision-making process: REGULATORY CONDITIONS Responsible Agency _ 7. Angels’ Piggery Farm needs to comply with the following: a. Ecological Waste Management System in accordance | Nagcarlan, Laguna LGU | with RA 9003; b. Labor Code of the Philippines, including occupational DOLE health and safety standards; ¢. Sanitation Code of the Philippines including provision of DOH temporary sanitary toilet facilities for construction workers; d. National Building Code of the Philippines including BFP adequate storm/drainage system and other flood control measures and compliance to the Fire Safety and Emergency Preparedness; e. Secure necessary permits from other government LLDA / ete. _agencies i.e. ENVIRONMENTAL PLANNING RECOMMENDATIONS FOR THE PROPONENT 2. Angels’ Piggery Farm shail ensure that socio-economic concems of stakeholders are adequately addressed. 7 3. Angels’ Piggery Farm shall consider the findings and recommendations with regards to the geological assessment of the project area including items related to structural integrity and seismic design. : @, Angels’ Piggery Farm shall undertake close monitoring in all stages of the project implementation to maintain a high level of environmental safety and performance efficiency and immediately address any environmental hazards. For dissemination and proper action of the parties concemed.

You might also like