You are on page 1of 6
Fee evil ECC Ref. Code No. RO3-1102-0079 EFREN L. ALVAREZ, D. Hum. (Owner/Manager ELA AGRICULTURAL ENTERPRISES Brgy: Villa Isla, Science City of Nuftoz Nueva Ecija Dear Mayor Alvarez, This refers to your application for an Environmental Compliance Certificate (ECC) for the proposed Livestock (Piggery Farm) Project to be located at Bray. Villa Isla, Science City of Munoz, Nueva Ecija. After satisfying the requirements of the said application, this Office has decided to grant an Environmental Compliance Certificate (ECC) to the above-mentioned project. In issuing this CERTIFICATE, it should be understood that the same is a PLANNING TOOL and not a PERMIT, It is expected that you will diligently secure pertinent PERMITS/CLEARANCES from all concerned government agencies. With the issuance of this ECC, you are expected to implement the measures presented in the Initial Environmental Examination (IEE) Checklist, intended to protect and mitigate the project's adverse impacts on community health, welfare and the environment. Environmental considerations shall be incorporated in all phases and aspects of the project. You may proceed with project implementation, after securing all the necessary permits from the pertinent government agencies. This Office will be monitoring the project periodically to ensure your compliance with the stipulations cited in the attached Ecc. Please be guided accordingly. Very truly yours, Al LORMELYN E. CLAUDIO Regional Director sad ENVIRONMENTAL COMPLIANCE CERTIFICATE (Issued under Presidential Decree 1586) RO3-1102-0079 THIS IS TO CERTIFY THAT ELA AGRICULTURAL ENTERPRISES is granted this Environmental Compliance Certificate (ECC) for the proposed Livestock (Piggery Farm) Project to be located at Brgy. Villa Isla, Science City of Muiioz, Nueva Ecija, by the Department of Environment and Natural Resources (DENR), through the Environmental Management Bureau, Region Ill. SUBJECT ONLY to the conditions and restrictions set-out in this ECC and in the attached document labeled as Annex A. Recommendations have been provided in Annex B as guidance to concemed government agencies and local government units for consideration in their decision making. 't shall cover the operation of a piggery farm (Gi<3__-D.4.a) with a population of three thousand (3,000) heads to be housed in three (3) units tunnel ventilated building in an area of two hundred twenty two thousand six hundred thirty six (222,636) square meters the boundary of which is defined under TCT No. NT-21763. Project Geographical Coordinates/Location North Latitude ~ 18°46'26.5" East Longitude = - 120°52'45.7" This certification is issued in compliance to the requirements of Presidential Decree No. 1586, in accordance to Department Administrative Order No. 30-2003. The Bureau, however, is not precluded from reevaluating, adding, removing, and correcting any deficiencies or errors that may be found after issuance of this certificate. ce Issued at City of San Fernando, Pampanga, this FEB 28 201 Recommending Approval: vw DENNIS 0. CELESTIAL Chief, Environmental impact Assessment Approved by: & Management Division Ir LORMELYN E. CLAUDIO Regional Director Ece-R03-1102-0079 {ECC is only a Planning Tool and not a Permit) Livestock (Piggory Farm) Project ELA AGRICULTURAL ENTERPRISES. Paget of 5 SWORN STATEMENT OF OWNER/AUTHORIZED REPRESENTATIVE ' &. SVANGELICTR, proponent of this i located in VILLA [SR _- SCIBNE TY OF MUO? takes full responsibility in complying with all conditions contained in this Environmental Compliance Commitment (Environmental Compliance Certificate or ECC). nature TIN _208 - 0S6~- S97 26200 Subscribed and sworn to before me thige® 2 ® day of 2014, the above-named affiant taking oath presenting Residence Certificate No. _O4281000 issued on_1 [uuu 2011 at Somme ae Doe. No. Page No. Book No. Series of 2011 ECC-ROS-1102-0079 EcC-R0s-1102-0079 ON Annex A CONDITIONS A. ENVIRONMENTAL MANAGEMENT and MONITORING PLAN (EMMoP) 1. All mitigating measures in the submitted Initial Environmental Examination (IEE) Checklist shall be implemented; 2. Implement proper housekeeping practices to prevent generation of obnoxious odor and proliferation of flies in the project area and adjacent vicinities; 3. Ensure that no wastes shall be burned in the area and that ecological waste management measures such as waste segregation, minimization, re-use, composting, etc., are implemented 4. The Wastewater Treatment Facility (WTF) shall operate effectively to ensure compliance with the effluent standards of the DENR; 5. Provide an accessible walk-way leading to the WTF or effluent outfall area and the periphery of the project site for easy conduct of monitoring and water sampling. 6. Mortality pit shall be provided with adequate lining to prevent contamination of groundwater. 7. Planting of trees shall be undertaken either within the project site and/or in other areas as part of the proponent's social and environmental program; B, GENERAL CONDITIONS 8. The proponent shall comply with the requirements of other environmental laws, i.e. Republic Act (RA) 8749 or “The Clean Air Act of 1999", RA 6969 or “Toxic Substances and Hazardous and Nuclear Wastes Control Act of 1990”, RA 9003 or “Ecological Solid Waste Management Act of 2000” and RA 9275 or "Clean Water Act of 2004’, among which are Facilities (WPSCF) Designate Pollution Control Officer (PCO) Submit quarterly Self Monitoring Report (SMR) Submit semi-annual Compliance Monitoring Report (CMR) Register as Hazardous Waste Generator /e Secure Permit to Operate Air Pollution Source Control Installations eg (APSCl) and Discharge Permit for Water Pollution Source/Control 9. Copy of Environmental Compliance Certificate (ECC) shall be posted in a conspicuous area in the project site; 10.An Abandonment Plan shall be submitted to this Office ninety (90) days prior to the project's abandonment. The plan shall include remediation, clean-up and rehabilitation measures of contaminated areas and proposed alternative project or activity suitable in the area. 11.The proponent shall set up a Multipartite Monitoring Team (MMT) composed of representatives from the proponent, concerned LGU, stakeholders and this Office within sixty (60) days upon receipt of this Certificate. Likewise, an Environmental Monitoring Fund (EMF) shall be established to cover all costs attendant to the operation of the MMT; 30f5 ‘Non-compliance with any of the provisions of this certificate shall be a sufficient cause for the et | cancellation or suspension of this certificate and/or imposition of a fine in an amount not t0 EC0-R03-1102.0079 (ECC is onty a Planning Tool and not a Permit) 12.The proponent shall formulate and implement Information Education Campaign (IEC) programs incorporating recommended environmental management practices through but shall not be limited to various advertising media (i.e., posters, billboards, etc) 13.That should there be any complaint from the community related to environmental sanitation problem brought about by the piggery farm's operation, the proponent shall be held responsible to address such problem; 14.The proponent shall allow inspection or monitoring that will be conducted by this Office anytime in coordination with concemed groups; RESTRICTIONS 15.Any expansion or modification of the approved project shall be subject to new EIA requirement; and 16.In case of transfer of ownership of this project, these same conditions and restrictions shall apply and the transferee shall be required to notify this Office within fifteen (15) days as regards to the transfer of ownership. exceed Fifty Thousand Pesos (50,000.00) for every violation thereof. OR No. 6853066, Proposed fee 4,000 Date : February 114, 2011 eas. [RE D BY | eRe re 2baly Page 4 of Annex B PROJECT ASSESSMENT PLANNING TOOL For the assistance of the Proponent and government agencies concerned in the management of the project and for better coordination in mitigation on the impact of the project on its surrounding areas and to the environment. By way of recommendation, the following have been taken notice by the undersigned and are forwarding these recommendations to the parties and authorities concerned for proper appreciation and action. RECOMMENDATIONS TO CONCERNED oe GOVERNMENT AGENCY/LGUs | AGENCIES/ENTITIES 1. Provision of drainage canal, concrete culverts, and| | City/Municipal other flood control measures to adequately receive and| | Engineers Office/ channel the run-off of silt-laden rain water to the nearby |_| Proponent receiving body of water. 2. Provision of a segregation, collection, recycling, and| | LGU/Proponent disposal mechanism for solid waste. 3. Compliance with the Sanitation Code of the Philippines, || DOH, DOLE- Bureau Labor Code of the Philippines including Occupational | | of Working Condition Health and Safety Standards and Building Code of the | | and Municipal Philippines. Planning & Devt Office/GU/Proponent 4, Observe and protect legal easement along rivers and| | HLURB/DENR-LMS/ creeks i.e. establishment of linear park along the| | LGU/Proponent easement, construction of boundary wall to prevent encroachment of the required legal easement of adjacent creek/river and regular clean-up and desilting of adjacent creek/river to prevent clogging. ENVIRONMENTAL PLANNING RECOMMENDATIONS FOR THE PROPONENT The following are recommendations for the Proponent for the protection of the project area and the affected environment. It is strongly recommended that the same be strictly complied by the Proponents. /1. Ensure efficient use of energy and other resources, i.e. rainwater collecting reservoir, pressure cleaners, nozzles, scraper systems, automatic drinking system, use of partially/fully elevated slatted floorings, etc. 2.Ensure that the best available technologies shall be adopted and promote the use of renewable energy, i.e. solar cell panel, solid/liquid separator, biogas digester with methane recovery, tunnel ventilated pig buildings to minimize use of water, prevent obnoxious odor and flies and ensure compliance with the effluent standards 3. Donate collectible recyclables to Local Government Unit (LGU) 4. Close monitoring by the proponent to maintain a high level of safety & efficiency to immediately address any environmental hazards or change that may take place 5. Mitigating measures in the submitted EMP shall be implemented to include the regular and proper cleaning of the area, using disinfectants to prevent proliferation of flies, proper collection of pig manure and proper disposal of dead pigs. For dissemination and proper action of the parties concemed DENNIS 0. CELESTIAL LORMELYN E. CLAUDIO Chief, EAMD f Regional Director ECO-RO3-1102.0079 Page Sof 5

You might also like