ELKHOMRA PROJECT

METHOD OF STATEMENT

water proofing

Table of contents
PURPOSE 

SCOPE 

RESPONSIBILITY 

MANPOWER 

TOOL & EQUIPMENT 

METHODS / PROCEDURES 

SAFETY PRECAUTION 

ATTACHMENT 
ELKHOMRA PROJECT

 - PURPOSE
The aim of this method statement is to execute the scope of work, provide and maintain an
effective quality control in compliance with standards and good practices at all stages/
activities for waterproofing work for roof deck opening area.

 - SCOPE

This method statement covers all sequence of the waterproofing works to be carried
out for roof deck where required for this project. The objective of this method
statement is to produce waterproofing work for roof deck.

 - RESPONSIBILITY

A full and detailed description of roles and responsibilities of all staff is included within
the project quality plan . for the works as covered this method statement , the following
personnel have specific duties

Technical Officer Engineer: Specific responsibilities include:


- Responsible for ensuring that the various submitting are timely undertaken (materials,
method statements, workshop drawings, subcontractor’s issues, technical issues).
- Responsible for quotations as required (materials, subcontractors).

- Responsible for ensuring RFI’s are timely undertaken on behalf of contractor.


- Responsible for the distribution of documents within contractor site personnel.

Site Engineer(s). Specific responsibilities include:


- Ensuring that the project is managed in a safe manner and meets the requirements
Of the project documentation
- Ensuring that subcontractors and suppliers achieve the on-site required
Standards
.
- Ensuring the Client is satisfied with our performance .
- Ensuring performance measurable are delivered.
ELKHOMRA PROJECT
- Shall refer to the QA/QC Department and the HSE
Department for advice and
guidance when required.

- Shall ensure that operatives comply with the relevant method statements, Toolbox
Talks and general site briefings.

HSE Site Representative(s). Specific responsibilities include:


- Assisting in the production of any health, safety, and environmental documents.
- Monitoring the implementation of health, safety, and environmental
Requirement
- Undertaking audits and ensuring that corrective and preventive actions are
- Taken where required Liaison with the senior site staff on health, safety, and
Environmental related matters

QA/QC Site Representative(s). Specific responsibilities include:


- Carrying out phased inspections as required.
- Ensuring that completed works are offered for inspection/approval to external

companies within specific dates/programmers.


- Preparation of the ITP.
- Ensuring that all required tests are performed and follow appropriate
specifications etc.
- Reviewing and ensuring that all shop drawings and material submitting are
presented to the appropriate bodies with adequate supporting information.
-Ensuring that materials are inspected when delivered to ensure they comply with the
various specifications

-Maintaining a record of all QA/QC activities on site.


- Controlling and ensuring all measuring and test equipment on site is properly calibrated.
-Controlling all non-conforming products or workmanship and implementing the required
preventive actions.
ELKHOMRA PROJECT
-Ensuring that corrective and preventive actions are taken when
required.

-Ensuring that the required testing is undertaken by approved independent laboratories,


and that all test results are reviewed.

-Undertake audits to ensure conformance to agreed Standards, Legislation, and project


specific requirements.
-Ensuring that staffs are aware of their responsibilities in respect of quality issues.

-Assisting and reporting to the QA/QC Manager as required.

Supervisor(s). Specific responsibilities include:


-To ensure that all operatives and appropriate subcontractors have been briefed as to the
content of the method statement and the works.

-To adequately control the works as required.

-To ensure the works are undertaken in a safe manner.


- To ensure all operatives are adequately training in their respective works.

-Reporting any UN-safe practices on site to the site team.

Subcontractors. Specific responsibilities include:


-To undertake their works as specified.

-To work in a safe manner.


-To ensure all operatives are adequately training in their respective works.
-Report any UN-safe practices on site to the site team.
ELKHOMRA PROJECT

 - MANPOWER
The Civil Supervisor shall control the overall activities at site and he will be directly
reporting to the Site Superintendent. The basic manpower under him shall consist
but not limited to the following:
 Lead Pre-Commissioning Engineer
 Testing Engineer
 Civil Lead Man
 Senior Technicians
 Technician
 Vendor Represented (if need)
 QC Engineer / Inspector
 Safety Engineer
 Company Representative

 - Materials :

- Handling and placing of the approved /specified material will be done as per the
Instructions of the manufacturer. o The approved/specified materials must be
delivered and placed in specific time

-Approved/specified materials shall be carefully checked, unloaded, placed and


handled properly.
-Approved materials must be ordered and tested as per the specification.

 - METHODS / PROCEDURES

The scope of this procedure covers the general construction plan for waterproofing work
for roof deck area. The purpose of the documentation is to implement the procedure & to
ensure that the quality control aspects are maintained and accurate records are
established. The objective is to ensure that the construction plan is executed, controlled
and documented in compliance with Contract Drawings & Specifications.

To apply (LIGHT WEIGHT FOAM CONCRETE) having 1% slope fall to drain with
50mm minimum thickness and 100 mm average thickness with density 350-450 kg/M3 as
a roof insulator and sloping screed. • To Supply and apply POLYURETHANE
(PU)FOAM SPRAYS 40 mm average thickness having the density of 40-45 kg/M3 on
top of LWFC roof deck area. • Supply and apply with two coats of Acrylic coating with
500 microns thickness (250+250). • Supply and lay Geo-textile sheet 140G/M2 as a
protection layer over the POLYURETHANE (PU ) System. • System will be covered&
ELKHOMRA PROJECT
protected by client by means of (Tiles, Gravel....ETC)

 - SAFETY PRECAUTION

-Safety requirements will be addressed in accordance with the project General


safety plan .

-Tools and equipment will be inspected periodic.

 Attachements : Section drawing :