Professional Documents
Culture Documents
BETWEEN
MR./MRS.____________________________________________, age____
years, PAN No._____________, Occu:-__________, Mobile
No._____________, email id No._______________ residing at
___________________ hereinafter referred to as “THE
ALLOTTEE/PURCHASER/S” (which expression shall, unless it be
repugnant to the context or meaning thereof, mean and include in the
case of an individual or individuals his/her or their respective heirs,
executors, administrators and permitted assigns / in case of a body
corporate, its successors and permitted assigns / in the case of a
2
partnership firm, the partners for the time being and from time to time
constituting the firm, and the survivors or survivor of them, and the
heirs, executors and administrators of the last survivor of them and
their, his or her permitted assigns / in the case of a trust, the trustees
for the time being and from time to time of the trust, and the survivors
or survivor of them, and the heirs, executors and administrators of the
last survivor of them and their, his or her permitted assigns) of THE
SECOND PART.
WHEREAS
WHEREAS:
A. Original Owner MR. ANIL RAMCHANDRA KANADE sold Plot no.
6, admeasuring approx. 0.11.64 Gunthas to MR. VISHWANATH
CHINTAMAN VAIDYA and MR. KRUSHNA BUDHAJI MESTRY
jointly vide REGISTERED DEED OF CONVEYANCE dated
25/06/1965. Accordingly, the said land was mutated in the name
of the said purchasers MR. VISHWANATH CHINTAMAN VAIDYA
and MR. KRUSHNA BUDHAJI MESTRY vide Mutation Entry
no. 1518 in the revenue records of Village Palghar.
3
B. Thereafter, the said original plot no. 6 was equally divided into
two smaller plots vide an Order from the Collector, dated
2/1/1995 bearing order no.
MAHSUL/K-1/T-2/BINSHETI/KAVI/1301 and accordingly as
per the order of Collector, the said Plot was sub-divided and the
name of MR. KRUSHNA BUDHAJI MESTRY and MR.
VISHWANATH CHINTAMAN VAIDYA were mutated singly
against Plot No. 6/A and 6/B respectively in the revenue records
vide Mutation Entry no. 3595, dated 22-8-1995 approved by the
circle officer on 19-9-1995.
C. Shree Vajreshwari Developers through its Partners 1. MR.
SACHIN SUBODH MOHILE, 2. MR. NITIN BHUVANESHWAR
TANDEL, 3. MR. SUNIL GAJANAN CHITRE and 4. MR.
BHUVANESHWAR BALKRISHNA TANDEL purchased the Said
land of 6/A from MR. KRUSHNA BUDHAJI MESTRY, Vide
Registered Deed of Conveyanc,e bearing PLR- 1275/2002,
dated 20/08/2002. Accordingly, the said Plot No. 6A was
mutated in the name of the purchasers vide Mutation Entry no.
4246 dated 21-8-2002.
D. Shree Vajreshwari Developers through its Partners 1. MR.
SACHIN SUBODH MOHILE, 2. MR. NITIN BHUVANESHWAR
TANDEL, 3. MR. SUNIL GAJANAN CHITRE and 4. MR.
BHUVANESHWAR BALKRISHNA TANDEL also purchased the
adjacent land of 6/B from MR. VISHWANATH CHINTAMAN
VAIDYA, vide Registered Deed of Conveyance bearing PLR-
551/2003, dated 13/03/2003. Accordingly, the said Plot No. 6B
was mutated in the name of the purchasers vide Mutation Entry
4
AND WHEREAS
AND WHEREAS
AND WHEREAS
AND WHEREAS
AND WHEREAS
The Allottee has applied to the Promoters for allotment of a Flat
No._____, in the Building named as “DECENT EVOQ” on ____ Floor,
in the “said Building” being constructed in the said Project.
AND WHEREAS
The Rera Carpet area of the said Flat admeasuring _______ sq. ft.
(i.e. _____ sq. mtrs.) ,an enclosed open balcony area adm.
_______sq. ft. (i.e. _____ sq. mtrs.), an enclosed Dry balcony area
adm. _______sq. ft. and an enclosed open Terrace area adm.
_______sq. ft. as defined under The Real Estate(Regulation and
Development) Act,2016 (hereinafter referred to as “said Act”) on the
______ floor, of Building Type ‘A’ of the said Building named “DECENT
EVOQ” being constructed by the Owner / Developer on the said Property
(hereinafter referred to as “said Flat”) together with/without car parking
space under stilt bearing no._______admeasuring _________Sq. mtr i.e.
_____sq. ft.The "carpet area” means the net usable floor area of an
Flat, excluding the area covered by the external walls, areas
under services shafts, exclusive of balcony appurtenant to the
said Flat for exclusive use of the Allottee or veranda area and
exclusive open terrace area appurtenant to the said Flat for
exclusive use of the Allottee, but includes the area covered by the
internal partition walls of the Flat.
9
AND WHEREAS
AND WHEREAS
Under section 13 of the said Act the Promoter is required to
execute a written Agreement for sale of said Flat with the Allottee,
being in fact these presents and also to register said Agreement under
the Registration Act, 1908.
TOTAL 100%
1(d) The time for payment of aforesaid amounts is the essence of the
contract. The Owner/Developer on due date or on reaching aforesaid
construction milestone/stage will forward to the Purchaser/s
intimation of the Owner/Developer having carried out the aforesaid
work at the address given by the Purchaser/s in this Agreement or by
Email and the Purchaser/s will be bound to pay the amount of
instalments within seven days of Owner/Developer dispatching such
intimation Under Certificate of Posting/Email/SMS/WhatsApp at the
address of the Purchaser/s or on mobile number as given in these
presents or on receiving such email from the Owner. The
Owner/Developer will keep Certificate of their Architects certifying
that the Owner/Developer has carried out given item of work and
such certificate will be open for inspection by the Purchaser/s at the
office of the Owner/Developer and such certificate shall be valid
and binding upon the Purchaser/s and the Purchaser/s agree not to
dispute the same.
2(e) The Total Price above excludes all expenses of stamp duty and
registration fees, any other incidental and applicable Indirect Tax
etc. also excludes GST which will have to be paid by the
Purchaser/s to the promoter or concerned authority separately.
2.1 The Promoters hereby agree to observe, perform and comply with
all the terms, conditions, stipulations and restrictions if any,
which may have been imposed by the concerned local authority
at the time of sanctioning the said plans or thereafter and shall,
before handing over possession of the Flat to the Allottee, obtain
from the concerned local authority occupancy and/or completion
certificates in respect of the Flat.
2.2 Time is essence for the Promoters as well as the Allottee. The
Promoter shall abide by the time schedule for completing the
project and handing over the [Flat] to the Allottee and the
common areas to the association of the allottees after receiving
the occupancy certificate or the completion certificate or both, as
the case may be. Similarly, the Allottee shall make timely
payments of the instalment and other dues payable by him/her
and meeting the other obligations under the Agreement subject
to the simultaneous completion of construction by the Promoter
as provided in clause 1 (c) herein above. (“Payment Plan”).
4.1 If the Promoter fails to abide by the time schedule for completing
the project and handing over the [Flat] to the Allottee, the
Promoter agrees to pay to the Allottee, who does not intend to
withdraw from the project, MLCR+2% of interest, on all the
amounts paid by the Allottee, for every month of delay, till the
handing over of the possession. The Allottee agrees to pay to the
Promoter, MLCR+2% of interest , on all the delayed payment
which become due and payable by the Allottee to the Promoter
under the terms of this Agreement from the date the said amount
is payable by the allottee to the Promoters.
5. The fixtures and fittings with regard to the flooring and sanitary
fittings' specifications to be provided by the Promoter in the said
building and the Flat as are set out in Annexure 'E', annexed
hereto.
the date the Promoter received the sum till the date the amounts
and interest thereon is repaid.
Agreement; or.
delay in sanction of building plans or further permissions
or grant of any NOC/permission/license/connection by
the Concerned authorities
extention of time for giving possession may be permitted
by the Regulatory Authority under the Real Estate
(Regulation and Development) Act 2016 due to such
circumstances as may be decided by the Regulatory
Authority.
7.2 The Allottee shall take possession of the Flat within 15days of the
written notice from the promoter to the Allottee intimating that
the said Flats are ready for use and occupancy:
7.4 If within a period of five years from the date of handing over the
Flat to the Allottee, the Allottee brings to the notice of the
Promoter any structural defect in the Flat or the building in
which the Flat are situated or any defects on account of
workmanship, quality or provision of service, then, wherever
possible such defects shall be rectified by the
PROMOTER/OWNER at their own costs and expenses and in
case it is not possible to rectify such defects, then the Allottee
shall be entitled to receive from the PROMOTER/OWNER,
compensation for such defects in the manner as provided under
the Act.
9. The Allottee shall use the Flat or any part thereof or permit the
same to be used only for purpose of residence.
23
10. The Allottee along with other Allottee(s) of Flats in the building
shall join in forming and registering the Society or Association or
a Limited Company to be known by such name as the Promoter
may decide and for this purpose also from time to time sign and
execute the application for registration and/or membership and
the other papers and documents necessary for the formation and
registration of the Society or Association or Limited Company
and for becoming a member, including the bye-laws of the
proposed Society and duly fill in, sign and return to the Promoter
within seven days of the same being forwarded by the Promoter
to the Allottee, so as to enable the Promoter to register the
common organisation of Allottee. No objection shall be taken by
the Allottee if any, changes or modifications are made in the draft
bye-laws, or the Memorandum and/or Articles of Association, as
may be required by the Registrar of Co-operative Societies or the
Registrar of Companies, as the case may be, or any other
Competent Authority.
12. In case there shall be deficit in this regard, the Purchaser shall
forthwith on demand pay to Builders his proportionate share to
make up such deficit.
13 . The Allottee shall to the Owners/Promoters being contribution
towards corpus fund to be created for maintenance of the Building.
The promoter/Owner shall deposit this amount along with the
amount so required from the other allottee into a separate Bank
account to be opened by the promoter for building maintenance
corpus and building maintenance charges and such Bank account
shall be certified by the chartered accountant showing the annual
expenses from such bank account ensuring that the money has
26
iii. There are no encumbrances upon the project land or the Project
except those disclosed in the title report;
iv. There are no litigations pending before any Court of law with
respect to the project land or Project except those disclosed in
the title report;
v. All approvals, licenses and permits issued by the competent
authorities with respect to the Project, project land and said
building/wing are valid and subsisting and have been obtained
by following due process of law. Further, all approvals, licenses
and permits to be issued by the competent authorities with
respect to the Project, project land and said building/wing shall
be obtained by following due process of law and the Promoter has
been and shall, at all times, remain to be in compliance with all
applicable laws in relation to the Project, project land,
Building/wing and common areas;
vi. The Promoter has the right to enter into this Agreement and has
not committed or omitted to perform any act or thing, whereby
the right, title and interest of the Allottee created herein, may
prejudicially be affected;
vii. The Promoter has not entered into any agreement for sale and/or
development agreement or any other agreement / arrangement
28
ii. Not to store in the Flat any goods which are of hazardous,
combustible or dangerous nature or are so heavy as to damage
the construction or structure of the building in which the Flat is
situated or storing of which goods is objected to by the concerned
local or other authority and shall take care while carrying heavy
packages which may damage or likely to damage the staircases,
common passages or any other structure of the building in which
the Flat is situated, including entrances of the building in which
the Flat is situated and in case any damage is caused to the
building in which the Flat is situated or the Flat on account of
negligence or default of the Allottee in this behalf, the Allottee
shall be liable for the consequences of the breach.
iii. To carry out at his own cost all internal repairs to the said Flat
and maintain the Flat in the same condition, state and order in
which it was delivered by the Promoter to the Allottee and shall
not do or suffer to be done anything in or to the building in
which the Flat is situated or the Flat which may be contrary to
the rules and regulations and bye-laws of the concerned local
authority or other public authority. In the event of the Allottee
committing any act in contravention of the above provision, the
Allottee shall be responsible and liable for the consequences
30
x. The Allottee shall observe and perform all the rules and
regulations which the Society or the Limited Company or Apex
Body or Federation may adopt at its inception and the additions,
alterations or amendments thereof that may be made from time
to time for protection and maintenance of the said building and
the Flats therein and for the observance and performance of the
Building Rules, Regulations and Bye-laws for the time being of
the concerned local authority and of Government and other
public bodies. The Allottee shall also observe and perform all the
stipulations and conditions laid down by the Society/Limited
Company/Apex Body/Federation regarding the occupancy and
use of the Flat in the Building and shall pay and contribute
regularly and punctually towards the taxes, expenses or other
out-goings in accordance with the terms of this Agreement.
32
2) KAMLESH PATEL
It shall be the duty of the Allottee and the promoter to inform each
other of any change in address subsequent to the execution of this
Agreement in the above address by Registered Post failing which all
communications and letters posted at the above address shall be
deemed to have been received by the promoter or the Allottee, as the
case may be.
33.GOVERNING LAW
That the rights and obligations of the parties under or arising out of
this Agreement shall be construed and enforced in accordance with the
laws of India for the time being in force and the Palghar Courts will
have the jurisdiction for this Agreement
ON OR TOWARDS EAST :
ON OR TOWARDS WEST :
ON OR TOWARDS NORTH :
ON OR TOWARDS SOUTH :
Photograph
in the presence of . . . . . .
1.
2.
2.
Photograph
SCHEDULE “A”
Apartment No. _____ having area ______ sq. ft. (i.e. _____ sq. mtrs.)
an enclosed open balcony area adm. _______sq. ft. (i.e. _____ sq. mtrs.),
an enclosed Dry balcony area adm. _______sq. ft. and an enclosed open
Terrace area adm. _______sq. ft. known as “DECENT EVOQ” on the
Project Land described in the First schedule mentioned hereinabove.
SCHEDULE “B”
FLOOR PLAN OF THE FLAT (Enclosed)
ANNEXURE – A (Enclosed)
Title Report
Details of the Title Report
ANNEXURE –B (Enclosed)
(Authenticated copies of Property Card or extract Village Forms VI or
VII and XII or any other revenue record showing nature of the title of
the Vendor/Lessor/Original Owner/Promoter to the project land).
43
ANNEXURE –C (Enclosed)
(Copy of Mutation entries )
ANNEXURE –C-1
(Layout Plan of the project & Authenticated copy of the plan of the Building
‘DECENT EVOQ’ approved by the concerned local authority)
ANNEXURE –D
AMENITIES
Note: the purchasers/allotee can install safety grill at their own cost and risk
having common design and depth as fixed by the owners/developers/promoters.
ANNEXURE - D
(Authenticated copy of the Registration Certificate of the Project granted by the Real
Estate Regulatory Authority)
ANNEXURE – E
44
(NOT APPLICABLE)
RECEIPT
Received `. _______/-
PROMOTER/OWNER
DECENT EVOQ, A PARTNERSHIP FIRM HAVING
THROUGH PARTNERS
1. FANIL SHAH
2. KAMLESH PATEL