Label Elevation Zone Type Base Flow Pattern Demand Calculated Pressure
(m) (l/s) (Calculated)Hydraulic Grade(m H2O)
(l/s) (m)
J-1 4,328.00 Zone Demand 0.00 Fixed 0.00 4,333.73 5.7
J-2 4,320.00 Zone Demand 0.00 Fixed 0.00 4,333.65 13.6
J-3 4,315.50 Zone Demand 0.00 Fixed 0.00 4,333.59 18.1
J-4 4,318.94 Zone Demand 0.00 Fixed 0.00 4,333.53 14.6
J-5 4,326.00 Zone Demand 0.00 Fixed 0.00 4,333.45 7.5
J-6 4,330.56 Zone Demand 3.00 Fixed 3.00 4,333.38 2.8
J-7 4,300.93 Zone Demand 0.00 Fixed 0.00 4,322.71 21.8
J-8 4,283.15 Zone Demand 0.00 Fixed 0.00 4,322.03 38.9
J-9 4,290.20 Zone Demand 0.00 Fixed 0.00 4,321.80 31.6
J-10 4,298.00 Zone Demand 0.00 Fixed 0.00 4,321.58 23.6
J-11 4,304.90 Zone Demand 0.00 Fixed 0.00 4,321.33 16.4
J-12 4,305.30 Zone Demand 0.00 Fixed 0.00 4,320.97 15.7
J-13 4,314.85 Zone Demand 0.00 Fixed 0.00 4,320.39 5.5
CAMARA
4,318.50
DE SALIDA
Zone Demand 25.00 Fixed 25.00 4,319.64 1.1
J-15 4,316.50 Zone Demand 0.00 Fixed 0.00 4,316.30 -0.2
J-16 4,315.00 Zone Demand 0.00 Fixed 0.00 4,316.00 1.0
J-17 4,313.00 Zone Demand 0.00 Fixed 0.00 4,315.85 2.9
J-18 4,312.30 Zone Demand 0.00 Fixed 0.00 4,315.75 3.5
J-19 4,311.00 Zone Demand 0.00 Fixed 0.00 4,315.58 4.6
J-20 4,310.00 Zone Demand 0.00 Fixed 0.00 4,315.50 5.5
J-21 4,309.20 Zone Demand 0.00 Fixed 0.00 4,315.41 6.2
J-22 4,305.80 Zone Demand 0.00 Fixed 0.00 4,315.22 9.4
J-23 4,305.20 Zone Demand 0.00 Fixed 0.00 4,315.08 9.9
J-24 4,302.50 Zone Demand 0.50 Fixed 0.50 4,312.80 10.3
J-25 4,297.00 Zone Demand 0.00 Fixed 0.00 4,315.43 18.4
J-26 4,293.20 Zone Demand 0.00 Fixed 0.00 4,315.32 22.1
J-27 4,287.50 Zone Demand 0.00 Fixed 0.00 4,315.26 27.8
J-28 4,285.00 Zone Demand 0.00 Fixed 0.00 4,315.06 30.1
J-29 4,287.00 Zone Demand 0.50 Fixed 0.50 4,311.80 24.8
J-30 4,291.50 Zone Demand 0.00 Fixed 0.00 4,314.83 23.3
J-31 4,291.50 Zone Demand 0.50 Fixed 0.50 4,313.02 21.5
J-32 4,285.00 Zone Demand 0.00 Fixed 0.00 4,314.94 29.9
J-33 4,292.60 Zone Demand 0.50 Fixed 0.50 4,311.62 19.0
J-34 4,318.00 Zone Demand 0.00 Fixed 0.00 4,318.00 0.0
J-35 4,317.00 Zone Demand 0.00 Fixed 0.00 4,317.82 0.8
J-36 4,317.00 Zone Demand 0.00 Fixed 0.00 4,317.63 0.6
J-37 4,316.00 Zone Demand 0.00 Fixed 0.00 4,317.30 1.3
J-38 4,310.00 Zone Demand 0.00 Fixed 0.00 4,316.92 6.9
J-39 4,289.50 Zone Demand 0.00 Fixed 0.00 4,316.06 26.6
J-40 4,290.00 Zone Demand 5.00 Fixed 5.00 4,315.36 25.4
J-41 4,285.00 Zone Demand 0.50 Fixed 0.50 4,314.12 29.1
J-42 4,280.00 Zone Demand 0.50 Fixed 0.50 4,313.37 33.4
J-43 4,281.80 Zone Demand 0.50 Fixed 0.50 4,313.15 31.3
J-44 4,311.80 Zone Demand 0.50 Fixed 0.50 4,315.06 3.3
J-45 4,309.00 Zone Demand 0.50 Fixed 0.50 4,314.75 5.8
J-46 4,306.00 Zone Demand 0.50 Fixed 0.50 4,314.03 8.0
J-47 4,304.60 Zone Demand 0.50 Fixed 0.50 4,314.58 10.0
J-48 4,300.00 Zone Demand 0.50 Fixed 0.50 4,313.48 13.5
J-49 4,291.80 Zone Demand 0.50 Fixed 0.50 4,314.67 22.9
J-50 4,291.00 Zone Demand 0.50 Fixed 0.50 4,313.78 22.8
J-51 4,235.00 Zone Demand 0.00 Fixed 0.00 4,286.37 51.4
J-52 4,227.20 Zone Demand 0.00 Fixed 0.00 4,285.59 58.4
J-53 4,205.00 Zone Demand 0.00 Fixed 0.00 4,276.74 71.7
J-54 4,186.00 Zone Demand 0.50 Fixed 0.50 4,256.41 70.4

Title: achahui Project Engineer:


d:\...\memoria de calculos\presiones achahui.wcd ColdFever WaterCAD v7.0 [07.00.027.00]
11/06/12 09:58:48 a.m. © Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1 of 2
Scenario: Base
Steady State Analysis
Junction Report

Label Elevation Zone Type Base Flow Pattern Demand Calculated Pressure
(m) (l/s) (Calculated)Hydraulic Grade(m H2O)
(l/s) (m)
J-55 4,265.00 Zone Demand 0.00 Fixed 0.00 4,289.51 24.5
J-56 4,256.00 Zone Demand 0.50 Fixed 0.50 4,287.80 31.8
J-57 4,235.00 Zone Demand 0.50 Fixed 0.50 4,285.23 50.2
J-58 4,228.50 Zone Demand 0.50 Fixed 0.50 4,284.36 55.9
J-59 4,266.80 Zone Demand 0.00 Fixed 0.00 4,289.40 22.6
J-60 4,245.00 Zone Demand 0.00 Fixed 0.00 4,287.77 42.8
J-61 4,224.00 Zone Demand 0.00 Fixed 0.00 4,286.61 62.6
J-62 4,222.00 Zone Demand 0.50 Fixed 0.50 4,284.26 62.3
J-64 4,223.50 Zone Demand 0.50 Fixed 0.50 4,283.16 59.7
J-65 4,266.20 Zone Demand 0.00 Fixed 0.00 4,289.39 23.2
J-66 4,266.00 Zone Demand 0.50 Fixed 0.50 4,287.34 21.3
J-67 4,264.00 Zone Demand 0.50 Fixed 0.50 4,289.39 25.4
J-68 4,245.00 Zone Demand 0.50 Fixed 0.50 4,286.40 41.4
J-70 4,280.00 Zone Demand 0.00 Fixed 0.00 4,289.79 9.8
J-71 4,270.00 Zone Demand 0.00 Fixed 0.00 4,289.32 19.3
J-72 4,265.00 Zone Demand 0.00 Fixed 0.00 4,288.30 23.3
J-73 4,250.00 Zone Demand 0.50 Fixed 0.50 4,284.23 34.2
J-74 4,260.00 Zone Demand 0.50 Fixed 0.50 4,286.74 26.7
J-75 4,263.00 Zone Demand 0.50 Fixed 0.50 4,288.07 25.1
J-76 4,316.00 Zone Demand 0.00 Fixed 0.00 4,316.65 0.6
J-77 4,315.50 Zone Demand 0.00 Fixed 0.00 4,316.55 1.1
J-78 4,315.00 Zone Demand 0.00 Fixed 0.00 4,316.33 1.3
J-79 4,312.00 Zone Demand 0.00 Fixed 0.00 4,315.80 3.8
J-80 4,310.00 Zone Demand 0.00 Fixed 0.00 4,312.56 2.6
J-81 4,305.00 Zone Demand 0.00 Fixed 0.00 4,312.08 7.1
J-82 4,297.00 Zone Demand 0.50 Fixed 0.50 4,310.89 13.9
J-83 4,305.50 Zone Demand 0.50 Fixed 0.50 4,310.02 4.5
J-84 4,297.00 Zone Demand 0.50 Fixed 0.50 4,308.76 11.8
J-85 4,302.00 Zone Demand 0.50 Fixed 0.50 4,313.66 11.7
J-86 4,307.00 Zone Demand 0.50 Fixed 0.50 4,314.54 7.5
J-87 4,301.00 Zone Demand 0.50 Fixed 0.50 4,312.02 11.0

Title: achahui Project Engineer:


d:\...\memoria de calculos\presiones achahui.wcd ColdFever WaterCAD v7.0 [07.00.027.00]
11/06/12 09:58:48 a.m. © Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 2 of 2