Professional Documents
Culture Documents
5. Hydran
Inlet
7. P3K
Kolam 1
(Kolam
Pendingin) Titik kemungkinan terjadinya kebakaran
WC
8.
T. Bakar
2
T. Bakar
3
T. Bakar
9. Titik kemungkinan terjadinya tumpahan OLI
Kolam
Komposting 1
Sortase
Rcycle
Transfer Cariage
St.
Bunch
10. Tong Sampah
Up
Up
Kantor
Press Sortase
Conveyor Fiber
KCB
11. Plang Kebijakan Mutu
Sand Trap Tank
Thresser
Drum
e
Drum
l Under Thresser
Bunch Elevator Tipler
Conveyor tank
Kolam Calsium
S Blow Down
i
Thresser
Drum
13. Exit
St. Boiler St. Nut & Kernel St. Pressing St. Thressing
Feed
P
A
N
GENSET
OilTank o
v
14.
E Tank CST e
Tank L
Solid
Reclamed 1 r
OilTank
y
TURBIN
Clean Ran
KSB S
Water Tank Water Tank
Fuel
Diesel Fat Fit
e
p
Despatch 15. Tower Security
a
tank
r
Transfer Cariage
a
t
P o
a r
16. Assembly Point / Titik Evakuasi
Sand Filter
r
k
Proses WC WC
WTP
17. Aliran Drain Pabrik
G.Barang Water Basin
G.LB3 G.Besi
Bekas Tua
MTC
W
a
Workshop
r
18. Pagar
e Clarifier
h Tank
o
Area Workshop u
Workshop
MTC
s
19. Acrilic APD
WC e
Gudang
Kalsium
Gudang
Arsip
Ruang
Pantry
Weighbridge
Finance
Sekretariat
Receptionis
GuestRoom
Superitendent Mushola
Baitul Muslimin
Parkiran
Motor
BARAK
Main
Parkiran Office Transport
Mess Mess Mess Kantin POS 2
Kebun Mobil
DMOM DMM Direksi MAS Security
Sayur Rumah
Datuk
A2-1
M2-14 M2-12 M2-11 M2-10 M2-9 M2-8 M2-7 M2-6 M2-5 M2-3 M2-2 M2-1 A2-2 A2-3 A2-5 A2-6 A2-7 A2-8 A2-9 A2-10 A2-11 A2-12 A2-14 A2-15 A2-16 A2-17 A2-18 A2-19 A-20 A2-21 A2-22
(Koperasi)
M1-9 M1-8 M1-7 M1-6 M1-5 M1-3 M1-2 M1-1 A1-1 A1-2 A1-3 A1-5 A1-6 A1-7 A1-8 A1-9 A1-10 A1-11 A1-12 A1-14 A1-15 A1-16 A1-17 A1-18 A1-19 A1-20 A1-21 A1-22
Water Intake
WADUK WADUK
POS 1
Security
WC Water Intake