You are on page 1of 2

QUANTITY IN QUANTITY

S.L NO LOCATION ITEM DESCRIPTION (REQUIRED) UNIT IN(CONTRACT)


1 BUILDINGS P.D 4CX16 SQ.MM(YWY) CABLE 165 MTR 50
2 UPS2 2CX6SQ.MM (YY) CABLE 90 MTR 140
3 UPS1 3.5CX25 SQ.MM(A2XFY) CABLE 60 MTR 30
4 BUILDINGS M.L 4CX6SQ.MM (YWY) 700 MTR 80
5 BUILDINGS M.L 4CX10SQ .MM(YWY) 235 MTR 120
6 BUILDINGS .P.D 4CX10SQ .MM(2XY) 155 MTR 100
7 BUILDINGS .INV 4CX6SQ.MM (2XY) 55 MTR 120
8 UPS ROOM. 4CX4SQ.MM (YWY) 15 MTR 80
9 BOOTH 3CX2.5SQ.MM(YY) 270 MTR 200
10 BOOTH 3CX6SQ.MM(YY) 378 MTR 100
11 BOOTH 3CX6SQ.MM(2XY) 65 MTR 0
12 BOOTH 3CX4SQ.MM(2XY) 460 MTR 380
13 CANOPY 3CX1.5SQ.MM(YY) 230 MTR 0
14 PANNEL 3.5CX150 SQ.MM(A2XFY) 70 MTR 60
15 D.G1 3.5CX185 SQ.MM(A2XFY) 35 MTR 25
16 D.G2 3.5CX70 SQ.MM (A2XFY) 35 MTR 25
17 HIGHMAST 4CX16SQMM(A2XFY) 1080 MTR 560

REMARKS:- IN THIS DEVIATED LOCATION NOT JUSTIFY 100% TO GIVEN LOCATION ,ACTUALLY IT CHANGES AS PE
TOTAL DEVIATION DEVIATION DEVIATION
UNIT QUANTITY RATE AMOUNT
MTR (+)115 730 83,950.00
MTR (-)50 190 9,500.00
MTR (+)30 190 5,700.00
MTR (+)620 350 217,000.00
MTR (+)115 495 56,925.00
MTR (+)55 495 27,225.00
MTR (-)65 350 22,750.00
MTR (-)65 240 15,600.00
MTR (+)70 140 9,800.00
MTR (+)278 260 72,280.00
MTR (+)65 260 16,900.00
MTR (+)80 220 17,600.00
MTR 0 0 0.00
MTR (+)10 779 7,790.00
MTR (+)10 950 9,500.00
MTR (+)10 430 4,300.00
MTR (+)520 170 88,400.00
TOTAL= 665,220.00
MINUS NEGATIVE DEVIATION = 85,650.00
TOTAL DEVIATION = 579,570.00
CTUALLY IT CHANGES AS PER THR NEED OF REQUIREMENTS IN THIS WORK