MONTHALY
WORKING
SL. NO. DESCRIPTION UNIT RENT/LABOUR
DAYS
RATE
2
FARANA 15 TON NOS 85,000.00 30
INSDUSTRIAL SOCKET
11 SET
(MALE-FEMALE)
12 PETROL 100.00
13 DIESEL 95.50
TOTAL
I WORK P-WAY
50 1,950,000.00 1 5009
40 1,040,000.00 2 5007
200 3,900,000.00 3 5007
6,890,000.00 4 NS
NI WORK S&T 5 5026a
20 390,000.00 6 5026b
NI WORK OHE 7 5026c
90 1,755,000.00 8 5026d
ALL TEAMS MEMBERS
1200 2 180,000.00
2 39811
1200 2 170,000.00
21002
720 3 330,000.00 2 NS(EPB)-9
3 19003
5 NS(EPB)-2
480 2 24,000.00
10 25,000.00
350 2,100,000.00
300 13,500.00
20 3,000.00
480 48,000.00
6120 584,460.00
13,272,960.00
REVENUE PLAN IN NI P-WAY
PROVISION OF TEMPORARY
GOOMTIES FOR NI WORKING
INCLUDING PROVISION OF
PUBLIC ADDRESS SYSTEM GOOMTY/
6000 12 72000.00
COMPLETE WITH MICRO DAYS
PHONES,SPECKERS ETC. IN
THE YARD DURING NON
INTERLOCKING.
INSTALLTION,
TERMINATION,WIRING,TESTI
NG & COMMISSIONING OG
NOS 12000 17 204000
POINT MACHINES INCLUDING
SUPPLY OF WIRE, GI BEND
Supply and Erection ofSETS
PIPE, INSULATION Over Head
ETC.
Equipment i.e. contact & catenary
wire (excluding TOTAL
cost of supply of contact &
REVENUE PLAN IN NI OHE
catenary wires), jumper wire,
dropper wire,
contact/catenary clips, fasteners
and all other material required at TKM Rs. 60,537.28 4 242149.12
turn
out/overlaps/diamond crossings etc.
Final checking of OHE and
Supply and erection
adjustment, of section
inspection
insulator assembly and
to be done by tower wagonassociated
for
fittings & (a) With
commissioning Porcelain
of conventional EACH Rs. 5,444.35 4 21777.40
Insulators 1050mm CD and Bar
OHE.-ERECTION
Insulator
Erection of Over Head Equipment
i.e. contact & catenary wire
(excluding cost of supply of
contact & catenary wires), jumper
wire, dropper wire,
TKM 100227.28 4 400909.12
contact/catenary clips, fasteners
and all other material required at
turn out/overlaps/diamond
crossings etc. for commissioning of
conventional OHE.
0 72000.00
0 204000.00
Rs. 276,000.00
0 242149.12
0 21777.40
0 400909.12
0 404808.80
0 667966.64
0 6536.24
Rs. 1,744,147.32
Rs. 6,352,422.08
MANPOWER REQUIRED DURING NI Up to Commissioning
WIREMAN FITTER BOLERO PICKUP Labour Fooding(Lunch & Dinner)
150
50 Ltr
5 nos Rassa
p to Commissioning
Per Day(Breakfast/Lunch/Dinner)
60
30
30
45
165