You are on page 1of 9

Measuremet sheet

10

Line Item
No
10

20
30

40

50

60
70

80

90
100
110
120

130

140
150
160
170
180

190

200
210
220

230
240
250
260
270
280

290
300

310

320
330
370

380

390
400

410

420
430

440

450
460
470

480
490
500
510
520
530
540
550
560
570
580
590
600
610
620

630
640
650

660
670
680
690
700
Measuremet sheet

Name of the work :-ARC for providing support in Maintenance of T&I Facilities at WRPL Mundra for two years.

Name of the contractor : -M/s Shubham Enterprises


LOA/Work Order No :-12028625 dated 20.01.2023
RA Bill No :- 3rd RA bill
Date of measurement : 05.10.2023 (Period of work: 01.06.2023 to 31.07.2023) MB No./Sheet No- 3

Quantities Amounts

Line Item
Item Description UOM Item Cost This Bill (RA Bill-03) This bill
No

10 ARC T&I facilities at WRPL, Mundra


10 Supply of Pressure Indicators (-1) to 5 EA 4,660.40 2 ₹ 9,320.80
30 Supply of Pressure Indicators 0 to 20 EA 4,805.26 3 ₹ 14,415.78
40 Supply of Pressure Indicators 0 to 40 EA 5,686.08 1 ₹ 5,686.08
50 Supply of Pressure Indicatorse 0 to100 EA 4,961.94 3 ₹ 14,885.82
130 SUPPLY-PLUGS 1" Plugs EA 74.44 10 ₹ 744.40
180 SUPPLY -CABLE Cat 6 UTP (LAN) SET 24.28 125 ₹ 3,035.00
190 SUPPLY-Power cable 3x2.5 mm2 Armoured M 111.48 100 ₹ 11,148.00
300 CABLING having outer diameter upto 20mm M 75.35 140 ₹ 10,549.00
310 Cables having OD b/w 20 to 30 mm M 85.68 160 ₹ 13,708.80
370 Providing hydraulic crane Service H 668.29 25 ₹ 16,707.25
380 SAND SUPPLY & FILLING : sand padding CUM 867.15 19.25 ₹ 16,692.64
390 BRICK SOLING : supply & laying of bricks SQM 899.14 28 ₹ 25,175.92
400 CABLE TRENCH:Excavation in unpaved area CUM 674.08 52.5 ₹ 35,389.20
410 WBM ROAD/CONCRETE BREAKING: CUM 4,591.11 3 ₹ 13,773.33
420 INSTALLATION OF PT / PS EA 9,679.18 7 ₹ 67,754.26
430 STEEL STRUCTURAL WORKS:Supply, fabricati KG 155.96 200 ₹ 31,192.00
440 INSTALLATION OF JUNCTION BOX EA 5,768.00 1 ₹ 5,768.00
470 CONDUIT 37 mm GI CONDUITS M 632.38 10 ₹ 6,323.80
490 Cable TRAY Supply, installation & fixing KG 188.78 200 ₹ 37,756.00
510 EARTHING 25 mm X 3 mm Copper flat M 660.44 20 ₹ 13,208.80
530 EARTHING GI Wire / GI Rope ( 8 SWG ) M 64.96 150 ₹ 9,744.00
570 1:2:4 [1 cement : 2 coarse sand (Zone-II CUM 7,469.54 3 ₹ 22,408.62
620 Lettering with black Japan paint EA 5.16 2000 ₹ 10,320.00
650 Painting Steel work SQM 138.41 50 ₹ 6,920.50
670 Two or more coats on new work SQM 123.51 5 ₹ 617.55
710 Upto 3 / 3.5 / 4 x 6 sqmm EA 1,468.65 3 ₹ 4,405.95
20 Fixed: Labour
10 Assistance to T&I Maintenance EA 1,016.24 20 0 ###₹ 0.00 ₹ 20,324.80
20 Assistance to T&I Maintenance activities EA 870.27 10 0 ###₹ 0.00 ₹ 8,702.70
30 Labour rate escalation factor EA 28.42 36.5 36.5 0 ###₹ 0.00 ₹ 1,037.33 0
Total Value of work done 0.00 ₹ 437,716.33
Total Value of work done after Discount @ 23.77% as per LOA 0.00 ₹ 333,671.16
GST @18% 0.00 ₹ 60,060.81
Total Value of work done after Discountand GST @18% 0.00 ₹ 393,731.96
Less value of work as per previous bills ( K)
Total Value of work done (F) in this bill