00 01 of 01 NG1281ET-923629 A

NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

TS OW NER.
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
NOTED.

2. TOTAL NOs. BORE HOLES. = 5


NARIYAH NARIYAH TOTAL NOs. OF THERMAL RESISTIVITY. = 4
NORTH BSP NORTH BSP SARAR-2 SARAR-2 TOTAL NOs. OF ELECTRICAL RESISTIVITY. = 5

TTEN CONSENT OF I
3. CONTRACTOR SHALL REFER TO THE SOIL INVESTIGATION
REPORT FOR THE EXACT LOACATION AND NUMBER OF
BOREHOLES AND THERMAL RESISTIVITY TEST.

MWC MSC
D COR-1

THOUT THE W RI
A
O
R

EXTERNAL CUSTOM ER
SS BH-05 ER-01 COR-2

5000
AREA
E

8000
| OF SA
C PARKING
C
A

TELECOM

10000
T E | OF STEEL
L D
A WI
MONOPOLE GANTRY

H
SP M

S DOCUMENT W I
A .0 FENCE TYPE-V
RELOCATED COMMUNICATION
LEGEND
D 5 TOWER

SE
6000
O TR - THERMAL RESISTIVITY
P
O 10000
R
P BH - BOREHOLE

ED

ED
RECT BURI

RECT BURI
ER - ELECTRICAL RESISTIVITY

TS (6x2)

TS (6x2)

THI
8kV PVC DI

8kV PVC DI
CONDUI

CONDUI
PANEL
CONTROL
LOCAL

DUCTBANK
CONTROL CABLE

NED FROM
TR-01

13.

13.
FUTURE

EL.
TOC
- 1.

T-601

CDP-1
30
PACU-1A

PACU-1B
TO EXTERNAL NETWORK
TR-04

N PART SHALL BE OBTAI


DEPTH IN METERS
BOREHOLES

REFER DRAWI
T/F OUTLI
8M 10M 12M 15M
HVAC POWER SMH-1 SEPTIC TANK

NG
NE
LSCD

SEEPAGE PIT

OWS OWS EWS


BH-01

2200
BATTERY AREA

F
P
TOILET
BH-02

SP
CONTROL ROOM

L
RMP RMP RMP RMP U/V U/F

TDI
FIRE WALL (18.00 x 12.50)

S
3200
BH-03

T
RMP RMP RMP AMR AMR 6BS1 6BC2 6BC16BBCU 6BB6 6BB5 6BB4 6BB3 6BB2 6BB1
BH-03

E
PQM

MRL
BH-04

T
ABTS RTCC3RTCC2RTCC1
ER-05 TR-02

(10.
CLEAN EGENT ROOM
BH-05

5 x 3.
PANEL
CONTROL
LOCAL

UBDC1
115kV GI
(12.
DUCTBANK
CONTROL CABLE

I
F-2 I
BM

18000
00X22.

2)
BH-02

-T3 -T3 -T3 -T2 -T2 -T2


BPP BPP
BC2
S ROOM

F-1 6AP PDM

W ATER TANK
S
EL.

50M)

UBDC2
TOC
- 1.

BC1
T-602

NV
DCDB
30

BPP
SAS

I
NV

57000
BH-01

N FULL OR I
BPP-2BPP-2BPP-2BPP-2BPP-2BPP-2
BPP-1BPP-1BPP-1BPP-1BPP-1BPP-1

S
L

BPP
SAS

-6.

UBAC1
-6.

2L
1L

BPP BPP
SAS

-5.
-5.

2L
1L
SAS

-4.
-4.
ROUGHLY GRADED AREA
ER-04

S
2L
1L

UBAC2
HVAC CONTROL

BPP
SAS

-3.

-T1 -T1 -T1


-3.
1800
(WITHOUT GRAVEL)

2L
1L

BPP
SAS

-2.
-2.
REFER DRAWI

2L
1L
T/F OUTLI

BPP
SAS

-1
-1

.
.

2
1
1200
800 1800 1600 1800 1600 1900
NG
NE

ACDB ACDB

I
3000 3000

3000

ON
2000 WORKSHOP

2000
COMM. ROOM
FIRE WALL

REPRODUCTI
9400

13.8kV PVC DIRECT BURIED


SIS MH
CONDUITS (3x2)
REFERENCE DRAWINGS

100000
EF- 1

NG

NG
VT/BUS
I/C

VT/BUS
SER/
A301

B331

B332

B335
B322

B323

B325
B324
B312

B313

B315

B316

B317

B318

B320

A304
B314

B321
B311

B334
B319

EARTHI
ER-02

B336
B333
EARTHI
NK
SUPPLY-1

BUS
1800

LI

A302
RI
DRAWING TITLE DRAWING NO.
I/C

7500 DRAWING CONTROL SHEET ET- 923628


SWITCHGER ROOM
BH-04
(
FUTURE)

(11X28)M
T-603

SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS- 21EN1004

NO
I/C MH

EARTHI
VT/BUS
T301 T302

RI

ADAP
A305

B340
B351

B341
B361

B360

B354

B344
B364

B363

B362

A303

B338

B337
B356

B355

B353

B352

B343

B342

B339
B358
B359

B357

LI

BUS
SER/
NK

SUPPLY- 2
NG

d SA
EF- 2

13.8kV PVC DIRECT

BURIED FOR CAPACITOR BANK

onalGri
1500

DN

13.8kV PVC DIRECT BURIED PACU-2A CDP-2 PACU-2B


CONDUITS (3x2)

OF Nati
TR-03
13.8kV PVC DIRECT BURIED
MH
CONDUITS (6x2)

4.0M WIDE ROAD (TYP)

N ARE THE SOLE PROPERTY


CURB STONE
(ASPHALT LIMIT)
65000

AS-BUILT BY DATE

NED HEREI
CONTAI
ROUGHLY GRADED AREA
(WITHOUT GRAVEL)
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
ER-03

AND THE I
DRAWN BY MNT CHECKED BY MS SCALE: 1:200
FENCE TYPE-III

DATE STARTED 2021-08-22 DATE COMPLETED 2021-08-24

COR-4 COR-3
OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
100000 CONSTRUCTION OR FOR ORDERING

S DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE 2021-08-30

BOREHOLE LOCATION PLANT

THI
CONSTRUCTING NATA 115/13.8KV GIS S/S-2 IN NATA AREA
NATA SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

A NG1281ET-923629 01 of 01 00
NG-A (2012/01)

NGA00
00 01 of 02 NG1281ET-923630 K
LEGEND NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. PACUs SHALL BE IN ACCORDANCE WITH 73-TMSS-1.

TS OW NER.
PI1 PRESSURE GAUGE FOR COMPRESSOR DISCH. SIDE 2. DESIGN AND INSTALLATION OF HVAC SYSTEM SHALL BE IN
CONFORMANCE WITH TES-K-100.01 & TCS-K-100.01
PI2 PRESSURE GAUGE FOR COMPRESSOR SUCTION SIDE RESPECTIVELY.

3. PACUs SHALL BE COMPLETE WITH FILTER SECTION, FRESH AIR


SD SMOKE DETECTOR INTAKE WITH SAND TRAP LOUVER, COOLING COILS.

TTEN CONSENT OF I
4. PROVIDE VOLUME DAMPERS ON ALL SUPPLY AND RETURN
BRANCHES, DIVISIONS IN MAIN SUPPLY AND RETURN DUCTS
INCLUDING EACH INDIVIDUAL AIR SUPPLY OUTLET AND OUTSIDE
AIR INTAKE DUCTS.

5. A POSITIVE PRESSURE OF APPROXIMATELY 5.0mm. WATER GAGE


SHALL BE MAINTAINED INSIDE THE BUILDING.

6. ELECTRIC DUCT HEATER SHALL BE PROVIDED AT THE MAIN


SUPPLY DUCT OF CONTROL ROOM AND COMMUNICATION ROOM.

MVD VD 7. PROVIDE FIRE DAMPERS OF THE DUCT PASSING THRU WALLS


AND FLOOR.

THOUT THE W RI
RA
8. INDEPENDENT HVAC CONTROL SYSTEM SHALL BE PROVIDED
PACU-1A FOR EACH SET OF PACUs (i.e ONE FOR PACU-1A & 1B,
100% CAPACITY ONE FOR PACU-2A & 2B) AND ONE FOR CABLE BASEMENT.
SA ( DUTY )

9. ALL MAIN SUPPLY AND RETURN DUCT PASSING THRU THE


WALL OUTSIDE THE BUILDING AND WALLS OF THE ROOMS
SA PROTECTED WITH FIRE SUPPRESSION SYSTEM SHALL BE
RA PROVIDED WITH MF/SD.

S DOCUMENT W I
BDD 10. BRANCH DUCTS SERVING GIS ROOM SHALL BE THROUGH THE
PI1 PI2
DOUBLE T SLAB.

MVD 11. LOCATION OF PACUs IS TENTATIVE.


RA
115kV
PACU-2A RA SD
100% CAPACITY SA GIS ROOM SA
SA
( DUTY ) PI1 PI2

THI
CLEAN AGENT MF/SD MVD

CYLINDERS ROOM MVD

NED FROM
SA VD
RA BDD
RA RA

PI1 PI2 BDD PACU-1B


SA 100% CAPACITY
SA ( STANDBY )

N PART SHALL BE OBTAI


MVD

13.8kV SWGR
SD RA

SA
SA ROOM RA
MVD
MF/SD
RA
VD SA
PI1 PI2 BDD

LEGEND
SA FA

MVD
CONTROL ROOM MVD PACU PACKAGED AIR CONDITIONING UNIT

SA VD

N FULL OR I
PACU-2B SA EDH-1
RA
MVD STL

100% CAPACITY MF/SD COMBINATION MOTORIZED FIRE AND SMOKE DAMPER


( STANDBY ) RA
SA MVD MOTORIZED VOLUME DAMPER
RA

VD MVD MANUAL VOLUME CONTROL DAMPER


VD

COMMUNICATION

I
TO ATMOSPHERE

ON
RA SD SAND TRAP LOUVER
SA ROOM

REPRODUCTI
RA
EDH-2
MVD SPF
MF/SD
STL REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
FA
RA DRAWING CONTROL SHEET ET- 923628
RA
SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS- 21EN1004
VD

NO
MVD
TOILET ROOM EA
-
WEF

d SA
-

onalGri
-

OF Nati
SUPPLY AIR FLOW

RETURN AIR FLOW

N ARE THE SOLE PROPERTY


BDD BACKDRAFT DAMPER

SA SUPPLY AIR

RA RETURN AIR

STL SAND TRAP LOUVER


RA
FA FRESH AIR

EDH ELECTRIC DUCT HEATER

TO ATMOSPHERE
SD AS-BUILT BY DATE

RA
SA
SPF MVD

NED HEREI
MF/SD
SPLIT AC - 1 WORKSHOP

CONTAI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
AND THE I
MNT AS/JAH NONE
DRAWN BY CHECKED BY SCALE:

2021-08-17 2021-08-17
DATE STARTED DATE COMPLETED

OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

S DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE 2021-08-30

HVAC SYSTEM SCHEMATIC DIAGRAM

THI
CONSTRUCTING NATA 115/13.8KV GIS S/S-2 IN NATA AREA
NATA SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

K NG1281ET-923630 01 of 02 00
NG-A (2012/01)

VECTOR NGA00
00 of 02 NG1281ET-923630 02 K
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

TS OW NER.
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
NOTED.

2. EXHAUST FANS FOR BASEMENT SHALL ALSO SERVE AS SMOKE


PURGE FANS.

3. PROPER FILTRATION SHALL BE PROVIDED FOR FRESH AIR FANS.

TTEN CONSENT OF I
4. FANS LOCATION SHOWN HERE IS TENTATIVE.

THOUT THE W RI
S DOCUMENT W I
EF- 1
SUPPLY-1 LEGEND
13.8kV PVC DIRECT BURIED
CONDUITS (6x2)

THI NED FROM


SUPPLY- 2
EF- 2

N PART SHALL BE OBTAI


13.8kV PVC DIRECT BURIED
CONDUITS (6x2)

13.8kV PVC DIRECT


BURIED FOR CAPACITOR BANK

UP

N FULL OR I
13.8kV PVC DIRECT BURIED
CONDUITS (3x2)

I
13.8kV PVC DIRECT BURIED

ON
CONDUITS (6x2)

REPRODUCTI
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
EXHAUST FAN (EF) - MIN 02 NO'S
DRAWING CONTROL SHEET ET- 923628

SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS- 21EN1004

NO d SA
-

onalGri
-

WALL -

OF Nati
CONCRETE DUCT
FLOOR SLAB

SIDE WALK

N ARE THE SOLE PROPERTY


SUBSTATION ROOF

EAG
WITH MFSD

SUPPLY FAN EF
AS-BUILT BY DATE

(MINIMUM 2 NOS.)
(MINIMUM 2 NOS.)

NED HEREI
CABLE BASEMENT
GROUND FLOOR

T/H

CONTAI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
SUPPLY GRILLS WITH MF/SD EA WITH MF/SD

TYPICAL AT 2 PLACES TYPICAL AT 2 PLACES

AND THE I
MNT AS/JAH NONE
DRAWN BY CHECKED BY SCALE:

2021-08-17 2021-08-17
CABLE BASEMENT DATE STARTED DATE COMPLETED

OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

S DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE 2021-08-30

HVAC SYSTEM SCHEMATIC DIAGRAM


CABLE BASEMENT VENTILATION SCHEMATIC SECTION-A (TYP)
(CABLE BASEMENT VENTILATION SYSTEM)

THI
CONSTRUCTING NATA 115/13.8KV GIS S/S-2 IN NATA AREA
NATA SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

K NG1281ET-923630 02 of 02 00
NG-A (2012/01)

VECTOR NGA00
00 01 of 03 NG1281ET-923631 L
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

TS OW NER.
1. ALL PLUMBING WORKS SHALL BE IN ACCORDANCE WITH THE
UNIFORM PLUMBING CODES, TES-P-119.19 & 75-TMSS-1.

2. WATER PIPING BURIED AND CONCEALED SHALL BE CPVC


SCH-80.

3. WATER PIPING ABOVE GRADE AND EXPOSED SHALL BE CPVC,

TTEN CONSENT OF I
SCH-80.

4. HOT WATER PIPING SHALL BE CPVC ASTM F441 SCHEDULE 80


AND INSULATION SHALL BE 25 MM THICK ASTM C534
FLEXIBLE CLOSED CELL ELASTOMERIC TUBE HAVING A
DENSITY OF 64 KG/M AT MEAN TEMPERATURE OF 25 C.

5. SHUT-OFF VALVES SHALL BE PROVIDED TO EACH FIXTURE


AND EQUIPMENT.

6. PUMP FOUNDATION,TANK FOUNDATIONS AND SUN SHED SHALL


BE PROVIDED.

THOUT THE W RI
7. THE TRANSFORMER PIT PUMP SHALL BE MANUALLY OPERATED.

8. TRANSFORMER PIT PUMPS SHALL BE PROVIDED WITH LOW


WATER LEVEL LIMIT SWITCH TO PROTECT IT FROM RUNNING
DRY.

9. SUMP PUMPS SHALL BE PROVIDED IN THE SUBSTATION


WBP BASEMENT AS SPECIFIED IN THE STANDARD SPECIFICATION
C/P TES-P-119.19.

S DOCUMENT W I
10. CONTRACTOR/CONSULTANT SHALL VERIFY THE AVAILABILITY OF
EXISTING MUNICIPALITY WATER LINE AND MEET WITH THE
REQUIREMENTS OF SEC STANDARD TES-P-119.19, ITEM
#7.2.17a, PAGE 30 OF 43.

PRESSURE SWITCH 11. AT GROUND FLOOR LEVEL, INSULATED POLYETHELENE WATER


(FOR BOOSTER PUMP ON/OFF) STORAGE TANK WITH MINIMUM CAPACITY OF.

LEVEL SWITCH

THI
HIGH LEVEL ELECTRODE
(FOR WATER TRANSFER
PUMP OFF)

NED FROM
50MM
LEGEND

PCT GATE VALVE (NORMALLY CLOSED)

N PART SHALL BE OBTAI


WTP WATER TRANSFER PUMP

WBP WATER BOOSTER PUMP


OVERHEAD
C/P CONTROL PANEL
WATER STORAGE TANK

50MM
PCT PRE-CHARGED TANK

NC NORMALLY CLOSED

COLD WATER LINE


WBP
ELECTRICAL WIRING
LOW LEVEL ELECTRODE

N FULL OR I
(FOR WATER BOOSTER PUMP OFF)

WTP
C/P TOILET
FIXTURES

I ON
WATER TANKER FILLING

REPRODUCTI
LINE HOSE CONNECTION

REFERENCE DRAWINGS
HOSE BIBB
DRAWING TITLE DRAWING NO.
NEAR PACU
DRAWING CONTROL SHEET ET- 923628
1A & 1B
SCOPE OF WORK AND TECHNICAL SPECIFICATIO PTS- 21EN1004

NO
-
50M M

WTP

d SA
-

onalGri
BOUNDARY WALL HIGH LEVEL ELECTRODE HOSE BIBB -
(FOR WATER TRANSFER
NEAR PACU -
PUMP OFF)

OF Nati
PIPE SLEEVE FOOT VALVE 2A & 2B
TO BE CONNECTED TO
NEAREST EXISTING
MUNICIPALITY WATER
50M M

SUPPLY LINE
NC

N ARE THE SOLE PROPERTY


POLYETHYLENE INSULATED
LOW LEVEL ELECTRODE
WATER STORAGE TANK HOSE BIBB
(FOR WATER TRANSFER
(CAP: MIN. 6000 LITERS)
PUMP OFF) NEAR
SPLIT AC-1

AS-BUILT BY DATE

NED HEREI
CONTAI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
AND THE I
MNT AS/JAH NONE
DRAWN BY CHECKED BY SCALE:

2021-08-17 2021-08-17
DATE STARTED DATE COMPLETED

OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

S DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE 2021-08-30

WATER PIPING & PUMP CONTROL SCHEMATIC DIAGRAM

THI
CONSTRUCTING NATA 115/13.8KV GIS S/S-2 IN NATA AREA
NATA SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

L NG1281ET-923631 01 of 03 00
NG-A (2012/01)

VECTOR NGA00
00 of 03 NG1281ET-923631 02 L
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
{110MM SPARE CONNECTION

TS OW NER.
1. ALL PLUMBING WORKS SHALL BE IN ACCORDANCE WITH THE
FOR FUTURE MUNICIPALTY MSC
BOUNDARY UNIFORM PLUMBING CODES, TES-P-119.19 AND 75-TMSS-1.
WATER SUPPLY SYSTEM
WALL 2. SANITARY SEWER,DRAINAGE AND VENT PIPING SHALL BE UPVC
/CPVC SASO 14/15 CLASS 4. FITTING MATERIALS SHALL BE OF
THE SAME MATERIALS AS PIPE.

TTEN CONSENT OF I
3. PIPING SYSTEM OR A PORTION THEREOF, SHALL NOT BE
COVERED OR CONCEALED UNTIL IT HAS BEEN INSPECTED,
PIPE SLEEVE
TESTED AND APPROVED.

SW
4. SANITARY SEWER/DRAINAGE PIPING OF 110 MM DIA PIPE SIZE
SHALL HAVE A SLOPE OF 1%. PIPE SIZE OF 90 MM DIA AND
BELOW SHALL HAVE A SLOPE OF 2%.

5. SLEEVES SHALL BE PROVIDED TO ALL PIPE PENETRATIONS


THROUGH WALLS ROOF SLAB, ROADS AND ROADWAYS.

6. CONTRACTOR/CONSULTANT SHALL VERIFY THE AVAILABILITY OF

THOUT THE W RI
EXISTING MUNICIPALITY SEWER/DRAINAGE LINE AND MEET WITH
THE REQUIREMENTS OF SEC STANDARD TES-P-119.19, ITEM
SMH-2 #7.2.17a, PAGE 30 OF 43.

7. NO. OF MANHOLES SHALL BE PROVIDED AS PER SITE


REQUIREMENT.

S DOCUMENT W I
LEGEND

SW
VL VENT LINE

SW SEWER LINE

DL DRAINAGE LINE

THI
EEW/DH EMERGENCY EYEWASH WITH DRENCH HOSE

GCO

NED FROM
FCO FLOOR CLEANOUT
SMH-1

LAV.
FD FLOOR DRAIN

VL
EW C
LAV LAVATORY

FD
DIA90MM PIPE RISER WWC WESTERN WATER CLOSET

N PART SHALL BE OBTAI


TO VENT TERMINAL
I.E EWC EASTERN WATER CLOSET
WITH BIRD SCREEN
PACU PACKAGED TYPE AIR CONDITIONING UNIT

IE INVERT ELEVATION
SEPTIC FGL FINISHED GRADE LEVEL

TANK FFL FINISHED FLOOR LEVEL

MSC MUNICIPALITY SEWER SYSTEM CONNECTION

SMH SEWER MANHOLE


I.E CDP CONDENSATE DRAIN PIT

TOA MWC MUNICIPALITY WATER SUPPLY SYSTEM


SEEPAGE CONNECTION

TOP OF ASPHALT
PIT TOA

N FULL OR I
CHDP CHEMICAL DRY PIT

WTC WATER TANKER CONNECTION

GCO GROUND CLEAN OUT

SEWER, DRAINAGE & VENT PIPING SCHEMATIC DIAGRAM (TOILET) TP TRANSFOMER PIT

TRANSFOMER PIT PUMP


TPP

I ON
REPRODUCTI
CDP-1 REFERENCE DRAWINGS
CO CO
DRAWING TITLE DRAWING NO.

PACU-1A DRAWING CONTROL SHEET ET- 923628

SCOPE OF WORK AND TECHNICAL SPECIFICATIO PTS- 21EN1004

NO
PACU-1B
-

d SA
-

onalGri
-

-
{50mm GS PIPE OILY/WASTE

OF Nati
WATER DISCHARGE CONNECTION
FOR MOBILE TANKER

N ARE THE SOLE PROPERTY


GIS ROOF

UP
STEEL STAIRCASE

AS-BUILT BY DATE

FGL FGL CENTRIFUGAL SELF PRIMING

NED HEREI
PUMP (TPP) W/SHED
PUMP CAPACITY
4 L/S (63 GPM)
DN

CONTAI
REV.
TO SPLASH BLOCK NO.
DATE BY DESCRIPTION CHKD. CERT. APPD.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
SWGR ROOF FOOT VALUE

NFORMATI
W/STRAINER
TP

AND THE I
MNT AS/JAH NONE
DRAWN BY CHECKED BY SCALE:

2021-08-17 2021-08-17
DATE STARTED DATE COMPLETED

OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


PACU-2A PACU-2B

NG
CONSTRUCTION OR FOR ORDERING

S DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE 2021-08-30

CO CO

CDP-2
OILY/WASTE WATER DRAINAGE PIPING SCHEMATIC DIAGRAM SEWER, DRAINAGE & VENT PIPING SCHEMATIC DIAGRAM

THI
CONSTRUCTING NATA 115/13.8KV GIS S/S-2 IN NATA AREA
CONDENSATE DRAIN PIPING SCHEMATIC DIAGRAM (PACU - 1A, 1B, 2A, 2B) SAUDI ARABIA
NATA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

L NG1281ET-923631 02 of 03 00
NG-A (2012/01)

VECTOR NGA00
00 of 03 NG1281ET-923631 03 L
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

TS OW NER.
1. REINFORCING STEEL SHALL HAVE THE FOLLOWING MINIMUM
COVERAGES OF CONCRETE.

A. CONC. DEPOSITED DIRECTLY AGAINST GROUND-75mm

B. CONC. IN WALLS-HALF WALL THICKNESS AT CENT.

C. CONC. IN ROOF SLAB-40mm

TTEN CONSENT OF I
2. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF
37.9 mPa @28 DAYS.

3. ALL REBARS SHALL BE OF DEFORMED STEEL 12mm DIA


(ASTM A305).

4. ALL REBARS DIMENSIONS AND BAR DIAMETER SHALL BE IN

12 BOLTS
MILLIMETER UNLESS OTHERWISE NOTED.
700
WASHER
19 x150 LG. GALV. NIPPLE
5. ALL EXTERIOR AND INTERIOR SURFACES OF CONCRETE SHALL
B BENT HORIZONTAL IN SLAB
65 570 65
BE APPLIED WITH 2COATS OF COAL TAREPOXY RESIN PER
78-SMSS-1.

THOUT THE W RI
T

65
6. HANDLES SHALL BE COATED WITH COALTAR BEFORE CONVERING

BENT HORIZONTAL
THE TANK WITH EARTH.
R6

275
IN SLAB
7. PROVIDE DOUBLE LAYER REBAR ARRANGMENT IN THE SECTION
19 PIPE NIPPLES FOR SLEEVES THRU TOP SLAB FOR AA & BB.

420

550
12 BAFFLE SUPPORT BOLTS
8. WASTE, DRAIN AND SEWAGE DISPOSAL SYSTEMS THROUGH SEPTIC
TC DOSING TANK 200
TANK AND SEEPAGE PIT SHALL BE PROVIDED IF EXISTING
10 THK X50 WD
INLET SEWER OR DISTRIBUTION MUNICIPAL SEWER LINE IS NOT AVAILABLE FOR CONNECTION

D
BAFFLE & SUPPORT

275
BOX

S DOCUMENT W I
WITHIN 200 METER RADIUS FROM THE PROPERTY.

R5
R11 G

65
A
16mm DIA. HOLES
R8
REDWOOD
200 300 200
A A T & G.

LEGEND

5@65m m O.C.
390
PLAN

THI
12 BOLTS

R9
WASHER

NED FROM
32
T
100x100/10x10 WWF

50
SEE NOTE 6
B

N PART SHALL BE OBTAI


PLAN SECTION ELEVATION

75

150
75
65 570 65
DETAIL OF BAFFLE

ELEVATION

DETAIL OF MANHOLE COVER

10 THK X50 WD

N FULL OR I
BAFFLE & SUPPORT

450 300
300 450
10 ROUND BAR
R5 R6 & R8

FIN. GRADE

150

I
40mm CLEAR

125
100 PVC

ON
SAN. TEE

REPRODUCTI
ELEVATION
300

BAFFLE-1200x450x50mm
100 PVC
S

SUPPORTED BY,50x50x10
LIQUID LEVEL PIPE
REFERENCE DRAWINGS
100 PVC STRAP IRONS BOLTED 100 125 100
PIPE TO TANK COVER. DRAWING TITLE DRAWING NO.
R4

225 225
DRAWING CONTROL SHEET ET- 923628
100 PVC

C
R3
PIPE
SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS- 21EN1004

NO
10 THK X50 WD
STEEL IN CENTER OF WALL
DETAIL BAFFLE & SUPPORT

d SA
SEE DETAIL-1 COVER HANELE

onalGri
10 THK X50 WD
BAFFLE & SUPPORT
T

OF Nati
R1 R2 75mm CLEAR

T B T

100
5
10 BOLT

N ARE THE SOLE PROPERTY


225

SECTION A-A

SECTION

DETAIL OF PVC PIPE SUPPORT

600

R6 R5&R9
FIN. GRADE AS-BUILT BY DATE
150

NED HEREI
D
300

R4

R4

LIQUID LEVEL

CONTAI
3-50x150mmREDWOOD
T&G PLANKS 1200mm
R7

R3 PERSONS
LONG. BOLTED TO TYPE SEPTIC TANK SCHEDULES REV.
NO.
DATE BY DESCRIPTION CHKD. CERT. APPD.
C

STRAPS 12 x75mm
FULL TIME
CARRIAGE BOLTS.
NO. A B C D G S R1 R2 R3 R4 R5 R6 R7 R8 R9 R10 R11 T CONC.
RESIDENTS DRAWING COMPLETION CERTIFICATE (DCC):
R10
mm mm mm mm mm mm MK. NO. mm C/C MX NO. mm m3

ON
1

NFORMATI
10 1220 3045 1220 300 100 375 401@300 402 @ 300 403 @ 300 404 @ 300 405 @ 300 406 @ 300 461 @ 300 471 @ 300 481 @ 300 491 @ 300 492 200 5.9

R2 R1

AND THE I
T

MNT AS/JAH NONE


DRAWN BY CHECKED BY SCALE:

R1 R2
DETAIL-1 2021-08-17 2021-08-17
DATE STARTED DATE COMPLETED

OPR'G. DEPT. ENG. DEPT.


T A T

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

S DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE 2021-08-30

SECION B-B SEPTIC TANK INSTALLATION DETAILS

THI
CONSTRUCTING NATA 115/13.8KV GIS S/S-2 IN NATA AREA
NATA SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

L NG1281ET-923631 03 of 03 00
NG-A (2012/01)

NGA00
VECTOR
00 01 of 01 NG1281ET-923632 P
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

TS OW NER.
1. THIS IS A CONCEPTUAL DRAWING. THE CONTRACTOR SHALL
PREPARE DETAILED DRAWINGS FOR ENGINEERING AND
E09 E07 E05 E03 E01 E02 E04 E06 E08 E10
CONSTRUCTION, BASED ON SCOPE SPECIFIED IN PTS.
115kV O/H T/L TO 115kV O/H T/L TO 115kV O/H T/L TO 115kV O/H T/L TO
2. AUTO CHANGE OVER SCHEME SHALL BE PROVIDED BETWEEN
AS-SARRAR 2 NARIYAH NORTH NARIYAH NORTH AS-SARRAR-2
FUTURE INCOMERS AND BUS COUPLER OF 400V SIDE MAIN
115/33/13.8kV SS 380/115kV BSP 380/115kV BSP 115/33/13.8kV SS
DISTRIBUTION BOARD.

TTEN CONSENT OF I
FUTURE (CB A603) (CB A607) (CB A624) (CB A602)
3. FOR CABLE SIZE REFER TO PTS FOR DETAILS.

1-795MCM CONDUCTOR/PHASE (TYP) 4. ALL 13.8kV CBs SHALL BE EITHER VACUUM OR SF6 TYPE.
3-1{, SA 3-1{, SA 3-1{, SA
108kV 108kV 108kV
115kV GIS SF6/AIR BUSHING (TYP.) 3-1{, SA
SF6/AIR BUSHING (TYP.) SF6/AIR BUSHING (TYP.) SF6/AIR BUSHING (TYP.) 5. DOTTED LINES FOR EQUIPMENTS OTHER THAN LV CABLES
OUTDOOR INDICATE FUTURE ADDITIONS BY OTHERS.
108kV
GIS BUSDUCT (TYP.)
VT606
VT602 6. FINAL ARRESTOR GROUNDING CONNECTIONS WILL BE DECIDED
K621 K609 K610 VT602 K622 BASED ON STUDY / CALCULATION DURING
DETAIL ENGINEERING.

DL-VT607 DL-VT603 DL-VT602 DL-VT606


HS M HS M M HS HS M HS M HS M

THOUT THE W RI
3-1{ VT
VT607 VT603 D614
115kV 115V 115V
M M M D606 M -115V X -115V M M
D605
3 3 3
D613
K607 K608 K620
K619 CL. 0.2 & 3P FOR BOTH WINDINGS
(TYP.)

M M M M M M

S DOCUMENT W I
A603 A602 A610
A609 A607 A606 LEGEND
1600A 1600A 1600A
1600A 1600A 1600A

K605 K606 K618 CIRCUIT BREAKER (FIXED TYPE)


K617

CIRCUIT BREAKER (WITH DRAWABLE TYPE)


M M D611 M M M M

M M M D603 D604 M M M
M A601 M
DL-VT1A

THI
DL-VT1B DISCONNECT SWITCH (MOTOR OPERATED)
2000A D612
M
115kV, 40KA (1 SEC), 2000A, BUS-1A 115kV, 40KA (1 SEC), 2000A, BUS-1B

NED FROM
D601 D602
K604
M K603 K601 M M M
GROUNDING SWITCH (MOTOR OPERATED)
M D607 K602 M D608 M
M

K611
K612

N PART SHALL BE OBTAI


HIGH SPEED LINE GROUNDING SWITCH
M M M
M HS (MOTOR OPERATED)
A605 A604 A608
1600A 1600A 1600A GROUNDING SWITCH (MANUALLY OPERATED)

K613
K614

VOLTAGE TRANSFORMER WITH TWO


M M SECONDARY WINDINGS
M
M D609 M D610
M
VT605 CABLE TERMINATION
K616
K615 VT604

N FULL OR I
E.S.
DL-VT605 HS M DL-VT604 EARTH SWITCH
M HS HS M

VOLTAGE TRANSFORMER WITH TWO

I
SECONDARY WINDINGS AND ISOLATING DEVICE

ON
REPRODUCTI
OUTDOOR
GIS BUSDUCT (TYP.)
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

DRAWING CONTROL SHEET ET- 923628


SF6/AIR BUSHING (TYP.)
SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS- 21EN1004

NO
1-795MCM CONDUCTOR/PHASE (TYP)

d SA
3-1{, SA
108kV

onalGri
(TYP)
TRANSFORMER T601 TRANSFORMER T602 TRANSFORMER T603
H1 H1 H1
50/67 MVA, ONAN/ONAF 50/67 MVA, ONAN/ONAF 50/67 MVA, ONAN/ONAF
H3 H2 115/13.8kV,60Hz, H3 H2 115/13.8kV,60Hz, H3 H2 115/13.8kV,60Hz,

OF Nati
Z=22% /(50MVA BASE) Z=22% /(50MVA BASE) Z=22% /(50MVA BASE)
X1 X1 X1
OLTC - 20% TO + 12.5% OLTC - 20% TO + 12.5% OLTC - 20% TO + 12.5%
X3 X3 X3
n Dyn1 n Dyn1 n Dyn1
X2 X2 X2

13.8kV SWITCHGEAR Solid Insulated Bus Bar System (SIS) Solid Insulated Bus Bar System (SIS)

N ARE THE SOLE PROPERTY


(1x3PH OR 3x1PH) VT E.S. E.S. E.S.
13.8kV 115V 115V
-115V X -115V
3 3 3 K301 K302 K303

(TYP.)

A301 A302 A303


3600A 3600A 3600A
E.S. E.S. E.S.

AS-BUILT BY DATE

13.8kV, 3600A, 3{, 25KA (1 SEC), BUS-1 K304 K305 13.8kV, 3600A, 3{, 25KA (1 SEC), BUS-2 K306 13.8kV, 3600A, 3{, 25KA (1 SEC), BUS-3

NED HEREI
A304
A305
3600A
3600A
NC B351 B352 B353 B354 B355 B356 B357 B358 B359 B360 B361 B362 B363 B364
B311 B312 B313 B314 B315 B316 B317 B318 B319 B320 B321 B322 B323 B324 B325 B331 B332 B333 B334 B335 B336 B337 B338 B339 B340 B341 B342 B343 B344 NO

1250A
1250A
630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A
1250A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

630A

CONTAI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

K321 K322 K323 K324 K325 K326 K327 K328 K329 K330 K331 K332 K333 K334 K335 K341 K342 K343 K344 K345 K346 K347 K348 K349 K350 K351 K352 K353 K354 K361 K362 K363 K364 K365 K366 K367 K368 K369 K370 K371 K372 K373 K374 DRAWING COMPLETION CERTIFICATE (DCC):

ON
Future Future Future

NFORMATI
Capacitor Bank Capacitor Bank Capacitor Bank

2 2
1x3 CORE - 300mm XLPE, 1x3 CORE - 300mm XLPE,
CU. CONDUCTOR 15kV CABLE CU. CONDUCTOR 15kV CABLE

AND THE I
DRAWN BY MNT CHECKED BY AHH SCALE: NONE

T-301 H1 400V MAIN DISTRIBUTION BOARD H1


DATE STARTED 2021-08-17 DATE COMPLETED 2021-08-17

STATION SERVICE H3 H2 H3 H2
TRANSFORMER T-302 OPR'G. DEPT. ENG. DEPT.
A001 A002
500kVA MINIMUM, SEE NOTE-3 STATION SERVICE TRANSFORMER
400V, 400V,
CERTIFIED
13.8kV / 400/230kV 500kVA MINIMUM, 13.8kV/400V/230V THIS DRAWING IS NOT TO BE USED FOR

NG
ACB ACB X1
3{, 60HZ, Dyn11, Z=5% X1 3{, 60HZ, Dyn11 Z=5%
CONSTRUCTION OR FOR ORDERING

S DRAW I
*A,*kA *A,*kA MATERIAL UNTIL CERTIFIED AND DATED BY DATE 2021-08-30

n X2 n X2
(TYP.) (TYP.)
X3 X3 MAIN ONE LINE DIAGRAM
A003
400V BUS-1,*kA 400V BUS-2,*kA

THI
600/1000V XLPE INSULATED CU. 600/1000V XLPE INSULATED CU.
2
N.O. 2
CONSTRUCTING NATA 115/13.8KV GIS S/S-2 IN NATA AREA
CABLE (2RUN 4X1COREX400MM ) CABLE (2RUN 4X1COREX400MM )
NATA SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

O/G FEEDERS O/G FEEDERS


P NG1281ET-923632 01 of 01 00
NG-A (2012/01)

NGA00
00 01 of 01 NG1281ET-923633 P
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

TS OW NER.
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
NOTED.

2. CONTRACTOR SHALL DETERMINE THE ACTUAL DIMENSIONS AT


SITE CONSIDERING THE MINIMUM BENDING RADIUS OF THE
CABLES.

TTEN CONSENT OF I
3. CONTRACTOR SHALL PROVIDE ACCESS BRIDGES ACROSS UNI
STRUT SUPPORTS AT CONVENIENT LOCATIONS.

4. UNI STRUT SUPPORTS, CABLE TRAYS/RACKS AND RELATED


NON CURRENT CARRYING METAL PARTS SHALL BE EFFEC-
TIVELY GROUNDED AS PER SEC ENGINEERING STANDARDS.

5. INCOMER CABLES SHALL BE ROUTED ONLY IN TREFOIL


FORMATION FORMED BY CORES OF R,Y & B PHASES AND
SINGLE NON-MAGNETIC CLAMPS SPECIALLY SHAPED FOR THE
SIZE OF THE TREFOIL SHALL BE USED FOR SUPPORTING THE
TREFOIL CABLES.

THOUT THE W RI
6. SUPPORTING ARRANGEMENT OF THE SINGLE CORE CABLE
BELOW THE 13.8kV SWITCHGEAR INCOMER CABLE SHALL BE
AS SHOWN IN SECTION B-B & D-D.

7. NUMBER OF 13.8kV CABLES PER PHASE SHOWN IN SECTIONS


A-A, AND C-C ARE ONLY CONCEPTUAL. FOR ACTUAL
CABLE SIZE, NUMBER OF CABLES PER PHASE REFER TO PTS.

8. CABLES SHALL BE ROUTED ON THE FLOOR WITH UNI-STRUT

S DOCUMENT W I
STEEL SUPPORT. HIGH STEEL SUPPORTS SHALL BE AVOIDED
AS IT RESTRICTS THE MOVEMENT OF PERSONNEL.

9. THIS DRAWING IS PRODUCED FROM DRAWING NO. TC-800115.

LEGEND

THI NED FROM


N PART SHALL BE OBTAI
13.8kV PVC DIRECT BURIED SIS
CONDUITS (3x2)

8kV CABLES TO SST


EF- 1

NG

NG
VT/BUS
I/C

VT/BUS
SER/
A301

B331

B332

B335
B322

B323

B325
B324
B312

B313

B315

B317

B318
B316

B320

A304
B314

B321
B311

B334
B319

EARTHI

B336
B333
EARTHI
SUPPLY-1

NK
BUS

N FULL OR I
13.8kV PVC DIRECT BURIED

A302
LI
RI
CONDUITS (6x2)
I/C

I
13.

ON
REPRODUCTI
13.8kV CABLES TO SST

REFERENCE DRAWINGS
I/C DRAWING TITLE DRAWING NO.

EARTHI
VT/BUS

RI
EF- 2

ADAP
A305

B340
DRAWING CONTROL SHEET ET- 923628

B351

B341
B361

B360

B354

B344
A303
B364

B363

B362

B338

B337
B356

B355

B353

B352

B343

B342

B339
B358
B359

B357

LI

BUS
SER/
13.8kV PVC DIRECT BURIED

NK
SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS- 21EN1004

NG
CONDUITS (6x2)

NO d SA
SUPPLY-2 13.8kV PVC DIRECT

onalGri
BURIED FOR CAPACITOR BANK

OF Nati
UP
13.8kV PVC DIRECT BURIED

N ARE THE SOLE PROPERTY


CONDUITS (3x2)

13.8kV PVC DIRECT BURIED


CONDUITS (6x2)

AS-BUILT BY DATE

NED HEREI
CONTAI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
13.8kV CABLES & SIS LAYOUT

NFORMATI
AND THE I
DRAWN BY MNT CHECKED BY MS SCALE: 1:150

DATE STARTED 2021-08-17 DATE COMPLETED 2021-08-17

OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

S DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE 2021-08-30

13.8kV CABLES & SIS LAYOUT

THI
CONSTRUCTING NATA 115/13.8KV GIS S/S-2 IN NATA AREA
NATA SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

P NG1281ET-923633 01 of 01 00
NG-A (2012/01)

NGA00
00 01 of 02 NG1281ET-923634 P
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

TS OW NER.
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
NARIYAH NARIYAH NOTED.
NORTH BSP NORTH BSP SARAR-2 SARAR-2
2. THIS IS A CONCEPTUAL DRAWING. THE CONTRACTOR SHALL
DEVELOP DETAIL DESIGN DRAWING FOR ENGINEERING AND
CONSTRUCTION.

TTEN CONSENT OF I
MWC MSC
D COR-1
A
O
R

EXTERNAL CUSTOM ER
SS COR-2

THOUT THE W RI
5000
AREA
E

8000
| OF SA
C PARKING
C
A

TELECOM

10000
T E | OF STEEL
L D
A WI
MONOPOLE GANTRY

H
SP M
A .0 FENCE TYPE-V
RELOCATED COMMUNICATION

D 5 TOWER

SE
6000

S DOCUMENT W I
O LEGEND
P
O 10000
R
P

ED

ED
RECT BURI

RECT BURI
TS (6x2)

TS (6x2)
8kV PVC DI

8kV PVC DI
CONDUI

CONDUI
PANEL
CONTROL
LOCAL

DUCTBANK
CONTROL CABLE

THI
13.

13.
FUTURE

EL.
TOC
- 1.

T-601

CDP-1
30

NED FROM
PACU-1A

PACU-1B
TO EXTERNAL NETWORK

REFER DRAWI
T/F OUTLI

N PART SHALL BE OBTAI


HVAC POWER SMH-1 SEPTIC TANK

NG
NE
LSCD

SEEPAGE PIT

OWS OWS EWS

2200
BATTERY AREA

F
P
TOILET

SP
CONTROL ROOM

L
RMP RMP RMP RMP U/V U/F

TDI
FIRE WALL (18.00 x 12.50)

S
3200

T
RMP RMP RMP AMR AMR 6BS1 6BC2 6BC16BBCU 6BB6 6BB5 6BB4 6BB3 6BB2 6BB1

E
PQM

MRL
T
ABTS RTCC3RTCC2RTCC1

(10.
CLEAN EGENT ROOM
S

5 x 3.
PANEL
CONTROL
LOCAL

UBDC1
115kV GI
(12.
DUCTBANK
CONTROL CABLE

I
F-2 I
BM

18000
00X22.

2)
-T3 -T3 -T3 -T2 -T2 -T2
BPP BPP
BC2
S ROOM

F-1 6AP PDM

W ATER TANK
S
EL.

50M)

UBDC2
TOC
- 1.

BC1
T-602

NV
DCDB
30

BPP
SAS

I
NV

57000
BPP-2BPP-2BPP-2BPP-2BPP-2BPP-2
BPP-1BPP-1BPP-1BPP-1BPP-1BPP-1

S
L

BPP
SAS

-6.

UBAC1
-6.

2L
1L

BPP BPP
SAS

-5.
-5.

2L
1L
SAS

-4.
-4.
ROUGHLY GRADED AREA

N FULL OR I
S
2L
1L

UBAC2
HVAC CONTROL

BPP
SAS

-3.

-T1 -T1 -T1


-3.
1800
(WITHOUT GRAVEL)

2L
1L

BPP
SAS

-2.
-2.
REFER DRAWI

2L
1L
T/F OUTLI

BPP
SAS

-1
-1

.
.

2
1
1200
800 1800 1600 1800 1600 1900
NG
NE

ACDB ACDB

3000 3000

3000
2000 WORKSHOP

2000
COMM. ROOM
FIRE WALL

I
9400

ON
13.8kV PVC DIRECT BURIED
SIS MH
CONDUITS (3x2)

REPRODUCTI
100000
EF- 1

NG

NG
VT/BUS
I/C

VT/BUS
SER/
A301

B331

B332

B335
B322

B323

B325
B324
B312

B313

B315

B316

B317

B318

B320

A304
B314

B321
B311

B334
B319

EARTHI

B336
B333
EARTHI
NK
SUPPLY-1

BUS
1800

LI

A302
RI
I/C
REFERENCE DRAWINGS
7500 SWITCHGER ROOM
(

DRAWING TITLE DRAWING NO.


FUTURE)

(11X28)M
T-603

MH
DRAWING CONTROL SHEET ET- 923628
I/C

EARTHI
VT/BUS
T301 T302

RI

ADAP
A305

B340
B351

B341
B361

B360

B354

B344
B364

B363

B362

A303

B338

B337
B356

B355

B353

B352

B343

B342

B339
B358
B359

B357

LI

BUS
SER/
SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS- 21EN1004

NK

SUPPLY- 2
NG

NO
EF- 2

13.8kV PVC DIRECT

BURIED FOR CAPACITOR BANK

d SA
1500

DN

onalGri
13.8kV PVC DIRECT BURIED PACU-2A CDP-2 PACU-2B
CONDUITS (3x2)

13.8kV PVC DIRECT BURIED


MH
CONDUITS (6x2)

OF Nati
4.0M WIDE ROAD (TYP)

N ARE THE SOLE PROPERTY


CURB STONE
(ASPHALT LIMIT)
65000

AS-BUILT BY DATE

NED HEREI
ROUGHLY GRADED AREA
(WITHOUT GRAVEL)

CONTAI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
FENCE TYPE-III

AND THE I
MNT CHECKED BY MS 1:200
COR-4 COR-3 DRAWN BY SCALE:

DATE STARTED 2021-08-11 DATE COMPLETED 2021-08-11

OPR'G. DEPT. ENG. DEPT.

100000
THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

S DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE 2021-08-30

SUBSTATION EQUIPMENT LAYOUT-OVERALL LAYOUT

THI
CONSTRUCTING NATA 115/13.8KV GIS S/S-2 IN NATA AREA
NATA SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

P NG1281ET-923634 01 of 02 00
NG-A (2012/01)

NGA00
00 of 02 NG1281ET-923634 02 P
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

TS OW NER.
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
NOTED.

2. THIS IS A CONCEPTUAL DRAWING. THE CONTRACTOR SHALL


DEVELOP DETAIL DESIGN DRAWING FOR ENGINEERING AND
CONSTRUCTION.

TTEN CONSENT OF I
THOUT THE W RI
S DOCUMENT W I
LEGEND

GIS ROOF

UP

THI
A

STEEL STAIRCASE

NED FROM
13.8kV PVC DIRECT BURIED SIS
CONDUITS (3x2)
EF- 1

NG

NG
VT/BUS
I/C

VT/BUS
SER/
A301

SUPPLY-1

B331

B332

B335
B322

B323

B325
B324
B312

B313

B315

B316

B317

B318

B320

A304
B314

B321
B311

B334
B319

EARTHI

B336
B333
EARTHI
NK
BUS
13.8kV PVC DIRECT BURIED

LI

A302
RI
CONDUITS (6x2)
I/C

N PART SHALL BE OBTAI


A

SUPPLY- 2
EF- 2

I/C DN
EARTHI
VT/BUS

RI

ADAP
A305

B340
B351

B341
B361

B360

B354

B344
B364

B363

B362

A303

B338

B337
B356

B355

B353

B352

B343

B342

B339
B358
B359

B357

LI

BUS
SER/

13.8kV PVC DIRECT BURIED


NK
NG

CONDUITS (6x2)

13.8kV PVC DIRECT


BURIED FOR CAPACITOR BANK

UP
13.8kV PVC DIRECT BURIED
SWGR ROOF
CONDUITS (3x2)

N FULL OR I
13.8kV PVC DIRECT BURIED
CONDUITS (6x2)

I ON
REPRODUCTI
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

DRAWING CONTROL SHEET ET- 922605

SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS- 20EN193

NO d SA
onalGri
OF Nati
BASEMENT PLAN ROOF DECK PLAN

N ARE THE SOLE PROPERTY


AS-BUILT BY DATE

NED HEREI
FLAME RED TERRA TAPE WARNING
(FOR POWER CABLE)

GRADE LEVEL
ASPHALT
(150MM THICK)
250

SELECTED BACKFILL

CONTAI
(BASE COURSE MATERIALS)
420

STEEL WIRE MESH REV. DATE BY CHKD. CERT. APPD.


DESCRIPTION
620

NO.
PVC COATED
1100

RED CONCRETE TILES DRAWING COMPLETION CERTIFICATE (DCC):

ON
1540

NFORMATI
/
1-50mmOPVC PIPE SLEEVE
FOR F/O CABLES (TYP)

SELECTED BACKFILL
(SUB-BASE COURSE MATERIALS)

AND THE I
440

DRAWN BY MNT CHECKED BY MS SCALE: 1:150

1x200mmO/PVC DUCTS WITH


115kV POWER CABLES DATE STARTED 2021-08-11 DATE COMPLETED 2021-08-11
200

THERMAL SAND
OPR'G. DEPT. ENG. DEPT.

/
1x200mmOPVC SPARE DUCTS THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
250 500 500 500 500 500 250 CONSTRUCTION OR FOR ORDERING

S DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE 2021-08-30

3000
SUBSTATION EQUIPMENT LAYOUT-BASEMENT AND ROOF DECK PLAN

SECTION A-A

THI
13.8kV U/G POWER & F/O CABLE TRENCH CONSTRUCTING NATA 115/13.8KV GIS S/S-2 IN NATA AREA
CROSS SECTION IN SAND DUCT BANK (12-CIRCUITS)
NATA SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

P NG1281ET-923634 02 of 02 00
NG-A (2012/01)

NGA00
00 01 of 01 NG1281ET-923635 P
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

TS OW NER.
1. THIS IS A CONCEPTUAL DRAWING. THE CONTRACTOR SHALL PREPARE DETAILED
DESIGN FOR ENGINEERING AND CONSTRUCTION AS DETAILED OUT
IN SOW/TS APPENDIX-IX.

2. CURRENT TRANSFORMER PARAMETERS AND THEIR APPLICATIONS SHALL BE AS


PER APPENDIX-IX OF THIS SOW/TS.
115kV, 40kA, 1 SECOND, 2000A, 3{, 60Hz, BUS-1A 115kV, 40kA, 1 SECOND, 2000A, 3{, 60Hz, BUS-1B 115kV, 40kA, 1 SECOND, 2000A, 3{, 60Hz, BUS-1B 3. METERS & MEASURING INSTRUMENTS MARKED WITH DOUBLE ASTERISK (**) SHALL

TTEN CONSENT OF I
BE PROVIDED WITH MAXIMUM DEMAND INDICATOR (FUNCTIONAL REQUIREMENT).

K611 K612 4. ACCURACY CLASS OF MAIN PTs OTHER THAN THOSE FOR REVENUE METERING,
SHALL BE 0.2/3P DUAL CLASS FOR BOTH WINDINGS.
D607 D608
5. ALL METERING CTs SHALL HAVE AN ACCURACY CLASS 0.2, ISF 5 UNLESS
OTHERWISE SPECIFIED.
M M M
6. THE CT METERING CORE FOR PQ METER SHALL BE EXTENDED UPTO AMI PANEL
(FOR T602) AND SHORTED.

THOUT THE W RI
BAY CONTROL UNIT (BCU) BAY CONTROL UNIT (BCU) BAY CONTROL UNIT (BCU)
A605 A604 A608
SEE NOTE-2
IED(C1) BCP IED(C1) BCP SEE NOTE-2 IED(C1) BCP SEE NOTE-2

25 25 25

DA DA DA
TC1 TC1 TC1 LEGEND
DV DV

S DOCUMENT W I
A605 DV A604 A608
ES ES ES ES ES ES 25 SYNCHRO CHECK RELAY
600/300/1A TC2 W W TC2 W TC2 600/300/1A
600/300/1A 79 AUTO-RECLOSING RELAY
MRCT MRCT
600/1A TAP VAR VAR MRCT VAR
600/1A TAP AVR AUTOMATIC VOLTAGE REGULATOR
600/1A TAP
CL.0.2 125V 125V 125V CL.0.2 DA DIGITAL AMMETER
ISF 5 DC DC CL.0.2 DC ISF 5 DPDM DIGITAL POWER DEMAND METER COVERING A, V, W, VARS & WHR

SEE NOTE-2
ISF 5
SEE NOTE-2

DPM DIGITAL POWER METER COVERING MW, MVAR


230V AC 230V AC 230V DC DRCT DUAL RATIO CURRENT TRANSFORMER
DV DIGITAL VOLTMETER

THI
TO BUS VTs TO BUS VTs TO BUS VTs EM ENERGY METER (INDEPENDENT OF DPDM)
K613 MRCT MULTI RATIO CURRENT TRANSFORMER
TO AMI
K614 TO AMI SA SURGE ARRESTER
98 PANEL 98 PANEL 98 AUTOMATIC CAPACITOR CONTROL SYSTEM

NED FROM
TO COM NET ACCS
M M
ABTS AUTOMATIC BUS TRANSFER SCHEME
D609 M IED (C) INTELLIGENT ELECTRONIC DEVICE - CONTROL
M RM REVENUE METER
PQM D610 TO PQM
M M PQM POWER QUALITY METER
SEC-WDG 1 DCU DATA COLLECTION UNIT

N PART SHALL BE OBTAI


SEC-WDG 1 BPP BAY PROTECTION PANEL
K615 K616
TO BUS PT BCP BAY CONTROL PANEL
(THROUGH BISTABLE RELAY) INTELLIGENT ELECTRONIC DEVICE - BUS PROTECTION
IED (BP)
IED (TP) INTELLIGENT ELECTRONIC DEVICE - BUSTIE PROTECTION
HS M 3,1 , PTs M HS M HS
3,1 , PTs IED (DOP) INTELLIGENT ELECTRONIC DEVICE - DIRECTIONAL O/C PROTECTION
115kV 115V 115V
-115V X -115V SEC-WDG 2
115kV 115V 115V IED (DP) INTELLIGENT ELECTRONIC DEVICE - DIRECTIONAL PROTECTION
SEC-WDG 2 3 3 3 -115V X -115V
3 3 3 IED (P) INTELLIGENT ELECTRONIC DEVICE - PROTECTION (O/C)
CL 0.2 & 3P FOR BOTH WDG.
CL 0.2 & 3P HMI HUMAN MACHINE INTERFACE
FOR BOTH WDG. (TYP.) LOCATED IN 13.8kV SWGR.

CHECK BUSBAR PROTECTION (CHECK ZONE)


S.A.

S.A. S.A. DISC BUSBAR PROTECTION (DISCRIMINATING ZONE)


3x108kV
PROTN. PROTECTION
H 3x108kV 3x108kV
H H

N FULL OR I
600/1A 600/1A 600/1A
MRCT SPARE SPARE MRCT SPARE MRCT
CL 0.2 CL 0.2 CL 0.2
ISF 5 ISF 5 ISF 5
TRANSFORMER T601 TRANSFORMER T602 TRANSFORMER T603
50/67 MVA, ONAN/ONAF 50/67 MVA, ONAN/ONAF 50/67 MVA, ONAN/ONAF
N 115/13.8kV,60Hz, 115/13.8kV,60Hz, N 115/13.8kV,60Hz, N
Z=22% (50MVA BASE) Z=22% (50MVA BASE) Z=22% (50MVA BASE)
OLTC +12.5% TO -20%, OLTC +12.5% TO -20%, OLTC +12.5% TO -20%,

I
Dyn1 Dyn1 Dyn1

ON
3600/3000/1A
3600/3000/1A SEE NOTE-2
MRCT

REPRODUCTI
SEE NOTE-2 MRCT
(ONLY
(ONLY ON
'B'-PH)
'B'-PH) TO AMI TO AMI
COM NET
TO PQM
PANEL
TO PQM
PANEL REFERENCE DRAWINGS
3600/3000/1A TO BUS 1AND 2 PT's 3600/3000/1A
MRCT MRCT, DRAWING TITLE DRAWING NO.
SPARE (THROUGH PT SELECTION)
CL 0.2 ISF 5
ISF 5 DRAWING CONTROL SHEET ET- 923628
L RM1 PQM L L
SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS- 21EN1004
BAY CONTROL UNIT (BCU)

NO
A605 COM NET COM NET
IED (C & C2) FOR AVR 3,1 , PTs IED (C & C2) FOR AVR
AND OTHER METERING AND OTHER METERING

d SA
IED(C) IED(C2) BCP RM2 13.8kV 115 115 RM3
(SAME AS T601 & (SAME AS T601 &
V-115V X V-115V
3,1 , PTs ES 13.8kV BUS-1) 13.8kV BUS-1)
3 3 3

onalGri
13.8kV 115 115
V-115V X V-115V 25 0.2 & 3P CLASS
3 3 3
0.2&3P CLASS DA
AVR
VAR ES ES

OF Nati
DV
AC

W K302 K303
DC

K301
TP
230V
125V

DV
98
SEE NOTE-2
125V DC

N ARE THE SOLE PROPERTY


SEE NOTE-2
230V AC
TO TAP CONTROL
COM NET
SEE NOTE-2
3,1 , PTs
13.8kV 115 115
V-115V X V-115V
3 3 3
RM4 CL 0.2 & 3P FOR BOTH WDG. (TYP.
TC1 TC1 FOR INCOMER & BUS VTs) TC1
A302 A303
TC2 TC2 TC2
3600A 3600A
A301
3600A 3,1 , PTs
3600/3000/1A 3600/3000/1A 13.8kV 115 115
MRCT MRCT V-115V X V-115V
3,1 , PTs 3 3 3
CORE-3 CORE-3
CL. 0.2, ISF5 13.8kV 115
V-115V X
115
V-115V
CL. 0.2, ISF5 CL 0.2 & 3P FOR BOTH WDG. (TYP. AS-BUILT BY DATE

3 3 3 FOR INCOMER & BUS VTs)

0.2&3P CLASS

NED HEREI
RM
SEE COM NET
SEE NOTE-2 NOTE-2

RM5

3{, 13.8kV, 3600A, 3WIRE, 25KA, 60Hz, BUS-1, 1 SECOND 3{, 13.8kV, 3600A, 3WIRE, 25KA, 60Hz, BUS-2, 1 SECOND 3{, 13.8kV, 3600A, 3WIRE, 25KA, 60Hz, BUS-3, 1 SECOND

CONTAI
IED(TP) K304 K305 IED(TP) K383 K384

25 25 REV. DATE BY DESCRIPTION CHKD. CERT. APPD.


IED(C) SEE IED(C) NO.
ES SEE ES
DA DA
SE

NOTE-2
NOTED OTHERW I

NOTE-2 ES ES
DV DV DRAWING COMPLETION CERTIFICATE (DCC):
IED(C)

ON
(A304) (A305) 3600/1A
SEE 3600/1A DA DA
ES NOTE-2 CT CORE-II

NFORMATI
AC

AC

CT CORE-II
98 98
DC

DC

DPDM DPDM

AC

DC
DC
AC

DA
230V

230V
125V

125V

NC NC 79
79

230V

125V
1250/800/400/1A

1250/800/400/1A
5

5
125V
127V

DPDM A304 A305


CT (TYP.)
1250/800

BUS-3 UNLESS
I
/400/1A

3600A 2000A
CORE-I

SF

SF
79
DRCT

DRCT
AC

CL 0.2 I

CL 0.2 I
DC

AND THE I
230V

125V

SEE NOTE-2 MNT AHH NONE


SEE NOTE-2 DRAWN BY CHECKED BY SCALE:

DATE STARTED 2021-08-17 DATE COMPLETED 2021-08-17


BUS-2 &

TC2 TC2 TC2


OPR'G. DEPT. ENG. DEPT.
B314 B315 B343 B344 B351 B360
TRIP B319 B320 B324 B325 B331 B332 B333 B336 B337 TRIP TRIP B352 B356 B357 B364
630A 1250A 1250A 630A 630A 1250A
TC1 TC1 TC1
CAL FOR BUS-1 &

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

S DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE 2021-08-30
SEE SEE SEE
NOTE-2 NOTE-2 NOTE-2
METERING ONE LINE DIAGRAM
TYPI

THI
K324
CONSTRUCTING NATA 115/13.8KV GIS S/S-2 IN NATA AREA
K326 K329 K330 K334 K335 K341 K342 K343 K346 K347 K353 K354 K361 K362 K366 K367 K370 K374
NATA SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

STATION SERVICE STATION SERVICE


CAPACITOR BANK
(FUTURE)
TRANSFORMER (T301)
CAPACITOR BANK
(FUTURE) TRANSFORMER (T302)
CAPACITOR BANK
(FUTURE)
P NG1281ET-923635 01 of 01 00
NG-A (2012/01)

NGA00
00 01 of 01 NG1281ET-923637 P
H NOTES
A
IY
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

R SP

TS OW NER.
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED.
A B
N 2. THE CLOUDED PORTION GENERALLY INDICATES THE PROPOSED
O V
T 0k WORK UNDER THE SCOPE OF THIS PROJECT & SHALL BE READ
3 ALONG WITH SOW/TS & EXISTING SYSTEM DRAWINGS/DATA FOR
2
CORRECT INTERPRETATION OF THE SCOPE OF WORK.

CONSENT OF I
3. THIS IS A CONCEPTUAL DRAWING. THE CONTRACTOR HAS TO DEVELOP
DETAILED DRAWINGS FOR ENGINEERING AND CONSTRUCTION PURPOSE
BASED ON SCOPE SPECIFIED IN SOW/TS.

TO BE DISMANTLED

TTEN
Telecom.

THOUT THE W RI
Tower

St LP
orage
Bui
ldings

Room

S DOCUMENT W I
LEGEND

SCOPE OF WORK

THI
Bui

NED FROM
ldi
ngs
MH (
E)

Cont MH(
E)
rol

N PART SHALL BE OBTAI


Room
CF
LP
CF
LP

MH Si
dewal
k
MH
MH

LP LP

N FULL OR I
MH
MH(
E) LP
MH

MH

I
CF (
E)

ON
REPRODUCTI
CF
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
Exi
s ting Nata 1
15/1
3.8kV
DRAWING CONTROL SHEET ET- 923628
Substation LP Gantary SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS- 21EN1004

NO
-
LP MH

d SA
-

onalGri
-

OF Nati
LP

N ARE THE SOLE PROPERTY


LP

AS-BUILT BY DATE

TO AS'SARRAR S/S

NED HEREI
CONTAI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
THE I
DRAWN BY MNT CHECKED BY MS SCALE: NONE

DATE STARTED 2021-08-25 DATE COMPLETED 2021-08-25

AND
OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

S DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE 2021-08-30

DISMANTLE/DEMOLITION WORK
AT EXISTING NATA 115/13.8KV SUBSTATION

THI
NATA-2 115/13.8KV SUBSTATION PORTION
NATA SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

P NG1281ET-923637 01 of 01 00
NG-A (2012/01)

VECTOR NGA00
NG1281ET-923643 01 of 01 00 S
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

TS OW NER.
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
NOTED.

2. THIS IS A CONCEPTUAL DRAWING. THE CONTRACTOR SHALL


DEVELOP DETAIL DESIGN DRAWING FOR ENGINEERING AND
CONSTRUCTION.

TTEN CONSENT OF I
N

THOUT THE W RI
orary
Tem p
erator
r Gen
Powe
osed
Encl

S DOCUMENT W I
LEGEND
NARIYAH
NORTH
BSP NARIYAH
NORTH
BSP
SARAR
-2
SARAR
-2

THI
COR-1

TOMER

NED FROM
PARKI

A
NG

M ARE
AL CUS

8000
MWC

TELECO
E)

EXTERN
ID
W FENC
E TY
MSC

5000
PE-V

N PART SHALL BE OBTAI


6000

0M |
OF S

5.
A

( |
OF S
MONO TEEL
POLE

AD
GANT
RY

10000
RO
COR-2
RELOC
ATED
COMMUN

SS
TOWER ICATI
ON

PANE
CONT
LOCAL
75

L
ROL

DUCT
CONT
15

CE
13

BANK
ROL
EL.
TOC
- 1.

CABL
30

E
T-601
AC 10000

ED
FUTU
RE

BURI

ED
BURI
x2)
T

RECT
TS (6

x2)
AL

RECT
C DI

TS (6
I
CDP-1
REFER OUTLI

CONDU

VC DI
PACU-1

8kV PV
T/F

I
A

DRAWI

CONDU
H

8kV P
NG
NE

13.
P

13.
AS
PACU-1

N FULL OR I
B

FI TO EX
RE W TERNA
ALL L NETWO
RK

ED
L
SCD
HVAC P
OWER

OS
OWS

A
OWS SMH-1

RY ARE
SEPTI
C TANK
EWS

PANEL
CONT
LOCAL
P
SEEPA
GE PI
T

ROL

BATTE

2200
DUCT
CONT
O
CONT

F
ROL

RMP R

PS
ROOM

BANK
ROL
TOI

P
LET

EL.
(
18.
00 x

RMP R
TOC
- 1.

CABL
1

PR
2.
50)

L
MP RM

TDI
30

S
T-602

MP RM

T
3200

P RMP

PQM
115kV
(12.

E
MRL
P AMR

ABTS R
00X22

T
U/V
GI

I
S ROOM

TCC3RT
AMR 6
.50M)

U/F

(10.
CLEAN
CC2RT
BS1 6B

S
BM B

UBDC1
18000

5 x 3
F-2 I

CC1 BPP BPP


DCDB

ON
C2 6B

C2 B
I
REFER OUTLI

EGENT
NV

F-1 6

-T3 -

.
T/F

2)
C16BB

C1 I
SAS S
DRAWI

S
AP

UBDC2
T3 -T

REPRODUCTI
NV BPP-1BPP
NG

ROOM
CU 6BB
NE

TANK
P
AS SA

BPP B
L

3 -T2
-6.
6 6BB5

L
BP
-6.
1L

P
S SAS

PP BP
-
2L
-5.

S
2

UBAC1

WATER
B
-1BPP-

-5.
1L

P
OL

-T2 -
P-2BPP
6BB4 6

2L
-4.

P BPP
CONTR
1

SAS S
800

-4.
1L
1BPP-1

T2 -
-2BPP-
BB3 6B
REFERENCE DRAWINGS

2L
-3.

-3.
1L
FI

AS SA
HVAC

S
RE W

BPP B

UBAC2
BPP-1B
ALL

T
2L
-2.

1
2BPP-2
B2 6B
13.
8kV P

-2.
1L
VC DI

-
S
RECT

T1 -T
PP BP
1200

2L
BURI

-1
PP-1
ED

B1
COND

BPP-2
UI

.
800

57000
TS (

-1
3x2) 1800

.
2
1600

1
P
2000
3000 ACDB
1800
1600
1
DRAWING TITLE DRAWING NO.
900

2000
3000
ACDB
SIS WORK
SHOP

ROUG DRAWING CONTROL SHEET ET- 923628


7500 HLY

3000
COMM
.ROO
M
GRAD

EF-1
(
WI ED A
9400 THOU REA
T GR

1800

B311

B312
AVEL) SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS- 21EN1004

FUTUR

B313

B314

B315

B316

B317

B318
T-603

B319

A301

NO
B320

B321

B322

B323

NG
B324

VT/BUS
B325

A304

NG
SER/
A

EARTH
I/C

VT/BUS
BUS

NK

B331
EARTHI

B332
LI

B333
RI

B334

B335
MH

B336
I/C

E)
SWI

A302
sp

TCHG
ER RO SUPP
OM LY-1

d SA
(11X28)
M

B364

B363

B362

B361

B360
I/C

B359
h

B358
EF-2

B357

A303
13.
8kV P

B356

B355
VC DI

EARTH
B354
RECT

B353

VT/BUS
B352
BURI

B351
COND ED

onalGri
RI
UITS (

LI
3x2)

A305
a

SER/
BUS

ADAP
NK
I

B344
NG

B343

B342

B341

B340

B339

B338

B337
lt

DN T301
T302 MH

1500

Y-2
SUPPL

100000
13.
8kV P
VC DI
RECT
BURI
R

COND ED 13.
UITS ( 8kV P
6x2) VC DI
BURI
ED FO RECT
PACU-2 R CA

OF Nati
A PACI
TOR B
ANK
o

MH CDP-2
PACU-2
B
a

4.
0M WI
d

DE RO
AD (
TYP)
(E

N ARE THE SOLE PROPERTY


x
is

65000
ti

CURB
STON
E
(
ASPHA
n

LT L
IMI
T)
g
)

ROUG
HLY
GRAD
(
WI ED A
THOU REA
T GR
AVEL) AS-BUILT BY DATE

NED HEREI
COR-4

CONTAI
FENC
E TY
PE-I
II
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

DRAWING COMPLETION CERTIFICATE (DCC):


100000

ON
NFORMATI
COR-3

AND THE I
MNT CHECKED BY MS 1:500
DRAWN BY SCALE:

2021-08-17 2021-08-17
DATE STARTED DATE COMPLETED

OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

S DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE 2021-08-30

SITE DEVELOPMENT PLAN

THI
CONSTRUCTING NATA 115/13.8KV GIS S/S-2 IN NATA AREA
NATA SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

S NG1281ET-923643 01 of 01 00
NG-A (2012/01)

NGA00
00 01 of 01 NG1281ET-923644 S
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

TS OW NER.
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
NOTED.
EXI
ST.115
KV O 2. THIS IS A CONCEPTUAL DRAWING. THE CONTRACTOR SHALL
HTL F
ROM DEVELOP DETAIL DESIGN DRAWING FOR ENGINEERING AND
NARI
YAH
NORTH CONSTRUCTION.
BSP T

TTEN CONSENT OF I
O AS-
SARRA
NARIYAH R-2 N

NORTH
BSP POINT-A
N:300
9718.
81
EXI E:250 POI
NT-B
STI
NG 660.83
TOWER

THOUT THE W RI
PROPO
SED
TOWER
PROPO
SED
TOWER

S DOCUMENT W I
PROPO LEGEND
SED C
ONDUC
TOR
SARAR
-2 S/S
EXISTI
NG
TOWER

THI NED FROM


N PART SHALL BE OBTAI
(NTS)
15KM
4.
PROPO
SED

N FULL OR I
TOWER
PROPO
SED
TOWER

I ON
REPRODUCTI
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

DRAWING CONTROL SHEET ET- 923628

AD SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS- 21EN1004


RO

NO
COR-1
SS
CE
AC
OMER

T E

d SA
PARKI
AREA

AL D
NG
CUST

H WI
8000

P MWC
AS .
COM

0M
RNAL
TELE

ED 5
EXTE

OS

onalGri
OP MSC
PR FENC

5000
E TY
PE-V

6000
|
OF S
A

|
OF S

OF Nati
MONO TEEL
POLE
GANT
RY

10000
COR-2
RELOC
ATED
COMMU
NI
CATI
TOWER ON
PANE
CONT
LOCAL
L
ROL

DUCT
CONT
BANK
ROL
EL.
TOC
- 1.

CABL
30

E
T-601

10000

ED
FUTU
RE

BURI

N ARE THE SOLE PROPERTY


ED
BURI
x2)
RECT
TS (6

x2)
RECT
VC DI

TS (6
I
CDP-1

CONDU
REFE

C DI
PACU-
T/F

UI
R DRAWI

1A

8kV P
OUTL

COND
8kV PV
I
NG
NE

13.

13.
PACU-1
B

TO EX
FI
RE W TERNA
ALL L NETWO
RK

LSCD
HVAC P
OWER

OWS
A

OWS SMH-1
RY ARE

SEPTI
C TANK
EWS
PANE
CONT
LOCAL

SEEPA
GE PI
T
L
ROL

BATTE

2200
DUCT
CONT

CONT
F

ROL
RMP R

PS

ROOM
BANK
ROL

TOI
P

LET
EL.

(
18.
00 x
RMP R
TOC
- 1.

CABL

12.
50)
L
MP RM

TDI
30

S
T-602

MP RM

3200
P RMP

PQM
115kV

E
(12.

MRL
P AMR

ABTS R
00X22

T
U/V U
GIS ROO

TCC3RT
AMR 6
.50M)

/F

(10.
CLEAN
M

CC2RT
BS1 6B

S
BM B

UBDC1
18000

5 x 3
F-2 I

CC1 BPP BPP


DCDB

C2 6B

C2 B
I

EGENT
NV
REFER OUTLI

F-1 6

-T3 -

.
T/F

2)
C16BB

C1 I
SAS S
DRAWI

S
AP PD BPP-

UBDC2
T3 -T
NV BPP-1BPP

ROOM
CU 6BB
NG
NE

TANK
AS SA

BPP B
L

3 -T2
-6.

L
6 6BB5

-6.
1L
S SAS

PP BP
2L
-5.

S
2BPP-2

UBAC1

WATER
-1BPP-

-5.
1L
OL

-T2 -
6BB4 6

2L
-4.

P BPP
CONTR

BPP-2B

1
SAS S

800
-4.
1L
1BPP-1

T2 -
BB3 6B

2L
-3.

-3.
1L

PP-2BP
AS SA
HVAC

FI
S

RE W
BPP B

UBAC2
BPP-1B

T1 -T

ALL
2L
-2.
B2 6B

13.
8kV P
-2.
1L

VC DI
P-2BPP
S

RECT
PP BP
1200

2L
-1

1 -T1
PP-1

BURI

AS-BUILT
B1

COND ED
.

57000
UI 800
1

-1

TS (
3x2) 1800
BY DATE
.
-2
2

1600
P

2000 1800
1600
3000 ACDB 1900
2000

3000
ACDB
SIS WORK
SHOP
ROUG
7500 HLY
3000

COMM
.ROO
M
GRAD
EF-1

(
WI ED A
9400 THOU REA
T GR
(

1800

B311

AVEL)
B312

NED HEREI
FUTUR

B313

B314

B315

B316

B317

B318
T-603

B319

A301

B320

B321

B322

B323

NG
B324

VT/BUS
B325

EARTHI

A304

NG
SER/

I/C
VT/BUS
BUS

NK

B331
I

B332
LI

EARTH

B333

B334
RI

MH
B335

B336

I/C
E)

SWI
A302

TCHGE
R RO SUPP
OM LY-1
(11X28)
M
B364

B363

B362

B361

B360

I/C
B359

B358
EF-2

B357

A303

13.
B356

8kV P
B355

EARTHI

VC DI
B354

B353

RECT
VT/BUS
B352

BURI
B351

COND ED
RI

UITS (
LI

A305

3x2)
SER/
BUS

ADAP
NK

B344
NG

B343

B342

B341

B340

B339

B338

B337

DN T301
T302 MH
1500

Y-2
SUPPL

100000

CONTAI
13.
8kV P
VC DI
RECT
BURI
ED
COND 13.
8kV P
UITS ( VC DI
6x2) BURI RECT
PACU-2 ED FO
R CA
A PACI
TOR B
ANK
MH CDP-2
PACU-2
B
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
4.
0M WI NO.
DE RO
AD (
TYP)

DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
65000
CURB
STON
E
(
ASPHA
LT L
IMI
T)

AND THE I
DRAWN BY MNT CHECKED BY MS SCALE: 1:500

ROUG
HLY 2021-08-17 2021-08-17
GRAD
(
WITHOU
ED A
REA DATE STARTED DATE COMPLETED
T GR
AVEL)

OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


COR-4

NG
CONSTRUCTION OR FOR ORDERING

S DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE 2021-08-30

FENC
E TY
PE-I
II LOOP IN AND LOOP OUT ARRANGEMENT

THI
100000
CONSTRUCTING NATA 115/13.8KV GIS S/S-2 IN NATA AREA
COR-3 NATA SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

S NG1281ET-923644 01 of 01 00
NG-A (2012/01)

NGA00
ET-923646 01 of 01 00 NG1282 P
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

TS OW NER.
1. THIS IS A CONCEPTUAL DRAWING ONLY. THE CONTRACTOR
SHALL PREPARE DETAILED DRAWINGS FOR ENGINEERING AND
CONSTRUCTION.

2. THE CLOUDED PORTION GENERALLY INDICATES THE PROPOSED


115kV GIS VOLTAGE TRANSFORMER WORK UNDER THE SCOPE OF THIS PROJECT & SHALL BE READ

TTEN CONSENT OF I
ALONG WITH SOW/TS & EXISTING SYSTEM DRAWINGS/DATA FOR
LOCATION WINDING RATIO DUAL CLASS BURDEN CORRECT INTERPRETATION OF THE SCOPE OF WORK.

115000 115 100 VA - WITH CLASS 3P


1 V -115V 0.2/3P
3 3 100 VA - WITH CLASS 0.2

115000 115V 100 VA - WITH CLASS 3P


2 V -115V 0.2/3P
3 3 100 VA - WITH CLASS 0.2

SIMULTANEOUS BURDEN WITH CLASS 3P = 200 VA (MIN.)

THOUT THE W RI
LEGEND

S DOCUMENT W I
M
MOTORIZED DISCONNECT SWITCH

MOTORIZED EARTHING SWITCH

HS
M

HIGH SPEED LINE EARTHING SWITCH


FROM 380kV FROM 380kV FUTURE

THI
(MOTORIZED)
TRASNFORMER T-801 TRASNFORMER T-802 T-803
(SH.01) (SH.01)

NED FROM
VOLTAGE TRANSFORMER
3-1/Cx 2000 Sq.mm, 115kV/Cu/XLPE CABLE/PHASE (TYP)
115kV GIS

GIS SURGE ARRESTER

N PART SHALL BE OBTAI


GIS S.A 3-1PH, GIS GAS INSULATED SWITCHGEAR
108kV (TYP.)
3-1PH, VT (TYP.)
115kV 115V 115V 115V 115V SF6/XLPE CABLE COMPARTMENT
K651 K624 K660
3 3 3
0.2 & 3P (DUAL CLASS)
M M M
SF6/AIR BUSHING TERMINATION
100VA (MIN.)
D647 D620 D656
M (TYP.) M M

AIR/XLPE TERMINATION
K650 K623 K659

M M M
OIL/AIR TERMINATION
A617 A608 A620
3150A 3150A 3150A

AD21
AD20
AD10

AD11

AD12

K649 K622 K658 SURGE ARRESTER (O/D)


K609 K601 K602 K610

AD34
AD33
AD31

AD32
AD22

AD23

AD24

AD25

AD26

AD27

AD28

AD29

AD30
AD01

AD02

AD03

AD04

AD09
AD05

AD06

AD07

AD08

N FULL OR I
AD13

AD14

AD15
M M M M M M
M M M
115kV, 3150A, 40KA (1 SEC), BUS-1A 115kV, 3150A, 40KA (1 SEC), BUS-1B

D601 D602 D607


M M A601 M M

D669 D663 D657 D651 D645 D639 D633 D627 D621 D615 D609 3150A D612 D618 D624 D630 D636 D642 D648 D654 D660 D666 D672
D605
M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M
K605 K607
3150A 3150A

I
M M

D670 D664 D658 D652 D646 D640 D634 D628 D622 D616 D610 D613 D619 D625 D631 D637 D643 D649 D655 D661 D667 D673

ON
K613
D606 K608

REPRODUCTI
M M M M M M M M M M M M M M M
K606 M
K613 M
M M M M M M M M M M M M M M M

M M M M

D608
115kV BUS-2A 3150A, 40kA (1 SEC) 115kV BUS-2B 3150A, 40KA (1 SEC) BUS-2B

D603
REFERENCE DRAWINGS
M
D604 M

M M M M K611 A602 M M M M M M M DRAWING TITLE DRAWING NO.


K673 M K667 M K661M K655 M K643 M K637 M K631M K625 M K619 M K613 M K612
M
K628 M K634 M K640 K646 M
K652 M
K664 K670 K676 M

3150A
3-1PH, VT
K616 DRAWING CONTROL SHEET ET-923645
115kV 115V 115V 115V 115V
A625 A623 A621 A619 A615 A613 A611 A609 A607 A605 A606 A610 A612 A614 A616 A618 A622 A624 A626
3 3 3 SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS-21EN1004
2000A 2000A 2000A 2000A 2000A 2000A 2000A 2000A 2000A 2000A 2000A 2000A 2000A 2000A 2000A 2000A 2000A 3150A 2000A 2000A

NO
CL 0.2/3P (DUAL CLASS)
M M M M
K614 M K614 M K614 M K614 M K644 M
K638 M
K632 M K626 M K620 M
K614 M TYPICAL GIS VT M
K629 M K635 M K641 M K647 M
K653 M
K665 M
K671 M K677 M M M M M

d SA
D671 D665 D659 D653 D641 D635 D629 D623 D617 D611 K617 D614 D626 D632 D638 D644 D650 D662 D668 D674
M M M M M M M M M M M M M M M M M M M M M M M M M M M
-

onalGri
HS HS HS HS HS HS HS HS HS HS HS HS HS HS HS HS HS HS HS HS HS HS HS HS
M M M M M M M M M M M M M M M M M M M M M M M M M M M

K639 K633 K627 K621 K615 K618 K636 K642 K648 K654 K666 K672 K678
K675 K669 K663 K657 K645 K630 -

OF Nati N ARE THE SOLE PROPERTY


KARMAH FUTURE
SEE NOTE-5 SEE NOTE-5 SEE NOTE-5
SVC
FUTURE FUTURE
SPARE

2-1/Cx 2000 Sq.mm,


115kV/Cu/XLPE CABLE/PHASE (TYP)

AS-BUILT BY DATE

NED HEREI
SPARE QARYAT NARIYAH-1 NARIYAH-2 NARIYAH-3 NARIYAH-1 QARYAT NATA-2 SS SPARE
AL-ULYA-2 NATA-2 SS AL-ULYA-2 01 2015-04-20 AAA CHANGE IN BAY DESIGNATION

CONTAI
FUTURE
T602
T603
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
SF6/AIR TERMINATION (TYP.) NO.

SA O/D DRAWING COMPLETION CERTIFICATE (DCC):

ON
3-1PH

NFORMATI
108kV
(TYP.) OIL/AIR TERMINATION (TYP.)

POWER TRANSFORMER 115/33kV


80/100MVA ONAN/ONAF Dyn1 M

AND THE I
T601 Z(PS)=14% (80 MVA BASE), DRAWN BY MNT CHECKED BY AHH SCALE: NONE

+10% to -15% OLTC TAPS


DATE STARTED 2021-08-25 DATE COMPLETED 2021-08-25
ON 115kV SIDE IN STEPS OF
SA 3-1PH
1.25% (20 STEPS)
30kV O/D OPR'G. DEPT. ENG. DEPT.

(TYPICAL) (TYPICAL)

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

S DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE 2021-08-30

AIR/XLPE TERMINATION (TYP.)


MAIN ONE LINE DIAGRAM (115kV)
REMOTE END S/S PROTECTION MODIFI. AT NARIYAH NORTH 380/115/33kV BSP

THI
NATA-2 115/13.8kV SUBSTATION
NATA SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

P NG1282 ET-923646 01 of 01 00
NG-A (2012/01)

VECTOR NGA00
ET-923647 01 of 01 00 NG1282 P
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

TS OW NER.
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED.

2. THIS IS A CONCEPTUAL DRAWING. CONTRACTOR HAS TO


DEVELOP DETAILED DESIGN DRAWINGS FOR ENGINEERING AND
CONSTRUCTION PURPOSE, BASED ON SCOPE SPECIFIED IN PTS.

3. THE CLOUDED PORTION GENERALLY INDICATES THE PROPOSED

TTEN CONSENT OF I
WORK UNDER THE SCOPE OF THIS PROJECT & SHALL BE READ
ALONG WITH SOW/TS & EXISTING SYSTEM DRAWINGS/DATA FOR
CORRECT INTERPRETATION OF THE SCOPE OF WORK.

4. THE PROPOSED LOCATION OF THE PROTECTION PANELS ARE


ONLY CONCEPTUAL. CONTRACTOR RESPONSIBILITY TO VERIFY THE
LOCATION BASED ON THE FINAL LAYOUT OF THE SUBSTATION.

THOUT THE W RI
S DOCUMENT W I
LEGEND

THI
CONTROL CABLE
CONTROL CABLE FUTURE DUCTBANK FE FIRE EXIT
TUNNEL CABLE

NED FROM
DUCTBANK EW/DH EYE WASH / DRENCH HOSE
FE
SIDEWALK (ALL AROUND) FACP FIRE ALARM CONTROL PANEL
DN

N PART SHALL BE OBTAI


1800

115kV (I) LINE/CABLE PROT. SET-1 380kV LINE PROT. SET-1


1800 1800

INVERTER

M ARSHALLING KIOSK
PANEL
115kV (I) LINE/CABLE PROT. SET-2 380kV LINE PROT. SET-1

FACP
FIRE PROTECTION

SAS COM M .
EQUIPMENT ROOM COMMUNICATION ROOM CONFERENCE ROOM STORE
(11000x15000)

PANEL
(7000 x 11000) (6000 x 11000) (4800 x 1100)
PSE SET-1 PSE SET-1

N FULL OR I
RELAY PANEL ROOM
SAS COM M .
PANEL
PSE SET-2 AUTO RECLOSE PSE SET-2

I ON
SAS PANELS

GATEW AYS,
115kV CABLE PROT. AUTO RECLOSE TCS/PD/BF

REPRODUCTI
SERVER,

.)
25000

.
GPS.
C O R R I D O R
REFERENCE DRAWINGS

(
DRAWING TITLE DRAWING NO.

BS, BC O/S 115kV BBD 115kV BFP 380kV RTCC REACTOR TRAN. PROT. (T801 & T802)
DRAWING CONTROL SHEET ET-923645

CONTROL &
SAS PANELS

GATEW AYS,
SERVER,

)
48V BATTERY SCOPE OF WORK AND TECHNICAL SPECIFICATIONS

.
PTS-21EN1004

.
GPS.

NO
(

d SA
TFR/SOE/SCADA/DSM BFP

125V BATTERY OFFICE -

onalGri
EW S
(6800x7900)

LCD M ONITOR
-
RELAY & TEST ROOM
AMR BBD BATTERY ROOM (8000x11000) -
115kV MET/ANN.

OF Nati
(8000 X 11000)

HM I

BANK-2

BANK-1
RTCC TRSF. PROT. (T601, T602,T603) 380kV MET/ANN.

N ARE THE SOLE PROPERTY


EW /DH
AUXILIARY ROOM TOILET
(10000x11000) (3000x6800)
1800

FE
DN
CONTROL CABLE
TUNNEL
AS-BUILT BY DATE

NED HEREI
75000

CONTAI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
AND THE I
DRAWN BY MNT CHECKED BY AHH SCALE: NONE

DATE STARTED 2021-08-25 DATE COMPLETED 2021-08-25

OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

S DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE 2021-08-30

CONTROL BUILDING EQUIPMENT LAYOUT


REMOTE END S/S PROTECTION MODIFI. AT NARIYAH NORTH 380/115/33kV BSP

THI
NATA-2 115/13.8kV SUBSTATION
NATA SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

P NG1282 ET-923647 01 of 01 00
NG-A (2012/01)

VECTOR NGA00
ET-923652 01 OF 01 00 NG1281 P
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

TS OW NER.
1. THIS IS A CONCEPTUAL DRAWING ONLY. THE CONTRACTOR
SHALL PREPARE DETAILED DRAWINGS FOR ENGINEERING AND
CONSTRUCTION.

2. THE CLOUDED PORTION GENERALLY INDICATES THE PROPOSED


WORK UNDER THE SCOPE OF THIS PROJECT & SHALL BE READ

TTEN CONSENT OF I
ALONG WITH SOW/TS & EXISTING SYSTEM DRAWINGS/DATA FOR
CORRECT INTERPRETATION OF THE SCOPE OF WORK.

115KV OHTL TO 115KV OHTL TO

NATA -2 115/13.8KV SS NATA -2 115/13.8KV SS

(A603) (A602)

THOUT THE W RI
LEGEND

S DOCUMENT W I
M
MOTORIZED DISCONNECT SWITCH

MOTORIZED EARTHING SWITCH

HS
M

HIGH SPEED LINE EARTHING SWITCH

THI
(MOTORIZED)

NED FROM
VOLTAGE TRANSFORMER

GIS SURGE ARRESTER

N PART SHALL BE OBTAI


GIS GAS INSULATED SWITCHGEAR

SF6/XLPE CABLE COMPARTMENT

SF6/AIR BUSHING TERMINATION

AIR/XLPE TERMINATION

OIL/AIR TERMINATION

SURGE ARRESTER (O/D)

N FULL OR I
I ON
REPRODUCTI
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

DRAWING CONTROL SHEET ET-923651

SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS-21EN1004

NO d SA
onalGri
OF Nati N ARE THE SOLE PROPERTY
AS-BUILT BY DATE

NED HEREI
CONTAI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
AND THE I
DRAWN BY MNT CHECKED BY AHH SCALE: NONE

DATE STARTED 2021-08-25 DATE COMPLETED 2021-08-25

OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

S DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE 2021-08-30

MAIN ONE LINE DIAGRAM


REMOTE END S/S PROTECTION MODIFI. AT AS-SARRA-2 SS

THI
NATA-2 115/13.8KV SUBSTATION
NATA SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

P NG1281 ET-923652 01 of 01 00
NG-A (2012/01)

VECTOR NGA00
ET-923653 01 OF 01 00 NG1281 P
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

TS OW NER.
1. THIS IS A CONCEPTUAL DRAWING ONLY. THE CONTRACTOR
SHALL PREPARE DETAILED DRAWINGS FOR ENGINEERING AND
CONSTRUCTION.

2. THE CLOUDED PORTION GENERALLY INDICATES THE PROPOSED


WORK UNDER THE SCOPE OF THIS PROJECT & SHALL BE READ
ALONG WITH SOW/TS & EXISTING SYSTEM DRAWINGS/DATA FOR

TTEN CONSENT OF I
CORRECT INTERPRETATION OF THE SCOPE OF WORK.

3. THE PROPOSED LOCATION OF THE PROTECTION PANELS ARE


ONLY CONCEPTUAL. CONTRACTOR RESPONSIBILITY TO VERIFY THE
LOCATION BASED ON THE FINAL LAYOUT OF THE SUBSTATION.

THOUT THE W RI
LEGEND

S DOCUMENT W I
THI
N FULL OR I
I ON
REPRODUCTI NED FROM
N PART SHALL BE OBTAI
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

DRAWING CONTROL SHEET ET-923651

SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS-21EN1004

NO d SA
onalGri
OF Nati N ARE THE SOLE PROPERTY
AS-BUILT BY DATE

NED HEREI
CONTAI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
AND THE I
DRAWN BY MNT CHECKED BY AHH SCALE: NONE

DATE STARTED 2021-08-25 DATE COMPLETED 2021-08-25

OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

S DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE 2021-08-30

CONTROL BUILDING EQUIPMENT LAYOUT


REMOTE END S/S PROTECTION MODIFI. AT AS-SARRA-2 SS

THI
NATA-2 115/13.8KV SUBSTATION
NATA SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

P NG1281 ET-923653 01 of 01 00
NG-A (2012/01)

VECTOR NGA00
E 244,000 UTM E 248,000 UTM E 252,000 UTM E 256,000 UTM KEY MAP
Nariyah

Abu Hadriyah
THE SITE
As Sarrar JUBAIL

Arabian
Gulf

Hanidh

DAMMAM

Nata SS
W
AY Abqai
q

PRE
EX
AM
M
M
DA
-
DH HOFUF
YA
RI QATAR
ROAD

Khur
ais

115kV Transmission Line


Nariyah BSP to Nata S/S RIYADH
(To be dismantle)
(Approx. Length=29.29km.)

Haradh
KEY MAP
Al-Kharj NOT TO SCALE
U TM

U TM
NOTES
3,012,000

3,012,000
1. ALL VALUES ARE IN METERS.

2. COORDINATES ARE IN UTM GRID, ZONE 39


DATUM: AIN EL ABD, SAUDI ARABIA

PROPOSED 3. USERS NOTING ERRORS OR OMISSIONS ON THIS MAP ARE


NATA 115/13.8kV SUBSTATION#2 REQUESTED TO MARK HEREON AND RETURN TO SENIOR
PROPERTY CORNER COORDINATES
CARTOGRAPHER, ESD S&ROW DIVISION-EAST.
115kV Transmission Line CORNER NORTHINGS EASTINGS
N

N
Tapping Point to Nata S/S
Nata Wooden H-Frame Structure Cor.#1 3010893.282 246878.937
S/S (On-Going Project) 115kV Trans. Line
Nariyah North BSP Cor.#2 3010878.786 246977.922
to As-Sarrar S/S#2
PP#154 SEE ENLARGEMENT No. 2 (On-Going Project) Cor.#3 3010779.822 246963.464
13.8kV Trans. Line
To NATA Substation Cor.#4 3010794.286 246864.458
PI-A3
PI-A4

PI-B4 PI-B3
NATA
115/13.8kV S/S#2

END POINT "A"


PROPOSED 115kV O/H TRANSMISSION LINE "A" PROPOSED 115kV O/H TRANSMISSION LINE "B"
NARIYAH N. BSP, POINT "A" TO NATA 115/13.8kV S/S#2 AS-SARRAR S/S#2, POINT "B" TO NATA 115/13.8kV S/S#2
END POINT "B"
UTM GRID, ZONE 39 UTM GRID, ZONE 39

(DATUM: AIN EL ABD, SAUDI ARABIA) (DATUM: AIN EL ABD, SAUDI ARABIA)
LEGEND
PROP. 115kV O/H TRANS. LINE PI-A2 A
NARIYAH NORTH BSP, POINT "A" POINT NORTHING EASTING DEFLECTION POINT NORTHING EASTING DEFLECTION
SEE ENLARGEMENT No. 1
TO NATA 115/13.8kV S/S#2 START/A 3009825.64 250830.47 START/B 3009809.65 250805.08
PI-B2
(Approx. Length 4.15 Km.)
PI-A1 3010015.05 250711.18 DL: 45-40-36 PI-B1 3009988.38 250692.53 DL: 45-40-40
115TL PROP. 115kV TRANSMISSION LINE
PI-A1
PROP. 115kV O/H TRANS. LINE A PI-A2 3010261.04 249565.97 DR: 05-10-53 PI-B2 3010231.99 249558.34 DR: 05-10-53
PI-B1
AS-SARRAR S/S#2, POINT "B" PI-A3 3010985.60 247240.22 DL: 25-08-54 PI-B3 3010954.97 247237.69 DL: 25-08-54 115TL 115kV TRANS. LINE (ON-GOING)
TO NATA 115/13.8kV S/S#2
PI-A4 3010939.09 246902.62 DL: 73-49-28 PI-B4 3010910.99 246918.47 DL: 73-49-28
(Approx. Length 4.15 Km.)
END/A 3010885.96 246894.84 END/B 3010883.10 246914.39
380kV TRANS. LINE (ON-GOING)
START POINT "A" (LOOP IN)

START POINT "B" (LOOP IN)


380TL EXIST. 380kV TRANSMISSION LINE

230TL EXIST. 230kV TRANSMISSION LINE

115TL EXIST. 115kV TRANSMISSION LINE

13.8TL EXIST. 13.8kV TRANSMISSION LINE

U/G PIPELINE (BURIED)


U TM

U TM
FENCELINE

380kV Trans. Line


3,008,000

3,008,000
Fadhili Gas Plant to
START Wadi Al-Summan BSP
Point (On-Going Project)

Waste
Dump Site
N

N
Proposed Access Road

13.8kV Trans./Line

115kV Transmission Line


Tapping Point to Nata S/S 13.8kV Trans. Line
Wooden H-Frame Structure To NATA Substation
(On-Going Project)
SCALE 1 : 20,000

0 200 400 600 800 1,000 2,000m.

METERS

PI-A4

rary Point#2
U TM

U TM
Tempo tor
Genera
Power Point#5
Enclosed
PI-B4
. Point#3
6m
.7
66 Point#4
3,004,000

3,004,000
Cor.
PROPOSED NATA ACCESS ROAD
AD #1
PROPERTY CORNER COORDINATES RO End"A" REV.
)
SS DE End"B" DATE BY DESCRIPTION CHK'D BY DATE

3.
. Cor.#2 No.
0m CE W I

99
5.5 .AC M

m
CORNER NORTHINGS EASTINGS 4 P PROP. 115KV O/H TRANS. LINE
O 5.0 CONCURRED BY:

.
. PR ( NARIYAH NORTH BSP, POINT"A"
5m
NT"A"

Point#1 3010829.77 246758.45 Point#1 .4 TO NATA 115/13.8kV S/S#2


19
TR A N S . LIN E

TR A N S . LIN E

PROP. 115KV O/H TRANS. LINE


S /S # 2, P O IN T"B "

Point#2 3010899.61 246870.20

‫ءﺍﺏﺭﻩﻙﻝﺍ ﻝﻕﻥ‬
NATA

8.
YAH NORTH BSP,POI

NARIYAH NORTH BSP, POINT"A"


S /S # 2

S /S # 2

ENLARGEMENT No. 1 Point#6 MANAGER, ENGINEERING DATE

16
TO NATA 115/13.8kV S/S#2 115/13.8kV S/S#2 PROP. 115KV O/H TRANS. LINE
Point#3 3010883.76 246978.61

m
SCALE NTS
AS-SARRAR S/S#2, POINT"B"

.
PROP. 115KV O/H TRANS. LINE . CONCURRED BY:
m TO NATA 115/13.8kV S/S#2

As
Point#4 3010878.81 246977.89
A NARIYAH NORTH BSP, POINT"A" 74
115/13.8kV

115/13.8kV

PROP. 115KV O/H TRANS. LINE


5. National Grid SA
ne

ph
N

N
TO NATA 115/13.8kV S/S#2 AS-SARRAR S/S#2, POINT"B"
8kV Trans.Li

al
Point#4 3010894.40 246871.29
O /H

O /H

t
TO NATA 115/13.8kV S/S#2

Ro
P Point#4 3010825.53 246761.10 MANAGER, PROJECT DATE
P R O P . 115K V

P R O P . 115K V

ad
BS
A S -S A R R A R

th
or

(E
N A TA

N A TA

N DRAWN BY: THIS DRAWING AND THE INFORMATION CONTAINED


Cor.#4
ah

xi
PI-A1 iy HEREIN ARE RESTRICTED. NO REPRODUCTION IN
ar

st
PROP. 115KV O/H TRANS. LINE
NARI

N
FULL OR IN PART SHALL BE OBTAINED WITHOUT THE
To 2019/11/21

in
Cor.#3
.13.

FAH
AS-SARRAR S/S#2, POINT"B"
C orridor

g)
CONSENT OF SURVEY & ROW DIV. - EAST
TO

TO

TO NATA 115/13.8kV S/S#2 PI-A4 CARTOGRAPHER DATE


A
st

PI-B1
Exi

FIELD VERIFICATION BY: CERTIFIED BY:

50m. Cor. PI-B4 A


#1 JOSEPH L. REGIS
EID G. AL-DHAFEERI
of R O W

| OF SA MWC
MSC
|
OF ST
MONOP EEL
OLE G
ANTRY

Cor. SURVEY DATE


R

#2
USTOME
AREA
NAL C
TELECOM
ED

EXTER

MANAGER, SURVEY & ROW DIV. - EAST


BURI

DATE
x2)

ED
RECT

BURI
TS (6

ED
I

x2)

BURI

ED
PVC D

BURI
RECT
CONDU

TS (6

x2)

x2)
RECT
VC DI

TS (3

RECT
115kV

TS (3
CONDU
PANEL
CONT

VC DI
LOCA

VC DI
I
8kV P
ROL
L

CONDU
DUCT

I
CONT

CONDU
R

BANK

8kV P
ROL CAB

13.
EL.

8kV P
TOC
- 1.30

LE

13.

13.
T-601

CHDP

T302
T301
EF-2
REFER
T/F OU

EF-3
EYE W
DRAWI

ASH
TLI
NG
NE

115kV P

.
VC DI
RECT
BURI
ED
CONDU
I
TS (6x2)
CABL
BASE
OPEN
ROOM
E ENT

FK 5-1
MENT
I
NG TO

EQUI
PMENT
ROOM

OUTLI
RY

NE
/

13.
8kV P
VC DI
RECT
BURI
-12

CONDU ED
ITS (
3x2)

13.8kV Trans. Line


FI
RE W
ALL

m
F
PSP

UP
HVAC P

LSCD
DN

NATA
PANE
CONT
LOCAL

91
DUCT
CONT

OWER
L
ROL

1
O

BANK
ROL CA

BANK-

OWS
OWS
L
TDI
BLE

PQM

EWS
ST
(1
ABTS R
T-602

CONTR
6.
GI

00 x

E
MRL
S EQU

ITOR
TCC3RT
(12.

B311
115kV

OL ROOM

T
U/V

1
00X23

AMR

2.
I

B312
PMENT
RAI

CC2RTC

50)
GI

ACDB

CAPAC

13.
L (TY

U/F

8kV P
S ROO

AMR

VC DI
.100M)

B313 RECT
IF-2 I
P.

C1

BURIED
OUTLI
)

S
BM

FOR
6BS1 6

UBDC1
M

-T3

3.
BPP

B314 CAPAC
13.
F-1 6AP

ITOR B
NE

ANK
BC2

BC2 6B

8 KV
-T3
BPP

B315
CDP-1
BC1
REFER

-T3
BPP

B316
C16BBC
T/F O

PDM

S
INV

UBDC2

SW GR
DRAWI

INV
UTLI

-T2

L
BPP-2B
BPP

B317
-6.

SAS
U

To NATA Substation
NG
NE

L
BPP-1B
2L

-6.

6BB6 6

115kV P
-T2
BPP

B318
RO O M

VC DI
-5.

1L
PP-2BP

P rop. E dge
SAS

RECT
ACDB

BURI 13.8kV
S
2L

-5.
PP-1BP

ED CABLE
UBAC1

CONDU TUNNEL
BB5 6B
-T2
CABL

I
BPP

TS ( B319
BASEME

-4.

1L
OPENI

6x2)
SAS
P-2BPP
ROOM

2L
E ENT

-4.

I
P-1BPP

/C
NG TO

-T1
BPP

B4 6BB
NT /

-3.

1L

A301
SAS
RY

-2BPP-
2L

-3.

13.
8kV P
-T1
BPP

-1BPP-
-2.

1L

VC DI
3 6BB2

SAS

B320
UBAC2

NK-2

RECT

11
BURI
2L

-2.

ED
2BPP-2

CONDU

BASE MAP OF
FRONT
-T1
BPP

ITS (
-1

1L

3x2)
SAS

B321
1BPP-1
.
FI

-1

6BB1
RE W

115/13.8kV S/S#2
.
1

TOR BA
SAS

B322
ALL

EF-1

HVAC CONTROL B323


EQUI
PMENT
OUTLI
NE
B324
CAPACI

DCDB
MECHANICAL B325
SHAFT
(AC DUCT
ROOM)
VT/BUS
WORKS

COMM.
ROOM
EARTHING

A304
HOP

BUS
RISER/
FUTURE
LINK
A

B364

B363

VT/BUS
B362

FRONT
B361

I/C
B360

EARTHING
B359

B358

FUTURE
B357

A303

B356

B331
B355

CDP-2
EARTH
B354

B353

VT/BUS
B352

B351

RI

B332
LI

A305
SER/
BUS

B344
NK

.
B343
I

ADAP
NG

B342

B341

B333
B340

I/C
B339

B338

B337

A302

3
B336

B335

B334

BANK-
E)
FUTUR
DN

ITOR

7m
CAPAC

(
TOI
LET

13.
8kV P WTPC
VC DI
RECT
BURI
U/G SEPTIC TANK
CONDU ED
ITS (
6x2) WST SEEPAGE
SMH

PIT

5.
4.
0M WI
DE RO

.
AD (
TYP)
D

30
m
115kV Trans. Line END POINT "A"
PROPOSED
NATA 115/13.8kV SUBSTATION#2 NARIYAH AREA
Nariyah North BSP PROPERTY CORNER COORDINATES
END POINT "B"
to As-Sarrar S/S#2
Cor.
#4
SHOWING
. Cor. C
L C
L C
L CORNER NORTHINGS EASTINGS
m (On-Going Project) #3
06
59.
1 Cor.#1 3010893.282 246878.937
. START POINT "A" (LOOP IN) 17.5m. 30.0m. 20.0m.
9m
.5 Cor.#2
18 3010878.786 246977.922

67.5m. Cor.#3 3010779.822 246963.464 PROPOSED 115kV O/H TRANS. LINES


START POINT "B" (LOOP IN)

115kV Transmission Line


Cor.#4 3010794.286 246864.458
TO FEED NATA 115/13.8kV S/S#2
2 Tapping Point to Nata S/S
S#
S/ Wooden H-Frame Structure
-S
ar
ra
r
(On-Going Project) CROSS SECTION "A - A"
s
A ENLARGEMENT No. 2
To
SCALE NTS
NOT TO SCALE

CONTROL No. MAP NUMBER SHEET REV. No.

E 244,000 UTM E 248,000 UTM E 252,000 UTM E 256,000 UTM 3-2007001 SB-203516 1 OF 1 00