Professional Documents
Culture Documents
OW NER.
14.IN CAPACITOR BANK AREA EACH GATE SHALL BE
PROVIDED WITH AN ELECTRICAL AND MECHANICAL 2. ANY DISCREPANCY IN SCALE IN THIS DRAWING, THE WRITTEN
INTERLOCK WHICH COULD BE RELEASED AFTER 10 DIMENSION SHALL BE GOVERN.
MINUTES OF IT'S INITIATION FROM CAPACITOR CONTROL 3. 132KV GIS CLEARANCES ARE AS PER TES-P-119.19.
PANEL. 4. RAISED FLOOR IS PROVIDED FOR CONTROL & COMM. ROOMS.
02 15.THE HEIGHT OF PARAPET WALL COMPLETELY HIDE THE 5.THE SIZES AND DIMENSIONS OF ALL TRANSFORMERS
TS
ROOF MOUNTED EQUIPMENT AND IT'S ACCESSORIES BY FOUNDATION ARE TENTATIVE UNTIL TO THE APPROVAL ON CIVIL
OF I
150MM AND PLEASE NOTE THAT THIS HEIGHT IS DRAWINGS SUBMITTAL.
48 TENTATIVE UNTIL RECIEVING ACTUAL BASE DESIGN OF 6.LOCATION OF HVAC EQUIPMENT, UNDER GROUND WATER STORAGE
.60 HVAC EQUIPMENT. TANK WITH WATER TRANSFER PUMP, SEWER MANHOLE, SEPTIC TANK,
63
°
CONSENT
SEEPAGE PIT, AND CONDENSATE DRAIN PIT, OVERHEAD WATER
STORAGE TANK WITH BOOSTER PUMP ARE TENTATIVE AND SHALL BE
FINALIZED IN THE RESPECTIVE DRAWINGS.
7. PANELS ARRANGEMENT , DESIGNATION AND SIZE IN CONTROL &
REMOVALBLE PRECAST BOUNDARY WALL COMMUNICATION ROOMS ARE TENTATIVE & WILL BE FINALIZED AFTER
N
TTEN
8. ALL CABLES ROUTE, DUCT BANKS DETAILS WILL BE SUBMITTED
COR-4 30M WIDE ROAD FUTURE SEPARATELY.
E=633922.153 COR-1 9. GIS, POWER TRANSFORMER AND SWGR ARE TENTATIVE AND SHALL
THE W RI
N=2719852.660 3{200 HV 3{200 HV
CABLE +1{110 CABLE +1{110
FOR FIBER OPTIC
FOR FIBER OPTIC
3{200 HV 3{200 HV
CABLE +1{110 CABLE +1{110
FOR FIBER OPTIC
FOR FIBER OPTIC
MAIN GATE E=633968.442 BE FINALIZED AFTER RECEIVING THE APPROVED BASE DESIGN.
CABLE CABLE CABLE CABLE
N=2719905.173 10. THE LCD DISPLAY IN CONTROL ROOM SHALL BE FIXED
6000
TYP.
TYP.
1500
1500
(SUSPENDED) FROM THE CEILING IN FRONT OF WORK STATION.
11. BOUNDARY WALL IN FRONT OF TRANSFORMERS SHOULD BE
REMOVABLE TYPE.
THOUT
12.COLUMN LOCATIONS AND BUILDING/ROOM DIMENSIONS ARE
00
R 300
TENTATIVE AND WILL BE FINALISED IN DETAIL DESIGN BASED
R3
ON MANUFACTURER'S DRAWING.
1 2 3 4 5 6 7 8
6000
WI
WALL
6.0M WIDE ROAD LEGEND
43575
DOCUMENT
6675 5730 6200 6100 6490 6260 6120 R T.O.C TOP OF CONCRETE EL ELEVATION
0
30 (3X2){160 PVC PIPE (3X2){160 PVC PIPE
30
BOUNDARY R A 0 LEVEL IN PLAN FFL FINISHED FLOOR LEVEL
FOR PT-01 CONTROL FOR PT-02 CONTROL
SH06 CABLES
R
CABLES
LEVEL IN SECTION
6
0
3000 300 3000 9644 3000 300 3000 9644 3000 300 3000 9644
BSB BASEMENT SPLASH BLOCK
0
00 REINFORCED CONCRETE
600
600
0
PT-01 PT-02 PT-03 60 RSB ROOF SPLASH BLOCK
600
2186 2186 2186
REWALL
R DOORS NUMBERS
REWALL
D00
REWALL
1500 1500 1500
PANEL FRONT
S
THI
FI
FI
02 DRAINAGE SUMP PIT.
FI
1505
1505
1505
02 RAISED FLOOR
FUTURE
02
SUMP
5562
02 SUMP
PRECAST
SUMP
6762
PIT PIT PIT CABLE TUNNEL
WALL
2
2
MANHOLE
U
2U 2U 2U
MH
5562
5562
2N 2N 2N
450
450
450
3W2 3U1 3W2 3U1 3W2 3U1
1N 1N 1N
FROM
E
SPACE
j j j
2V
2V
2V
2V 2V 2V
SR SHUNT REACTOR
450
450
450
1333
(1W) (1V) (1U) (1W) (1V) (1U)
02 (1W) (1V) (1U)
SH08
2600
5100
2W
2W
2W
2W 2W 2W
FUTURE HH HANDHOLE
SD SCUPPER DRAIN
FOR
1267
ROAD
02
CMH COMMUNICATION MANHOLE
SR-1
BOUNDARY
TUNNEL-1
TUNNEL-2
TUNNEL-3
02
NED
G G G REVISION MARK
600
600
600
1W 1V
Tank q
1U 1W 1V
Tank q
1U 1W 1V
Tank q
1U BSF BASEMENT SUPPLY FAN
2500
1950 216 1950 1950 216 1950 1950 216 1950
PULLING
SHALL BE OBTAI
(3X2){160 PVC
HOOKS GRADE SLAB
1200 1200 1200 EL.-0.200(S.O.G) PIPE FOR P BEF BASEMENT EXHAUST FAN
DE
NER-1 GRADE SLAB EL.-0.200(S.O.G) NER-3 T-03 CONTROL
Y NER-2 Y Y
CABLE
800
CABLES
CABLE
G
CABLE
GRADE SLAB
WI
02 EL.-0.200(S.O.G)
WALL
5000
SH08
800
800
B R B R 800mm(H)x B R
7088
2972
1X{110MM PVC 1500mm(W)
6879
SLEEVES FOR
KV
KV
0M
KV
PRECAST
NER CONTROL N
02
6.
CABLE
2457
8
13.
13.
13.
02 RSB
RSB WALL CUTOUT RSB BSB-2 RSB GRADE BEAM
02 02
1927
{200MM
1800
1800
1800
800mm(H)x1500mm(W) 02 BSB-5
BSB-1
2192
SLAB
1000
OPENING WALKWAY 02 SHEAR WALL
WALKWAY
RE
COR-1
TE
TU
GA
10
N
FU
AI
A A
M
31280 1000 SHEAR WALL 6. M
MH-4
0M
AD
PART
W
2644
1500 ID
2434
W
ID
L
RO
FUTURE-1
2134
AL
132kV GIS E
E
W
S/S S/S RO
RY
[132 kV RO
3934
SPARE-1 AD
GALVANIZED CAGED STEEL 9078 SPARE-2 FUTURE
DA
3723
C
4073
8511A 8511B
3
BER OPTI
UN
-0
GT-2
REACTOR] (31280X11785)
ID
PT
BO
[CABLE] [CABLE] [CABLE] [CABLE] [CABLE] [CABLE]
3{200 HV LADDER FROM YARD TO GT-1 BSF-1.02 02
T
3{ 200 HV
R
AS
Y
Y Y Y Y Y
L
Y
AL
MH.COVER E
W
EC
IR
F
B R B R EL.+0.00(F.F.L) B R B R B R
-3
FU
CABLE
5015
B R
B
PR
L
CABLE PVC
E
B R AS
N
N
M
U
T
ROOF
E
L
-3
E
PH
TU
AB
ER
C
N
30
L
KV
8
LB
13.
EL.+0.00(T.O.C) AL
2
SLEEVES FOR
-0
A
02 T
RE
OV
FOR FI
PT
AR
M
BUS-1
RE
N
AD
BUS-A BUS-A BUS-2 BUS-B BUS-B EA
R
FUTURE SR-1
I
RO
LL
A
EW
IR
F
RSB SECTION
7295
B
5591
11785
L
E
N
E
UN
T
D5 GALVANIZED STEEL
ID
LE
B
-2
R
CA
S
NE
GI
KV
W
.8
13
1
I
I
V
GIS CRANE ACCESS
-0
2k
Y
0M
7
0
SH
NC
13
E
PT
NC
6.
FE
EA
1000
OF
2500
TE GE
LADDER
RO
00
FULL OR
TO
L
HG
EE
VA 3
R
ST
SE M
NT
GA ER
LT
BA FRO
7M P-
TC
ME
Y
COR-2
R
L
I
L
A
EAHA
00
SW
IREW
CA
F
EM
E
R
2595 1500
TU
U
ARSP
F
-1
V
EL
N
8k
UN
A
T
00
.
E
C
L
B
13
-1
AD
CA
BER OPTI
ER
N
ER
V
KV
CO
MH.
.8
T
13
LE
CE
21
RO
STAIRCASE (2) FROM
I
E
D5
-1
PA
TO
B'
R
BUS-1A
FO TU
R
COR-4
VA 2
S
OP
S
U
7M P-
D1
SH
R
R
NT
ME
3{ 200 HV
RK
E
SE
CA
BA
WO
1500 3080 1500 3080 1500
ID
OM
R
FR
BUS-1B
RO EN N
BASEMENT FLOOR LEVEL
W
AG EA
CABLE
OM T
CL
0M
OM
MH.
1000
COVER
4.
ON
WEF-03
RO
RO I
OM
T
B 10
CA
TO YARD LEVEL
I
L
UN
VA 1
RO
UNILOADING
MM
7M P-
R
CO
FOR FI
NT
M
CA
CO
5.
FROM BASEMENT BUS-2A SH06 0M
3714
PLATFORM W
5124
W
ID ID
M
H
.
C
O
V
E
R
-1
D5 BUS-2B E
1
U
30
RM
400 E
T
RO
A L
-2
AD
400
E VE
U
B
M
1800 RO
ARRA
2895 2864
G
+HVAC
LP1
D07 D05 D03 D01 D130 D02 D04 D06 D08 D10 D12
02
1600
3
FACP FECP
T
1600
AD
A EL
FACB
+I
EA L
GR NN
02
N
AR VE
300
RSB FU
R HA
2100
1800 150 150 498 1600 1300 1600 2900 2130 1300 1600 2900 1300 1600 1600 1300 1600 631
I
E
02
FO C
NC
EWS HMI
FE
N
HV TEST KIT IS NOT
AI
L
TU
EE
2390
150
DR
ST
150
EA
C'
L
1800 IN GIS SCOPE OF
ME NA
RE
AR
CO ER
1200 23859
LE XT
4017
4170
TE E
SUPPLY
ON
1200
+HVAC
3550
1600
550
+OLP
BEF-1.01 COR-3
LCD MONITOR 1800
2736
TYP. TYP.
REPRODUCTI
350 1100
150
FU
150
.
1600
=
U F
F
3+
1300
R
WALKWAY
+ELP
70004
C C
70001
UT
T.
REFERENCE DRAWINGS
M
.
7
D4
TYP.
3+
150
X{ 200MM)
=
SHEAR WALL
FRONT
U
F
R UT BSF-1.02 02
1800
F
150
PVC SLEEVES
.
1800
T
8KV
6
1000 1000
1
CH.
= TYP. TYP.
26505
DRAWING TITLE DRAWING NO.
CABLES
= +
FU
FU
FOR 13.
. 2200 23200 5880
T
RM
AA 01
T.
+ 2500
5
1
=
UH
=
ROAD
6X
2
31280
K
+R +R
CH.
FU
3
5410
5410
4X4)
.
CE-1231238
T
.
28975
=
4000
1
BUS-C
=6
AA 02
BUS
TYP.
DCP-2
+ METERING
X+
1750
=3
+R 2000
1
FU
SECTION-2
22000
MCCB
/RISER
R0
(
UH
.
T
5.
K
D2
3
2
TYP.
02 =
H320
FRONT
=
150
6X
02 H16 H18 H20 H22 H24 H26 H28 H30 H32 H320 UNILOADING PTS-20CN104
SCOPE OF WORK & TECHNICAL SPECIFICATION
3050
BEF-1.02 = +R R H34 H36 H38 H40 H42 H44 H46 H48 H50 H52 H54 H56 H58 H60 H62 H64 H66
FU
1800 A
AA 03
T.
01
M
NO
1
.1
PLATFORM
UH
1600
=6
K
+R
=3
FRONT FRONT
FU
+R
DE
COND. .
FUTURE
T
01
150
.
M
-
1
=
2
1905 =
ISOLATE BUSBAR CONDENSER
PIT-1 =
AA 01
6X
WALL
+ +R
D D
INTER-PANEL CONNECTION
+
1
3
FU
FUTURE
WI
UH
. EL.+0.00(F.F.L) C
AM
11600
T
04
d SA
RSB
K
TYP.
I3
X{ 200MM)
1200
800
3500
02
=6
1600
PVC SLEEVES
EL.+0.00(T.O.C) SH07
8000
D5 -
X+
+
3
=
FU
8KV
R0
.
AM
T
AA 02
4.
4000
+
NET
13.8kV SWITCHGEAR
I2
DCP-1
1
CABLES
2
800
UH
FOR 13.
=6
=3
FRONT
=3
K
+
X
+R
(31280X11600)
CABI
+A
TYP.
R0
01
FRONT
0M
FRONT
D
M
onalGri
8.
I1
=
1
=6
AA 03 A 10 AA 20 AA 30 AA 40
1600
4X4)
=3
=6
+ SH07
X+
R
1
X+
R0
UH
BC
BOUNDARY
5.
02
1000
BATTERY
8.
K
TYP.
1905 = H14 H12 H10 H08 H06 H04 H02 H120 H120 H120 H01 H03 H05 H07 H09 H11 H13 H15 H17 H19 H21 H23 H25 H27 H29 H31 H33
1750
6440
6440
2
H
= =
-
(
=3
A1
FRONT
ROAD
6X
+
6
+ +R
+R
B A
X
1500
UH
03
BB
10
K
=
150
1800
.1
=3
1600
METERING/ METERING
SECTION-1
BSF-1.03 02
=
02 BEF-1.03
6X
+ TYP.
+U
+R
1
+B RISER
X
FL
UH
ASPHALT
10
S-
.
6000
BA
=
2
= =
=6
OF Nati
3+
FRONT
TYP.
6
2250
02 + + +R
X
X
UF
1
2600
LS
UH
AREA
- C
03
V
1800
DCDB
K
1000
2
.1
=
03
1000 =
=3
1600
=6
6
+U
+ + +R
X
X
1
VL
DE
UH
- C
03
V
S
K
.2
02
=
FRONT
=
FRONT
+
=
=6
3
SA
+ +R
X
X
UV
DE
E E
S+
WI
A
LS
C
IO
02
V
.
-2
01
OFMR PSE-2PSE-1
1
= = D3
=3
EL.-0.05(F.F.L) D5 TO ROOF
6X
6
+U
+R
FU
+R
WI
200 1500
D4
X
D5 .
PRECAST
LS
1200
02
EL.-0.10(T.O.C)
22
3200
-3
.2
COMMUNICATION ROOM
0
3190
= =
=6
3200
6
800 + +R
3
EL.+0.00(F.F.L) EL.+0.00(F.F.L)
X
5670
X+
R
CONTROL ROOM (6000X5670)
AC
TOILET
10M
FRONT
06
23
SE
SDP-1
1800
EL.+0.00(T.O.C)
0
LAN/
WEF-01
PLATFORM
+
6X
3
D3 +R 900 FROM
LOADI
C TO SWGR ROOF
10M
1500
A
WORKSHOP
5660
WAN
+R
CLEAN
13
5670
.2
02 BASEMENT
0
CONVERTER
T/A 02
150
EL.-1.20(T.O.C)
AGENT SPU-01 E'
UNI
EL.+0.00(F.F.L)
1800
1&2
900
12515 1800 EL.-1.20(T.O.C) ROOM D4 D5
SDP-2
1000
CU-01
8600 D4
6000
PUMP
800
WEF-02
LY
CCTV RSB
DS
COND.
OL
ACDB
CTRL
OPERATOR
TR
CCTV PIT-2
F 02
R
1500
D4 3{160MM PVC DN
10
1000
WALKWAY 02 D3 UP
02 1263 1500 1263 WALKWAY SLEEVES FOR 0 GRAPHIC SCALE:
2300 1500 1500 0
13.8KV CABLES MH.COVER
0
02 RSB T302 T301 MH-1 REINFORCED
RMU-2 RMU-1
UNILOADING BSB-3 02 RSB CAP.BANK (3X2){160MM 0 0.5 1 2 3 4 5 10 15m
02 RSB 1200 CONCRETE
PVC SLEEVES
1170
F PLATFORM UNDERGROUND
FOR 13.8KV
2250
02 UP
SH08 WATER TANK
02 3050 CABLES 6000 LITRES SCALE : 1 : 150
UP
0
EL.-0.200(S.O.G)
M.H
0
6
WALL
6675 5730 6100 6490 6260 6120
R
GATE
MH.COVER
6200
AS-BUILT BY TDP COMPANY DATE 21.07.2024
6.5M WIDE ROAD
4000
MH-3
43575 4.0M WIDE ROAD
6500
BOUNDARY
6600
6000
STEEL
1 2 3 4 5 6 7 8
NED HEREI
EMERGENCY
02
FENCE
4
0
R
1 X {200MM DIA.
1000
1000
1000
0
40
M.H
PVC PIPE FOR
STEEL 13073
00
13.8KV CABLES
FENCE TO RMU 01 04.05.23 M.E REVISED AS PER COMMENTS E.A JEC JEC
00 GRADE SLAB 00 GRADE SLAB 00 GRADE SLAB
30 30 30
EL.-0.725(S.O.G) EL.-0.85(S.O.G) EL.-0.875(S.O.G)
CURB STONE 00 09.03.23 SR.M ISSUED FOR APPROVAL A.M EZZ EZZ
ON CONTAI
PRECAST
EXTERNAL
3000
GRAVEL
6200
SEPTIC
TELECOME C.M.H AREA REV.
7224
7224
7224
TANK DATE BY CHKD. CERT. APPD.
DESCRIPTION
TYPE-02 NO.
3000
3000
3000
AREA
2180 2180 2180 DRAWING COMPLETION CERTIFICATE (DCC):
SEEPAGE PIT
NFORMATI
30 4792 30 4792 30 4792
00 CAP-1 00 CAP-2 00 CAP-3
C.M.H 8200 7MVAR
TYPE-01 7MVAR 7MVAR
1000
1000
1000
DRAIN COR-2
AND THE I
CHANNEL FOR PRECAST BOUNDARY WALL E=634020.936 SARA A.M 1:150
DRAWN BY CHECKED BY SCALE:
COR-3 (5X4)X{200MM)
GRAVEL AREA PVC SLEEVES
N=2719858.860
E=633974.664 PRECAST BOUNDARY WALL FOR 13.8KV
CABLES
DATE STARTED DATE COMPLETED
N=2719806.370
69974
OPR'G. DEPT. ENG. DEPT.
NG
CONSTRUCTION OR FOR ORDERING
S DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE
THI
CONSTRUCTION OF 132/13.8KV SUBSTATION #8370 FOR QIDDIYA PROJECT
AR-RIYADH SAUDI ARABIA