Protection Relay: GR1: Siprotec 7UM622, 1-3Hz injection unit: Siprotec 7XT71
Tripping value: Resistance <5kohms- Tripping with time delay of 1 sec, Resistance <80Kohms-
Alarm with time delay of 10 secs.
Main problem observed: Continuous fluctuation of Rotor resistance value measured in Generator
relays.
1) Check: Rotor Insulation resistance was checked by disconnecting 1-3 Hz injection wire with
Field breaker closed & open.
Observation: The Insulation resistance was 9Mega ohms when field breaker was open &
200Kohms when field breaker is closed.
2) Check: Rotor Insulation resistance was checked by starting 1.5 Hz injection unit with FB
closed & open
A REPORT ON GENERATOR TRIPPING ON ROTOR
EARTH FAULT AT UNIT 2 AT 2 X 351MW GPPC PROJECT
Observation: GR1 & GR2 relay reads value 999Kohms (max value for display) when FB is
open and 200Kohms when FB is closed and there was no fluctuation in rotor resistance
value.
3) Check: GR1 & GR2 relays rotor earthfault protection was checked by placing a test resistor.
Observations: GR1 & GR2 relays were reading the same resistance value which was
placed. Also it tripped on tripping values with set time delay.
Action taken: DC & AC bus insulators in AVR were cleaned. And clearance was given
for machine start up on 13.06.2015.
4) Check: During next start up on 13.06.2015 measured rotor IR was checked in GR1 & GR2
relay.
Observation: The resistance value was observed fluctuating/varying from 90kohms to
300kohms. Sometimes value even reached 50kohms. Machine tripped after running for
approx 10 hrs.
Action taken: Machine started to perform to check the fluctuation in resistance due to high
variation in filed current.
8) Check: The shaft grounding brush on the shaft between Gas turbine and Generator was
grounded bypassing Ground Brush Monitoring system (GBM).
Observation: When this grounding was done bypassing grounding brush monitoring system,
the fluctuation in rotor resistance almost disappeared. The AC-DC toggle switch in the
Detector Unit of GBM was placed in DC. Due to some problem in detector unit, the
continuity between incoming shaft brush connection was disconnected with the ground.
Connection from GR1 was removed (As per Siemens recommendation only one relay need
to be connected to 7XT71)
Observation: The variation in rotor insulation resistance in GR2 was reduced. The result
was checked in GR1 too.
Observing the values for half an hour, machine was synchronized. After running the
machine at 26 MW for more than 5 hours the rotor insulation resistance was stable at
999Kohm (Max value to display).