You are on page 1of 1

SET 1:

(1) COVER METER TEST RESULTS


Type of Diameter Number of
Location
reinforcement (mm) reinforcement
Hanger bar 10 2 Top
Main bar 16 3 Bottom
80 mm c/c 1/3 from left
Stirrup 8 100 mm c/c 1/3 in the middle
80 mm c/c 1/3 from right
* Other details,
concrete cover = 25 mm

(2) REBOUND HAMMER TEST RESULTS


Line 1 A B C D
1 25 30 35 40
2 24 28 32 38
3 26 27 33 42
4 25 31 31 41
5 23 29 34 39

Line 2 A B C D
1 26 32 36 42
2 27 30 33 40
3 25 29 33 40
4 23 27 35 43
5 22 28 34 41

(3) ULTRASONIC PULSE VELOCITY TEST RESULTS


Line 1 Line 2
Position
Column Time (µs) Column Time (µs)
1 A 46.8 A 47
2 B 45.7 B 46.1
3 C 44 C 44.5
4 D 43.1 D 43.3