4000 2000 4000

STEEL BEAM FRAME SCHEDULE


4000 2000 4000 4000 2000 4000

B1 B2 B3

C1 C2 C3 C4 C1 C2 C3 C4 C1 C2 C3 C4

FC1 FC2 FC3 FC4

4000

B16

B19

B22

B25
4000

4000
B4

B5 B6 B7

C5 C6 C7 C8 C5 C6 C7 C8 C5 C6 C7 C8

2000

B15

B18

B21

B24
2000

2000
FC5 FC6 FC7 FC8
B8 B9 B10

C9 C10 C11 C12 C9 C10 C11 C12 C9 C10 C11 C12

FC9 FC10 FC11 FC12

4000

B14

B17

B20

B23
4000

4000
B11 B12 B13

C13 C14 C15 C16 C13 C14 C15 C16 C13 C14 C15 C16

FC13 FC14 FC15 FC16

01 FOUNDATION PLAN 02 COLUMN PEDESTAL PLAN 03 TIE BEAM PLAN


SCALE: 1:100 MTRS S 1 SCALE: 1:100 MTRS S 1 SCALE: 1:100 MTRS
S 1

04 2ND FLR. BEAM PLAN 05 3RD FLR. BEAM PLAN 06 4TH FLR. BEAM PLAN
S 1 SCALE: 1:100 MTRS S 1 SCALE: 1:100 MTRS S 1 SCALE: 1:100 MTRS

CIVIL ENGINEER CONSULTANT PROJECT OWNER REVISIONS SHEET CONTENTS PROJECT CODE SHEET NO.

FOUNDATION PLAN
MARK MALLONE U. FABIAN
PROPOSED 5- STOREY APARTMENT COLUMN PEDESTAL PLAN
CASA FELIZGO
PROPERTIES INC
TIE BEAM PLAN
BEAM PLAN S1
LOCATION: LOT 18, BLOCK 28, BRGY. LOURDES, ANGELES PAMPANGA STEEL BEAM FRAME SCHEDULE