You are on page 1of 5

Date: 18/07/2023

To,

GVG Invivo Hospital


647, 5th Main Rd, RBI Layout, JP Nagar 7th Phase, J. P. Nagar,
Bengaluru, Karnataka 560078

Subject : Proposal for e-Waste.

Sl No Item Qty Max Price per Unit


1 CPU 1 250
2 CPU CABINET 1 10
3 CONDEMNED LCD MONITOR 1 175
4 ALL IN ONE PC 1 200
5 LAPTOP 1 300
6 MOUSE 1 2
7 DOT MATRIX PRINTER 1 30
8 LASERJET PRINTER 1 75
9 FAST DOT MATRIX PRINTER 1 30
10 KEYBOARD 1 5
11 PASSBOOK PRINTER 1 30
12 FLATBED SCANNER 1 25
13 DOCUMENT SCANNER 1 25
14 CTS SCANNER 1 25
15 IPAD 1 100
16 TAB 1 50
17 BIOMETRIC 1 25
18 COMPUTER CABLES 1 1
19 UPS 1 KVA 1 200
20 UPS 2 KVA 1 300
21 UPS 3 KVA 1 400
22 UPS 5 KVA 1 500
23 UPS 7.5 KVA 1 700
24 2 TON AC ( With outdoor unit) 1 700
25 LED TV (40") 1 100
26 AQUAGUARD 1 10
27 FAX AND COPIER MACHINE 1 30
28 CCTV RECORDER 1 10
29 CCTV CAMERA 1 2
30 ETHERNET SWITCH 1 30
31 INVERTER 1 100
32 LAND LINE PHONE 1 2
33 FIRE ALARM CONTROL PANEL 1 15
34 DVD PLAYER 1 10
35 ADAPTER 1 2
36 MOBILE TABS 1 50
37 HAEDPHONES 1 2
38 RACKS 1 100
39 COOLERS 1 50
40 MOTORS 1 50
41 PROJECTORS 1 100
42 WACOM DEVICES 1 20
43 NOTE COUNTING MACHINE (BIG) 1 250
44 NOTE COUNTING MACHINE (SMALL) 1 50
45 ATM MACHINE 1 3500
46 CHEQUE BOOK KIOSK 1 500
47 TOKEN COLLECTION MACHINE 1 20
48 STABILIZER 1 25
49 LCD PROJECTOR 1 100
50 SPEAKER (SMALL) 1 5
51 SPEAKER (BIG) 1 10
52 XEROX MACHIINE 1 800
53 METAL SCRAP 1 KG 18
54 PLASTIC SCRAP 1 KG 8
55 CABLES 1 KG 12
56 CRT MONITORS 1 -150
57 TONERS AND CATRIDGES 1 KG -40
58 TUBELIGHTS 1 KG -350
59 Modem 1 20
60 Atomizer 1 50
61 SMPS 1 25
62 Switch 1 50
63 PCI Switch 1 75
64 Phones 1 2
65 Wall Clock 1 2
66 Mother Board 1 25
67 Typing Machine 1 25
68 AC Indoor Cabinet 1 150
69 Ac Outdoor Cabinet 1 800
70 DVR 1 10

You are requested to arrange for necessary space, place, power supply, and security arrangements for loading. The
necessary documents like Transport Manifest Form no. 6 will be issued by us and it shall be signed by you.
Terms & Conditions:
1. Lifting of material can be scheduled within 24 hours in advance.
2. After lifting the material, the same will be transported to our facility; there the subject will be dismantled and
destructed and the Metal, Plastic, and glass parts will be segregated for recycling.
3. The destruction certificate will be issued within 15-30 days from the date of procuring the material.
4. The financial quote has been issued based on the conditions of the material.
5. Prices are Inclusive of Taxes GST 18%.
6. The payment will be issued by NEFT/RTGS immediately once the material is collected.

You might also like