The document outlines a plan to install new valves and piping. A new demin tank (B) will be connected to the anion tank with a new inlet valve (A). A new outlet valve (C) will direct flow to the header pump. A new interconnection valve (D) will be installed on an existing line.
The document outlines a plan to install new valves and piping. A new demin tank (B) will be connected to the anion tank with a new inlet valve (A). A new outlet valve (C) will direct flow to the header pump. A new interconnection valve (D) will be installed on an existing line.
The document outlines a plan to install new valves and piping. A new demin tank (B) will be connected to the anion tank with a new inlet valve (A). A new outlet valve (C) will direct flow to the header pump. A new interconnection valve (D) will be installed on an existing line.
New Demin Tank C Valve Outlet to header pump New Valve for existing line Interconnection Valve D NU EA B C D NU EA