STRUCTURE DESIGN

( VVPAT STORAGE )

TOTAL LOAD ON SLAB – CONECRETE MIX- M25


STEEL - Fe415
Self wt. of slab - 3.0kn
Live load - 3.0kn
Floor Finishing - 2.0kn
Total - 8.0kn/m 2

LOAD TRANSFER TO BEAM FROM SLAB

HB-1 L= 2.33 M

1/2 x 2.33 x 1.165 x 8 = 10.86


2.33 x 0.23 x 0.30 x 25 = 4.02
=14.88kn

HB-2 L= 3.615 M

1/2 x 3.615 x 1.807 x 8 = 26.13


3.615 x 0.23 x 0.30 x 25 = 6.24
= 32.37kn

HB-3 L= 2.805 M

1/2 x 2.805 x 1.402 x 8 = 15.73


2.805 x 0.23 x 0.30 x 25 = 4.84
= 20.57kn

HB-4 L= 3.6 M

1/2 x 3.6 x 1.8 x 8 = 25.92


3.6 x 0.23 x 0.30 x 25 = 6.21
= 32.13kn

HB-5 L= 4.23 M

1/2 x 4.23 x 2.115 x 8 = 35.78


4.23 x 0.23 x 0.30 x 25 = 7.3
= 43.1kn

HB-6,HB7,HB8,HB36,HB37,HB38 L= 3.9 M

1/2 x 3.9 x 1.95 x 8 = 35.78


3.9 x 0.23 x 0.30 x 25 = 6.73
= 37.15kn

HB-9 L= 3.345 M

3.345+ 0.660 x 1.342 x 8 = 21.49


2
3.345 x 0.23 x 0.30 x 25 = 5.77
= 27.26kn

HB-10 L= 2.33 M
1/2 x 2.33 x 1.165 x 8 = 10.86
2.33 x 0.23 x 0.30 x 25 = 4.02
= 14.88kn
HB-11 L= 3.615 M

1/2 x 3.615 x 1.807 x 8 = 26.12


3.615 x 0.23 x 0.30 x 25 = 6.24
= 32.36kn

HB-12 L= 4.23 M

1/2 x 4.23 x 2.115 x 8 = 35.78


4.23+ 0.50 x 1.865 x 8 = 35.28
2
4.23 x 0.23 x 0.30 x 25 = 7.30
= 78.36kn

HB-13,HB14,HB15,HB23,HB24,HB25,HB29,HB30,HB31 L= 3.90 M

2x 1/2 x 3.90 x 1.95 x 8 = 60.84


3.90 x 0.23 x 0.30 x 25 = 6.73
= 67.57kn

HB-16 L= 2.805 M

1/2 x 2.805 x 1.402 x 8 = 15.73


2.805 [4.23+ 0.50 x 1.865 x 8 ] = 28.48
9.750 2
2.805 x 0.23 x 0.30 x 25 = 4.84
= 49.05kn

HB-17 L= 3.345 M

3.345+ 0.660 x 1.342 x 8 = 21.50


2
3.345 [9.75+ 6.75 x 1.5 x 8] = 33.96
9.750 2
3.345 x 0.23 x 0.30 x 25 = 5.77
= 61.23kn

HB-18 L= 3.6 M

1/2 x 3.6 x 1.80 x 8 = 25.92


3.6 [9.75+ 6.75 x 1.5 x 8 ] = 36.55
9.750 2
3.6 x 0.23 x 0.30 x 25 = 6.21
=68.68kn

HB-19,HB20,HB21 L= 3.25 M

1/2 x 3.25 x 1.625 x 8 = 21.12


3.25 [9.75+ 6.75 x 1.5 x 8 ] = 33.0
9.750 2
3.25 x 0.23 x 0.30 x 25 = 5.61
=59.73kn
HB-22 L= 4.23 M

2 x1/2 x 4.23 x 2.115 x 8 =71.57


4.23 x 0.23 x 0.30 x 25 = 7.3
=78.87kn

HB-26,HB27,HB28 L= 3.25 M

2 x1/2 x 3.25 x 1.625 x 8 =71.57


3.25 x 0.23 x 0.30 x 25 =5.61
=47.86kn
HB-32 L= 4.23 M

2 x1/2 x 4.23 x 2.115 x 8 =71.57


4.23 x 0.23 x 0.30 x 25 =7.3
=78.87kn
HB-33,HB34,HB35 L= 3.25 M

1/2 x 3.25 x 1.625 x 8 =21.12


3.25 x 0.23 x 0.30 x 25 =5.61
=26.73kn

HB-39 L= 4.23 M

1/2 x 4.23 x 2.115 x 8 =35.78


4.23 x 0.23 x 0.30 x 25 =7.3
=43.10kn

VB-1 L= 3.730 M

3.730+ 1.40 x 1.165 x 8 = 23.90


2
3.73 x 0.23 x 0.30 x 25 = 6.43
= 30.33kn

VB-2 L= 3.730 M

3.730+ 1.40 x 1.165 x 8 = 23.91


2
3.730+ .115 x 1.807 x 8 = 27.79
2
3.73 x 0.23 x 0.30 x 25 = 6.43
= 58.13kn

VB-3 L= 5.030 M

5.030 + 2.225 x 1.402 x 8 = 40.69


2
3.730 + 0.115 x 1.807 x 8 = 27.79
2
5.030 x 0.23 x 0.30 x 25 = 8.68
= 77.16kn
P.L = HB9/2 = 16.18
(16.18+77.16 =93.34)

VB-4 L= 3.0 M

1/2 x 3.0 x 1.50 x 8 =18.0


3.0 x 0.23 x 0.30 x 25 =5.175
= 23.17kn
VB-5 L= 3.865 M

3.865+ 0.615 x 1.625 x 8 =29.12


2
3.865 x 0.23 x 0.30 x 25 = 6.67
= 35.79kn

VB-6 as VB5

VB-7 L= 5.030 M

1/2 x 2.685 x 1.342 x 8 =18.0

5.030+ 2.225 x 1.625 x 8 = 29.12


2
5.030 x 0.23 x 0.30 x 25 = 8.68
= 63.78kn
P.L = HB9/2 = 13.63
(13.63+63.78 =77.41)

VB-8,VB10 L= 7.732 M

4x (3.865+ 0.615 x 1.625 x 8) =116.48


2
7.732 x 0.23 x 0.45 x 25 = 20.0
= 136.48kn
P.L = HB26+HB27 /HB27+HB28 = 47.86
2
(47.86+136.48=184.34)

VB-9 L= 5.030 M

1/2 x 2.685 x 1.342 x 8 =14.41

5.030+ 1.430 x 1.8 x 8 =46.51


2
5.030 x 0.23 x 0.30 x 25 = 8.68
= 69.78kn
P.L = HB9/2 = 13.63
(13.63+69.78 =83.27)

VB-11 L= 5.030 M

5.030+ 1.430 x 1.8 x 8 =46.51


2
1/2 x 3.73 x 1.865 x 8 =27.83
1.13 [4.3+ 0.07 x 2.115 x 8 ] = 9.72
4.3 2
5.030 x 0.23 x 0.30 x 25 = 8.68
= 92.74kn
P.L = HB12/2 = 13.63
(39.18+92.74 =131.92)

VB-12 L= 3.0 M

1/2 x 3.0 x 1.5 x 8 =18.0


3.0 [4.3+ 0.07 x 2.115 x 8 ] = 25.79
4.30 2
3.0 x 0.23 x 0.30 x 25 = 5.17
= 48.96kn

VB-13 L= 3.865 M

3.865+ 0.615 x 1.625 x 8 =29.12


2
3.86 [5.730+ 1.50 x 2.115 x 8 ] = 41.26
5.730 2
3.865 x 0.23 x 0.30 x 25 = 6.67
= 77.05kn

VB-14 L= 3.865 M

3.865+ 0.615 x 1.625 x 8 =29.12


2
1.865 [5.730+ 1.50 x 2.115 x 8 ] = 19.91
5.730 2
2.0 [4.31+ 0.08 x 2.115 x 8 ] = 17.23
4.31 2
3.865 x 0.23 x 0.30 x 25 = 6.67
= 72.93kn
P.L = HB32/2 = 39.43
(39.43+72.93 =112.36)

VB-15 L= 2.010 M

2.010[4.31+ 0.08 x 2.115 x 8 ] = 17.32


4.31 2
2.10 x 0.23 x 0.30 x 25 = 3.47
=20.79kn

VB-16 L= 5.030 M

1/2 x 3.73 x 1.865 x 8 =27.82


4.015+ 0.115x 1.950 x 8 =32.21
2
1.130 [4.30+ 0.070 x 2.115 x 8 ] = 9.71
4.30 2
0.875[4.015+ 0.115 x 1.950 x 8 ] =6.78
4.015 2
5.030 x 0.23 x 0.30 x 25 = 8.68
= 85.2kn
P.L = HB12+HB13 =72.96
2 (72.96+85.2=158.16)

VB-17 L= 3.0 M
3.0 [4.30+ 0.070 x 2.115 x 8 ] = 25.79
4.30 2
3.0[4.015+ 0.115 x 1.950 x 8 ] =24.07
4.015 2
3.0 x 0.23 x 0.30 x 25 = 5.17
= 55.03kn
VB-18 L= 4.015 M

4.015+ 0.115 x 1.950 x 8 = 32.21


2
4.015[5.73+ 0.115 x 2.115 x 8 ] =42.86
5.730 2
4.015 x 0.23 x 0.30 x 25 = 6.92
= 81.99kn

VB-19 L= 4.015 M

4.015+ 0.115 x 1.950 x 8 = 32.21


2
1.71 [5.73+ 1.5 x 2.115 x 8 ] =18.31
5.730 2
2.30 [4.31+ 0.080 x 2.115 x 8 ] =19.82
4.310 2
4.015 x 0.23 x 0.30 x 25 = 6.92
= 77.26kn
P.L = HB32/2 = 39.43
(39.43+77.26 =116.69)
VB-20 as VB14

VB-21,VB22,VB23,VB24 L= 8.030 M

4x4.015+ 0.115x 1.950 x 8 =128.86


2
8.030 x 0.23 x 0.45 x 25 = 20.78
= 149.64kn
P.L = HB13+HB14/HB14+HB15/HB29+HB30/HB30+HB31 = 67.57
2
(67.57+149.64=217.21)
VB-25,VB26,VB27,VB28 L= 4.015 M

4.015+ 0.115x 1.950 x 8 =32.21


2
4.015 x 0.23 x 0.45 x 25 = 6.92
= 39.13kn
Load transfer from beam to column

S.No. BEAM LOADS TOTAL LOAD/FLOOR

C1- HB1 + VB1 = 14.88 + 30.33 = 22.60 kn


2 2

C2- HB1+ HB2 + VB2 = 14.88 + 32.37 + 58.13 = 52.69 kn


2 2

C3- HB2+ HB3 + VB3 = 32.37 + 20.57 + 93.34 = 73.14 kn


2 2

C4- HB3 + VB7 = 20.57 + 77.41 = 48.99 kn


2 2

C5- HB4 + VB9 = 32.13 + 83.27 = 57.70 kn


2 2

C6- HB4 +HB5 + VB11 = 32.13 + 43.10 + 131.92 = 103.57 kn


2 2

C7- HB5 +HB6 + VB16 = 43.10 + 37.15 + 158.16 = 119.20 kn


2 2

C8- HB6 +HB7 + VB21 = 37.15 + 37.15 + 217.21 = 145.75 kn


2 2

C9- HB7 +HB8 + VB21 = 37.15 + 37.15 + 217.21 = 145.75 kn


2 2

C10- HB8 + VB25 = 37.15 + 39.13 = 38.14 kn


2 2

C11- VB1 + HB10 = 30.33 + 14.88 = 22.60 kn


2 2

C12- HB10 + HB11+VB2 = 14.88 + 32.36 + 58.13 = 52.68 kn


2 2

C13- VB25 + VB26 + HB15 = 39.13 + 39.13 + 67.57 = 72.91 kn


2 2

C14- VB3 + VB4 + HB16 = 93.34 + 23.17 + 49.05 = 82.78 kn


2 2

C15- HB16 +HB17 + VB7 = 49.05 + 61.23 + 77.41 = 93.84 kn


2 2

C16- HB17 +HB18 + VB9 = 61.23 + 68.68 + 83.27 = 106.59 kn


2 2

C17- VB11 + VB12 + HB18 = 131.92 + 48.96 + 68.68 = 124.78kn


2 2
C18- VB16 + VB17 = 158.16 + 55.03 = 106.59 kn
2 2

C19- VB4 + VB5 + HB19 = 23.17 + 35.79 + 59.73 = 59.34 kn


2 2

C20- HB19 +HB20 + VB8 = 59.73 + 59.73 + 184.34 = 151.90 kn


2 2

C21- HB20 +HB21 + VB10 = 59.73 + 59.73 + 184.34 = 151.90 kn


2 2

C22- HB21 +HB22 + VB12 +VB13 = 59.73 + 78.87 + 48.96 +77.05 = 132.30 kn
2 2

C23- HB22 +HB23 + VB17 +VB18 = 78.87 + 67.57 +55.03 + 81.99 = 141.73 kn
2 2

C24- HB23 +HB24 + VB21 +VB22 = 67.57 + 67.57 + 217.21 +217.21 = 284.78 kn
2 2

C25- HB24 +HB25 + VB23 +VB24 = 67.57 + 67.57 + 217.21 +217.21 = 284.78 kn
2 2

C26,- VB26 + VB27 + HB25 = 39.13 + 39.13 + 67.57 = 72.91 kn


2 2

C27- VB5 + VB6 + HB26 = 35.79 + 35.79 + 47.86 = 59.72 kn


2 2

C28- VB13 + VB14 + HB28 = 77.05 + 112.36 + 47.86 = 118.63kn


2 2

C29- VB18 + VB119 + HB29 = 81.99 + 116.69 + 67.57 = 133.17 kn


2 2

C30- VB27 + VB28 + HB31 = 39.13 + 39.13 + 67.57 = 72.91 kn


2 2

C31- VB6 + HB33 = 77.41 + 26.73 = 52.07kn


2 2

C32- HB33 +HB34 + VB8 = 26.73 + 26.73 + 184.34 = 118.90 kn


2 2

C33- HB34 +HB35 + VB10 = 26.73 + 26.73 + 184.34 = 118.90 kn


2 2

C34- VB14 + VB15 + HB35 = 112.36 + 20.79 + 26.73 = 118.90 kn


2 2

C35- VB19 + VB20 + HB36 = 116.69 + 20.79 + 37.15 = 87.31 kn


2 2

C36- HB36 +HB37 + VB22 = 37.15 + 37.15 + 217.21 = 145.75 kn

2 2

C37- HB37 +HB38 + VB24 = 37.15 + 37.15 + 217.21 = 145.75 kn


2 2
C38- HB38 + VB28 = 37.15 + 39.13 = 38.14 kn
2 2

C39- VB15 + HB39 = 20.79 + 43.10 = 31.94 kn


2 2

C40- VB20 + HB39 = 20.79 + 43.10 = 31.94 kn


2 2
COLUMN DESIGN
C1 – ALL COLUMNS ACCPET C8,C9,C20,C21,C24,C25,C32,C33,C36 & C37

MAX. LOAD ON COLUMN/FLOOR (C23) = 141kn

SELF WEIGHT OF COLUMN 230X230

0.23X0.23X4.2X25 =5.55kn

LOAD OF BRICK WALL TRANSFER FROM TIE BEAM TO COLUMN

LENGTH 1/2(3.02+4.015+3.1=5.06m

LOAD 4.06X.23X4.2X20 =97.75kn

WEIGHT OF TIE BEAM

5.06X0.23X0.30X25 =8.72kn

TOTAL LOAD /FLOOR =253.15

LOAD FOR THREE FLOOR =759.45kn

FOCTORED LOAD =1139kn

PROVIDE 230X230 COLUMN WITH 4X20ϕ+2X16ϕ BARS

TOTAL LOAD CARRING CAPASITY 1213kn

C2 – COLUMNS C8,C9,C20,C21,C24,C25,C32,C33,C36 & C37

MAX. LOAD ON COLUMN/FLOOR (C24) = 284.78kn

SELF WEIGHT OF COLUMN 230X350

0.23X0.350X4.2X25 =8.45kn

LOAD OF PARTITION WALL TRANSFER FROM TIE BEAM TO COLUMN

LOAD 3.90X.115X3.30X20 =29.60kn

WEIGHT OF TIE BEAM

3.90X0.23X0.30X25 =6.73kn

TOTAL LOAD /FLOOR =329.56

LOAD FOR THREE FLOOR =988.68kn

FOCTORED LOAD =1483.02kn

PROVIDE 230X350 COLUMN WITH 6X20ϕ BARS

TOTAL LOAD CARRING CAPASITY 1581kn


PILE & PILE CAP DESIGN
MAXIMUM LOAD C24-988.68kn

PROVIDE FACTOR OF SEFTY 3

DESIGN LOAD OF PILE(TOTAL LOAD ON PILE)-2966.04kn(30TON)

PROVIDE 2No’s 300ϕ 3.5m LONG SINGLE UNDER-REAMED PILE AS /IS-2911(PART 3rd 1980)

SAFE LOAD 16 TON /PILE

PILE CAP –

BM AT CENTER OF PILE CAP DUE TO PILE RECTION =16X0.75TM(120knm)

0.125x18.9x1.5=3.54 knm

Mu/bd2 =123.5X106 /600X550X550 =0.66

Pt.=0.189% =623mm2

PROVIDE 600X600 PILE CAP 4X16ϕ BARS IN TOP & BOTTAM

CHECK FOR SHEAR

Pile cap 600x600

Max. shear force -160 kn

Steel% at support -0.19%

(Tou)Tc for M25 concrete & 0.19 % steel -0.36n/mm2

Shear capacity of concrete 600x265x0.361296004n (129.6kn)

Shear to be taken by steel –(160-129.6)=30.4 kn

Shear capacity of tow legged vertical stirrups 8ϕ@200c/c for mm. depth provided =99.82kn
SLAB DESIGN
(REFER SP-16 DESIGN AID TO I.S -456)

TOTAL LOAD ON SLAB –

Slab thickness = 120mm

Self wt. of slab - 3.0kn


Dead load - 3.0kn
Floor Finishing - 2.0kn
Total - 8.0kn

S1- Ly= 3.90M Lx= 3.79M Ly/Lx = 1.03

0.062 x 12 x 3.7902 = 10.75 kn Main bars = 8 ϕ @ 140 c/c


0.062 x 12 x 3.7902 = 10.68 kn Cross bars = 8 ϕ @ 140 c/c

S2- Ly= 3.755M Lx= 3.14M Ly/Lx = 1.2

0.084 x 12 x 3.142 = 9.94 kn Main bars = 8 ϕ @ 170 c/c


0.059 x 12 x 3.142 = 7.0 kn Cross bars = 8 ϕ @ 200 c/c

S3- Ly= 4.20M Lx= 4.12M Ly/Lx = 1.01

0.062 x 12 x 4.122 = 12.63 kn Main bars = 8 ϕ @ 140 c/c


0.062 x 12 x 4.122 = 12.63 kn Cross bars = 8 ϕ @ 140 c/c

S4- Ly= 5.62M Lx= 4.12M Ly/Lx = 1.01

0.096 x 12 x 4.122 = 19.55 kn Main bars = 10 ϕ @ 120 c/c


0.053 x 12 x 4.122 = 10.80 kn Cross bars = 10 ϕ @ 200 c/c

S5- Ly= 3.62M Lx= 2.22M Ly/Lx = 1.62

0.110 x 12 x 2.222 = 6.54 kn Main bars = 8 ϕ @ 200 c/c


0.042 x 12 x 2.222 = 2.48 kn Cross bars = 8 ϕ @ 210 c/c

S6- Ly= 3.62M Lx= 3.505M Ly/Lx = 1.03

0.065 x 12 x 3.502 = 9.55 kn Main bars = 8 ϕ @ 160 c/c


0.065 x 12 x 3.502 = 9.14 kn Cross bars = 8 ϕ @ 160 c/c

S7- Ly= 4.92M Lx= 2.70M Ly/Lx = 1.82

0.115 x 12 x 2.702 = 10.06 kn Main bars = 8 ϕ @ 170 c/c


0.037 x 12 x 2.702 = 3.23 kn Cross bars = 8 ϕ @ 210 c/c

S8- Ly= 3.23M Lx= 2.57M Ly/Lx = 1.26


0.093 x 12 x 2.572 = 7.37 kn Main bars = 8 ϕ @ 200 c/c
0.059 x 12 x 2.572 = 4.67 kn Cross bars = 8 ϕ @ 210 c/c

S9- Ly= 4.92M Lx= 3.49M Ly/Lx = 1.40

0.099 x 12 x 3.492 = 14.46 kn Main bars = 10 ϕ @ 180 c/c


0.051 x 12 x 3.492 = 7.45 kn Cross bars = 8 ϕ @ 200 c/c

S10- Ly= 9.64M Lx= 2.89M Ly/Lx = 3.33(one way)

0.125 x 12 x 2.892 = 12.53 kn Main bars = 8 ϕ @ 130 c/c


Cross bars = 8 ϕ @ 210 c/c
CHECK FOR SHEAR(Beam)
Beam size -230x300

Max. shear force on HB12 -78.36 kn

Steel% at support -1.343%

(Tou)Tc for M25 concrete & 1.343 % steel -0.72n/mm2

Shear capacity of concrete 230x265x.72=43884n (43.88kn)

Shear to be taken by steel –(78.36-43.88)=34.48 kn

Shear capacity of tow legged vertical stirrups 8ϕ@200c/c for 300mm. depth provided =54.45kn

Beam size -230x450

Max. shear force on VB11 -131.92 kn

Steel% at support -1.143%

(Tou)Tc for M25 concrete & 1.143 % steel -0.70n/mm2

Shear capacity of concrete 230x415x.70=66815n (66.81kn)

Shear to be taken by steel –(131.92-66.81)=65.11 kn

Shear capacity of tow legged vertical stirrups 8ϕ@200c/c for 450mm. depth provided =81.67kn

Beam size -230x600

Max. shear force on VB8 -184.34 kn

Steel% at support -1.55%

(Tou)Tc for M25 concrete & 1.55 % steel -0.74n/mm2

Shear capacity of concrete 230x565x.74=96163n (96.16kn)

Shear to be taken by steel –(184.34-96.16)=88.18 kn

Shear capacity of tow legged vertical stirrups 8ϕ@150c/c for 550mm. depth provided =133.09kn