Professional Documents
Culture Documents
1. SGB Copyright
This drawing is the copyright of SGB. No unauthorized use, copy or disclosure is
to be made and it is to be returned upon request. The drawing is supplied subject to the
company's standard condition as applicable. SGB reserve the right to amend
drawing details and material components subject to stock availability.
2. Basis of Design
This drawing has been prepared from information supplied to us, by or on behalf of the customer,
who should that we have correctly interpreted his requirements and that all loading, dimensions,
details, erection, pouring and striking sequences etc., are as required and practicable.
The following drawings obtained have been used to prepare this scheme:-
Customer Drawing __
Customer Drawing __
Design Brief __
Customer Method Statement __
Other Information __
X4 X3 This drawing has been prepared in accordance with SGB Equipment Data Sheets, Formwork, A
F1 G1 Guide to Good Practice (Concrete Society) 2nd Edition, Ciria Report 108 Concrete Pressure
on Formwork, as well as the relevant statutory provisions and Code of Practice.
Std.-2.0m
Std.-2.0m
Std.-2.0m
Std.-2.0m
Std.-2.0m
Std.-2.0m
Std.-2.0m
Falsework Self Weight of Concrete __ kN/m3
Self Weight of Formwork __ kN/m2
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Board-3.0m Board-2.5m Board-1.0m Board-2.5m Board-3.9m Board-3.9m Live Load __ kN/m2
+115.800 +115.800 Formwork Max. Concrete Pressure allowed __ kN/m2
Concrete Type (Ciria 108) __
Concrete Temperature __ degrees C
Rate of Rise __ m/hr
Lift Height
Lift Height
Lift Height
Tu
Tu
00 00 00
2000
2000
be
be
2000
25 25 25 Access Working Lifts __ No. @ __ kN/m2
be
25
25
00
00
Std.-3.0m
Board-2.5m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Max. Design Wind Speed -- kph
4. Timber
Tu No timber is supplied by SGB unless specifically stated. Where SGB
Tu Tu does not supply, the design and supply of timber is the responsibility of the customer.
be
Lift Height
b be
Lift Height
Lift Height
00
00
25 e To enable us to complete this the following properties (based on Formwork,
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
2000
25 25
25
25
2000
2000
00 00 00 A Guide to Good Practice), for the Customer timber(s), have been allowed for:-
be
be
Tu
Tu
Main Bearers __ Secondary Bearers
Walings __ Other(s) __
Timber Grade allowed
Board-2.5m
Plywood 19mm Dougles Fir with face grain orientated parallel to span.
Ladder 5. Formwork
THE CUSTOMER IS RESPONSIBLE FOR ENSURING THAT ALL SGB COMPONENTS THAT
COME INTO CONTACT WITH CONCRETE ARE TREATED WITH CHEMICAL RELEASE
Lift Height
Lift Height
Lift Height
Tu
Tu
Std.-3.0m
00 00
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
2000
2000
2000
be
be
25 25 25 6. Foundations/Support
be Typical Skewed Ladder Access Detail
25
25
Tu be be
00
0
Tu Tu Unless otherwise noted, no soleplates or other means of spreading the imposed loads are
0
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
b be
Lift Height
Lift Height
e
00
00
25 e
2000
25 25
2000
2000
25
25
be
retaining clamp
The Customer is responsible for ensuring all structures remain adequately tied and/or braced to
Tu
Tu
carry the load and ensure stability. No ties or braces are to be removed or altered in any way
without the expressed written authority from SGB. Where SGB supplying equipment only, the
supply and fixing of all necessary ties is the responsibility of the Customer.
16015
16015
Std.-3.0m
Std.-3.0m
Board-2.5m
+108.000
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Int. Transom 9. Temporary Working Platforms
Scaffold Tubes
Unless specifically stated, it is assumed that any other working platforms (for erection
Tu Tu Bracing tube & fitting's Cuplok Ledger or dismantling purpose) will be designed, supplied and fitted by the Customer.
00 00
Lift Height
Lift Height
1500
Lift Height
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
2000
25
be __
Tu Cuplok Standard __
Swivel Coupler Unless indicated otherwise, all loads shown are not factored.
Board-2.5m Maximum calculated leg load = ----- kN
+106.000 Cuplok Ledger
Cuplok
Ledger
Lift positions bracing frequency to be as shown on the drawing.
Tube brace
Lift Height
Lift Height
Tu Tu Maximum calculated tie load = --- kN
00
00
be be
25
25
2000
2000
Tie Type ---
Tu Fixed with Swivel 25 25
be
be
Tu
Tu
Coupler 0 Note, method of assessment of loads in the tie rods allows for elongation of ties
Std.-3.0m
Std.-3.0m
25
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
2000
Cuplok Ledger
00 All tube & fitting cross bracing must be and not continuity. Ref. Formwork, AGuide to Good Practice 2nd edition 3.8.2.
located within 300mm of the node and
connected to standard-to-standard using Unless a specification for tolerance has been provided, deflection has been limited
using swivel couplers to 1/270th of the maximum span of each member.
Base & Head Plate
BRACING DETAIL with Universal Jack
11. Back Propping
Board-2.5m
+104.000 +104.000
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Back Propping is the responsibility of the user. The Architect/Engineer should
Universal Jacks are thoroughly check back propping layout and placement prior to use.
00 00
Lift Height
Lift Height
12. Erection
2000
2000 be e
b
b
e
used they must not The Customer is responsible for all matters relating to work on site where SGB
Tu Tu
25
does not supply labour or technical supervision. This includes the method, control,
Lift Height
00
00 extend more than and suitability of all sequencing, the timing, checking, loading, striking, movement,
2000
25
49°
e lifting and stripping of the temporary work and the design, supply and erection of any
b 400mm as this
45°
45°
Tu temporary working platforms for the erection and dismantling.
exceeds 2/3rd's of All legs are to be erected plumb and loaded concentrically.
40°
Std.-3.0m
Board-2.5m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Std.-3.0m
Preliminary Construction
Lift Height
Lift Height
Tu Tu
00
00
Std.-2.0m
Std.-2.0m
Std.-2.0m
Std.-2.0m
Std.-2.0m
Std.-2.0m
be be
25
25
2000
2000
Tu
be 25 25 Universal Jack Detail
be
be
25 0 00
Tu
Tu
380
By :
342
342
MIN.
LADDER
900
Section Elevation - ------------------------------- ------------ ----
4000
To CPI Piperack, Grid F1 -to- L1, EL.115.718
This Scaffolding has been 20kg
(45lbs) Section, Elevation & Details
designed for Light Duty One man and 20kg. per sq.m
max total load 120kg sq.m
Safaniya Wet Crude Facilities
SHEET 1 OF 1