You are on page 1of 1

Drawing Notes:

1. SGB Copyright
This drawing is the copyright of SGB. No unauthorized use, copy or disclosure is
to be made and it is to be returned upon request. The drawing is supplied subject to the
company's standard condition as applicable. SGB reserve the right to amend
drawing details and material components subject to stock availability.
2. Basis of Design
This drawing has been prepared from information supplied to us, by or on behalf of the customer,
who should that we have correctly interpreted his requirements and that all loading, dimensions,
details, erection, pouring and striking sequences etc., are as required and practicable.

The following drawings obtained have been used to prepare this scheme:-
Customer Drawing __
Customer Drawing __
Design Brief __
Customer Method Statement __
Other Information __
X4 X3 This drawing has been prepared in accordance with SGB Equipment Data Sheets, Formwork, A
F1 G1 Guide to Good Practice (Concrete Society) 2nd Edition, Ciria Report 108 Concrete Pressure
on Formwork, as well as the relevant statutory provisions and Code of Practice.

To enable us to complete this drawing, we have allowed for the following:-


The Customer is to read all notes shown on this drawing.
The Customer must check and confirm all details and dimensions.
1800 180 5900 All timber work is to be designed, supplied and fixed by the Customer.
+116.750 +116.750 Any areas where supports have not shown, these areas are by site!
The Customer is to check and confirm that we have correctly interpreted his requirements.
3. Applied Loads
+116.718 +116.718 Applied loads (unless otherwise indicated) Where applicable:-
Std.-2.0m

Std.-2.0m

Std.-2.0m

Std.-2.0m

Std.-2.0m
Std.-2.0m

Std.-2.0m

Std.-2.0m
Falsework Self Weight of Concrete __ kN/m3
Self Weight of Formwork __ kN/m2

Std.-3.0m

Std.-3.0m

Std.-3.0m
Std.-3.0m

Std.-3.0m

Std.-3.0m
Board-3.0m Board-2.5m Board-1.0m Board-2.5m Board-3.9m Board-3.9m Live Load __ kN/m2
+115.800 +115.800 Formwork Max. Concrete Pressure allowed __ kN/m2
Concrete Type (Ciria 108) __
Concrete Temperature __ degrees C
Rate of Rise __ m/hr
Lift Height

Lift Height

Lift Height
Tu

Tu
00 00 00
2000

2000
be
be

2000
25 25 25 Access Working Lifts __ No. @ __ kN/m2
be

25
25

b e b e Additional Lift __ No. @ __ kN/m2


Tu

00
00

Tu Tu Hop-Up Brackets __ No. @ __ kN/m2

Wind Wind Loads, where applicable, have been calculated in


Std.-3.0m

Std.-3.0m

Board-2.5m
Std.-3.0m

Std.-3.0m

Std.-3.0m

Std.-3.0m

Std.-3.0m

Std.-3.0m
Max. Design Wind Speed -- kph
4. Timber
Tu No timber is supplied by SGB unless specifically stated. Where SGB
Tu Tu does not supply, the design and supply of timber is the responsibility of the customer.
be
Lift Height

b be

Lift Height

Lift Height
00

00
25 e To enable us to complete this the following properties (based on Formwork,

Std.-3.0m

Std.-3.0m

Std.-3.0m
Std.-3.0m

Std.-3.0m

Std.-3.0m
2000

25 25
25

25

2000

2000
00 00 00 A Guide to Good Practice), for the Customer timber(s), have been allowed for:-
be

be
Tu

Tu
Main Bearers __ Secondary Bearers
Walings __ Other(s) __
Timber Grade allowed
Board-2.5m
Plywood 19mm Dougles Fir with face grain orientated parallel to span.
Ladder 5. Formwork
THE CUSTOMER IS RESPONSIBLE FOR ENSURING THAT ALL SGB COMPONENTS THAT
COME INTO CONTACT WITH CONCRETE ARE TREATED WITH CHEMICAL RELEASE
Lift Height

Lift Height
Lift Height
Tu

Tu

00 AGENT PRIOR TO EACH USE.


Std.-3.0m

Std.-3.0m

00 00
Std.-3.0m

Std.-3.0m

Std.-3.0m

Std.-3.0m

Std.-3.0m

Std.-3.0m
2000

2000

2000
be
be

25 25 25 6. Foundations/Support
be Typical Skewed Ladder Access Detail
25
25

Tu be be
00
0

Tu Tu Unless otherwise noted, no soleplates or other means of spreading the imposed loads are
0

supplied by SGB. Where SGB equipment is supported, suspended, anchored


Cuplok Ledger or tied to an existing structure or the ground, the Customer must ensure that the structure
Board-2.5m Standard ground is adequate to safely supported the additional imposed loads.

Std.-3.0m

Std.-3.0m

Std.-3.0m
Std.-3.0m

Std.-3.0m

Std.-3.0m

Toe board clips


or wrapover putlog 7. Modification
coupler This drawing has been prepared using the Safe Working Loads of the SGB
Tu
+109.500 +109.500 Tu Tu
Toe board components specified. No alteration to components, assembly, loading or any other
b aspect must be made without authority from SGB
Lift Height

b be
Lift Height

Lift Height
e
00

00

25 e
2000

25 25

2000
2000
25

25

00 Board 8. Tying and Bracing


00 00
be

be

retaining clamp
The Customer is responsible for ensuring all structures remain adequately tied and/or braced to
Tu

Tu

carry the load and ensure stability. No ties or braces are to be removed or altered in any way
without the expressed written authority from SGB. Where SGB supplying equipment only, the
supply and fixing of all necessary ties is the responsibility of the Customer.
16015

16015
Std.-3.0m

Std.-3.0m

Board-2.5m
+108.000
Std.-3.0m

Std.-3.0m

Std.-3.0m

Std.-3.0m

Std.-3.0m

Std.-3.0m
Int. Transom 9. Temporary Working Platforms
Scaffold Tubes
Unless specifically stated, it is assumed that any other working platforms (for erection
Tu Tu Bracing tube & fitting's Cuplok Ledger or dismantling purpose) will be designed, supplied and fitted by the Customer.
00 00

Lift Height
Lift Height

b e b e 25 25 Cuplok Node Point 10. Design Output


Toe Board Details
1500

1500
Lift Height

20 20 be be Ledger Connection This drawing should be read in conjunction with:-


00 00 00 Tu Tu

Std.-3.0m

Std.-3.0m

Std.-3.0m
Std.-3.0m

Std.-3.0m

Std.-3.0m
2000

25
be __
Tu Cuplok Standard __
Swivel Coupler Unless indicated otherwise, all loads shown are not factored.
Board-2.5m Maximum calculated leg load = ----- kN
+106.000 Cuplok Ledger
Cuplok
Ledger
Lift positions bracing frequency to be as shown on the drawing.
Tube brace
Lift Height

Lift Height
Tu Tu Maximum calculated tie load = --- kN
00

00

be be
25

25

2000

2000
Tie Type ---
Tu Fixed with Swivel 25 25
be

be

Cuplok Standard Cuplok Std. Tie spacing to be as shown


be 0 00
Lift Height

Tu

Tu

Coupler 0 Note, method of assessment of loads in the tie rods allows for elongation of ties
Std.-3.0m

Std.-3.0m

25
Std.-3.0m

Std.-3.0m

Std.-3.0m

Std.-3.0m

Std.-3.0m

Std.-3.0m
2000

Cuplok Ledger
00 All tube & fitting cross bracing must be and not continuity. Ref. Formwork, AGuide to Good Practice 2nd edition 3.8.2.
located within 300mm of the node and
connected to standard-to-standard using Unless a specification for tolerance has been provided, deflection has been limited
using swivel couplers to 1/270th of the maximum span of each member.
Base & Head Plate
BRACING DETAIL with Universal Jack
11. Back Propping
Board-2.5m
+104.000 +104.000
Std.-3.0m

Std.-3.0m

Std.-3.0m

Std.-3.0m

Std.-3.0m

Std.-3.0m
Back Propping is the responsibility of the user. The Architect/Engineer should
Universal Jacks are thoroughly check back propping layout and placement prior to use.
00 00
Lift Height
Lift Height

25 25 760mm long. When


Tu

12. Erection
2000

2000 be e
b

b
e

used they must not The Customer is responsible for all matters relating to work on site where SGB
Tu Tu
25

does not supply labour or technical supervision. This includes the method, control,
Lift Height

00

00 extend more than and suitability of all sequencing, the timing, checking, loading, striking, movement,
2000

25
49°

e lifting and stripping of the temporary work and the design, supply and erection of any
b 400mm as this
45°

45°
Tu temporary working platforms for the erection and dismantling.
exceeds 2/3rd's of All legs are to be erected plumb and loaded concentrically.
40°

their overall length.


Cuplok Standard
Std.-3.0m

Std.-3.0m

Board-2.5m
Std.-3.0m

Std.-3.0m

Std.-3.0m

Std.-3.0m

Std.-3.0m

Std.-3.0m
Preliminary Construction
Lift Height

Lift Height

Tu Tu
00
00

Std.-2.0m

Std.-2.0m

Std.-2.0m

Std.-2.0m

Std.-2.0m

Std.-2.0m
be be
25
25

2000

2000

This drawing is for This design has been


Lift Height

Tu
be 25 25 Universal Jack Detail
be
be

discussion, pricing, and checked for loadings, local


1500

25 0 00
Tu
Tu

0 approval by the customer. and overall stability in


00 It forms no part of any accordance with our
agreement until issued interpretation of the
and signed in its customers requirements.
1800 1300 1000 1300 1000 1300 Socket Base & 1600 1300 1600 1600 1600 construction status.
380

380

By :
342

342

Universal Jack By : N.,SULTAN


342

+99.900 +99.900 Date : Date : 18.04.2021

MIN.
LADDER

900
Section Elevation - ------------------------------- ------------ ----

Scale 1 : 50 Scale 1 : 50 SGB


Revision Revision Details Date By

Total Boarded Level = 1


Total Working Level = 1 Title:

Cuplok Birdcage Access Scaffold, Ht.=16.015m

4000
To CPI Piperack, Grid F1 -to- L1, EL.115.718
This Scaffolding has been 20kg
(45lbs) Section, Elevation & Details
designed for Light Duty One man and 20kg. per sq.m
max total load 120kg sq.m
Safaniya Wet Crude Facilities
SHEET 1 OF 1

Access, 25psf (1.2kN/sq.m (25psf) Customer:


New Horizon
75° Depot: Scale:
Jeddah 1:50
1000 Prepared By: Date: Drawing Number:

LADDER POSITION N., SULTAN 18/04/2021


Checked By: Date: SA21-NA-807883-905
O., EDMAR 18/04/2021