PACKAGE CONTENT
1 Task List
2 Equipment Schedule of Results
3 Authentication of Result
4 Condition Score
INSTRUCTIONS
1 Load button to start and save form.
2 Complete the top section of each page of the Equipment Schedule of Results.
3 Add additional equipment as required to the Equipment Schedule of Results.
4 Complete tasks.
5 Refer to the work order for possible special job instructions.
6 Record Results and Condition Score on the Equipment Schedule of Results.
7 Fields not completed shall be marked with line (---) unless greyed out.
8 If the test was required and could not be completed a score of 3 and the reason
must be given in limitations.
9 Provide comments on form for all equipment with a score of 2,3,4, or 5.
10 Include photographs for scores of 4 or 5.
11 Records shall be submitted by the end of each week from the date of completion.
12 Submit Record.
Doc ID: CHE378 - Electrical - Earth Grid - Task List - Soil Resistivity Testing Revision:4 - Active: 27/07/2016
Printed copies of this document should be verified for currency against the published electronic copy. PAGE 1 OF 9
Soil resistivity testing
The objective is to manage the risk of touch, step, and transfer voltages, personnel injury, damaging cable and
equipment by inspecting and testing of Earth Grid (EGD).
This inspection excludes surge, HV, LV, MEN and lightning protection systems including cathodic protection. Also
excludes earth fault loop impedance testing.
The Condition Score incorporates the results of inspection and examination maintenance operations. The tasks
below indicate formal items that should be inspected for the Earth Grid. Record results and condition score on the
Equipment Schedule of Test Results form.
Note: Electricians with training in Earth Grid testing are required to perform the inspection and testing.
In the case of HV systems appropriate HV qualified personnel is also a requirement.
Documentation
All measurement, test and design documentation should be properly recorded and kept. To maintain
the integrity of the earthing installation over a long period of time and to assess the suitability of the
Earth Grid for present fault levels the following records should be maintained.
• Engineering design specification and calculations
• Results of installation and commissioning tests
• Results of periodic inspections and measurements
• Update of fault level if any
• Drawings showing the earthing system layout including location and size of all Earth
Conductors, Electrodes, Earth Grid and the location of all Grid Connections.
• Obtain and Review any previous test results and schematics to detect changes and Report.
• Defined Earth Grid and Earth Electrode Tag numbering to be used on Result sheet and
Layout Drawings.
Doc ID: CHE378 - Electrical - Earth Grid - Task List - Soil Resistivity Testing Revision:4 - Active: 27/07/2016
Printed copies of this document should be verified for currency against the published electronic copy. PAGE 2 OF 9
Earth Grid layout Examples
Out of Scope
Site Transformer
Neutral/Protective earth (PEN)
Main Switch Board/MCC on Site L1 L2 L3
L1 MEN Connection
L2 Main Earth Bar
L3 MEN Connection
N
Neutral Bar
Neutral Bar
Other Earth Connections
EARTH GRID CONNECTION Layout Example No.2 (Multiple Earth Electrodes) EARTH GRID CONNECTION Layout Example No.3
(Green in Scope) Energex Supply Out of Scope Energex Supply (Green in Scope)
Earth Grid Out of Scope Energex Substation
Main Earth Conductor Earth Grid
Main Earth Bar Main Earth Conductor L3
Main Earth Bar
L1 L2 L3 Neutral/Protective earth (PEN)
MEN Connection
L1L2L3 Neutral
Main MEN Connection
Neutral Bar Neutral Bar
L1 L2 L3 N
L1L2L3 N Co Generation
Doc ID: CHE378 - Electrical - Earth Grid - Task List - Soil Resistivity Testing Revision:4 - Active: 27/07/2016
Printed copies of this document should be verified for currency against the published electronic copy. PAGE 3 OF 9
Task List
Definitions
Calibrate
A comparison of measuring equipment against a standard instrument of higher accuracy, a known
value reference cell or a standardised solution to detect, correlate, adjust, rectify and
document the accuracy of the instrument being compared. - ISA Calibration Principles.
Element
The Probe, Electrode, Sensor or Transducer that is used to interface with the actual product or
process medium.
Function Test
Tests the function of the complete loop from measuring device through to the final output element,
for operation as designed.
May
Indicates the existence of an option. - AS/NZS 3760
Proof Test
Proves the operation of the equipment and tests for otherwise undetectable faults.
Setup
Measuring equipment is setup for the intended range and parameters of the application.
Some instruments can be setup but not calibrated.
Shall
Indicates a statement is mandatory to achieve compliance.
Items that are designated shall and that are not completed should be detailed in limitations.
Should
Indicates a statement is preferred as indicating good practice, but is not mandatory. - AS/NZS 3760
Tolerance
Permissible deviation from a specified value; may be expressed in measurement units,
percent of span, or percent of reading. Tolerance is application specific. - ISA Calibration Principles.
Visual Inspection
Generally an external inspection using ones senses to determine the condition of the equipment.
May require partial dismantling of equipment, does not include use of test equipment.
Doc ID: CHE378 - Electrical - Earth Grid - Task List - Soil Resistivity Testing Revision:4 - Active: 27/07/2016
Printed copies of this document should be verified for currency against the published electronic copy. PAGE 4 OF 9
Reset
Work Order
Equipment Ref: MST No:
Equipment Description:
Reference Documents
Maintenance Manual: Drawing No:
Test Equipment (Type,
Model & Serial):
Special Instructions
Fixed Results
Condition
Soil Resitivity
PotentialTest
Earthpotential
Connections
Cad welder/
type Bolted/
Conenction
Overall Grid
Resistance
Installation
Earth grid/
Rise (EPR)
resistance
Score
conductor
Earthing /
Description
Individual
Insulation
<10 ohms
Potenetial
Clamped
Resitiivity
restiance
Terminal
Bonding
Type of
<1ohm
contact
Touch
Date
Step
size
Test
1-5
-
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Additional comment if required.
Doc ID: CHE378 - Electrical - Earth Grid - Task List - Soil Resistivity Testing Revision:4 - Active: 27/07/2016
Printed copies of this document should be verified for currency against the published electronic copy. PAGE 5 OF 9
Equipment Schedule of Results
Work Order
Equipment Ref: MST No:
Fixed Results
Condition
Connections
Type Bolted/
Resistance
Earth grid /
Installation
Connection
Conductor
Cad wlded/
Earth Grid
Resistivity
Score
<10 ohms
Description
Continuity
Resitance
Insulation
Individual
continuity
Earthing/
Potential
Potential
<5 ohms
Potential
Terminal
Bonding
Clamped
Contact
Type of
Touch
Earth
Date
Step
Size
Test
Test
Rise
Soil
1-5
-
-
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Additional comment if required.
Doc ID: CHE378 - Electrical - Earth Grid - Task List - Soil Resistivity Testing Revision:4 - Active: 27/07/2016
Printed copies of this document should be verified for currency against the published electronic copy. PAGE 6 OF 9
Equipment Schedule of Results
Work Order
Equipment Ref: MST No:
Fixed Results
Condition
Connections
CadWerlded
type Bolted/
Earth grid /
Connection
Resistance
Installation
Earth Grid
Resistivity
Score
<10 ohms
Continuity
conductor
Resitance
/Clamped
Insulation
Individual
continuity
Earthing/
Description
Potential
<5 ohms
Potential
Potential
Terminal
Bonding
Contact
Type of
Touch
Earth
Date
Test
Step
Rise
Size
Test
Soil
1-5
-
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Tag
Description
Additional comment if required.
Doc ID: CHE378 - Electrical - Earth Grid - Task List - Soil Resistivity Testing Revision:4 - Active: 27/07/2016
Printed copies of this document should be verified for currency against the published electronic copy. PAGE 7 OF 9
Equipment Schedule of Results
Work Order
Equipment Ref: MST No:
Authentication Of Results
The results recorded in the Schedule of Results verifies, subject to the specified level of maintenance or inspection and any limitations & observations listed below, the condition of the
equipment listed.
Limitations & Observations (Technician to detail limitations and items requiring attention. Condition Score 2,3,4,5):
2. Crossout
_____________________ _________________________ _____________________ _________________________
Work Order License/Qualification Type & Number 3. Check Signature
Planned Corrective (For Office Use. Receiving Officer to record reference numbers and comments):
Doc ID: CHE378 - Electrical - Earth Grid - Task List - Soil Resistivity Testing Revision:4 - Active: 27/07/2016
Printed copies of this document should be verified for currency against the published electronic copy. PAGE 8 OF 9
Condition Score
Condition Score
Very Good Condition.
1 It is stable, no additional work required.
Advise normal or extended maintenance interval.
Good Condition.
Only used where repair/replacement work is completed as per job instructions
2
Now it is stable and safe.
Doc ID: CHE378 - Electrical - Earth Grid - Task List - Soil Resistivity Testing Revision:4 - Active: 27/07/2016
Printed copies of this document should be verified for currency against the published electronic copy. PAGE 9 OF 9