You are on page 1of 3
“Wy HEXACON CONSTRUCTION PTE LTD 492 Balestier Road #02-432 Public Mansion Singapore 329813 To): 6251 9388 Fax: 6253 1638 E-mail: info@hexacon.com.sg Business Reg, No. 198204843K INVOICE TO: Zhong Ren Construction Pte Ltd Block 1014 Geylang East Ave 3 02-232 Singapore 389729 TAX INVOICE: A 18812 Attn: Mr.Chen Sheng Yu ahi: 17-Jul-2023 Proposed Commercial Development on Lot 553T T30 at Central Boulevard Singapore PROJECT: (SBD) GST REGISTRATION NO. M2-0058132-6 Tem DESCRIPTION AMOUNT I Safoty Violation Notice Ref : HC/SCBD/SIP/227 Date 3/7/2023, Description 1. Workers Carrying out $ 1,600.00 ‘work without PTW 2.Absence of Supervisor and Safety Personnel 3. Poor Housekeeping & Chemical barriers not stored properly 4, Worker without hand gloves and face shield when Using marble cutter R ‘Add : 5% administration charges 8 80.00 "To be deducted from payment due to you AC : 140002, PCC : 09-30-00 E8O.E, TOTAL $1,680.00 GST 8% § 6.40 AMOUNTDUE} $1,686.40 HEXACON CONSTRUCTION PTE LTD gi te SAFETY VIOLATION NOTICE Note: This notice is to inform the safety violation(s) committed on site that has contravened our Company's Rules & Regulations. ‘Company: Zhong Ren Construction Pte Ltd TO | Attn: Mr. Chen Shengyun REF.NO | HC/SCBD/SIP/227 Phone: 9298 7788 HEXACON CONSTRUCTION PTE LTD - SCBD Time:03.30hrs Location: ScD. West Towor - 36 in: 1. Workers Carrying out work without PTW. 2. Supervisor and Safety personal don’t have on work Site. 3. Poor housekeeping at work zone and Chemical barrels are not stored proper manner at L36. 4, Worker without hand gloves and face shield to use marble cutter at L36. (Ref-EHS Requirement for Project Workplace — (schedule 6A- 04, 20, 35 37) Failure to use appropriate PPE for carrying out the work - $100, Failure to carryout daily housekeeping at workplace - $500, Yorking without a permit where a permit-to-work (PTW) is required - $500, Failure fo comply to Relevant EHS Requirements - $500) Corrective actions to be taker Work site must require Safety personal & supervisor. ‘Supervisor should be PTW apply prior to start work. Comply with in-house rules and regulation (PTW required for all works) Daily housekeeping needs to carry out after the work completed. Chemical barrels are need to store at designated storage area and required proper exclusion zone and warning signages. SeONS As such disciplinary action will be taken against you as marked below: Total Penalty imposed ( $) Warning Dismissal $100+$500+$500+$500=$1600 ia a Issue by: A.Tamil (WSHC) Recommended by: Alluri Approved By: Lim Wei Chin (CM) (EHS Safety officer} $C 477) 2083. DISTRIBUTION: 15" copy to safety department, 2" copy to QS Departrfient, 3" copy to contractor NOTE: The penalty wil be deducted from next involoe/ progress payment.— = SAFETY VIOLATION NOTICE

You might also like