You are on page 1of 1

W 01: W 02: W 03:

1,800
600 600 600 1,800 1,800
25 100 A (31) 002/B 25 100 A (31) 002/B20
25 25 A (31) 002/B 25 25 25 25 25 18 18 18 132 18 25 25 25 20 20 20 25 25
150 600 225 525

25 25
550 575 525 150 614 632

20 25 25

25 25
Fixed 400mm glazed ventlight.

150

150
pv pv pv pv pv pv pv pv

18 18
Standard steel window casement window Standard steel window casement window Standard steel window casement window

135
V frame painted to approval. frame painted to approval. frame painted to approval.
F F
F

450

155
1,200

1,200

1,200
Round steel section mullions folded as

1,100

18 18
Round steel section mullions folded as

1,100
C C C

135
patterned to approval.
F F patterned to approval.

20
100
25
Permanet vent louvres.
F R =100mm

200

450
3mm thick clear glass in metal putty. Varied 3mm thick stained glass panels F 3mm thick clear glass in metal putty.
F F fixed in metal putty patterned to approval.

25 25
25 25

100

25 25
25
25 20 75 20 25 A (31) 002/A A (31) 002/A A (31) 002/A
200 200

Elevation: C (31) 001/A Elevation: C (31) 002/A Elevation: C (31) 003/A

Plan: C (32) 001/B Plan: C (32) 002/B Plan: C (32) 003/B

DESCRIPTION: DESCRIPTION: DESCRIPTION:


1800mm WIDE STEEL CASEMENT WINDOW PAINTED TO APPROVAL. 1800mm WIDE STEEL CASEMENT ORNAMENTAL WINDOW WITH STAINED 1800mm WIDE STEEL CASEMENT WINDOW WITH MULLION GRID
GLASS PATTERNED TO APPROVAL TO APPROVAL. PATTERNED TO APPROVAL TO APPROVAL.
H X W: H X W: H X W:
1200mm X 1800mm 1200mm X 1800mm 1200mm X 1800mm
LEVEL: LEVEL: LEVEL:
900mm 900mm 900mm
LOCATION: LOCATION:
1. SHOP FRONTS. RESTAURANT. LOCATION:
2. RESTAURANT. OFFICES..

QUANTITY: QUANTITY: QUANTITY:


13NO. 13NO. 13NO.
IRONMONGERY SCHEDULE: IRONMONGERY SCHEDULE: IRONMONGERY SCHEDULE:
3NO. BRASS WINDOW STAYS; 1NO. LEVER UPRIGHT MORTICE LOCK AS 1NO. LEVER UPRIGHT MORTICE LOCK AS 'UNION'. 1NO. BRASS WINDOW STAYS; 1NO. LEVER UPRIGHT MORTICE LOCK AS
'UNION'. 'UNION'.

W 04: 1,800 A (31) 002/B


W 05: W 06:
900 A (31) 002/B 900A (31) 002/B
25 25 25 18 18 25 25 25 25 18 115 25 25 25 18 18 18 25 25
520 350 240 525 450 240 190 190 175 190
25 25

25 25

25 18 75 50
pv pv pv pv
140 145

pv pv pv
Standard steel window casement window 4mm clear glass on ventlight.
18 18

200
frame painted to approval. V
F Round steel section mullions folded as Standard steel window casement window
155

frame painted to approval.


1,200

1,200

1,200
patterned to approval.
18 18
1,100

1,100

C C C
130

750
Varied 3mm clear stained annealed glass
C C
445

F F fixed in metal putty. F Permanet vent louvres.


3mm thick clear glass in metal putty.
25 25

25 25

25 25
A (31) 002/A A (31) 002/A A (31) 002/A

Elevation: C (31) 004/A Elevation: C (31) 004/A Elevation: C (31) 004/A

Plan: C (32) 004/B Plan: C (32) 004/B Plan: C (32) 004/B


DESCRIPTION: DESCRIPTION: DESCRIPTION:
1800mm WIDE STEEL CASEMENT WINDOW PAINTED TO APPROVAL. 900mm WIDE STEEL CASEMENT WINDOW WITH 8 GAUGE PRESSED METAL LOUVRES. 900mm WIDE STEEL CASEMENT WINDOW PAINTED TO APPROVAL.

H X W: H X W: H X W:
1200mm X 1800mm 1200mmX 900mm 1200mmX 900mm

LEVEL: LEVEL: LEVEL:


900mm 900mm 900mm
LOCATION: LOCATION: LOCATION:
APARTMENTS APARTMENTS BEDROOMS. APARTMENT LOUNGES.
QUANTITY: QUANTITY: QUANTITY:
13NO. 13NO. 13NO.
IRONMONGERY SCHEDULE: IRONMONGERY SCHEDULE: IRONMONGERY SCHEDULE:
2NO. BRASS WINDOW STAYS; 1NO. LEVER UPRIGHT MORTICE LOCK AS 1NO. BRASS WINDOW STAYS; 1NO. LEVER UPRIGHT MORTICE LOCK AS 2NO. BRASS WINDOW STAYS; 1NO. LEVER UPRIGHT MORTICE LOCK AS
'UNION'. 'UNION'. 'UNION'.

W 07: 12 12
500 200
A (31) 002/B
50 18 50
190 190 25x33 o/a steel casement
125

pv pv sash framing. 3mm clear glass in glass putty as per


12 24

schedule.
180 225
600

V
25 25 20

F Masonry walling; See plan.


Finish as per schedule. r.c beam to S.E's detail.
200

A (31) 002/A
Elevation: C (31) 007/A
25 12

12

ex 25x125mm thick window board painted Mastic asphalt pointing.


to approval. 10
Wall finish as per schedule. 20
12 12 12

25x33 o/a steel casement


Cill line. sash framing.
25

Plan: C (32) 007/B Cement/ sand jointing.


PLAN: A (31) 001
12

Cement/ sand jointing.


DESCRIPTION: SCALE: 1:5
20 20
20

500mm WIDE STEEL CASEMENT WINDOW SERVICE WINDOWS.


20mm quadrant timber bead 10x10mm drip mould.
H X W:
80

600mm X 900mm
60

250x80mm bevelled precast concrete cill 120 120


40

LEVEL: to SE's detail.


1500mm 10x10mm drip mould. 3mm clear glass in glass putty as per
10 schedule.
12

LOCATION: 15 15
TOILETS. Wall finish as per schedule. HEAD DETAIL: A (31) 002/B
QUANTITY: SCALE: 1:2
Masonry walling; See plan.
13NO.
IRONMONGERY SCHEDULE:
1NO. BRASS WINDOW STAYS; 1NO. LEVER UPRIGHT MORTICE LOCK AS
'UNION'.
SILL DETAIL: A (31) 002/A
SCALE: 1:2

NOTES STRUCTURAL WORKS: JOB TITLE: JOB NO. SCALE:


GENERAL: 1. All black cotton soils to be removed from all building plinths. All buildings to be clear of black
1. All dimensions to be checked on site before commencement of any work. Use cotton soil to a distance of 3m. MIXED URBAN DEVELOPMENT
figured dimensions only. Any discripancies should be reported to the Architect 2. All basement columns to be provided with angle iron protection 1500mm high.
immediately.
2. All dimensions are in milimetres unless otherwise specified as interior room
3. All paved surfaces to be clear of black cotton soil to a distance of 500mm outside the edge of the
surface.
DAVID LOKI E. PJ 7/2007 1:20; 1:2
dimensions in metres.
CIVIL WORKS:
4. Refer to structural Engineers details for all r.c works.
5. Fountation depth to be determined on site to structural Engineer's approval.
BO2/0265/03
1. All soils under slabs and around external fountations to be treated for termite 6. All walls less than 200mm thick to be reinforced with hoop irons at every alternate course. DRAWING TITLE: DRAWING NO. DRAWN: DATE:
control. 7. All adjacent r.c work and masonry walls to be tied with strap irons at every course.
E.D MAY, 2007
2. All soils on cut emberkments to be stabilised. Slope not to exceed the natural angle
of repose.
MECHANICAL WORKS:
WINDOW SCHEDULES:
3. All slabs at ground level to be poured over 1000 gauge polythene sheeting on
1. All sanitry fittings, doors, windows and lifts to schedules.
2. All plumping and drainage to comply with city council's specifications. SC (31) 001 CHECKED:
50mm stone blinding on hardcore. 3. All service ducts to be accessible from every floor.
4. SVP denotes soil vent pipe to be provided at the head of drainage.

You might also like