L (--) 011

L(--)012
Basement walling to
be provided with
A B C D E F internal tanking and G
protective walling. No
excavationto be
done outside the
plot. boundery
Plot boundary
400 400 up.
30,000
400
7,300 4,800 200
2,500 2,500 200
4,800 200
7,300 200 400
11,800 4,800 4,600 4,500 3,500
400

400
400
400

400
150
1 1
4.6mX2.7m

420
4.5mX3.725m 3.725mX3.725m
4.8mX6.12m Fuel storage Transformer Generator
[-2/03]

2,800
STORE 1c 2a room room

2,380
150 200 [-2/02] 200 200 200 [-2/06]

3,800
[-2/05]

3,800
7,100 4,700 4,800 4a 3a 4,600 4,500 3,500
200 100 200
Up to Upper
3,600 900
1c 2a
Drip oil drain channels with steel
grating sloped to sump. 5,300
6,000

100 200

200

6,400
6,300

6,200
D-03 Drip oil drain channels with steel 1c 2a

6,200
grating sloped to sump.
Edge of Turbman basement 4a 3a

800
Corners left flat 4a 3a

900
D-03 4.6mX3.22m

100 200
road up.

200
D-01 D-01

200
1,700 to avoid uneven 1c 2a Switch 200 250 250

3,200
ramp slope. 1c 2a 750 3,000 750 3,000
4a 3a room

1,800

2,200
600mm steel
4a 3a 600mm steel
[-2/04] D-02 provide sump for Sump

1,100
louvred double louvred double draining dripping oil.
leaf doors on leaf doors on

300
ducts. ducts.

200 200

200 200

200

200
2 2

400
DRY & WET Fire hose

645

645
ELEC. TELCOM
Fire hose RISER
Lift Lift
DUCT DUCT 1c 2a cabinet.

1,800
cabinet. 200
8 Person/ 630kg
1100x1400x2200
8 Person/ 630kg
1100x1400x2200
100 200 4a 3a 200 Edge of
700 700 3,000

1,450
Vehicular ramp 1:10 1,500 (wxdxh) 1.6m/s (wxdxh) 1.6m/s
tarmaced road
4,700

4,700
with a ribbed 300mm Thick R.C lift
5,300

4,500

4,500
300

5,000
25 24 23
Pump
up.

250
concrete finish to core walls to S.E Terrazzo floor finish on lift lobby

approval. detail area. 4.7mX4.7m


300 200 300 COMMUNICATION CABLES

1,800
2,100 2,100 TERMINATION ROOM 100

3,000
Lifts to schedule [-2/07] 2,400 2,300 2,450 950
Lobby SC(71) 001 D-02

200 150

200

200
3 3
Stair/ lift lobby to be finished see detail
1 L (24)
19 001
Fire hose
with Non-slip concrete tiles. 2
Detail
18
cabinet.

3,000
3 17
20 4
5 HOIST
16
15 22
6 14

2
1,012.720 m
6,400

6,400
7 8 9 10 11 12 13
L (--) 009

200
Fall L (--) 010
30,400

19 R.C Staircase to detail

3,000
Turban 21 Steel grating over drain sloped
to pump.
33,100

33,100
C(24) 001
Tread=300mm; rise=150mm
Road above.

L(31) 212
BIASHARASTREET

200
4 composite water-proof 4 ABOVE.
basement retaining wall
with internal Mastic Fall

2,150
Asphalt tanking.
see detail
5,000

5,000
4,700

4,700
18 17 16 15 14 13

200
L (21) 001 L (21) 001
400 400
7,300 2,300 2,300 2,300 2,300 2,300 2,300 7,100

2,150
All columns in the parking
space to be provided with Trench drain with
1500mm angle iron bars for steel grating and

200
5 protection against car knocks. sloped to sump. 5
See detail A (28) 001 see detail
L (52) 001

2,800
-5.850 1a 2b BASEMENT
4a 3a
PARKING

200
6,400

6,400
6,000

Fall
[-2/01]

2,800
Parking markers done
with road paint to
approval.
12

400
6 6
1

2,100
2,300
400 400 400
2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300
400
4,600

5,000

4,700
400
11 10 9 8 7 6 5 4 3 2
2,300

2,200
400

400
400

7 7
400

400

400 400 400 400 400


2,000 24,000 2,000 800
7,300 4,800 2,500 2,500 4,800 7,300
400 400
30,000

A B C D E F G
L(--)012

Muindi mbingu street above.

L (--) 008

FINISHES SCHEDULE:
1: FLOOR 2: WALLS 3: CEILING 4: SKIRTING
FLOOR WALLS 1a: RIBBED CONCRETE. 2a: EPOXY ESTER PAINT 3a: PYROC 4a: 150mm POLISHED TERRAZZO
1b: SCREED 40mm FINISHED SMOOTH. 2b: WATER PROOFING TEXTURED PAINT. 3b: PAINTED RIBBED CONCRETE. 4b: EX 150 X 25MM HARDWOOD SKIRTING
E

1 2 1c: POLISHED TERRAZZO 2c: WOOD FLOAT PLASTER. 3c: APPROVED CERAMIC TILES. 4c: EX. 150 X 25MM SOFTWOOD SKIRTING
N

1d: APPROVED GRANITE TILES ON SCREED. 2d: APPROVED CERAMIC TILES. 3d: ARMSTRONG FISSURED MINABOARD 4d: 150X150mm QUARRY TILES.
W

1e: 300X300mm NON-SLIP CERAMIC TILES 2e: 102X305 'TAGUS' EUROCON WALL TILES. CONCEALED SUSPENDED CEILING SYSTEM. 4e: 100X20mm GRANO.
4 3
SKIRTING CEILING
1f: PARQUET FLOOR FINISH.
1g: 'TIRANE' EUROCON FLOOR TILES.
2f: 3-COATS SATIN FINISH 'BASCO' PAINT
2g: 'MAMORAN'
3e: CRATE CEILING.
3f: CHIPBOARD
4f: 100X20 CONCRETE TILES.
N
1h: 'PLUTO' EUROCON TILES. 2h: GRANO. 12mm POLISHED. 3g: CYPRESS T&G
1i: QUARRY TILES 2i: EMULSION PAINT. 3h: EMULSION PAINT

NOTES STRUCTURAL WORKS: JOB TITLE: JOB NO. SCALE:


GENERAL: 1. All black cotton soils to be removed from all building plinths. All buildings to be clear of black
1. All dimensions to be checked on site before commencement of any work. Use cotton soil to a distance of 3m. MIXED URBAN DEVELOPMENT
figured dimensions only. Any discripancies should be reported to the Architect 2. All basement columns to be provided with angle iron protection 1500mm high.
immediately.
2. All dimensions are in milimetres unless otherwise specified as interior room
3. All paved surfaces to be clear of black cotton soil to a distance of 500mm outside the edge of the
surface.
DAVID LOKI E. PJ 7/2007 1:100
dimensions in metres.
CIVIL WORKS:
4. Refer to structural Engineers details for all r.c works.
5. Fountation depth to be determined on site to structural Engineer's approval.
BO2/0265/03
1. All soils under slabs and around external fountations to be treated for termite 6. All walls less than 200mm thick to be reinforced with hoop irons at every alternate course. DRAWING TITLE: DRAWING NO. DRAWN: DATE:
control. 7. All adjacent r.c work and masonry walls to be tied with strap irons at every course.
E.D MAY, 2007
2. All soils on cut emberkments to be stabilised. Slope not to exceed the natural angle
of repose.
MECHANICAL WORKS:
LOWER BASEMENT PLAN
3. All slabs at ground level to be poured over 1000 gauge polythene sheeting on
1. All sanitry fittings, doors, windows and lifts to schedules.
2. All plumping and drainage to comply with city council's specifications. LAYOUT (PARKING) L (--) 001 CHECKED:
50mm stone blinding on hardcore. 3. All service ducts to be accessible from every floor.
4. SVP denotes soil vent pipe to be provided at the head of drainage.