Professional Documents
Culture Documents
PileCap
PileCap
Rev. Revised/Checked
No. Form/Sheet No. Description on Revision Date Revised
No. by
List of Acceptance Minutes for Pile Cap
Br-IS-PC-01
1 4 construction: 22/12/2010 Mr. Tuan Mr Xuan
rev.04
+ Remain the former sheet content.
Br-IS-PC-02 Inspection for Foundation Hole Elevation:
2 4 22/12/2010 Mr. Tuan Mr Xuan
rev.04 + Remain the former sheet content.
Inspection for Pile Location:
Br-IS-PC-03
3 4 + Remain the former sheet content, 22/12/2010 Mr. Tuan Mr Xuan
rev.04
Remarks:
Data
Elevation (m) - Point 1 2 3 4
Existing Actual
Ground Original
After Actual
Excavation Design
Difference (m)
Water Level (m)
Remark:
DESCRIPTION
1. Quality OK NG
1.Number of piles Ö
2.Pile head height Ö
3.Horizontal position of pile Ö
4.Pile mass Ö
5.Equipment condition Ö
6.Removal and cleaning of loose concrete Ö
7.Removal and cleaning of harmful material Ö
8.Cut-off Quality Ö
Remark:
1
2
3
4
5
6
7
8
9
Total 0 0
Remark :
General Information
Concrete Class C10-(Mix Design Name)
Design Conc.Vol. ; Actual Conc. Vol. 0.00 m3
Pouring method
Concrete mix ratio W/C (%) Water (L) Cement (kg) Sand (kg) Stone (kg) Additive (mL) Other
Design - 1m3
Actual - 1m³
Concrete supply & transport method : By agitator truck
Time Slump Conc. Temp. Volume No. of
No. Truck No.
Arrival Wait Start Finish (cm) (°C) (m3) Samples
1
2
3
4
5
Total 0 0
Remark:
Remark :
Acceptance (Sự chấp thuận): Accepted (chấp thuận): Not accepted (không chấp thuận):
Item Tolerance/Description
1. Formwork OK NG
Length
Section dimensions
Position in plan view
Straightness
Flat surface
Cleanliness
Chamfer
Supporting/falsework
Overall judgement Accepted Not accepted
2. Reinforcement
Re-bar size, length& lapping
Position
Covering
Spacer
Rigidity of rebar cage
Cleanliness
Starter bars for column
Overall judgement Accepted Not accepted
3. Construction Preparation Work
Concrete batching plant
Concrete transport
Concrete class
Concrete vibrating tamper
Concrete penetrating vibrator
Electricity
Concrete pump
Cement
Sand
Aggregate
Water
Additive
Other
Overall judgement Accepted Not accepted
Remark:
1
2
3
4
5
6
7
8
9
10
Total
Remark :
FOR CONTRACTOR
FOR CONSULTANT
CONSTRUCTION MANAGER
CONSTRUCTION TEAM SITE ENGINEER INSPECTOR
Inspector
INSPECTION FOR CONCRETING OF PILE CAP
Project Name/Contract No.
Abutment/Pier No: File No:
Location: Weather:
Shop drawing of pile cap: Date:
(Approved on -----/------/-----------)
General Information
Concrete Class C30-(Design Mix Name)
Design Conc. Vol. Actual Conc. Vol. 0.00 m3
Curing method Bags + water
Protection from raining Cover with plastic sheet
Pouring method Pumping car
Concrete mix proportion
W/C (%) Water (L) Cement (kg) Sand (kg) Stone (kg) Additive (mL) Other
Design - 1m3
Concrete supply and transport method : By agitator truck
Time Slump (cm) Conc. Volume No. of
No. Truck No.
Arrival Wait Discharge 1st 2nd Temp.(°C) (m3) Samples
1
2
3
4
5
6
7
8
9
10
11
12
Total 0 0
Remark:
DESCRIPTION
2. Data
Coordinate 1 2 3 4
of Corner X (North) Y (East) X (North) Y (East) X (North) Y (East) X (North) Y (East)
Design (m)
Actual (m)
Difference (mm)
Hor. Dev. (mm)
Tolerance (mm)
Conclusion OK OK OK OK
Elevation Location
of Surface 1 2 3 4 5 6 7 8 9
Design (m)
Actual (m)
Difference (mm)
Tolerance (mm)
Conclusion OK OK OK OK OK OK OK OK OK
Dimension Note
L1 L2 W1 W2
Design (m) Horizontal Deviation (Hor. Dev. - A):
Actual (m) A = (DX2+DY2)0.5
Difference (mm) DX: Difference in X direction
Tolerance (mm) -10 mm ≤ DL ≤ +50 mm DY: Difference in Y direction
Conclusion OK OK OK OK
3. Construction Joint between Column & Pile Cap OK NG
Roughening the Construction Joint between Column & Pile Cap Ö
4. Visual shape & Surface Checking Tolerance/Description OK NG
Straightness/Cuvredness - Ö
Flatness of horizontal/vertical surface ± 5 mm Ö
Repair of visual surface defects (cracks, honeycombs, spalls…) - Ö
Position of embedment (drainage pipe, …) - Ö
Overall Judgement Ö Accepted Not accepted
Remarks
APPROVED BY
CHẤP THUẬN BỞI