Professional Documents
Culture Documents
Quiz 2
a) Prepare suitable IS vision, mission and goal based on the given business strategic
information as follows:
Business Strategic Information IS Strategic Information
Vission To be a leading construction in a global i) To become a digital transformation
market. pioneer in the construction industry.
Mission To provide the highest level of service in ii) To make the operations at the
the construction industry while offering management level or the field level of
superior craftsmanship and information construction sites more efficient,
to every project. productively, and safe.
Goals To generate continued profitable growth iii) To reduce costs and maximize the
and to become more customer focused profitability
c) Prepare a balanced score-card for Wanida Construction based on the case given
Financial Perspective
Objective Measures
To reduce costs Percentage of reduction
in cost per unit
e) Identify TWO (2) factors that affect the length of time in developing strategic IS plan.
1. Number of persons interviewed. A longer time is needed when many persons need to be
interviewed.
2. Plan complexity. If the plan involves many components and details, it needs a longer
development time.