You are on page 1of 174

1

2
3
4
5
6
7
8
9
10
PAGE NO. CONTENTS

12 INTRODUCTION

19 COMPANY DOCUMENTS

36 CERTIFICATES

43 COMPANY APPROVALS

118 TEST CERTIFICATES

11
INTRODUCTION

12
MISSION STATEMENT
VISION
• To be one of leading companies in the manufacture steel
products.
MISSION
• To strengthen relationships with our customers by delivering reliable products in the most
efficient manner and thus to become the most Preferred and trusted steel manufacturing.
• To continue to pursue our strategic goals by adhering to the highest quality standards of
service and corporate governance to consolidate our industry standing.

GOALS
• To continue our tradition of management excellence to preserve our culture and
corporate values.
• Enhance corporate governance, organization structure, policies and procedures.
• To develop. Retain and well reward talented and committed employees.
• To continue our social commitment to invest in our youth as being the untapped
potential for the years to come.

STRATEGY
• Concentric growth in combination with market and product development through
adding new regional channels of distribution.
• Expand vertically by investing downstream and upstream manufacturing activities,
through current and future ventures.

13
QUALITY POLICY STATEMENT
Tameer Steel Ltd. accepts quality as a factor of development to become
more competitive.
TSL is committed to publicizing this Quality Culture with employees, suppliers,
clients and community, supported by the Total Quality Management Model, the
principles of which are the following :-
• Quality is a consequence of valuing customer satisfaction and obtaining positive
business results.
• Meet the quality levels established in the company in accordance with ISO
9001.
• Encourage participation and teamwork for decision making.
• Satisfy the needs of our clients and meet their expectations at a cost that
represents value.
• Provide human resources, both technical and economical, to achieve continuous
improvement and rest for the environment.
• Manage human resource in our company to achieve the maximum potential.
The goal of TSL is to achieve superior external and internal client satisfaction level.
The Management of TSL is committed to the implementation and support of
managerial and operational systems to realize this goal.

INTERNATIONAL SPECIFICATIONS
Tameer Steel Ltd, with its extensive sourcing capacity, is capable of manfcure
materials of all known international specifications and quality standards.
However, according to the regional market demand and specially

14
Corporate Values

TAMEER STEEL Company was established in 2015 with paid up capital of SR 131.250 Million.
TAMEER STEEL is specialized in producing reinforcement steel bars from 10 to 32 mm. Product
comes to the customer after undergoing a rigid inspection strictly as per customer requirements in his
defined application. At all stages of the manufacturing, proper care is taken to prevent the pollution
and keep healthy environment in and around the plant.

TAMEER STEEL has an efficient infrastructure situated at Jeddah, KSA. At present, TAMEER STEEL
has an efficient organization comprising a team of dedicated professional personnel in all areas of
management, as well as experienced engineers who always keep production lines in best
performance to ensure the highest quality. And yes, we never fail to match the delivery schedules and
always believe in timely supply of material to our valued customers.

Keys of succes Manufacturing Standers

 Costumer needs is our top priority.  SASO ASTM A 615


 Capacity to execute large orders.  BS4449
 Quality matches customer requirements.  ISO 9001
 Dedicated teamwork.
 Committed to timely supply.
 Protecting environment
 Plant safety.

15
Quality Certificates

 IOS 9001
 ISO 14001
 OHSAS 18001
 SASO ASTM 615

____________________________________________________________________________________

Jeddah 2nd Industrial City Tel: +966 12 2881688 / +966 920010189 Fax: +966 12 6482179

P.O. Box 12212 Jeddah 21473 16


Email info@tameersteel.com website www.tameersteel.com
TAMEER STEEL FACTORY CO. LTD. ‫مصنع شركة تعمير الحديد المحدودة‬
Limited liability company ‫شركة ذات مسؤولية محدودة‬
Industrial Lic. No. : 111031119029 111031119029 : ‫ترخيص صناعي‬
C.R. : 4030209719 4030209719 : ‫سجل تجاري‬

Rolling Mill MANAGAER

Deputy R.M Manager

Financial Manager
Operation Manager
Warehouses Manger Purchasing Manager Sales & Marketing Manager
Billet storage Officers Sales Men Production Manager Electrical Manager Quality Manager
Finished product Purchasing Operator Marketing Officers Production Engineers Electrical Supervisor Rolling Programs
Shipment supervision Shift supervisor Electric Specialist Cost Analysis
Billet bay supervisor Cranes operators Electronic/PLC Specialist Quality Control
Finished product supervisor Entry furnace operator Automation Specialist Laboratory Operator
Shipment supervisor Reheating furnace supervisor Mechanical supervisor Analyst
Helpers Rolling mill operators Helpers Helpers
Main pulpit supervisor Cranes and general maintenance supervisor
Cut to length operator Operators
Bundling operator
Bundle storage Helpers
Stand & guide preparation
Tool machine operators
Stand Specialist
Guides Specialist
Warehouse distributor
HR Manager Electrical spare parts
Officers Warehouse consumables
Legal Paper Tracker Roll shop
Lawyer

ORGANIZATIONAL HIERARCHY

17
List of Materials

Material : RE-BAR

Size MM Length M
10 12
12 12
14 12
16 12
18 12
20 12
22 12
25 12
32 12

Material : PRIME STEEL BILLET

Billet Dimensions

Cross Section Billet Length Chamber

130 × 130 mm
≤10 mm / Mrt.
125 × 125 mm 9 – 12 m Max 60 mm on
Total Length
120 × 120 mm

18
COMPANY DOCUMENTS

19
̀˹˹˺˿˽˽˼˽́
˽˹˼˹˻˹̂̀˺̂
˰ϫ˺˽˼˻˹˼˻˿

ΓΩϭΩΣϣϟ΍ΩϳΩΣϟ΍έϳϣόΗΔϛέηϊϧλϣ
ϯΩϭό˰˰˰˰γ ΔϳΑϧΟ΃ΓΩϭΩΣϣ
˰ϫ˺˽˾́˹˺˹˼ ˰ϫ˺˽˼˻˹˼˻˿ Δϧγ˻˾
˻̀˾́ˬϲγέϣϟ΍ˬ˿́˹˽
˻˻̀˾́
ϱέΎΟΗϟ΍ίϣέϟ΍΢γϣ˯ΎΟέϟ΍ΔρηϧϷ΍ΕΎϧΎϳΑϰϠϋωϼρϼϟ
ϱΩϭόγ்˺˽́က˺˻˾က˹˹˹
έΗΣΩϳέϓέϭΗϛϓΩϳέϓ ϥΎϣέϗϡηΎϫϲϠϋΩϣΣϣέϳϣγ
ϲϟϭΗϣϟ΍ϡϳϫ΍έΑ΍ϥΎϣϳϠγϕέΎρ αΎρόϟ΍ΩϣΣϣέϣϋϥϳγΣ
ϲϟϭΗϣϟ΍ϡϳϫ΍έΑ΍ΩϣΣ΍ϱΩΟϣ

Δϛέηϟ΍ΩϘϋϪϳϠϋιϧΎϣΏγΣ

ΓΩΟ ΓΩΟ
˰ϫ˺˽˽˽˹˽˹̀ ˺˺˿̀́˽˺ ˰ϫ˺˽˽˾˺˺˺̂

20
(7001644348)
(622670)
(111031119029)

Industrial Investment License


1445/11/13 1431/11/26
2024/05/21 2010/11/03 162075

--------------------------------------------------------------------------------------------------------------------------------------------------------------
(375,000,000) ( 600)

+966126606329 966+966534027724 21463 11700 .


--------------------------------------------------------------------------------------------------------------------------------------------------------------

/ /
44.96% 701084 25.33% 622668
29.71% 622669
--------------------------------------------------------------------------------------------------------------------------------------------------------------

190000 72132000 200000 ) 72071100


(
100000 72143000 150000 U 72163100
60000 72139900 50000 72131000
20000 72166900 10000 73145000
10000 ( ) 72166900 20000 72172000

--------------------------------------------------------------------------------------------------------------------------------------------------------------
:
:241012
:251141

1443/12/26

1443/12/25 :
2 - 1
. https://eservices.sagia.gov.sa/verify

21
(7001644348)
(622670)
(111031119029)

Industrial Investment License


1445/11/13 1431/11/26
2024/05/21 2010/11/03 162075

--------------------------------------------------------------------------------------------------------------------------------------------------------------
(375,000,000) ( 600)

+966126606329 966+966534027724 21463 11700 .


--------------------------------------------------------------------------------------------------------------------------------------------------------------

:251142
--------------------------------------------------------------------------------------------------------------------------------------------------------------

736966 . .

1443/12/26

1443/12/25 :
2 - 2
. https://eservices.sagia.gov.sa/verify

22
‫ﺗﺮﺧﻴﺺ ﻣﻨﺸﺄﺓ ﺻﻨﺎﻋﻴﺔ‬

‫ﺍﺳﺘﺜﻤﺎﺭ ﺃﺟﻨﺒﻲ‬

‫‪١٤٤٣-١٢-٢٥‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻟﻘﺮﺍﺭ‬ ‫‪١٤٣٢-٠١-٠١‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻟﺘﺮﺧﻴﺺ‬ ‫‪٣٣٢٨‬‬ ‫ﺭﻣﺰ ﺍﻟﻤﻨﺸﺄﺓ‬


‫‪١٤٤٦-١٢-٢٥‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻻﻧﺘﻬﺎﺀ‬ ‫‪٤٣٢١٠٢١١٩٧٥٢‬‬ ‫ﺭﻗﻢ ﺍﻟﻘﺮﺍﺭ‬ ‫ﺗﻌﺪﻳﻞ‬ ‫ﻧﻮﻉ ﺍﻟﻘﺮﺍﺭ‬

‫‪+٩٦٦٥٤٤٠٣٣٩٠٨‬‬ ‫ﻫﺎﺗﻒ‬ ‫ﻣﺼﻨﻊ ﺷﺮﻛﺔ ﺗﻌﻤﻴﺮ ﺍﻟﺤﺪﻳﺪ ﺍﻟﻤﺤﺪﻭﺩﺓ‬ ‫ﺍﺳﻢ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﺼﻨﺎﻋﻴﺔ‬
‫‪٧٠٠١٦٤٤٣٤٨‬‬ ‫ﺍﻟﺮﻗﻢ ﺍﻟﻮﻃﻨﻲ ﺍﻟﻤﻮﺣﺪ‬ ‫‪٤٠٣٠٢٠٩٧١٩‬‬ ‫ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻟﻠﻤﻨﺸﺄﺓ ﺍﻟﺼﻨﺎﻋﻴﺔ‬
‫)‪(N21.11036509270176 ,E39.23461854457855‬‬ ‫ﻣﻮﻗﻊ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﺼﻨﺎﻋﻴﺔ‬ ‫ﻣﺼﻨﻊ ﺷﺮﻛﺔ ﺗﻌﻤﻴﺮ ﺍﻟﺤﺪﻳﺪ ﺍﻟﻤﺤﺪﻭﺩﺓ‬ ‫ﻣﺎﻟﻚ ﺍﻟﻤﻨﺸﺄﺓ‬
‫ﻣﻨﻄﻘﺔ ﻣﻜﺔ ﺍﻟﻤﻜﺮﻣﺔ‬ ‫ﺍﻟﻤﻨﻄﻘﺔ‬ ‫‪٤٠٣٠٢٠٩٧١٩‬‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﺍﻟﺮﺋﻴﺴﻲ‬
‫ﺟﺪﺓ‬ ‫ﺍﻟﻤﺪﻳﻨﺔ‬ ‫ﺻﻨﻊ ﺍﻟﺤﺪﻳﺪ ﺍﻟﻘﺎﻋﺪﻱ ﻭﺍﻟﺼﻠﺐ ‪٢٤١٠ /‬‬ ‫ﺍﻟﻨﺸﺎﻁ ﺍﻟﺮﺋﻴﺴﻲ‬
‫‪١١١٠٣١١١٩٠٢٩‬‬ ‫ﻭﺯﺍﺭﺓ ﺍﻻﺳﺘﺜﻤﺎﺭ‬

‫ﻣﺎﺋﺘﻴﻦ ﻭ ﺇﺛﻨﺎﻥ ﻭ ﺗﺴﻌﻮﻥ ﻓﺮﺩ َﺍ‬ ‫‪٢٩٢‬‬ ‫ﻋﺪﺩ ﺍﻟﻌﻤﺎﻟﺔ‬


‫ﺧﻤﺴﻤﺎﺋﺔ ﻭ ﻋﺸﺮ ﻣﻠﻴﻮﻥ ﻭ ﺧﻤﺴﻤﺎﺋﺔ ﻭ ﺇﺛﻨﺎﻥ ﻭ ﺃﺭﻳﻌﻮﻥ ﺃﻟﻔﺎ ﻭ ﺳﺘﻤﺎﺋﺔ ﻭ ﻋﺸﺮ ﺭﻳﺎﻝ ﻭ ﺇﺛﻨﺎﻥ ﻭ ﺳﺒﻌﻮﻥ ﻫﻠﻠﺔ‬ ‫‪٥١٠٥٤٢٦١٠.٧٢‬‬ ‫ﺣﺠﻢ ﺍﻻﺳﺘﺜﻤﺎﺭ‬

‫ﺍﻟﻮﺣﺪﺓ‬ ‫ﺍﻟﻄﺎﻗﺔ ﺍﻻﻧﺘﺎﺟﻴﺔ‬ ‫ﺍﻟﻨﺸﺎﻁ ﺍﻟﺼﻨﺎﻋﻲ‬ ‫ﻭﺻﻒ ﺍﻟﻤﻨﺘﺞ‬ ‫ﺭﻣﺰ ﺍﻟﻤﻨﺘﺞ‬

‫ﻃﻦ‬ ‫‪٥٠٠٠٠.٠‬‬ ‫‪ / ٢٤١٠٩٠‬ﺃﻧﺸﻄﺔ ﺃﺧﺮﻯ ﻟﺼﻨﺎﻋﺔ ﺍﻟﺤﺪﻳﺪ ﻭﺍﻟﺼﻠﺐ‬ ‫ﺣﺪﻳﺪ ﺗﺴﻠﻴﺢ ﻭﻗﻄﺎﻋﺎﺕ ﺣﺪﻳﺪﻳﺔ‬ ‫‪٧٢١٣١٠٠٠‬‬

‫ﻃﻦ‬ ‫‪١٠٠٠٠٠.٠‬‬ ‫‪ / ٢٤١٠٤٠‬ﺻﻨﺎﻋﺔ ﺻﻔﺎﺋﺢ ﻭﺃﻟﻮﺍﺡ ﻭﻟﻔﺎﺋﻒ ﺷﺮﻳﻄﻴﺔ ﻭﻗﻀﺒﺎﻥ ﻭﺃﺳـﻴﺎﺥ ﻭﺯﻭﺍﻳﺎ ﻭﺃﺳﻼﻙ ﻭﻣﻘﺎﻃﻊ‬ ‫ﺍﺳﻴﺎﺥ ﺣﺪﻳﺪ ﺗﺴﻠﻴﺢ ﻋﻠﻰ ﺍﻟﺴﺎﺧﻦ‬ ‫‪٧٢١٤٣٠٠٠‬‬
‫ﺑﻜﺎﻓﺔ ﺃﺷﻜﺎﻟﻬﺎ‬
‫ﻃﻦ‬ ‫‪٢٠٠٠٠٠.٠‬‬ ‫‪ / ٢٤١٠١٩‬ﺻﻨﺎﻋﺔ ﻣﻨﺘﺠﺎﺕ ﺃﻭﻟﻴﺔ ﻣﻦ ﺍﻟﺤﺪﻳﺪ ﺃﺧﺮﻯ‬ ‫ﻛﺘﻞ ﺣﺪﻳﺪﻳﺔ "ﺑﻴﻠﻴﺖ"‬ ‫‪٧٢٠٧١١٠٠‬‬

‫ﻭﺯﻳﺮ ﺍﻟﺼﻨﺎﻋﺔ ﻭﺍﻟﺜﺮﻭﺓ ﺍﻟﻤﻌﺪﻧﻴﺔ‬

‫ﺑﻨﺪﺭ ﺑﻦ ﺇﺑﺮﺍﻫﻴﻢ ﺍﻟﺨﺮﻳﻒ‬

‫‪23‬‬
‫ﺗﺮﺧﻴﺺ ﻣﻨﺸﺄﺓ ﺻﻨﺎﻋﻴﺔ‬

‫ﺍﺳﺘﺜﻤﺎﺭ ﺃﺟﻨﺒﻲ‬

‫ﺍﻟﻮﺣﺪﺓ‬ ‫ﺍﻟﻄﺎﻗﺔ ﺍﻻﻧﺘﺎﺟﻴﺔ‬ ‫ﺍﻟﻨﺸﺎﻁ ﺍﻟﺼﻨﺎﻋﻲ‬ ‫ﻭﺻﻒ ﺍﻟﻤﻨﺘﺞ‬ ‫ﺭﻣﺰ ﺍﻟﻤﻨﺘﺞ‬

‫ﻃﻦ‬ ‫‪٦٠٠٠٠.٠‬‬ ‫‪ / ٢٤١٠٤٠‬ﺻﻨﺎﻋﺔ ﺻﻔﺎﺋﺢ ﻭﺃﻟﻮﺍﺡ ﻭﻟﻔﺎﺋﻒ ﺷﺮﻳﻄﻴﺔ ﻭﻗﻀﺒﺎﻥ ﻭﺃﺳـﻴﺎﺥ ﻭﺯﻭﺍﻳﺎ ﻭﺃﺳﻼﻙ ﻭﻣﻘﺎﻃﻊ‬ ‫ﻟﻔﺎﺕ ﺷﺮﺍﺋﺢ ﺣﺪﻳﺪﻳﺔ‬ ‫‪٧٢١٣٩٩٠٠‬‬
‫ﺑﻜﺎﻓﺔ ﺃﺷﻜﺎﻟﻬﺎ‬
‫ﻃﻦ‬ ‫‪١٥٠٠٠٠.٠‬‬ ‫‪ / ٢٤١٠٤٠‬ﺻﻨﺎﻋﺔ ﺻﻔﺎﺋﺢ ﻭﺃﻟﻮﺍﺡ ﻭﻟﻔﺎﺋﻒ ﺷﺮﻳﻄﻴﺔ ﻭﻗﻀﺒﺎﻥ ﻭﺃﺳـﻴﺎﺥ ﻭﺯﻭﺍﻳﺎ ﻭﺃﺳﻼﻙ ﻭﻣﻘﺎﻃﻊ‬ ‫ﻗﻄﺎﻋﺎﺕ ﺣﺪﻳﺪﻳﺔ ﻣﺠﺮﻯ ﻳﻮ ‪ .‬ﺳﻲ‬ ‫‪٧٢١٦٣١٠٠‬‬
‫ﺑﻜﺎﻓﺔ ﺃﺷﻜﺎﻟﻬﺎ‬ ‫ﻣﺴﺤﻮﺑﺔ ﻋﻠﻰ ﺍﻟﺴﺎﺧﻦ‬
‫ﻃﻦ‬ ‫‪١٩٠٠٠٠.٠‬‬ ‫‪ / ٢٤١٠٤٠‬ﺻﻨﺎﻋﺔ ﺻﻔﺎﺋﺢ ﻭﺃﻟﻮﺍﺡ ﻭﻟﻔﺎﺋﻒ ﺷﺮﻳﻄﻴﺔ ﻭﻗﻀﺒﺎﻥ ﻭﺃﺳـﻴﺎﺥ ﻭﺯﻭﺍﻳﺎ ﻭﺃﺳﻼﻙ ﻭﻣﻘﺎﻃﻊ‬ ‫ﻟﻔﺎﺕ ﻭﻗﻀﺒﺎﻥ ﺣﺪﻳﺪ ﺗﺴﻠﻴﺢ‬ ‫‪٧٢١٣٢٠٠٠‬‬
‫ﺑﻜﺎﻓﺔ ﺃﺷﻜﺎﻟﻬﺎ‬

‫ﻭﺯﻳﺮ ﺍﻟﺼﻨﺎﻋﺔ ﻭﺍﻟﺜﺮﻭﺓ ﺍﻟﻤﻌﺪﻧﻴﺔ‬

‫ﺑﻨﺪﺭ ﺑﻦ ﺇﺑﺮﺍﻫﻴﻢ ﺍﻟﺨﺮﻳﻒ‬

‫‪24‬‬
‫‪1444/8/6‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻷﺻﺪﺍﺭ ‪:‬‬

‫‪573144486030892‬‬
‫‪1445/8/16‬‬
‫ﺭﻗﻢ ﺍﻟﺮﺧﺼﺔ ‪:‬‬

‫ﺗﺎﺭﻳﺦ ﺍﻻﻧﺘﻬﺎء ‪:‬‬


‫ﺭﺧﺼﺔ ﺗﺸﻐﻴﻞ‬

‫ﺷﺮﻛﻪ ﻣﺼﻨﻊ ﺗﻌﻤﻴﺮ ﺍﻟﺤﺪﻳﺪ ﺍﻟﻤﺤﺪﻭﺩﻩ‬ ‫ﻳﺮﺧﺺ ﻟـ‪: ‬‬

‫ﺭﺳﻢ ﺗﻮﺿﻴﺤﻲ ﻟﻠﻤﻮﻗﻊ‬ ‫‪1445/11/19‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻻﻧﺘﻬﺎء ‪:‬‬ ‫‪1432/3/26‬‬ ‫ﺗﺎﺭﻳﺨﻪ ‪:‬‬ ‫‪4030209719‬‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ‪:‬‬

‫ﺟﺪﺓ ﺍﻟﺜﺎﻧﻴﺔ‬ ‫ﺍﻟﻤﺪﻳﻨﺔ ﺍﻟﺼﻨﺎﻋﻴﺔ ‪:‬‬

‫‪813026‬‬ ‫ﺭﻗﻢ ﺍﻟﻌﻘﺪ ‪:‬‬

‫‪0150B00021‬‬ ‫ﻣﻮﻗﻊ ﺍﻟﻌﻘﺎﺭ ‪:‬‬

‫ﺍﻟﺸﺮﻭﻁ ﻭﺍﻷﻧﻈﻤﺔ‪:‬‬

‫‪.1‬ﺗﻌﻨﻲ ﻫﺬﻩ ﺍﻟﺮﺧﺼﺔ ﺍﻹﺫﻥ ﺑﺘﺸﻐﻴﻞ ﺍﻟﻤﻨﺸﺄﺓ ﻭﺃﻥ ﺍﻟﻤﺮﺧﺺ ﻟﻪ ﺑﺘﺸﻐﻴﻞ ﻫﺬﻩ ﺍﻟﻤﻨﺸﺄﺓ ﻫﻮ ﺍﻟﻤﺸﻐﻞ ﺍﻟﺤﻘﻴﻘﻲ ﻟﻪ ﻭﻓﻖ ﻛﻴﺎﻧﻪ ﺍﻟﻘﺎﻧﻮﻧﻲ ﻭﺗﺮﺍﺧﻴﺼﻪ ﻭﺳﺠﻼﺗﻪ ﻭﻻ ﻳﺤﻖ ﻟﺼﺎﺣﺐ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﺘﻨﺎﺯﻝ ﻋﻦ‬
‫ﺍﻟﺘﺸﻐﻴﻞ ﻭﺍﻟﺮﺧﺼﺔ ﺃﻭ ﺃﻱ ﺟﺰء ﻣﻨﻬﺎ ﻟﻠﻐﻴﺮ‪..‬‬

‫‪. 2‬ﻳﻠﺘﺰﻡ ﺍﻟﻤﺮﺧﺺ ﻟﻪ ﺑﺎﻟﺘﻘﻴﺪ ﺑﺎﻝ ﺷﺮﻭﻁ ﻭﺍﻻﻟﺘﺰﺍﻣﺎﺕ ﺍﻟﻤﻜﺘﻮﺑﺔ ﻓﻲ ﻫﺬﻩ ﺍﻟﺮﺧﺼﺔ ﻭﺑﻜﺎﻓﺔ ﺍﻷﻧﻈﻤﺔ ﻭﺍﻟﻠﻮﺍﺋﺢ ﻭﺍﻟﺸﺮﻭﻁ ﻭﺍﻟﺘﻌﻠﻴﻤﺎﺕ ﺍﻟﺼﺎﺩﺭﺓ ﻣﻦ" ﻣﺪﻥ"‪ ،‬ﻭﻳﺘﻢ ﺍﻟﺮﺟﻮﻉ ﻟﻸﻧﻈﻤﺔ ﻭﺍﻟﻠﻮﺍﺋﺢ ﺍﻟﺴﺎﺭﻳﺔ ﺍﻟﻤﻔﻌﻮﻝ‬
‫ﺍﻟﻤﻌﻤﻮﻝ ﺑﻬﺎ ﻓﻲ ﺍﻟﻤﻤﻠﻜﺔ ﺍﻟﻌﺮﺑﻴﺔ ﺍﻟﺴﻌﻮﺩﻳﺔ ﻓﻴﻤﺎ ﻟﻢ ﻳﺮﺩ ﺑﺸﺄﻧﻪ ﺗﻨﻈﻴﻢ ﻟﺪﻯ" ﻣﺪﻥ‪".‬‬

‫‪. . 3‬ﻳﻠﺘﺰﻡ ﺍﻟﻤﺮﺧﺺ ﻟﻪ ﺑﺘﺠﺪﻳﺪ ﻫﺬﻩ ﺍﻟﺮﺧﺼﺔ ﺧﻼﻝ ﻣﺪﺓ ﻻ ﺗﺰﻳﺪ ﻋﻦ ‪ 15‬ﻳﻮﻣﺎ ﺑﻌﺪ ﺍﻧﺘﻬﺎﺋﻬﺎ‪.‬‬

‫ﻋﻘﺪ ﺍﻹﻳﺠﺎﺭ ﺳﺎﺭﻱ ﺣﺘﻰ ‪ 1452/8/3 :‬ﻫـ‬

‫ﻳﻠﺯﻡ ﺍﻟﺗﺣﻘﻖ ﻣﻥ ﺻﺣﺔ ﻭﺻﻼﺣﻳﺔ ﺍﻟﺷﻬﺎﺩﺓ ﻋﺑﺭ ﺯﻳﺎﺭﺓ ﺍﻟﺭﺍﺑﻁ ﺍﻭ ﻋﻥ ﻁﺭﻳﻖ ﺃﺳﺗﺧﺩﺍﻡ ﺍﻟﺭﻣﺯ ﺑﺎﻷﺳﻔﻝ‬

‫‪Page 1 of 2‬‬

‫‪25‬‬
26
27
Membership Certificate ‫ﺷﻬ ﺎ د ة ﻋ ﻀ ﻮ ﻳ ﺔ‬
First Class ‫اﻟ ﺪر ﺟ ﺔ ا ﻷ وﻟ ﻰ‬
This is to certify that ‫ﻧ ﺸﻬ ﺪ ﺑ ﺄ ن‬
‫ﻣ ﺼ ﻨ ﻊ ﺷﺮ ﻛ ﺔ ﺗ ﻌ ﻤﻴﺮ اﻟﺤ ﺪ ﻳ ﺪ اﻟ ﻤﺤ ﺪ و د ة‬
---
Is a registered member ‫ﻣ ﺴﺠ ﻞ ﻟ ﺪ ﻳ ﻨ ﺎ‬
Unified Number 7001644348 ‫ر ﻗ ﻢ اﻟ ﻤ ﻨ ﺸ ﺄ ة‬
Date of Subscription 27/03/1432 - 2011/03/02 ‫ﺗ ﺎ ر ﻳ ﺦ ا ﻻ ﺷ ﺘ ﺮا ك‬
Expiry Date 19/11/1445 - 2024/05/27 ‫ﺗ ﺎر ﻳ ﺦ ا ﻻﻧﺘﻬ ﺎ ء‬
Commercial Record/ License 4030209719 ‫ اﻟ ﺮﺧ ﺼ ﺔ‬/ ‫اﻟ ﺴ ﺠﻞ اﻟﺘ ﺠ ﺎر ي‬
Release Date 26/03/1432 - 2011/03/01 ‫ﺗ ﺎ ر ﻳ ﺦ ا ﻻ ﺻ ﺪا ر‬
Expiry Date 19/11/1445 - 2024/05/27 ‫ﺗ ﺎر ﻳ ﺦ ا ﻻﻧﺘﻬ ﺎ ء‬

28
~
N
w
N
e . I if~ 0
~~ ~ im "'- ~~~~~~~~~~~~• I
--
....N
@ @
f@ !~ Jfil
lr-- -
~~
t ll t ,,i 00
0
- tl @
t Jal/ lt11~ !Ill ...
0
0 Cll V1
"'"'
l-

't~ ~- l
E ~· ~·
~
l:.. t
t. t.
t !: ·tt
tf
- 'b
C
b· ;
t f
r-

29
~ ' . !" .. '•:
......•

... ....
[" .:. ··-·.
. ::·. ········ ~· ..
t~r l
t~
.. ::- b ·~· e·
'
~t[ [
~ .
" '
·t .r
l 1l ·~ ~ ~ 0
~ ·C. t -
i~~- \· .::
-"
~ [ ~ ~ I"' q· i €' ~
t
'b· ~
[[
'C
-+ · h~ ~
'o
-
t .t ,~ '

- " o E
~
f' l[
tf ~ g -()" fl ~
~ : .;
~ -~
~[l ~;; ~v a§ .~ n
~ ·~· ~ F v !:: £. t) N
.... -... ::;e
".o
~[ ~ ~[
. , r· f:
·~(;..- 'e~t; i
'o .. .. ·~· .:
-;~€.
~'t !!:
f. t ' ·; ~ ~- r[ ~ [ :f
~ ~v -t ~ ~E
~f ~ ·· -
e; .... - -
1 t
{ {v~f;. :~ ·. [~fi
- ~ - ~ .t·'l Ra
..
t[ f t
30
‫‪١٤٤٤/١١/١٦‬‬ ‫ﺍﻟﺘﺎﺭﻳﺦ‬
‫‪٠٥/٠٦/٢٠٢٣‬‬ ‫ﺍﻟﻤﻮﺍﻓﻖ‬
‫ﺭﻣﺰ ﺍﻟﺸﻬﺎﺩﺓ ‪٥٥٠١٦٨٠٥‬‬

‫ﺷﻬﺎﺩﺓ‬

‫ﺷﺮﻛﺔ ﻣﺼﻨﻊ ﺗﻌﻤﻴﺮ ﺍﻟﺤﺪﻳﺪ ﺍﻟﻤﺤﺪﻭﺩﻩ‬


‫ﺇﺳﻢ ﺍﻟﻤﻨﺸﺄﺓ ‪:‬‬
‫ﺹ‪.‬ﺏ ‪ ١٢٢١٢ :‬ﺟﺪﺓ ‪٢١٤٧٣‬‬
‫ﺍﻟﺴﻌﻮﺩﻳﺔ‬
‫‪٥٠٣٧٧٣١٤٧‬‬ ‫ﺭﻗﻢ ﺍﻹﺷﺘﺮﺍﻙ ‪:‬‬
‫ﻣﺼﺪﺭﻩ ‪:‬‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ‪٤٠٣٠٢٠٩٧١٩ :‬‬

‫ﻛﺘﺎﺑﺔ‬ ‫ﺭﻗﻤﺎ‬
‫ﻣـﺎﺋﺔ ﻭ ﺃﺭﺑﻌﻪ ﻣﺸﺘﺮﻛﺎ‬ ‫‪١٠٤‬‬ ‫ﻋﺪﺩ ﺍﻟﻤﺸﺘﺮﻛﻴﻦ ﺍﻟﺴﻌﻮﺩﻳﻴﻦ‬
‫ﻣﺎﺋﺘﻴﻦ ﻭ ﺗﺴﻌﺔ ﻭ ﺛﻤﺎﻧﻮﻥ ﻣﺸﺘﺮﻛﺎ‬ ‫‪٢٨٩‬‬ ‫ﻋﺪﺩ ﺍﻟﻤﺸﺘﺮﻛﻴﻦ ﻏﻴﺮ ﺍﻟﺴﻌﻮﺩﻳﻴﻦ‬
‫ﺛﻼﺛﻤﺎﺋﻪ ﻭ ﺛﻼﺛﺔ ﻭ ﺗﺴﻌﻮﻥ ﻣﺸﺘﺮﻛﺎ‬ ‫‪٣٩٣‬‬ ‫ﺍﻟﻤﺠﻤﻮﻉ‬

‫ﺗﺸﻬﺪ ﺍﻟﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ ﺑﺄﻥ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺃﻋﻼﻩ ﻗﺪ ﺃﻭﻓﺖ ﺑﺈﻟﺘﺰﺍﻣﺎﺗﻬﺎ ﺗﺠﺎﻩ ﺍﻟﻤﺆﺳﺴﺔ‬
‫ﻭﻓﻖ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻤﻘﺪﻣﺔ ﻣﻨﻬﺎ ﺣﺘﻰ ﺗﺎﺭﻳﺦ ﺇﺻﺪﺍﺭ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ‪ ،‬ﻭﺍﻟﺘﻲ ﺗﻢ ﻣﻨﺤﻬﺎ ﻟﺘﻘﺪﻳﻤﻬﺎ ﻷﻳﺔ ﺟﻬﺔ ﺗﻄﻠﺒﻬﺎ ‪ ،‬ﻭﻫﻲ‬
‫ﺻﺎﻟﺤﺔ ﻟﺠﻤﻴﻊ ﺍﻷﻏﺮﺍﺽ ﺍﻟﺘﻲ ﻧﺺ ﻋﻠﻴﻬﺎ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ ﻓﻲ ﺍﻟﻤﺎﺩﺓ )‪ (١٩/٦‬ﻣﻨﻪ‪.‬‬
‫ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﺳﺎﺭﻳﺔ ﺍﻟﻤﻔﻌﻮﻝ ﺣﺘﻰ ‪ ١٤٤٤/١٢/١٦‬ﻫـ‪.‬‬
‫ﻋﻦ ﻃﺮﻳﻖ ﺍﺳﺘﺨﺪﺍﻡ‬ ‫ﺃﻭ‬ ‫ﻳﻠﺰﻡ ﺍﻟﺘﺤﻘﻖ ﻣﻦ ﺻﺤﺔ ﻭﺻﻼﺣﻴﺔ ﺍﻟﺸﻬﺎﺩﺓ ﻋﺒﺮ ﺯﻳﺎﺭﺓ ﺍﻟﺮﺍﺑﻂ‬
‫ﺍﻟﺮﻣﺰ ﺍﻟﻤﻌﺮﻑ ﺍﻟﺘﺎﻟﻲ ‪:‬‬ ‫ﺃﺩﻧﺎﻩ ﻓﻲ ﺍﻟﻤﻮﻗﻊ ﺍﻹﻟﻜﺘﺮﻭﻧﻲ ﻟﻠﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ‬

‫‪www.gosi.gov.sa/vc‬‬

‫) ﺍﻟﺸﻬﺎﺩﺓ ﻣﻌﺘﻤﺪﺓ ﻣﻦ ﺻﺎﺣﺐ ﺍﻟﺼﻼﺣﻴﺔ ﻭﻻ ﺗﺤﺘﺎﺝ ﺇﻟﻰ ﺗﻮﻗﻴﻊ ﺃﻭ ﺧﺘﻢ (‬

‫ﺗﻌﺪ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﻣﻦ ﺍﻟﻮﺛﺎﺋﻖ ﺍﻻﻟﻜﺘﺮﻭﻧﻴﺔ ﺍﻟﺤﻜﻮﻣﻴﺔ ﺍﻟﺮﺳﻤﻴﺔ ‪ ،‬ﻭﻳﺤﻈﺮ ﻗﻄﻌﻴﺎ ﺗﻘﻠﻴﺪﻫﺎ ﺃﻭ ﺇﺩﺧﺎﻝ ﺃﻱ ﺗﻌﺪﻳﻼﺕ ﻋﻠﻴﻬﺎ ﺳﻮﺍﺀ ﺑﺎﻹﺿﺎﻓﺔ ﺃﻭ ﺍﻟﺤﺬﻑ‬
‫ﺃﻭ ﺍﻟﺘﻐﻴﻴﺮ ﻓﻲ ﺑﻴﺎﻧﺎﺗﻬﺎ ﺃﻭ ﻏﻴﺮ ﺫﻟﻚ ﻣﻦ ﺍﻧﻮﺍﻉ ﺍﻟﺘﻌﺪﻳﻞ ‪ ،‬ﻭﺗﻌﺪ ﺍﻟﺸﻬﺎﺩﺓ ﻻﻏﻴﺔ ﺇﺫﺍ ﺷﺎﺑﻬﺎ ﺷﻲﺀ ﻣﻦ ﺫﻟﻚ ‪ ،‬ﻛﻤﺎ ﺗﻌﺮﺽ ﺻﺎﺣﺒﻬﺎ ﻟﻠﻤﻼﺣﻘﺔ ﺍﻟﻨﻈﺎﻣﻴﺔ‬
‫ﺃﻣﺎﻡ ﺍﻟﺠﻬﺎﺕ ﺍﻟﻤﺨﺘﺼﺔ ﺑﺎﻹﺿﺎﻓﺔ ﺇﻟﻰ ﻣﺎﻳﻔﺮﺿﻪ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﻣﻦ ﻋﻘﻮﺑﺎﺕ ‪ ،‬ﻭﻻﻳﺠﻮﺯ ﺗﺪﺍﻭﻝ ﺍﻟﺸﻬﺎﺩﺓ ﺇﻻ ﻓﻲ ﺍﻷﻏﺮﺍﺽ ﺍﻟﺘﻲ‬
‫ﺃﺻﺪﺭﺕ ﻷﺟﻠﻬﺎ ﻭﻓﻘﺎ ﻷﺣﻜﺎﻡ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ‪ ،‬ﻭﺍﻟﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﻏﻴﺮ ﻣﺴﺆﻭﻟﻪ ﻋﻦ ﺃﻱ ﺁﺛﺎﺭ ﺃﺧﺮﻯ ﻣﺘﺮﺗﺒﺔ‬
‫ﻗﺒﻞ ﺍﻟﻐﻴﺮ ﻋﻦ ﺍﻟﺸﻬﺎﺩﺓ ﻭﻏﻴﺮ ﻣﺴﺆﻭﻟﺔ ﻋﻦ ﺃﻱ ﻋﻤﻠﻴﺔ ﺗﺰﻭﻳﺮ ﺃﻭ ﺗﻌﺪﻳﻞ ﺗﺘﻢ ﻋﻠﻰ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻮﺍﺭﺩﺓ ﻓﻴﻬﺎ ‪.‬‬

‫‪31‬‬
1110246485
٣٠٠٣٣٠٦٦٣٢
١١١٠٢٤٦٤٨٥
‫ ﻫـ‬١٤٤٤/١١/١٥

‫ﺷﻬﺎدة‬
Certificate
The Zakat,Tax and Customs  ‫ﺗﺸﻬﺪ ﻫﻴﺌﺔ اﻟﺰﻛﺎة واﻟﻀﺮﻳﺒﺔ‬

Authority certifies that the Taxpayer / ‫واﻟﺠﻤﺎرك أن اﻟﻤﻜﻠﻒ‬

‫ﻣﺼﻨﻊ ﺷﺮﻛﺔ ﺗﻌﻤﻴﺮ اﻟﺤﺪﻳﺪ اﻟﻤﺤﺪودة‬

Entity Unified No./ID No. ٧٠٠١٦٤٤٣٤٨ ‫ رﻗﻢ ﻫﻮﻳﺔ‬/ ‫اﻟﺮﻗﻢ اﻟﻤﻮﺣﺪ ﻟﻠﻤﻨﺸﺄة‬

Commercial Registration/License/
٤٠٣٠٢٠٩٧١٩  ‫ ﻋﻘﺪ رﻗﻢ‬/  ‫ رﺧﺼﺔ‬/ ‫ﺳﺠﻞ ﺗﺠﺎري‬
Contract No

Has submitted his tax return for the period ending on 31/12/2022 AD, and he ، ‫ ﻫـ‬١٤٤٤/٠٦/٠٧ ‫ﻗﺪم إﻗﺮاره ﻋﻦ اﻟﻔﺘﺮة اﻟﻤﻨﺘﻬﻴﺔ ﻓﻲ‬
was granted the certificate to complete all his transactions including the ‫وﻗﺪ ﻣﻨﺢ ﻫﺬه اﻟﺸﻬﺎدة ﻹﻧﻬﺎء ﺟﻤﻴﻊ ﻣﻌﺎﻣﻼﺗﻪ ﺑﻤﺎ ﻓﻲ ذﻟﻚ ﺻﺮف‬
payment of the final amount due on the contract. .‫ﻣﺴﺘﺤﻘﺎﺗﻪ اﻟﻨﻬﺎﺋﻴﺔ ﻋﻦ اﻟﻌﻘﻮد‬
The Certificate is valid until 21/10/1445 AH corresponding to 30/04/2024 ‫ ﻫـ اﻟﻤﻮاﻓﻖ‬١٤٤٥/١٠/٢١ ‫ﻳﺴﺮي ﻣﻔﻌﻮل ﻫﺬه اﻟﺸﻬﺎدة ﺣﺘﻰ ﺗﺎرﻳﺦ‬
AD ‫ م‬٢٠٢٤/٠٤/٣٠

( The Twenty first of Shawwal one thousand four hundred forty-five Hijri ) ( ‫) اﻟﺤﺎدي و اﻟﻌﺸﺮون ﻣﻦ ﺷﻮال أﻟﻒ و أرﺑﻌﻤﺎﺋﺔ و ﺧﻤﺴﺔ و أرﺑﻌﻮن ﻫﺠﺮي‬

www.zatca.gov.sa :‫ﻻﻳﻌﺘﺪ ﺑﻬﺬه اﻟﺸﻬﺎدة إﻻ ﺑﻌﺪ اﻟﺘﺤﻘﻖ ﻣﻦ ﻣﻮﻗﻊ اﻟﻬﻴﺌﺔ اﻻﻟﻜﺘﺮوﻧﻲ‬

This certificate is not valid until verified by the Authority's Website: www.zatca.gov.sa

32
‫‪1110246485‬‬
‫‪٣٠٠٣٣٠٦٦٣٢‬‬
‫‪١١١٠٢٤٦٤٨٥‬‬
‫‪ ١٤٤٤/١١/١٥‬ﻫـ‬

‫ﻗﺎﺋﻤﺔ ﻓﺮوع اﻟﻤﻜﻠﻒ‬


‫‪List of Taxpayer Branches‬‬

‫اﻟﻤﺪﻳﻨﺔ‬ ‫إﺳﻢ اﻟﻔﺮع‬ ‫رﻗﻢ ﺳﺠﻞ ﺗﺠﺎري ‪/‬رﺧﺼﺔ ‪/‬ﻋﻘﺪ‬


‫‪City‬‬ ‫‪Branch Name‬‬ ‫‪CR/License/Contact Number‬‬

‫ﺷﺮﻛﺔ ﻋﺎﻟﻢ اﻟﻔﻮﻻذ ﻟﻠﺼﻨﺎﻋﺎت اﻟﻤﻌﺪﻧﻴﺔ‬ ‫‪٤٠٣٠٤١٠١٩٤‬‬

‫‪33‬‬
‫‪100191005634072‬‬

‫ﺗﺎﺭﻳﺦ ﺍﻹﺻﺪﺍﺭ‪2019/02/24 :‬‬


‫ﺍﻟﺮﻗﻢ ﺍﻟﻤﻤﻴﺰ‪3003306632 :‬‬

‫ﺷﻬﺎﺩﺓ ﺗﺴﺠﻴﻞ ﻓﻲ ﺿﺮﻳﺒﺔ ﺍﻟﻘﻴﻤﺔ ﺍﻟﻤﻀﺎﻓﺔ‬


‫‪VAT Registration Certificate‬‬

‫ﺗﺸﻬﺪ ﺍﻟﻬﻴﺌﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺰﻛﺎﺓ ﻭﺍﻟﺪﺧﻞ ﺑﺄﻥ ﺍﻟﻤﻜﻠﻒ ﺃﺩﻧﺎﻩ ﻣﺴﺠﻞ ﻓﻲ ﺿﺮﻳﺒﺔ ﺍﻟﻘﻴﻤﺔ ﺍﻟﻤﻀﺎﻓﺔ‬
‫ﺑﺘﺎﺭﻳﺦ ‪2017/08/25‬‬
‫‪Hereby, The General Authority of Zakat & Tax (GAZT) certifies that the taxpayer below is‬‬
‫‪VAT registered on 25/08/2017‬‬

‫‪Taxpayer Name:‬‬ ‫ﻣﺼﻨﻊ ﺷﺮﻛﺔ ﺗﻌﻤﻴﺮ ﺍﻟﺤﺪﻳﺪ ﺍﻟﻤﺤﺪﻭﺩﺓ‬ ‫ﺍﺳﻢ ﺍﻟﻤﻜﻠﻒ‪:‬‬

‫‪VAT Registration Number:‬‬ ‫‪300330663200003‬‬ ‫ﺭﻗﻢ ﺍﻟﺘﺴﺠﻴﻞ ﺍﻟﻀﺮﻳﺒﻲ‪:‬‬

‫‪Effective Registration Date:‬‬ ‫‪2019/01/01‬‬ ‫ﺗﺎﺭﻳﺦ ﻧﻔﺎﺫ ﺍﻟﺘﺴﺠﻴﻞ‪:‬‬

‫‪Taxpayer Address:‬‬ ‫ﺟﺪﺓ‪،‬ﺍﻟﻤﻨﻄﻘﻪ ﺍﻟﺼﻨﺎﻋﻴﻪ ‪22426،‬‬ ‫ﻋﻨﻮﺍﻥ ﺍﻟﻤﻜﻠﻒ‪:‬‬

‫ﻛﻤﻜﻠﻒ ﻣﺴﺠﻞ ﻓﻲ ﺿﺮﻳﺒﺔ ﺍﻟﻘﻴﻤﺔ ﺍﻟﻤﻀﺎﻓﺔ‪ ،‬ﻻ ﻳﺠﻮﺯ ﻟﻚ ﺗﺤﺼﻴﻞ ﺿﺮﻳﺒﺔ ﺍﻟﻘﻴﻤﺔ ﺍﻟﻤﻀﺎﻓﺔ ﻣﻦ ﻋﻤﻼﺋﻚ ﻗﺒﻞ ﺗﺎﺭﻳﺦ‬
‫ﻧﻔﺎﺫ ﺍﻟﺘﺴﺠﻴﻞ ﺑﺎﻟﻀﺮﻳﺒﺔ‪ .‬ﻓﻲ ﺣﺎﻝ ﺗﺒﻴﻦ ﻏﻴﺮ ﺫﻟﻚ‪ ،‬ﺳﺘﻘﻮﻡ ﺍﻟﻬﻴﺌﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺰﻛﺎﺓ ﻭﺍﻟﺪﺧﻞ ﺑﺘﻨﻔﻴﺬ ﺍﻟﻐﺮﺍﻣﺎﺕ ﺍﻟﻤﺴﺘﺤﻘﺔ‬

‫‪34‬‬
‫‪100191005634072‬‬

‫ﺗﺎﺭﻳﺦ ﺍﻹﺻﺪﺍﺭ‪2019/02/24 :‬‬


‫ﺍﻟﺮﻗﻢ ﺍﻟﻤﻤﻴﺰ‪3003306632 :‬‬

‫‪Taxpayer Name:‬‬ ‫ﻣﺼﻨﻊ ﺷﺮﻛﺔ ﺗﻌﻤﻴﺮ ﺍﻟﺤﺪﻳﺪ ﺍﻟﻤﺤﺪﻭﺩﺓ‬ ‫ﺍﺳﻢ ﺍﻟﻤﻜﻠﻒ‪:‬‬

‫‪CR / License / Contract No.:‬‬ ‫‪4030209719‬‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ‪/‬ﺍﻟﺮﺧﺼﺔ‪/‬ﺍﻟﻌﻘﺪ‪:‬‬

‫‪Tax Period:‬‬ ‫ﺷﻬﺮﻱ‪Monthly-‬‬ ‫ﺍﻟﻔﺘﺮﺓ ﺍﻟﻀﺮﻳﺒﻴﺔ‪:‬‬

‫‪First Filing due date:‬‬ ‫‪2018/04/30‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﺳﺘﺤﻘﺎﻕ ﺃﻭﻝ ﺇﻗﺮﺍﺭ ﺿﺮﻳﺒﻲ‪:‬‬

‫ﻛﻤﻜﻠﻒ ﻣﺴﺠﻞ ﻓﻲ ﺿﺮﻳﺒﺔ ﺍﻟﻘﻴﻤﺔ ﺍﻟﻤﻀﺎﻓﺔ‪ ،‬ﻻ ﻳﺠﻮﺯ ﻟﻚ ﺗﺤﺼﻴﻞ ﺿﺮﻳﺒﺔ ﺍﻟﻘﻴﻤﺔ ﺍﻟﻤﻀﺎﻓﺔ ﻣﻦ ﻋﻤﻼﺋﻚ ﻗﺒﻞ ﺗﺎﺭﻳﺦ‬
‫ﻧﻔﺎﺫ ﺍﻟﺘﺴﺠﻴﻞ ﺑﺎﻟﻀﺮﻳﺒﺔ‪ .‬ﻓﻲ ﺣﺎﻝ ﺗﺒﻴﻦ ﻏﻴﺮ ﺫﻟﻚ‪ ،‬ﺳﺘﻘﻮﻡ ﺍﻟﻬﻴﺌﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺰﻛﺎﺓ ﻭﺍﻟﺪﺧﻞ ﺑﺘﻨﻔﻴﺬ ﺍﻟﻐﺮﺍﻣﺎﺕ ﺍﻟﻤﺴﺘﺤﻘﺔ‬

‫‪35‬‬
CERTIFICATES

36
37
38
39
40
41
TAMEER STEEL FACTORY CO. LTD. ‫مصنع شركة تعمير الحديد المحدودة‬
Limited Liability Company ‫شركة ذات مسؤولية محدودة‬
Industrial Lic. No. : 111031119029 111031119029 : ‫ترخيص صناعي‬
Company Registration : 4030209719 4030209719 : ‫ســــــجل تجاري‬
VAT Registration ID 300330663200003 300330663200003 : ‫تسجيل ﺿريﺑي‬

Dear Sir,

Please find below chart related to specification of Saudi Standards, metrology & quality Organization (SASO) following in our Steel Rebar's products:

Compliance Sheet
Complay
Item Project Specification Material Specification Note
Yes No

Steel Rebars's 10mm SASO 2/SASO 107 SASO ASTM A 615M Yes SASO 2 & SASO 107 are equivalent to SASO ASTM A 615M

Steel Rebars's 12mm SASO 2/SASO 107 SASO ASTM A 615M Yes SASO 2 & SASO 107 are equivalent to SASO ASTM A 615M

Steel Rebars's 14mm SASO 2/SASO 107 SASO ASTM A 615M Yes SASO 2 & SASO 107 are equivalent to SASO ASTM A 615M

Steel Rebars's 16mm SASO 2/SASO 107 SASO ASTM A 615M Yes SASO 2 & SASO 107 are equivalent to SASO ASTM A 615M

Steel Rebars's 18mm SASO 2/SASO 107 SASO ASTM A 615M Yes SASO 2 & SASO 107 are equivalent to SASO ASTM A 615M

Steel Rebars's 20mm SASO 2/SASO 107 SASO ASTM A 615M Yes SASO 2 & SASO 107 are equivalent to SASO ASTM A 615M

Steel Rebars's 25mm SASO 2/SASO 107 SASO ASTM A 615M Yes SASO 2 & SASO 107 are equivalent to SASO ASTM A 615M

Steel Rebars's 32mm SASO 2/SASO 107 SASO ASTM A 615M Yes SASO 2 & SASO 107 are equivalent to SASO ASTM A 615M

Thank you for your corporations.

Tameer Steel Factory Co. Ltd.

Tel: +966 12 2881688 Unified No. 920010189 Fax: +966 12 6482179 P.O.Box 12212 Jeddah 21473 www.tameersteel.com

42
33
COMPANY APPROVALS

43
Saudi Arabian Oil Company Tel.: (966 13) 874-0958
Supplier Relationship Management Fax: (966 13) 874-1495
B-102 North Park 2
Dhahran 31311
Saudi Arabia

November 27, 2022

SQU-060-22

Sameer Qaraman, Executive Manager


Tameer Steel Co. Ltd. Factory
P.O.BOX 12212
Jeddah 21473
Saudi Arabia

Fax 12 288 1688

Mr. Qaraman,

We are pleased to inform you that your company is included in the Saudi Aramco Supplier
Information System under Vendor Code No. 10065807 for the following products provided your
company continues to meet relevant Saudi Arabian and Saudi Aramco standards.

9COM Description
6000000615 BAR; REINFORCING; STEEL; ASTM A 615

This approval, however, should not be construed as a commitment by Saudi Aramco to purchase
from you. Being approved as a supplier only grant your company the opportunity, along with other
approved sources, to respond to requests for submitting proposals in accordance with Saudi
Aramco’s established policies and procedures. All purchase agreements and orders will be issued
based on the name and address stated in your commercial registration (CR), as stated above.

Saudi Aramco wishes to remind you that being recognized as a potential supplier is a privilege
which carries with it serious obligations and responsibilities to act in a legal and ethical manner.
We wish to remind you of the Saudi Aramco Supplier Code of Conduct (SCOC) which you
acknowledged. Failure to abide by the principles set forth in the SCOC can result in adverse
actions being taken by Saudi Aramco against you including suspension of you as a supplier.
Saudi Aramco also expects each of its suppliers to satisfy each of the requirements of any
purchase agreements or orders which might be placed and to act responsibly and reliably as a
supply chain supplier.

Page 1 of 2
Saudi Arabian Oil Company (Saudi Aramco), is a company formed by Royal Decree No. M/8 dated 04/04/1409H, and is a joint stock company, with certificate of registration number 2052101150 having its principal office
at P.O. Box 5000, Dhahran, Postal Code 31311, kingdom of Saudi Arabia and a fully paid capital of SAR 60,000,000,000.
Saudi Aramco: Company General Use 44
Saudi Arabian Oil Company Tel.: (966 13) 874-0958
Supplier Relationship Management Fax: (966 13) 874-1495
B-102 North Park 2
Dhahran 31311
Saudi Arabia

SQU-060-22

Please note that evidence of representation from your supply source(s) must be supported by
letter(s) of confirmation stipulating the territorial coverage and specific product lines involved.
Your supply sources must have been accepted as qualified suppliers of the range of materials
that you wish to supply. It is also important that you advise us immediately of any changes in the
agreements which you have negotiated with your supply sources and/or any changes in your
contact information such as postal address, telephone and fax numbers.

Suppliers should apply for Saudi Aramco Supplier Portal access by forwarding a request to portal-
registration@aramco.com. The Supplier Portal is the main electronic business tool used between Saudi
Aramco and its suppliers and serves to improve the flow and accuracy of key supply chain information.

For linking applicable 9CATs, please communicate with Standardization engineer Talal
Alshammari (013) 874-2820 or on talal.shammari.4@aramco.com

For further information or assistance, please contact Mohammed Alshuayl on (013) 874-1479 or
the Supplier Help Desk on (013) 874-2222 or on SupplierHelpDesk@aramco.com

___________________________________
Adnan Jaman, Supervisor
Supplier Qualification Unit

It is the responsibility of the supplier to notify Saudi Aramco Supplier Relations Management Unit of the following:
1. Change of Name/ Address/ Owner(s)
2. Any change of the supplier location (sub sourcing fabrication of major components)
3. Discontinue of fabrication or supply of approved commodities (9COMs, 9CATS and/or MSGs)

Page 2 of 2
Saudi Arabian Oil Company (Saudi Aramco), is a company formed by Royal Decree No. M/8 dated 04/04/1409H, and is a joint stock company, with certificate of registration number 2052101150 having its principal office
at P.O. Box 5000, Dhahran, Postal Code 31311, kingdom of Saudi Arabia and a fully paid capital of SAR 60,000,000,000.
Saudi Aramco: Company General Use 45
‫ﺭﻗﻢ ﺍﻟﺼﺎﺩﺭ ‪٣٨٥٢٣ :‬‬
‫‪١٤٤٤/٠٦/١٥ :‬‬ ‫ﺍﻟﺘﺎﺭﻳﺦ‬
‫ﺍﻟﻤﺮﻓﻘﺎﺕ ‪ :‬ﺑﺪﻭﻥ‬

‫ﺍﻟﻤﻮﺿﻮﻉ‪ :‬ﻃﻠﺐ ﺗﺠﺪﻳﺪ ﺍﻋﺘﻤﺎﺩ ﻣﻨﺘﺞ‪.‬‬

‫ﺍﻟﻤﺤﺘﺮﻣﻴﻦ‬ ‫ﺍﻟﺴﺎﺩﺓ ﻣﺼﻨﻊ ﺷﺮﻛﺔ ﺗﻌﻤﻴﺮ ﺍﻟﺤﺪﻳﺪ ﺍﻟﻤﺤﺪﻭﺩﺓ‬


‫) ﺹ‪.‬ﺏ ‪ - ١١٧٠٠‬ﺟﺪﺓ ‪( ٢١٤٦٣‬‬

‫ﺍﻟﺴﻼﻡ ﻋﻠﻴﻜﻢ ﻭﺭﺣﻤﺔ ﺍﻟﻠﻪ ﻭﺑﺮﻛﺎﺗﻪ‬

‫ﺇﺷﺎﺭﺓ ﺇﻟﻰ ﺧﻄﺎﺑﻜﻢ ﺭﻗﻢ ﺑﺪﻭﻥ ﻭﺗﺎﺭﻳﺦ‪١٤٤٤/٥/١٣‬ﻫـ ﻭﺍﻟﻤﻮﺭﺩ ﻟﻠﻮﺯﺍﺭﺓ ‪ ٤٢٣٨٣‬ﻭﺗﺎﺭﻳﺦ‬


‫‪١٤٤٤/٥/١٩‬ﻫـ ﺑﺨﺼﻮﺹ ﻃﻠﺐ ﺗﺠﺪﻳﺪ ﺍﻋﺘﻤﺎﺩ ﻣﺼﻨﻌﻜﻢ ﻹﻧﺘﺎﺝ ﺍﻟﻤﻮﺍﺩ ﺍﻟﺘﺎﻟﻴﺔ‪:‬‬

‫ﺍﻷﻗﻄﺎﺭ‬ ‫ﻧﻮﻉ ﺍﻟﺘﺴﻠﻴﺢ‬

‫‪٣٢ ٢٥ ٢٢ ٢٠ ١٨ ١٦ ١٤ ١٢ ١٠‬‬ ‫ﺣﺪﻳﺪ ﺍﻟﺘﺴﻠﻴﺢ ﺩﺭﺟﺔ ‪(٦٠ Grade) ٦٠‬‬

‫ﻧﻔﻴﺪﻛﻢ ﺑﻘﻴﺎﻡ ﺍﻟﻤﺨﺘﺼﻴﻦ ﻟﺪﻳﻨﺎ ﺑﻤﺮﺍﺟﻌﺔ ﺍﻟﻤﻠﻒ ﺍﻟﻤﺮﻓﻖ ﻭﺍﻻﺧﺘﺒﺎﺭﺍﺕ ﺍﻟﺘﻲ ﺗﻤﺖ ﻣﻦ ﻗﺒﻠﻜﻢ‬
‫ﻭﻣﻦ ﺛﻢ ﺯﻳﺎﺭﺓ ﻣﺼﻨﻌﻜﻢ ﻭﺍﻻﻃﻼﻉ ﻋﻠﻰ ﺃﺳﺎﻟﻴﺐ ﺿﺒﻂ ﺍﻟﺠﻮﺩﺓ ﻟﺪﻳﻜﻢ ﻭﺗﻔﻘﺪ ﺧﻄﻮﻁ ﺍﻹﻧﺘﺎﺝ‬
‫ﻭﺃﺧﺬ ﻋﻴﻨﺎﺕ ﻭﺇﺟﺮﺍﺀ ﺑﻌﺾ ﺍﻻﺧﺘﺒﺎﺭﺍﺕ ﺍﻟﻼﺯﻣﺔ ﻟﻬﺎ ﻭﺗﺒﻴﻦ ﻣﻄﺎﺑﻘﺔ ﺍﻷﺗﻲ‪:‬‬

‫ﺍﻷﻗﻄﺎﺭ‬ ‫ﻧﻮﻉ ﺍﻟﺘﺴﻠﻴﺢ‬

‫‪٢٥ ٢٢ ٢٠ ١٨ ١٦ ١٤ ١٢ ١٠‬‬ ‫ﺣﺪﻳﺪ ﺍﻟﺘﺴﻠﻴﺢ ﺩﺭﺟﺔ ‪(٦٠ Grade) ٦٠‬‬ ‫√‬

‫‪٣٢‬‬ ‫ﺣﺪﻳﺪ ﺍﻟﺘﺴﻠﻴﺢ ﺩﺭﺟﺔ ‪(٦٠ Grade) ٦٠‬‬ ‫√‬

‫ﻟﺬﺍ ﻻ ﻣﺎﻧﻊ ﻣﻦ ﺍﺳﺘﺨﺪﺍﻡ ﻣﻨﺘﺠﺎﺗﻜﻢ ﺍﻟﻤﻄﺎﺑﻘﺔ ﻟﻠﻤﻮﺍﺻﻔﺎﺕ ﻓﻲ ﻣﺸﺎﺭﻳﻊ ﺍﻟﻮﺯﺍﺭﺓ ﻭﻟﻤﺪﺓ‬


‫ﺛﻼﺙ ﺳﻨﻮﺍﺕ ﻣﻦ ﺗﺎﺭﻳﺦ ﺧﻄﺎﺑﻨﺎ ﻫﺬﺍ‪ ،‬ﻋﻠﻤﺎً ﺃﻧﻪ ﺳﺘﻜﻮﻥ ﻫﻨﺎﻙ ﺯﻳﺎﺭﺍﺕ ﺩﻭﺭﻳﺔ ﻟﻀﻤﺎﻥ ﺍﺳﺘﻤﺮﺍﺭ‬
‫ﺍﻟﺠﻮﺩﺓ ‪.‬‬
‫ﻭﺗﻘﺒﻠﻮﺍ ﺃﻃﻴﺐ ﺗﺤﻴﺎﺗﻲ‪،،،‬‬

‫‪46‬‬
‫ﺭﻗﻢ ﺍﻟﺼﺎﺩﺭ ‪٣٨٥٢٣ :‬‬
‫‪١٤٤٤/٠٦/١٥ :‬‬ ‫ﺍﻟﺘﺎﺭﻳﺦ‬
‫ﺍﻟﻤﺮﻓﻘﺎﺕ ‪ :‬ﺑﺪﻭﻥ‬

‫ﻣﺪﻳﺮ ﻋﺎﻡ ﺍﻹﺩﺍﺭﺓ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺠﻮﺩﺓ ﻭﺍﻟﺒﻴﺌﺔ‬


‫ﺗﻢ ﺍﻋﺘﻤﺎﺩ ﺍﻟﺨﻄﺎﺏ ﺇﻟﻜﺘﺮﻭﻧﻴﺎً‬
‫ﺍﻟﻌﺒﺎﺱ ﺍﺣﻤﺪ ﺍﻟﺤﺎﺯﻣﻰ‬

‫ﺹ‪ /‬ﻣﻊ ﺍﻟﺘﺤﻴﺔ ﻟـ ﺳﻌﺎﺩﺓ ﻣﺪﻳﺮ ﻗﺴﻢ ﺍﻟﻤﺨﺘﺒﺮ ﺍﻟﻤﺮﻛﺰﻱ‬ ‫«‬


‫ﺹ‪ /‬ﻣﻊ ﺍﻟﺘﺤﻴﺔ ﻟـ ﺳﻌﺎﺩﺓ ﻣﺪﻳﺮ ﺇﺩﺍﺭﺓ ﺍﻟﻤﻮﺍﺻﻔﺎﺕ ﻭﺍﻟﻤﻘﺎﻳﻴﺲ‬ ‫«‬

‫‪47‬‬
48
49
50
01234203056ÿ31809


 !ÿ#$%&'$()ÿ*+(,-$(./01
2443ÿ
ÿ3ÿ45 6ÿ67ÿ59
89ÿ: ÿ05326ÿ05;0
67
67ÿ59ÿ<ÿ
5
=
>?ÿ@A8B =
>?ÿ3F=:B6 6BIB6B3JBÿ3F=:B6
C 5D Eÿ@5  3@?GC@6
3G39H22 3@?GC@6
3G39H22
I ÿKCIG39300Lÿ85MD  ÿ4  ÿ Dÿ@
=BB6ÿ<ÿGÿ<
= D 55ÿ ÿ<5
I5  3@?ÿ4  ÿJ 5 ÿGÿ3B9=ÿ4N57ÿ85 5G3@?
@ ÿK0L 3@?ÿ4  ÿJ 5 ÿGÿ3B9=ÿ4N57ÿ85 5G3@?ÿKPÿ 5L
J ÿK0L 3B9=ÿQ7ÿRÿB  ÿ4  ÿJ 5 ÿGÿ3B9=ÿGÿB S 5 SÿRÿ@   ÿ<5N ÿ4ÿKPÿ 5L
<  < 76ÿ0;ÿ=7ÿ0305ÿ0804842ÿ8=ÿ
<@ÿKO=@ÿP35833L
< 32

ÿ49JF=B3@ÿ
@@
JT=B3@<ÿK0L
KUÿ L

4G333333GH0333333H2G 30 ;23420305 G85MD  ÿ4  ÿ Dÿ@


=BB6ÿ<
ÿGÿC 5ÿ=7
3<JGJ>VGJ6<G33301 ÿ<ÿ= D 55ÿ ÿ<5WÿJ6< 85 
4G333333GH0333333H2G 30 ;23420305 G85MD  ÿ4  ÿ Dÿ@
=BB6ÿ<
ÿGÿC 5ÿ=7
3<JGJ>VG8Q4G3333H5 ÿ<ÿ= D 55ÿ ÿ<5 85 

ÿ=B<<
OB
C 5D Eÿ6NEÿT 57
@ÿ ÿ  ÿNÿ ÿÿX85MD  ÿ4  ÿ Dÿ@
=BB6ÿ<ÿGÿ<ÿ= D 55ÿ ÿ<5XÿE 5D EÿE
ÿD  E Sÿ5ÿ8
YZ[\ÿ^_`a\b[^^`cÿd`\ÿ̀e^fb`^[g`cchÿijaj_`^jkl

4 ÿ3 < 85   6NEÿ9  J  


4G333333GH0333333H2G @ÿ? ÿ4JJ 3ÿ4  ÿJ 5 
ÿGÿC 5ÿ=7ÿ85 
3<JGJ>VGJ6<G33301

822  22  51 20


6/18/23, 8:43 AM Aconex

Yasir El-Duri Final (WF-003289) BUJV-PQ Submittal (CA 03) - ST_Pr… YESTERDAY
DAR AL-HANDASAH (SHAIR AND PARTNERS) - SAUDI ARABIA WORKFLOW TRANSMITTAL DAH-WTRAN-009082

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Workflow Transmittal DAH-WTRAN-009082 DAH-WTRAN-009082

Final (WF-003289) BUJV-PQ Submittal (CA 03) - ST_Prequalification of (C3) M/s


Tameer Steel Factory Co. Ltd. for Structural Steel Reinforcement Bars

From Mr Yasir El-Duri - Dar Al-Handasah (Shair and Partners) - Saudi Arabia

To (6) Mr Jamal Sakr - Dar Al-Handasah (Shair and Partners) - Saudi Arabia (+5 more...)

Cc (19) Mr Ahmad Abu Al Hayjaa - Al Bawani Company Ltd. (+18 more...)

Sent Saturday, 17 June 2023 5:29:19 PM AST (GMT +03:00)

Status N/A

DOCUMENT ATTACHMENTS (1)

(0 selected)

Planned
Revision
File Document No Revision Title Status Submission
Date
Date

Prequalification of (C3) M/s


5YNBU05-YNBU- B - Approved
Tameer Steel Factory Co. Ltd. for
08-BUJV-ST- 01 05/06/2023 with
Structural Steel Reinforcement
PRQ-00012 Comments
Bars

ATTRIBUTES

Attribute 1 ST - Structural Steel

MESSAGE

Workflow Review History

The attached documents have completed the "BUJV-PQ Submittal (CA 03) - ST_Prequalification of (C3) M/s Tameer Steel Factory Co. Ltd. for
Structural Steel Reinforcement Bars" workflow with the following results :

https://ksa1.aconex.com/hub/index.html
52 1/3
6/18/23, 8:43 AM Aconex

This transmittal was automatically generated.

Doc No Step Participant Review Outcome Comments

-Approval is conditional to
material submittal approval
and No delivery of material
5YNBU05-YNBU-08- Step1.1 - SC Discipline B - Approved with is alowed until getting
W Fares
BUJV-ST-PRQ-00012 Engineer Comments approval of material. -All
legal documents should be
valid during the project
period.

1-Pre-Qualification (Quality
Assessment and Technical
Evaluation) will be done by
third party approved
agency inspector inside or
outside KSA, prior to
Step1.2 PMC QA/ QC M Zahid Reviewed with Comments
material delivered to site.
2- SASO certificate has
not been attached. 3-All
government legal and valid
document to be attached
with material submittal.

Step 1.3 PMC Review S Faiz B - Approved with The Prequalification of M/S
Comments Tameer Steel Factory Co.
Ltd is Approved Code-B.
However, the following
deficiencies & anomalies
needs to be clarified
before any supply is
delivered to the Project
Site. 1. As per Saudi
Building Code SBC 304-
Clause 20.2.2.25, the
Ratio between Actual
Tensile Strengths and
Actual Yield Strengths
should be Minimum of
1.25. However - as per the
Test Reports attached in
the submittal - all of the
samples for Dia 32, 25, 20,
16, 14, and 12 are less
than 1.25. This is a serious
issue that needs to be
clarified. 2. Grade-80

https://ksa1.aconex.com/hub/index.html
53 2/3
6/18/23, 8:43 AM Aconex

Rebar - as proposed in the


Submittal - has a higher
Yield Strength than Grade-
75 Rebar which is actually
required as per Project
Specification. However, t
must satisfy the
requirements of SBC 304
Clause 20.2. 3. As per the
Project Specification,
Grade-75 Rebar requires
the maximum Carbon
Content of 0.30%. As per
the Test Results submitted
in the Submittal the
Carbon Content varies
from 0.25% to 0.26%. As
such the Grade-80 Rebar
proposed in he submittal
meets with the
requirements of the Project
Specification 4. Doesn't
have SASO Accreditation.
It is mentioned that it is
under renewal. It must be
submitted before delivery
of Rebars to the Project
Site. Note: The delivery of
Rebars to the Project Site
should not be accepted
unless the Test Results
report satisfy that the ratio
between Actual Tensile
Strengths and Actual Yield
Strengths are equal to or
greater than 1.25. that is,
they satisfy the SBC 304
requirements for the same.

Step 1.4 SEVEN Review A Al-Merdhemah Reviewed

B - Approved with
Step 02: SC RE J Sakr No further comments.
Comments

B - Approved with
Step 03: SC Close-Out Y El-Duri
Comments

https://ksa1.aconex.com/hub/index.html
54 3/3
Programme: King Abdullah Financial District (KAFD)

Observation & Comments Sheet (OCS)

PROJECT / PARCEL KAFD Parcels 1.06 PROGRAMME No. KAFD00254


OCS NUMBER KAFD-MUP-DAH-DCM-OCS-00324 Rev. R00 DATE 21-May-23

ORIGINATOR ISAM KABBANI (IKK) TRANSMITTAL No. / DATE WF-013442

DOCUMENT No. KAFD-106-IKK-STR-MAR-00012 Rev. R00 DISCIPLINE Structure

DOCUMENT TITLE Steel rebar Reinforcement (Tameer) DOCUMENT TYPE MAR

Comment Code Legend (for individual comments): Reply Code Legend:


Comments / Replies Legends & Status Open / Closed
1 = Action Required; 2 = Note / Advisory / Recommendation i = Incorporated; ii = Not incorporated for reason stated in reply
Page / Section / Comment Reply Reply Status by
No. Initial Reviewer Comment Originator Reply
Sheet Code Code Reviewer

final approval subject to 3rd party test results for the car park
1 BK GEN 2
project

contractor to secure the approval of design drawings prior to


2 BK GEN 2
the use of the material at the site

A - Approved B - Approved with Comment C - Revise and Resubmit


Review Status Code: B D - Rejected
Project Management-Construction Development and Management Company
Supervision Consultant (SC) Originator
Management (PMCM) (KAFD-DMC)
Reviewer Name(s) / COMMENTS / STATUS COMMENTS / STATUS COMMENTS / STATUS
Position REPLY APPROVED BY
Initials RECOMMENDED BY SC RECOMMENDED BY PMCM ADVISED BY KAFD-DMC
Structural
Baker Kitana Name: Spiridon Mitri Name: Name: Name:
Engineer

Position: Project Director Position: Position: Position:

Signature: Signature: Signature: Signature:

Date: 21-May-2023 Date: Date: Date:


*Approval or No Objection status from the Reviewer shall be deemed as permission to proceed and shall not constitute acceptance or approval of design details, calculations, analyses, test methods, or
materials developed or selected by the Originator and shall not relieve him from full compliance with contract technical specifications and drawings*

55
Form No. KAFD-MUP-SAP-QMS-FRM-00071 R00 23-Aug-2022 Page 1 of
56
57
58
59
60
61
62
63 CamScanner
9/27/22, 10:47 AM Aconex

Albin Salipdan Final (WF-027628) 0000100201/050_MTS FOR STEEL … 10:46 AM


SAUDI ARABIAN PARSONS LIMITED WORKFLOW TRANSMITTAL PAR-WTRAN-066505

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Workflow Transmittal PAR-WTRAN-066505 PAR-WTRAN-066505

Final (WF-027628) 0000100201/050_MTS FOR STEEL REINFORCING BARS BY


TAMEER STEEL FACTORY CO.

From Mr Albin Salipdan - SAUDI ARABIAN PARSONS LIMITED

To
(3) Mr Albin Salipdan - SAUDI ARABIAN PARSONS LIMITED (+2 more...)

Cc
(6) Mr 100201DCC MAH - MOFARREH ALHARBI AND PARTNERS (+5 more...)

Sent Tuesday, 27 September 2022


10:46:16 AM AST (GMT +03:00)

Status N/A


DOCUMENT ATTACHMENTS
(1)

(0 selected)

Revision
File Document No Revision Title Status
Date

0000100201/050_MTS FOR STEEL A - Work


03-620000-0000100201-
01 17/09/2022 REINFORCING BARS BY TAMEER STEEL May
MAH-CIV-MAT-000044
FACTORY CO. Proceed


MESSAGE

Workflow Review History

The attached documents have completed the "0000100201/050_MTS FOR STEEL REINFORCING BARS BY TAMEER STEEL FACTORY
CO." workflow with the following results :

This transmittal was automatically generated.

Doc No Step Participant Review Outcome Comments

Please see the


03-620000-0000100201-
PMC Design Review A Salipdan A - Work May Proceed commented documents
MAH-CIV-MAT-000044
attached

https://ksa1.aconex.com/Logon
64 1/2
Materials Submittal (MAT)
(Complete All Fields)

03-620000-0000100201-
Contractor Mofarreh Alharbi & Partners Material Submittal No. MAH-CIV-MAT-000044

NEOM Contract No. 0000100201/050 Date 17-September-2022

Material Description STEEL REINFORCING BARS BY Area of Application (Mark


See the enclosed drawing
(One item/ system per form) TAMEER STEEL on Drawings)

ACONEX Reference of Drawing ECG-STR-DRG-720236_1; ECG-STR-DRG-720401_1; ECG-STR-DRG-720546_1; ECG-STR-DRG-


with Revision 720551_1; ECG-STR-DRG-720556_1; ECG-STR-DRG-720586_1; ECG-STR-DRG-720591_1
03-620000-4200000009-ECG-
Specification Reference Applicable Code / Standard Section 033000
DES-SPC-000002_C, FEB 2022
Locally Manufactured Yes No
Listed in NEOM Mandatory List Yes No (Identify Country of Origin if
imported, with justification)
Contractor’s Representative Mohamed Khedr Signature

Disciplines:
Architectural Civil / Structure Interior Design Landscape MEP/ HVAC

Wet Services Transportation Sustainability Mechanical Electrical

Geotechnical Traffic Fire Protection Telecom, ICT & ELV Others

Manufacturers/Suppliers:
Company Name TAMEER STEEL FACTORY CO. LTD.

Jeddah 2nd Industrial City,


Address P.O. Box 12212 Jeddah 21473 Tel: +966 12 2881688 / +966
920010189
Saudi Arabia Other details
Fax: +966 12 6482179
Local agent

Delivery Duration (Long Long Lead


Scheduled Date of Delivery on Site
Lead/ Short Lead) Short Lead

Checklist for Attachments (as applicable):


Index & Separators/ Fliers Drawings / Specification Specification Compliance Sheet

Product Data Design Mixes (Concrete / Asphalt / JMF) Mill Certificates

Test Reports Compliance Certificates Warranties

Prequalification Approval reference Source Quality Control Reports Certificates & Accreditations

LEED Submittals Welding Certificates Safety Data Sheet

Previous Client Approvals Completed Projects (Similar in Nature) Delegated Design Submittals

Samples Mockups Record/ Data Maintenance Data

65
Lead Materials Engineer’s Review Comments

No objection.

Status code: A - Work May Proceed

Revised date: 21 Sep 2022

Revised by: Raghad Al Abdullah & Michael Nellen


SAPL-Associate Engineer SAPL-Lead Structural Engineer
Mobile: +966 55 895 5478

Engineering Director’s Review Comments


Incorporate Comments &
Work May Proceed Revise and resubmit
Status code Proceed
Rejected Review not required Issued for Construction

Project Manager’s Signature &


name Date

NEOM Project Signature &


Director Date

Received by Contractor

Signature &
Name
Date

66
MATERIAL APPROVAL
0000100201/050_ MTS FOR STEEL REINFORCING BARS BY
TAMEER STEEL FACTORY CO.

(03-620000-0000100201-MAH-CIV-MAT-000044 /Rev-01/Sept 2022)

67
Document history

Revision code Description of changes Purpose of issue Date

01.00 First Issue For Approval 17 Sept. 22

Document approval

Prepared by Reviewed by Approved by

NAME Qaisar K. Wendell B. Mohamed Khedr

JOB TITLE PQCS QA/QC MGR PROJECT MGR

68
Materials Submittal (MAT) Page Divider

03-620000-0000100201-
Contractor MOFARREH AL-HARBI & PARTNERS Material Submittal No.
MAH-CIV-MAT-000044

NEOM Contract No. 0000100201/050 Date

Material Description
STEEL REINFORCING BARS BY TAMEER STEEL
(One item/ system per form)

Manufacture / Supplier Details TAMEER STEEL FACTORY CO. LTD.

03-620000-4200000009-ECG-
Specification Reference Applicable Code / Standard Section 033000
DES-SPC-000002_C, FEB 2022

Checklist for Attachments (as applicable):


Index & Separators/ Fliers Drawings / Specification Specification Compliance Sheet

Product Data Design Mixes (Concrete / Asphalt / JMF) Mill Certificates

Test Reports Compliance Certificates Warranties

Prequalification Approval reference Source Quality Control Reports Certificates & Accreditations

LEED Submittals Welding Certificates Safety Data Sheet

Previous Client Approvals Completed Projects (Similar in Nature) Delegated Design Submittals

Samples Mockups Record/ Data Maintenance Data

DRAWINGS / SPECIFICATIONS

REVISION CODE: 01.00

69
N In no case shall maximum size of coarse aggregate exceed 3/4 of the minimum clear
spacing between bars or between reinforcing bars and forms.

P For general purpose, a maximum size of 25 mm shall be satisfactory.

2.3 MIXING WATER

A Mixing water for concrete: Comply with ASTM C94M, shall be drinking water (potable
water) or water of chemical composition acceptable for drinking (except for bacterio-
logical limits) and be clean and free from organic impurities, industrial, contamina-
tion oils, salts and any other substances that may be harmful to cement or steel rein-
forcement.

B For plain concrete and mud slabs without reinforcement sea water may be used for
mixing concrete only after approval of the Engineer, and increasing the cement to
obtain same compressive strength required.

2.4 STEEL REINFORCING BARS

A Reinforcement shall be as shown on Drawings and shall comply with the require-
ments of the Standard Specifications for:

1. High Yield steel “T”: ASTM A 615 Grade 60 deformed bars ( fy = 420 MPa).
2. Mild Steel “Y”: ASTM A 36 Grade 36 (fy = 250 MPa).
3. Welded Wire fabrics: ASTM 252.

B Grade 420 bars shall be deformed and contain notches to sustain better bond with
concrete. The area of the non-continuous notches and deformations shall not be tak-
en into consideration.

C Table 3 gives the lower limit for the results of the Standard Tensile Test.

Table 3
Lower Limits for Standard Tensile Test of Steel

Kind of Steel Yield Stress Proof Stress Tensile Strength Minimum


MPa MPa MPa Elongation
%
Normal Mild Steel 250 0 360 20
(Grade 36)
High Tensile Steel - 420 600 12
(Grade 60)

D Mill certificates shall be submitted for each consignment of reinforcing steel. This mill
certificates shall state the place of manufacture, details of composition, manufacture,
strength, and mill analysis and test reports. Follow-up tests shall be performed by an
approved testing laboratory. Specimens shall be selected by the representative of
testing laboratory under the supervision of the Engineer from batches received on
Site.

Cast-in-Place Concrete Section 033000


4200000009/009-SPC- Oxagon Community 200 Accommodation Units (Prj. 3118) Page 7 of 20
Earthwork, Infrastructure & Utilities
70
9/20/22, 4:21 PM Aconex

Syed Zain Hassan Final (WF-027067) 0000100201/050_Prequalification of T… 2:04 PM


NEOM - ENGINEERING & TECHNICAL SERVICES DEPT WORKFLOW TRANSMITTAL NEN-WTRAN-027169

NEOM - Engineering & Technical Services Dept


ITCC Complex, Al Raidah Digital City
Level 2, Building IN01
Riyadh
An Nakheel 12382 Saudi Arabia

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Workflow Transmittal NEN-WTRAN-027169 NEN-WTRAN-027169

Final (WF-027067) 0000100201/050_Prequalification of Tameer Steel for


Reinforcing Steel Bar(Rebar)

From Syed Zain Hassan - NEOM - Engineering & Technical Services Dept

To
(3) Syed Zain Hassan - NEOM - Engineering & Technical Services Dept (+2 more...)

Cc
(8) Mr 100201DCC MAH - MOFARREH ALHARBI AND PARTNERS (+7 more...)

Sent Tuesday, 20 September 2022


2:04:09 PM AST (GMT +03:00)

Status N/A


DOCUMENT ATTACHMENTS
(1)

(0 selected)

Revision
File Document No Revision Title Status
Date

0000100201/050_Prequalification of B - Incorporate
03-620000-0000100201-
01 13/09/2022 Tameer Steel for Reinforcing Steel Comments -
MAH-CIV-PQD-000064
Bar(Rebar) Proceed


MESSAGE

Workflow Review History

The attached documents have completed the "0000100201/050_Prequalification of Tameer Steel for Reinforcing Steel Bar(Rebar)" workflow
with the following results :

This transmittal was automatically generated.

Doc No Step Participant Review Outcome Comments

03-620000-0000100201-
PMC REVIEWER P Mayers A - Work May Proceed
MAH-CIV-PQD-000064

https://ksa1.aconex.com/Logon
71 1/2
9/20/22, 4:21 PM Aconex

ETSD QC S Hassan B - Incorporate Comments Contractor to follow


- Proceed inspection category 1 (Test
certificates required upon
material delivery)

https://ksa1.aconex.com/Logon
72 2/2
Proposed vendor is acceptable for the subjected scope of work at KSP - CP02

Anas Albreki 06/04/2022


Muhammad Shaderma 06/04/2022

73
74
75
76
77
Materials Sector
,.a;.~ ~:.~ 1 4$~1
Purchasing Department Saudi Erectricity 'C'Dmpany
Vendors Affairs Division ~;Em!IJY

Date: 22/2/2018
Vendor Name: TAMEER STEEL
P.O. Box : 11700
C. R. NO: 4030209719
E­mail : m.tabl@hotmail.com

SUBJECT: VENDOR'S REGISTRATION NOTIFICATION

Dear Sir,
We are pleased to inform that your commercial documents have been  evaluated and your company is now
registered with Saudi Electricity Company under Vendor No ( 2006865 )

You must fill up the prequalification form/ requirements whenever it is applicable, which available on SEC
website ( Click Here ) in order to deliver materials based on your activity in your Commercial Registration.

Notice :
1. This approval should not be construed as commitment by SEC to purchase from you but when needed SEC
will invite you to bid and will be evaluated based on the established policies & procedures.
2. If the Bid is considered as a LOW VALUE you must quote through the e­bidding system . However, if the bid
is a HIGH VALUE you must submit the quotation in a closed envelope and submit to reception of purchasing
sections in operating area's requested the materials.

We would suggest that you maintain a continuous contact with Purchasing Sections in SEC operating areas.
We thank you for your interest to deal with Saudi Electricity Company.

Best Regard,

Localization and Technical Qualification Department


Headquarters � Grnatah Tower (A6) ‐ Gth floor
Riyadh ‐ Saudi Arabia
prc‐vendor@se.com.sa

78
APPROVED
MATERIAL LIST
5A
REVISION 7

JULY 2019
FEBRUARY 2020

79
SAUDI INDUSTRIAL PROPERTY AUTHORITY
Material Submittal Log - STRUCTURAL
S.No Item Supplier Name Specs No.

S1 SOIL INVESTIGATION AND METRIAL TESTING LABS

Arab Company for Laboratories and soil

Fugro-Suhaimi, Ltd.

Houti Stanger Limited

Engineer Nizar Kurdi Laboratory


BACKFILL- Structural Backfill,compacted to achieve minimum
95% of dry density for each 300mm layers. Each layer shall be Riyadh for Geotechnical and piling Engineers
S1.a 02221
tested and recorded, Materials Test.
Rashed Engineering & Geotechnical labs

Gulf Consult, AlKhobar

Nasser Al-Assaf Geotechnical and Material test

A.A.M*

Al Jazzar (OJCE)*

VAPOR RETARDER - ASTM E1745 Class [A] [B] polyethylene ATCO


sheeting, minimum 0.25 mm 10 mil[
S1.b 0.38 mm 15 mil] thickness or other equivalent material with a UniTECH 07200
maximum
permeance rating of 0.04 perms per ASTM E96/E96M. WAMCO

S2 REINFORCEMENT STEEL

Fawazan

SABIC Steel

Al-Rajhi Steel

REINFORCEMENT STEEL :-Deformed reinforcing bars (8- Saudi Rebar Co Ltd


32mm dia, and welded mesh) meeting the
requirements of ASTM A615/A615M with the bars marked. Yamama
S2.a Deformed steel Bars Grade 60 ASTM A615 fy=420 Mpa 03200
(Minimum Yield Strength) Al-Fouzan Steel
Welded wire fibric fy=517 Mpa comply with ASTM
A1064/A1064M carbon steel Rashed AbdulRahman Al Rashed Sons

Absal Trading & Contracting Co Ltd.

Solb Steel Company

TAMEER Steel*

REBAR COPLING SYSTEM:- Bar couplers must meet the High Build Co. As per ASTM
S2.b requirements of ASTM A722/A722M and develop 100 percent
A722/A722M
of the minimum bar ultimate tensile strength. MAGO

S3 CONCRETE WORKS

Saudi Ready Mix

READYMIX CONCRETE:- Al-Tawi


Shall comply with ASTM C-94 & ACI 211-1
Conmix Saudi Arabia
a) Blinding Concrete, fc' = 20Mpa (Minimum 28 days
S3.a 03300
Compressive Strength)
Al Bustan Mix
b) Reinforced Concrete, fc' = 30Mpa (Minimum 28 days
Compressive Strength) OR as specified Unibeton Ready Mix

Al-Redwan

80
Saudi Aramco E-Reference No. 0001647

Registration Approval Letter


December 17, 2019

Attention : TAMEER STEEL CO. LTD. FACTORY

CR Number : 4030209719
Country : Saudi Arabia
We are pleased to inform you that TAMEER STEEL CO. LTD. FACTORY is now registered in the Saudi
Aramco Supplier Management System under Vendor Code No. 10065807, provided your company continues
to meet all relevant Saudi Arabian and Saudi Aramco standards.

This registration, however, should not be construed as a commitment by Saudi Aramco to procure from you.
Being registered as a supplier only grants your company the opportunity, along with other registered
sources, to respond to requests for submitting proposals in accordance with Saudi Aramco's established
policies and procedures. All procurement instruments including but not limited to service contracts, purchase
agreements, or purchase orders will be issued based on the name and address included in your commercial
registration (CR), as stated in your Supplier Registration.

Saudi Aramco wishes to remind you that being recognized as a supplier carries with it serious obligations
and responsibilities to act in a legal and ethical manner. We wish to remind you of the Saudi Aramco
Supplier Code of Conduct (SCOC) which you acknowledged. Failure to abide by the principles set forth in
the SCOC can result in adverse actions being taken by Saudi Aramco against you including suspension of
you as a supplier. Saudi Aramco also expects each of its suppliers to satisfy each of the requirements of any
procurement instrument which might be placed and to act responsibly and reliably as a supply chain supplier.

Material Suppliers should apply for Saudi Aramco Supplier Portal access by forwarding a request to
portal-registration@aramco.com. The Supplier Portal is the main electronic business tool used between
Saudi Aramco and its suppliers and serves to improve the flow and accuracy of key supply chain information.

For further information or assistance please contact the Saudi Aramco Supplier Help Desk by forwarding a
request to SupplierHelpDesk@aramco.com or via the unified call center +966 (13) 874-2222.

Dawoud Suliman Al Nuwais, Supervisor


Supplier Registration Unit
Supplier Relationship Management Div

It is the responsibility of the supplier to update Saudi Aramco Supplier Registration Profile thorugh Ariba for
the following:
1. Change of Name / Commercial Registration Number / Address / Owner(s)
2. Any change of the supplier location
3. Discontinue supply of approved commodities (9COMs and 9CATS)

This is an electronically generated letter by Saudi Aramco. To verify Supplier approval status, please contact
Supplier Help Desk at supplierhelpdesk@aramco.com

81
82
83
84
85
Document Submittal

Project Name: RUA AL MADINAH PROJECT MAIN INFRASTRUCTURE PACKAGE


Contractor: Al Ajmi & CR18G Contractor Ref #: MIP-JVC-MAT-CIV-000004-00

PMC: Parsons TSC: WSP


Location: Jeddah Date: 08-Aug-22

Please check appropriate box:

☐ Letter ☐ Technical Report ☐Shop Drawing


☐ Technical Submittal ☐ GIS or CAD ☐Reports
☐ Bill of Quantities  Material Approval ☐Test Reports
☐ Procedure or Methodology ☐ Engineering Calculation ☐Permissions
☐ PM Plan ☐ Program ☐Manuals
☐ Product Data ☐ As Built ☐Others (please specify)
☐ Pre-qualification ☐ Certificates 
☐ Material Sample ☐ Drawings 
Purpose: ☐ For Information  For Review & Approval ☐ As Requested

Subject: Material submittal for black steel reinforcement (Supplier M/S Tamer Steel Factory)

Document Description:
SR. Hard Soft
No. Document No. BoQ # Document Name Rev. Copy Copy
Material Submittal for Tamer Steel
1 MIP-JVC-MAT-CIV-000004-00 00 
Factory
2

3
Contractor PD:
Name: Eng. Alaa Abu Dalou Date: 08-Aug-22 Signature: Stamp

WSP Review & Approval Status Discipline Engineer / QA-QC Manager


A - Approved (Work may proceed)
Name: Mohamed Eleissawy
 B - Approved as Noted (Work may proceed subject to Incorporation
of Comments) Sign:
C - Revise and Resubmit (Work may not proceed)
D - Rejected Date: 10-Aug-2022
E - For Information
Comments:
ITP has to be Submit
The black steel manufacturer has to be approved before supplying

WSP Resident Engineer


Name: Mohamed Salama Sign: Date: 10-Aug-22

WSP-55003310-RAM-SUB-FO203-00, 17 May 2022 Page 1


86
Document Submittal

Project Name: RUA AL MADINAH PROJECT MAIN INFRASTRUCTURE PACKAGE


Contractor: Al Ajmi & CR18G Contractor Ref #: MIP-JVC-RPT-QMN-000010-01

PMC: Parsons TSC: WSP


Location: Al-Madinah Date: 17-Nov-22

Please check appropriate box:

☐ Letter ☐ Technical Report ☐ Shop Drawing


☐ Technical Submittal ☐ GIS or CAD ☐ Reports
☐ Bill of Quantities ☐ Material Approval  Test Reports
☐ Procedure or Methodology ☐ Engineering Calculation ☐ Permissions
☐ PM Plan ☐ Program ☐ Manuals
☐ Product Data ☐ As Built ☐ Others (please specify)
☐ Pre-qualification ☐ Certificates
☐ Material Sample ☐ Drawings

Purpose: ☐ For Information  For Review & Approval ☐ As Requested

Steel test reports (Mechanical and Chemicals) from Tameer steel factory which prepared by third party
Subject:
laboratory (ACES).

Document Description:
SR. Hard Soft
No. Document No. BoQ # Document Name Rev. Copy Copy
Steel test reports (mechanical and
1 MIP-JVC-RPT-QMN-000010-01 ---
chemicals))
01 
2

3
Contractor PM:
Name: Ahmed Roshdy Date: 17-Nov-22 Signature: Stamp

WSP Review & Approval Status Discipline Engineer / QA-QC Manager


 A - Approved (Work may proceed) Name:

 B - Approved as Noted (Work may proceed subject to Incorporation
of Comments) Sign:
 C - Revise and Resubmit (Work may not proceed)
 D - Rejected Date:
 E - For Information
Comments:
.
1-The chemicals steel properties have been re-tested and the test results reports have been reviewed and found to be satisfactory as per project specifications.
2-the mechanical steel properties have been tested previously and the test results reports have been reviewed as per attached the following diameters 12-14-
16-20-25-32 mm accepted, regarding the diameter 10 mm isn't achieve the elongation requirements as per the ASTM -615 ,re-test required for approval.
3-JVC has to submit MIR for each delivery of steel with the compliance certificate and the frequency test will be done under the TSC witness prior to start the
work.

WSP Resident Engineer


Name: Mohamed Salama Sign: Date: 24/11/2022

WSP-55003310-RAM-SUB-FO203-00, 17 May 2022 Page 1


87
Project : KJ-129 Quantum Switch Tamasuk Data Center 2 @ Modon 2 Dammam

MATERIAL APPROVAL REQUEST


To M/s. QUANTUM SWITCH TAMASUK LIMITED
Attention Mr. Colin Tovey For Resubmittal Only
Mat. No. KJ-129-O-EN-MAT-0042-00 Client Letter Ref:
Date September 7, 2022 Date:

:
APPROVAL REQUESTED FOR
STEEL REINFORCEMENT (Alternative Supplier)
:
:
Manufacturer/ Supplier TAMEER STEEL FACTORY COMPANY LTD.
:
Country of Origin : SAUDI ARABIA
Sample/ Finish :
Catalogue Ref: :

Attachment: Technical Data Catalogue Sample List Physical Sample Others - Drawings

ALL AREAS

RELEVANT DRAWINGS AND SPECIFICATIONS:

MATERIAL CONFORMS TO SPECIFICATION : YES

Prepared By Reviewed By Approved By

Signature

Name Wissam Alabid Ahmad Ribhi Alzghoul Abdullah Alkilani


Designation Architect Construction Manager Project Director

CONSULTANT COMMENTS:

Code B: Approved with Code C: Rejected (Revise &


Code A: Approved Code D : For Information
Comments Resubmit)

REMARKS :

Note: Approval correction or comments made relative to submittals during this review DO NOT relieve the contractor from compliance with the requirements of drawings and specifications.
This check is only for review of general conformance with design concept of the project and general compliance with the information given in the contract documents. The contractor is
responsible for confirming and correlating all quantities and dimensions selecting fabrication processes and techniques of construction; coordinating his work with that of other trades, and
performing his work in a safe and satisfactory manner.

CLIENT / PROJECT MANAGEMENT COMMENTS:

REMARKS :

Signature: Name: Date:

Page 1 of 1 KJ-129-O-EN-MAT-0042-00 Steel Reinforcement - Tameer Steel


88
89
90
91
92
93
94
95
96
97
98
ZI..'I.I,AIR FAYEZ PARTNERSHIP
\
PROJECT

INFRASTRUCTURE
WORKS PROJECT Haif &mryny
{JEDDAH SOUT!'{ }
SITE 50

SUBMITTAI- FQRM
SUBJECT: TAMEER STEEL REINFORCEMENT

Specs. Oode & Ref. B.O.Q. Code Ref. SubmittalNo. M-41


{ 03200 } 51.05
6ate Received: 1214ftA21

Date Retumed:

3ub-contractor.
Narne: Address:
Address: Phone; Telex:

Manufacturer Supplier/ Agent


Name: TAMEERSTEELFACTORYCOMPANY
Name:
LIMITED
Address: 8O11700 JEDDAH 21463
Address
Fhone: 01?2881688
Phone:
Fax: 4fi648?179 Telex: Fax: Telex:

lnformation submitted and attaehed:


Cedificates Operation & Maintenance Manual n
Technicai Brochure Spare Pari,s List n
illanufacturer's Data & Specs" As Built Orawings D
Shop Drawings U Warranty T1

Others
Contractor's Comments:
AfiACHED DATA SI.IEET AND MANFACTURE APFROVAL FOR STEEL REINFORCEMENT
FROM TAMEER STEEI- FACTCIRY COMPANY LNMITEO" TO USE IN STORM WATER MANI-IOI
&CHAMBER & BOX CULVERT$.

Eee Attachment
l,{ote: This review does not relieve the contractor MAHMOUD HAMED
of his respon$ibilitie$ under the terms of the
contract nor authorize additionai
compensation. lt* I ,4
Cqnsuttcnt'$Comment$: i- & f-Jt .-pU 'br ** ",i "t,
lt, <)gl
e)p\ -\i,, jd t
-ti:), j,
-:-fL!sV f\br; u {"Lt}_, *j- !2\€__s.r
bbqt *" 324<j.J1" irUs J-i '
'q_-;Jt ..- j.r \)> L,
I
>.A t }4 sllll ,
$eeAttachnrent tr
slatu-e: Oiscipline $ign & Date Resident
1 ,Approved tr I Arch
2 Approved as noted
3 Revise and submit
g m' civit uidlt#<Ntltl/r o*n'@
f, I Mech Date: {t-d4-
4 Rejected tl n Elect
il HVAC

Soc. Ref: CSFOBa/5


99
100
101
102
103
104
105
106
107
108
109
110
•~_,~I~..J..ooJ I~~~~ I :~~I

·t~ ~~.b.~.)~

~.JWi"Wt~~~~ ~i~li~l.\.U;Jo'Q /.
ll~IJ l..l&ll U~JLlolll..~llS~ /i~Lo.JI /
~WI ~.>li..UI ~..,WI [)A 'hi(i.tl ~~.).!~1 ;'!aii J~l ~~~ ~U...

<~J4..L6WI_jU>! _ ~~ >.;jLaliw< ~J~I ~.>tl >le~l~ <~J4..L6WI >


..0~.>-JJ Jl1 ~J_j \"4,.!1c r.)L..u.t1
~l:JI ~~I...UI ~_y.bj\0-4 ~~ S'~~~~JI ~ Jlqbi ~ ..1t~ Jkl Jl ;;.JL:ul

.(~J~J1b..ll_ ~.P. _ 4.!::...,.::...,11) u~~ (JJ~ 1 ~__>-11) ~~I 4f? ~ (~J~J1b..ll)

U.J--'-"~ ~I~~·.·;==-, 4) t~l ~~~I ~.JL:.:L......~I '-:-ll..k;.. G~.JJ ~

~.)~Lb.;..~~~ ,~, ~10.../A/' r ~..JLJJ 1AA/n.1o.../ r u ~ ~.) <u.J-J..J~I

;;~J...L.::>o.ll ~.w1~ c; ·o4 ~L..w:.1 0 ~ , ~, ~1o...1v /1· ~..Jl.3J ACC/M91/2018

·t~ ~ ...l:...b- ~.)~

c; •o4 ~~\0-4 ~LA~ 4_j\ ~J f==-,1:9 0-A ~~1 ub~IJ JI.JJ~I ~I.J-A ~J
~J~Il,)-4 ('l==-,.! a•.: ~ I.!.LJjJ 't~ ~ ....t...:.j.:). ~.)~ ;;~J...L>J.I ....t.-:~1~

.~1 .::.La...ol_,.._, .b~ '4k ..=......,.; ~. ......... L.L.l..l :u..~~

' .. ~~~-' .

~..,.....,. ... tl;1~11 ,.~~"'-'

<jol.ol.ill ~~ ~~

111
1/24/2018 ‫ ﺗﺳﺟﯾل اﻟﻣوردﯾن‬- ‫اﻹدارة اﻟﻌﺎﻣﺔ ﻟﻠﻣﺷﺎرﯾﻊ‬

Materials Approval Request

Request No VAN-C900

Company Name tameer steel

Discipline Civil & structural

Manufacture, Factory Location jeddah industrial sity

Suppiler, Head Office Location

Product steel rebar

Brand tameer

Project Name in KAU NO

Work Experience With Consultants

Prefered by Contractors NO

Reasons for Applying:


1- To Request to Consultant Remarks
2- To Set a Presentation Date
3- To be In-Listed into Approved Vendor List

Personal Information:
Name mahmoud tabl
Job Title sales supervisor
Email m.tabl@hotmail.com
Company Phone No. 012648463
Mobile No. 00966560064545
Website www.tameersteel.com

http://projects-management.kau.edu.sa/Pages-e3tmad.aspx
112 1/2
KEPrngineering i;*-+-rt ,-ere"ffi
& fl
COllSULTlfCtmClf ffnS -ol! *sf {J dr
o+JJr'.1?,',t u*u.r^. o+rJr,i ^?,.+!::Jt! :A\AI_J R.=AL ES-rATE C{}MPANY

Material Review Process Check Form (MRP)

Client lalrJl 63i is-ri Date : 231061202Q

Consultant Ol]JLin*l OrH${i rrsJ&J rni iti {s-d submittal # (0i1) : STR. - MRP (47&48) - (004)

Contractor : Souq-7

Disciptine I civil / Structure fl nncH E Electrical l-lMechanical l-lsurvey


Material Description 61.,- ^lt 5'-11 .r.,j 45 "j, .!*

r ltieili, YreS. r':No :r: eF.ar!!S- i


1 Supplier Approval
.w" n
2 Project Specification Ref. n n
J B.O.Q Ref. n n
4 Construction Drawing Ref. ! n
6 Certificates n I
6 Manufature data l tr

ffiffiffimmstmmffirfrffis
l,lOTt: IriE fNGINEER'S APPROVAT DOES NOT
lN ANY \rvAY Rrll[VE THE COIITRACTOft Of BESPONSl6ll"lTY
rc)fl corvlpLlANCE Wl?il $PECIFIED PR$VISIONS
AND THE CONTRACT DOCUMENT REqUIREMENTS.

[] lrRnovro ls NorED

lp

'-tttt'

l--l a npprovea fl m epproved as Noted


f] e Revise and Resubmit EL! Rejected

Engineer : Project ltlirnager :

Signature : Date : Signature :

113
114
i9.lFL')l io:l*Jl ;:=r;rjl iS,|lJl
't5, el*atl icr.+"
i,S ,u-tPt, ;u&Jt oj|j.i,Jt 6JDJ

4.-Jr{Jt crbl,i,j-Yj asJi^Jl e4.at Jl aibl

rcccn
!relffiaPri6 f;ou3E oF ixp{R1i9:
@rn-ll
dalY MAr<a,t
@Lelt oil.l
v!!!alPAirT':
rJ3x*Jt
;ilr,allj +*$iJl aJfj
o(3:J
cr6+.&
a.bJt 511:!t
5llsl

Jb.,r,1, a.allJr 6;tdi*ul


.6.a ;;1.,.! J.qJ,f :lL.'>Jt oty unraa:J !:r!Lc J.rr: lS;lJl s-- \'1 .9q ..^ll a!
'lJJ I !

*-u€Jl obl,il-)tJ "E"ij,iij-1;l is3s+r : d;Jl..ii-ll e*


V :o,$Jl o!-

r:,)gGJls SJI+rlJ 4:tr*Jl 4rJ^*Jl a5; : 29;d i;,"Ji JgLA.Jl g- \o/. q/Y. Y. ; p1$:Jl 7u;lJ

SJairarl 6.llnjl r-rl qis eiJ; +.t- : 6Jl^Jl e-


aaL-Jl :iil-r*Jl rtr;Lc JE:.u,lt j au3Jt9 +cfl
6,:9.r*Jl J9J^JI J1si a9; 7;-a. : 6,r:,1

\ \V..:u.,r (U..;ill 6 - :9s a Ja-h*) a^69'.li- s!;t+e : ilJ*r.-!l O&

Y1 tlY: >"_
(1-t) &(A-t) &(V-t) &(1-t) : crtirplqnjl ,i Jtl ,.!

\ . -l-A-V : ot
^SJl
J:.t+ j qJt es-
&"! aZJii.Jl crti{rl3'.Jl ,ri Ji.Jl crti{o|J,
".ir.ll

-6' .l:Jl e*q-r:ajq artiJl a.iljl .:rUrr3+X k!;o


i.!i^JI U#Jl eru\tj laej (1-r) &(^-i) &(v-r) &(1-i)

:t

. :eel Knaa, 6brJl .b.f,: lgttuJl u"J:4al


DM qA bd4,Dh a
t; ,r trds I rrrtl^ir),| i^,4'*r
;m.j
[-*.x '
Effii&
ffi
-i:ff.iu,* b)!zg4 ps
f:./.:-lt g*.u4..

N,** ffi,ffi@E =tr<:


A},S PA&I
e'r,: tg,Jt -rn, Cr* /C ,r+rijll|
r-- ,Io:-:J'
YJ ,<U's /;
(.p.rtE->t" 6" 4ail5") (4iil3aJL 4,"a5dl)

( kGr? ';y+g;J, ) Or-s"I Oci erbr*rrrr .r-l ul


a-J.a.Jl :'rLrjlj rJg-Jt o(na ig:j 6;ls! 3$
E.*;!6t4*"g,n1 (, -o otli-Y,,r- ii.il s)
(4tulJJt? +-Jll)
q\ {0> t}x , L {-gWt.*t-*{Wb 3{'4} U \ lil-r,lrricrbr.$)r.'r-i,--r<,
rlg*J r:r(A {ii 511.r!;.tn / tJtrirl"u.Jr{a b?.-",
,sr^;lr ou.€634ffi;* --{.%*
dWGt61S.1/ u"\^

"/ rl
{2/"-,/'l,)\-/
?<

X:V
.a n\V
/tl
,f \/

115
116
117
TEST CERTIFICATES

118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
Mill Test Certificate
Customer Name: For approval
Certificate No : 2023.01.542
Shipping Address: For approval Date of Issue : 12-01-2023

Size , mm 10
12 M Length , SASO
Test methods
Specification.
ASTM 615 2021 G60 Tensile Test ASTM A370
Batch No. 27A08
Nominal Weight/M , (Kg/M). 0.616 Bend Test ASTM E290
Area , mm2 78.5

Chemical analysis Mechanical Test


C% 0.17 : 0.30 0.25 Ts. N/mm2 Min : 550 N/mm2 647
P% 0.050 Max 0.027 Ys. N/mm2 Min : 420 N/mm2 524
S% 0.050 Max 0.036 El % . Gauge 200 mm Min : 8 mm 16.0
Si % 0.30 Max 0.21 Bending Test Satisfactory

Prepared by Approved by
Name Abdulrahman Aldhaifi
Sign
Date 12-01-2023

Doc .Code: F-QC-10 140


Issue Date: 1/31/2023 Rev. : 0.2
Mill Test Certificate
Customer Name: For approval
Certificate No : 202301.678
Shipping Address: For approval Date of Issue : 11-01-2023

Size , mm 12
12 M Length , SASO
Test methods
Specification.
ASTM 615 2021 G60 Tensile Test ASTM A370
Batch No. Ps-127
Nominal Weight/M , (Kg/M). 0.8878 Bend Test ASTM E290
Area , mm2 113.04

Chemical analysis Mechanical Test


C% 0.17 : 0.30 0.25 Ts. N/mm2 Min : 550 N/mm2 657
P% 0.050 Max 0.026 Ys. N/mm2 Min : 420 N/mm2 524
S% 0.050 Max 0.038 El % . Gauge 200 mm Min : 8 mm 16.0
Si % 0.30 Max 0.22 Bending Test Satisfactory

Prepared by Approved by
Name Abdulrahman Aldhaifi
Sign
Date

Doc .Code: F-QC-10 141


Issue Date: 1/31/2023 Rev. : 0.2
Mill Test Certificate
Customer Name: For approval
Certificate No : 202301.654
Shipping Address: For approval Date of Issue : 22-01-2023

Size , mm 14
12 M Length , SASO
Test methods
Specification.
ASTM 615 2021 G60 Tensile Test ASTM A370
Batch No. 22D04
Nominal Weight/M , (Kg/M). 1.208 Bend Test ASTM E290
Area , mm2 153.86

Chemical analysis Mechanical Test


C% 0.17 : 0.30 0.26 Ts. N/mm2 Min : 550 N/mm2 656
P% 0.050 Max 0.027 Ys. N/mm2 Min : 420 N/mm2 558
S% 0.050 Max 0.035 El % . Gauge 200 mm Min : 8 mm 16.5
Si % 0.30 Max 0.20 Bending Test Satisfactory

Prepared by Approved by
Name Abdulrahman Aldhaifi
Sign
Date

Doc .Code: F-QC-10 142


Issue Date: 1/31/2023 Rev. : 0.2
Mill Test Certificate
Customer Name: For approval
Certificate No : 202301.342
Shipping Address: For approval Date of Issue : 18-01-2023

Size , mm 16
12 M Length , SASO
Test methods
Specification.
ASTM 615 2021 G60 Tensile Test ASTM A370
Batch No. 26A05
Nominal Weight/M , (Kg/M). 1.578 Bend Test ASTM E290
Area , mm2 200.96

Chemical analysis Mechanical Test


C% 0.17 : 0.30 0.25 Ts. N/mm2 Min : 550 N/mm2 652
P% 0.050 Max 0.026 Ys. N/mm2 Min : 420 N/mm2 542
S% 0.050 Max 0.037 El % . Gauge 200 mm Min : 8 mm 16.0
Si % 0.30 Max 0.22 Bending Test Satisfactory

Prepared by Approved by
Name Abdulrahman Aldhaifi
Sign
Date 18-01-2023

Doc .Code: F-QC-10 143


Issue Date: 1/31/2023 Rev. : 0.2
Mill Test Certificate
Customer Name: For approval
Certificate No : 202301.874
Shipping Address: For approval Date of Issue : 22-01-2023

Size , mm 20
12 M Length , SASO
Test methods
Specification.
ASTM 615 2021 G60 Tensile Test ASTM A370
Batch No. 29A07
Nominal Weight/M , (Kg/M). 2.466 Bend Test ASTM E290
Area , mm2 314

Chemical analysis Mechanical Test


C% 0.17 : 0.30 0.26 Ts. N/mm2 Min : 550 N/mm2 669
P% 0.050 Max 0.027 Ys. N/mm2 Min : 420 N/mm2 524
S% 0.050 Max 0.040 El % . Gauge 200 mm Min : 8 mm 16.0
Si % 0.30 Max 0.22 Bending Test Satisfactory

Prepared by Approved by
Name Abdulrahman Aldhaifi
Sign
Date

Doc .Code: F-QC-10 144


Issue Date: 1/31/2023 Rev. : 0.2
Mill Test Certificate
Customer Name: For approval
Certificate No : 202301.548
Shipping Address: For approval Date of Issue : 29-01-2023

Size , mm 25
12 M Length , SASO
Test methods
Specification.
ASTM 615 2021 G60 Tensile Test ASTM A370
Batch No. PS-177
Nominal Weight/M , (Kg/M). 3.853 Bend Test ASTM E290
Area , mm2 490.625

Chemical analysis Mechanical Test


C% 0.17 : 0.30 0.26 Ts. N/mm2 Min : 550 N/mm2 666
P% 0.050 Max 0.027 Ys. N/mm2 Min : 420 N/mm2 545
S% 0.050 Max 0.038 El % . Gauge 200 mm Min : 8 mm 16.0
Si % 0.30 Max 0.22 Bending Test Satisfactory

Prepared by Approved by
Name Abdulrahman Aldhaifi
Sign
Date 29-01-2023

Doc .Code: F-QC-10 145


Issue Date: 1/31/2023 Rev. : 0.2
Mill Test Certificate
Customer Name: For approval
Certificate No : 202301.487
Shipping Address: For approval Date of Issue : 28.01-2023

Size , mm 32
12 M Length , SASO
Test methods
Specification.
ASTM 615 2021 G60 Tensile Test ASTM A370
Batch No. PS-316
Nominal Weight/M , (Kg/M). 6.313 Bend Test ASTM E290
Area , mm2 803.84

Chemical analysis Mechanical Test


C% 0.17 : 0.30 0.26 Ts. N/mm2 Min : 550 N/mm2 674
P% 0.050 Max 0.026 Ys. N/mm2 Min : 420 N/mm2 543
S% 0.050 Max 0.038 El % . Gauge 200 mm Min : 8 mm 16.5
Si % 0.30 Max 0.22 Bending Test Satisfactory

Prepared by Approved by
Name Abdulrahman Aldhaifi
Sign
Date

Doc .Code: F-QC-10 146


Issue Date: 1/31/2023 Rev. : 0.2
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174

You might also like