Wyndham Addis Five Star Hotel Final Fire Sprinkler System Material Request

FIRE FIGHTING WORK ADDITIONAL MATERIAL LIST FOR PURCHASING


Project: Wyndham Addis Five star Hotel
Client: SANTA MARIA REAL ESTATE AND HOTELS PLC
Contractor: FISCOMM Engineering
Consultant: Lilu Engineering plc Date:- June 14/2023

Qty
NO. Description of Goods Un it Required Floor Picture
TO be Purchase

2 1/2" Zonal Control Valve Assembly


a. 2 1/2" dia Butterfly valve, Grooved, SD-B Series, Shield
1 b. 1" dia Test Drain valve, SD-TDV50T, Shield No's 2 14th & 15th
c.  Water Flow Switch, SD-WFD, Shield
d.  Pressure Gauge - PSI SD-PI Shield

3" Zonal Control Valve Assembly


a. 3" dia Butterfly valve, Grooved, SD-B Series, Shield
2 b. 1" dia Test Drain valve, SD-TDV50T, Shield Nos 1 13th
c.  Water Flow Switch, SD-WFD, Shield
d.  Pressure Gauge - PSI SD-PI Shield

Concealed Sprinkler Head 1/2'' 68 Deg. Qulick Response, K- 1st floor and
3 Factor.5.6, Bess Finish, W/Concealed cover plated,crome Finish, Pcs 100 ground floor
UL /FM Approved, Model. $D1055-QR, Said (Spar 12Nos ) laundary

Adjustable Pipe Hanger MIO x 1 1/4", Electro Galvanized with


4 Pcs 25
10mm Swivel Nut, UL/FM Approved, Model: SD-HB - Shield

Adjustable Pipe Hanger MIO x 1 1/2", Electro Galvanized with


5 Pcs 65
10mm Swivel Nut, UL/FM Approved, Model: SD-HB - Shield

2nd basement,
Adjustable Pipe Hanger MIO x 2", Electro Galvanized with 10mm
6 Pcs 42 Ground ,1st &
Swivel Nut, UL/FM Approved, Model: SD-HB - Shield
10th

Adjustable Pipe Hanger MIO x 2 1/2", Electro Galvanized with


7 pcs 57
10mm Swivel Nut, UL/FM Approved, Model: SD-HB - Shield

Adjustable Pipe Hanger MIO x 3" , Electro Galvanized with 10mm


8 pcs 40
Swivel Nut, UL/FM Approved, Model: SD-HB - Shield

9 Ball valve 3" Nos 2 Ground

10 Crosses 11/2" Threaded, Mod. SDT-13, G.l - Shield Pcs 8 2nd basement
Page 1 of 6
Wyndham Addis Five Star Hotel Final Fire Sprinkler System Material Request

FIRE FIGHTING WORK ADDITIONAL MATERIAL LIST FOR PURCHASING


Project: Wyndham Addis Five star Hotel
Client: SANTA MARIA REAL ESTATE AND HOTELS PLC
Contractor: FISCOMM Engineering
Consultant: Lilu Engineering plc Date:- June 14/2023

Qty
NO. Description of Goods Un it Required Floor Picture
TO be Purchase

11 GI Grooved Cross, Sch-40,65 mm ( 2½ " ) Pcs 6 2nd basement

Double Horizontal Type Fire Hose Rack Cabinet, Recessed


12 Mounted, Front Facia SS 304 Brush Finish, Back Box Mild Steel, Nos 1 2nd basement
Solid Door, Sheet Thickness: 1.2mm Naffco IJ.A.E C w,'

13 Elbow 90 Deg ½", Threaded, Mod. SDT-IOO, 6.1 - Shield pcs 24 2nd basement

For public area


14 Elbow 45 Deg 11/2", Threaded, Mod. SDT200, G.l - Shield pcs 10
cabinet

Grooved Concentric Reducer 3" x 2 1/2", Ductile Iron, Mod. SDG-


15 pcs 20
35, Red - SHIELD 2nd basement,
Ground ,1st &
10th

16 Grooved Coupling 2" , Ductile Iron, Mod. SDG-22, Red - SHIELD 6

17 Grooved Coupling 8" , Ductile Iron, Mod. SDG-22, Red - SHIELD pcs 22 2nd Basement

Page 2 of 6
Wyndham Addis Five Star Hotel Final Fire Sprinkler System Material Request

FIRE FIGHTING WORK ADDITIONAL MATERIAL LIST FOR PURCHASING


Project: Wyndham Addis Five star Hotel
Client: SANTA MARIA REAL ESTATE AND HOTELS PLC
Contractor: FISCOMM Engineering
Consultant: Lilu Engineering plc Date:- June 14/2023

Qty
NO. Description of Goods Un it Required Floor Picture
TO be Purchase

Grooved Elbow 90 Deg. 3", Ductile Iron, "S" Type, Mod. SDG-105, 2 nd Basement
18 pcs 15
Red- SHIELD Ground & 1st

Grooved Elbow 90 Deg. 8", Ductile Iron, "S" Type, Mod. SDG-105,
19 pcs 10 2nd Basement
Red- SHIELD

Grooved Flange 8", Ductile Iron, PCD 298.5mm, 8 Holes, Hole


20 pcs 7 2nd Basement
Dia.22.4mm, Mod. SDG-15 Class-150 Red - SHIELD

Grooved Flange 8", Ductile Iron, PCD 298.5mm, 8 Holes, Hole


21 pcs 11 2nd Basement
Dia.22.4mm, Mod. SDG-16 Class-150 Red - SHIELD

Grooved End Flange 8", Ductile Iron, PCD 298.5mm, 8 Holes,


22 pcs 4 2nd Basement
Hole Dia.22.4mm, Mod. SDG-14 Class-150 Red - SHIELD

Mechanical Tee 2 " x 1", BS Threaded, Ductile Iron, Mod SDG-


23 pcs 52
42, Red - SHIELD

Mechanical Tee 2 1/2" x 11/2", BS Threaded, Ductile Iron, Mod.


24 pcs 13
SDG-42 Red - SHIELD

Mechanical Tee 2-1/2" x 1-1/4", BS Threaded, Ductile Iron, Mod.


25 pcs 10 2nd basement,
SDG-42 Red - SHIELD
Ground ,1st
Mechanical Tee 4" x 2", BS Threaded, Ductile Iron, Mod SDG-42, ,10th,14th &
26 pcs 6
Red - SHIELD 15th

Mechanical Tee 6" x 2 1/2", Ductile Iron, Mod, SDG-53, Red


27 pcs 4
SHIELD

Mechanical Tee 6" x 2", BS Threaded, Ductile Iron, Mod. SDG 42,
28 pcs 3
Red - SHIELD

Mechanical Tee 6" x 3", BS Threaded, Ductile Iron, Mod. SDG 42,
29 pcs 3
Red - SHIELD
2nd Basement
Mechanical Tee 8" x 2 1/2" , Ductile Iron, Mod. SDG-44, Red
30 pcs 4
SHIELD

Equal Tee Threaded, Mod. SDT-12, G.I – Shield Dia 15 mm (½")


31 pcs 10 2nd Basement

Grooved Tee 8", Ductile iron, "S" Type, Mod. SDG-102, Red -
32 pcs 8 2nd
Page 3 of Basement
6
SHIELD
Wyndham Addis Five Star Hotel Final Fire Sprinkler System Material Request

FIRE FIGHTING WORK ADDITIONAL MATERIAL LIST FOR PURCHASING


Project: Wyndham Addis Five star Hotel
Client: SANTA MARIA REAL ESTATE AND HOTELS PLC
Contractor: FISCOMM Engineering
Consultant: Lilu Engineering plc Date:- June 14/2023

Qty
NO. Description of Goods Un it Required Floor Picture
TO be Purchase

33 Reducing coupling SDT-30 3/4" X 1/2" pcs 14 2nd Basement

34 no 46
Jute
For all Floor

35 Pcs 288

Shellac, Brand: TUF

36 NRV 1/2" pcs 10 2nd Basement

37 union 1/2" pcs 15 2nd Basement

38 GI Nipples Dia 15 mm(½") pcs 15


2nd basement,
39 GI Nipples Dia (3/8") pcs 10 Ground ,1st &
10th
40 GI Nipples Dia 25 mm(1") pcs 90

41 GI Nipples Dia 80 mm(3") pcs 15 Ground

Reducing Tee 1 1/2" X 1" x 1", Threaded, Mod. SDT-53 , G.l -


42 pcs 55
Shield
2nd basement,
Reducing Tee 1 1/4" x 1" x 1", Threaded, Mod. SDT-53, G.I - Ground ,1st &
43 pcs 65
Shield 10th

44 Reducing Tee 11/2"x 11/2" x 11/4", Threaded, Mod. SDT-53, G.l pcs 10
Shield

Page 4 of 6
Wyndham Addis Five Star Hotel Final Fire Sprinkler System Material Request

FIRE FIGHTING WORK ADDITIONAL MATERIAL LIST FOR PURCHASING


Project: Wyndham Addis Five star Hotel
Client: SANTA MARIA REAL ESTATE AND HOTELS PLC
Contractor: FISCOMM Engineering
Consultant: Lilu Engineering plc Date:- June 14/2023

Qty
NO. Description of Goods Un it Required Floor Picture
TO be Purchase

Grooved Reducing Tee6" x 2½" x 6" Ductile Iron, I'S" Type, Mod.
45 pcs 2 2nd Basement
SDG-102, Red SHIELD

Grooved Reducing Tee 6" x3" x 6"Ductile Iron, I'S" Type, Mod.
46 pcs 2 2nd Basement
SDG-102, Red SHIELD

47 pcs 10
Socket ½", Threaded, Mod. SDT-22, G.l - Shield
48 pcs 10
Socket 1¼", Threaded, Mod. SDT-22, G.l - Shield 2nd basement,
Ground & 1st
49 pcs 10
Socket 1½", Threaded, Mod. SDT-22, G.l - Shield
50 pcs 7
Socket 2", Threaded, Mod. SDT-22, G.l - Shield

U -Bolt 3" x 10mm With 2 Nut & 2 Washers, G,l, Model. SD-UB 2nd basement,
51 pcs 26
SHIELD Ground & 1st

U -Bolt 8" x 12mm With 2 Nut & 2 Washers, G.l, Model: SD-UB
52 pcs 15 2nd Basement
SHIELD

For External fire


53 G.I. Bolt, DIN 933 M16 x120mm with two washers and nut pcs 400
hydrant

For External fire


54 G.I. Bolt, DIN 933 M20 x120mm with two washers and nut pcs 82
hydrant

For External fire


55 HDPE pipe dia 150mm (6") Mtr 48
hydrant

For External fire


56 HDPE Elbow dia 150mm (6") pcs 8
hydrant

For External fire


57 HDPE Stub flange dia 150mm (6") pcs 8
hydrant

Page 5 of 6
Wyndham Addis Five Star Hotel Final Fire Sprinkler System Material Request

FIRE FIGHTING WORK ADDITIONAL MATERIAL LIST FOR PURCHASING


Project: Wyndham Addis Five star Hotel
Client: SANTA MARIA REAL ESTATE AND HOTELS PLC
Contractor: FISCOMM Engineering
Consultant: Lilu Engineering plc Date:- June 14/2023

Qty
NO. Description of Goods Un it Required Floor Picture
TO be Purchase

For External fire


58 Back ring 8 hole 150mm pcs 8
hydrant

For External fire


59 Rubber gasket 150mm pcs 8
hydrant

ERW Galvanized Pipe, PLAIN Ends, Conforming to ASTM A-53,


60 pcs 12 2nd Basement
Grade B, Sch-40, 5.8Mtr length. Dia 15 mm(½")

For Public floor


ERW Galvanized Pipe, PLAIN Ends, Conforming to ASTM A-53,
61 pcs 15 cabinet & 2nd
Grade B, Sch-40, 5.8Mtr length. Dia 40 mm(1½")
basement

ERW Galvanized Pipe, PLAIN Ends, Conforming to ASTM A-53, 2nd basement,
62 pcs 10
Grade B, Sch-40, 5.8Mtr length. Día 65 mm (2½") Ground & 1st

ERW Galvanized Pipe, PLAIN Ends, Conforming to ASTM A-53, 2nd basement &
63 pcs 16
Grade B, Sch-40, 5.8Mtr length. Día 150 mm (6") ground

ERW Galvanized Pipe, PLAIN Ends, Conforming to ASTM A-53,


64 pcs 5 2nd Basement
Grade B, Sch-40, 5.8Mtr length. Día 200 mm (8")

65 8'' OS and y Gate valve pcs 1 2nd Basement

Box
750 ml
pressuriz Note:- It is better to
Fire Rated Polyurethane foam Nullifier FF197 Gun Grade
66 ed box 91 For all Floor add more Boxes of
Fire Rated PU Foam as per attached Specification
canister Fire rated Foam, if it
(12 per is needed to other
Page 6 of 6
box) works.